Award of Construction Contract Water System Improvements 2024 North English Road Water Main Extension ProjectCity of Dubuque City Council /_[QIfQ►III=1iy 6RIE ,I Copyrighted October 6, 2025 ITEM TITLE: Award of Construction Contract Water System Improvements 2024 North English Road Water Main Extension Project SUMMARY: City Manager recommending City Council award the construction contract for the Water System Improvements — 2024 North English Road Water Main Extension project to Top Grade Excavating, of Farley, IA in the amount of $1,487.135.00. RESOLUTION Awarding contract for the North English Road Water Main Extension Project SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. N English RD WM Extension Award Memo 9.29.2025 3. Letting (Cons, Award, Delegate) (Dubuque #26 2025)-v2 4. Award Recommendation Letter - Origin 5. Bid Tabulation - North English Road Water Main Extension Page 1218 of 1264 THE C Dubuque DUj!BQTE AIFAWca Ciq rw ni I Masterpiece on the Mississippi � pp 20°2.2° 13 Zd17*7*2Q19 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Water System Improvements 2024 N English Rd Water Main Extension Project - Award Construction Contract DATE: October 1, 2025 Water Department Director Christopher Lester is recommending City Council award the construction contract for the Water System Improvements — 2024 North English Road Water Main Extension project to Top Grade Excavating, of Farley, IA in the amount of $1,487.135.00. The lump sum bid of $1,487,135.00 is 13% lower than the engineer's estimate of $1,700,000.00. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Christopher Lester, Water Department Director Jennifer Larson, Chief Financial Officer Eldon Schneider, Water Project Supervisor Carl Plumley, Water Distribution Supervisor Page 1219 of 1264 THE CITY OF DUB F Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Christopher Lester, Water Department Director DATE: September 29, 2025 Dubuque AII•America Oily I I 2007-2012-2013 2017*2019 SUBJECT: Water System Improvements 2024 N English Rd Water Main Extension Project - Award Construction Contract INTRODUCTION The purpose of this memorandum is to request award of the Water System Improvements — 2024 North English Road Water Main Extension project to Top Grade Excavating, of Farley, IA in the amount of $1,487.135.00. BACKGROUND The City of Dubuque's Water Department has identified a phased capital improvement program to extend and make necessary improvements throughout the community. The improvements are primarily associated with the water distribution system. These improvements will address water resiliency, reduce bottlenecks, improve water storage and pumping at key locations throughout the community to support the existing customer base and prepare the city for increased demands associated with existing and new customers. The improvements will also assist the City's need to reduce and better manage dead-end water mains and other areas where the water age and water quality can suffer due to lack of circulation. In 2022, Origin Design was awarded the City -Wide Water Distribution System, Storage, and Pumping Improvements Project and completed the preliminary design identifying five (5) capital projects. One of the five projects is the North English Road Water Main Extension project that will bring water service to a portion of the SW Arterial, starting at Edval Lane and N. Cascade Road, west along the SW Arterial to North English Road. This project will allow continued extensions, looping water main along the SW Arterial between USHWY 151/61 to USHWY 20 while also providing service between pressure zones and increasing water service reliance to the city's southern and western most customers. Origin also prepared and assisted the City in securing an Iowa SRF loan for the proposed improvements, and a Planning and Design Loan. DISCUSSION Origin Design has completed the plans and specifications for the installation of a 12-inch water main extension, beginning at Edval Lane on North Cascade Road and extending south to the Southwest Arterial. At the intersection with the Southwest Arterial, the main increases to Page 1220 of 1264 16 inches in diameter and continues west to North English Mill Road, where it turns north and extends approximately 1,100 feet along North English Road. The North English Road water main extension creates a path for a future loop and connection of Pressure Zone 3 and 4, when in later phases it can extend to English Mill Road and then south to the English Mill Pump Station. This project has been awarded funding through the Iowa State Revolving Fund (SRF) program and was originally advertised for bids on June 18, 2025. Following a design modification to upsize the water main along North English Road from 12 inches to 16 inches, an addendum and revised Notice to Bidders were required. As a result, a new public hearing date was scheduled for August 18, 2025. The revised Notice to Bidders was posted on the City of Dubuque website and the Construction Update Plan Room on July 22, 2025. Sealed bids for the Water System Improvements — 2024 North English Road Water Main Extension project were received and publicly opened on August 21, 2025. Top Grade Excavating, Inc, of Farley, Iowa submitted the apparent low bid in the amount of $1,478,135.00. A summary of the bid proposals received is as follows: Item No. Contractor Name Lump Sum Bid Amount 1 Top Grade Excavating $1,487,135.00 2 Tschiggfrie Excavating $1,571,495.00 3 Shift General Contracting $1,574,525.50 4 Midwest Concrete $1,579,545.00 5 Portzen Construction $1,697,319.00 6 Pirc-Tobin Construction $1,715,464.50 7 Boomerang Corp. $1,767,333.00 8 Connolly Construction $1,805,997.00 9 Eastern Iowa Excavating & Concrete $2,138,833.65 The lump sum bid of $1,487,135.00 is 13% lower than the engineer's estimate of $1,700,000.00. BUDGET IMPACT The estimate of probable and awarded costs for the project are summarized as follows: Description Estimate Award Construction $1,700,000.00 $1,487,135.00 Contingency 10% $170,000.00 $148,713.50 Total Project Cost $1,870,000.00 1 635 848.50 The funding summary is: CIP Funding Source Amount 4281000048 State of Iowa Revolving Fund $1,782,000.00 Total Project Funding $1,782,000.00 Of the SRF funds in the amount of $1,782,000.00, the project has adequate funding for the total construction cost plus 10% construction contingency of $1,635,848.50. 2 Page 1221 of 1264 ACTION TO BE TAKEN I respectfully request that the City Council award the construction contract for the Water System Improvements — 2024 North English Road Water Main Extension project to Top Grade Excavating, of Farley, IA in the amount of $1,487.135.00. cc: Jennifer Larson, Chief Financial Officer Eldon Scnheider, Water Project Supervisor Carl Plumley, Water Distribution Supervisor 3 Page 1222 of 1264 DORSEY DORSEY+WHI-rNEY LLP October 1, 2025 VIA EMAIL Jenny Larson Chief Financial Officer Dubuque, Iowa Re: North English Road Water Main Extension Project Our File No. 430411-26 Dear Jenny: We have prepared and attach proceedings related to further consideration of bids and award of a construction contract for the North English Road Water Main Extension Project. The materials attached include the following items: 1. Minutes of the October 6, 2025, City Council meeting reflecting further reporting and consideration of the construction bids received for the Project, followed by the resolution awarding the contract and fixing the amount of the performance and/or payment bonds. This resolution also authorizes the execution of the contract, subject to the receipt of the performance and payment bonds and a written determination by the Project Engineers that such bonds and other contract documents are satisfactory. 2. Attestation Certificate with respect to the validity of the transcript. As these proceedings are completed, please return one fully executed copy to our office. If you have any questions, please contact Emily Hammond or me. Best regards, David D. Grossklaus John P. Danos Attachments cc: Christopher Lester Crenna Brumwell Adrienne Breitfelder Origin Design 8oi Grand Avenue I Suite 41001 Des Moines, IA 15o3og-800z IT 515.283.1000 I dorsey.com Page 1223 of 1264 Dubuque / 430411-26 / Letting (Cons/Award) MINUTES OF MEETING TO FURTHER CONSIDER BIDS CONTRACT 430411-26(L) Dubuque, Iowa October 6, 2025 AND AWARD The City Council of the City of Dubuque, Iowa, met on October 6, 2025, at 6:30 p.m., at the Historic Federal Building, 350 W. 6`h St, Second Floor Council Chambers, in the City, pursuant to posted notice. The Mayor presided and the roll was called showing the following members of the Council present and absent: Present: Mayor Cavanagh, Council Members Farber, Jones, Resnick, Roussell, Sprank, Wethal. Absent: • • Other Business- - MOTION TO APPROVE RESOLUTION Council Member Roussell introduced the resolution next hereinafter set out, and moved that the said resolution be adopted; seconded by Council Member Wethal. The Mayor announced that bids for the construction of the North English Road Water Main Extension Project had been received before 2:00 p.m., on August 21, 2025, in the office of the Assistant City Clerk, City Hall -First Floor, 50 West 131h St, Dubuque, Iowa, and that on the same day, at the same time, in the City Hall -Conference Room A, 50 West I P St, in the City, such bids had been opened and read. The bids were initially reported to the Council on September 2, 2025, and this was the time and place set for the consideration of such bids. Thereupon, the results of the bidding were reported, and Origin Design Co. (the "Project Engineers") made their recommendations thereon to the City Council. The bids received for the construction of the North English Road Water Main Extension Project are as follows: Name and Address of Bidder Amount of Bid (List here or attach a sheet listing proposals received.) -1- DORSEY & WHITNEY LLP, ATTORNEYS, DES MOINES, IOWA Dubuque / 430411-26 / Letting (Cons/Award) After due consideration thereof by the City Council, the Mayor put the question upon the motion and the roll being called, the following named Council Members voted: Ayes: Roussell, Sprank, Resnick, Jones, Wethal, Cavanagh, Farber. Nays: Whereupon, the Mayor declared the said motion duly carried and the said resolution duly adopted. -2- DORSEY & WHITNEY LLP, ATTORNEYS, DES MOINES, IOWA origin August 21, 2025 Chris Lester, Water Department Director City of Dubuque 1902 Hawthorne St. Dubuque, IA 52001 Re: City of Dubuque Water System Improvements 2024 North English Road Water Main Extension Award Recommendation Project No.: 21197 Dear Chris: In accordance with owner instructions, bids for the Water System Improvements 2024 North English Road Water Main Extension project were opened and read at 2:00 p.m. on August 21, 2025. Ten bids were received for this project, however when tabulating the bids it was discovered that Temperley Excavating used an incorrect bid schedule which renders their bid nonresponsive. The bid results for the nine bidders are as follows: Contractor Bid Total Top Grade Excavating $1,487,135.00 Tschiggfrie Excavating $1,571,495.00 Shift General Contracting $1,574,525.50 Midwest Concrete $1,579,545.00 Portzen Construction $1,697,319.00 Pirc-Tobin Construction $1,715,464.50 Boomerang Corp. $1,767,333.00 Connolly Construction $1,805,997.00 Eastern Iowa Excavating & Concrete $2,138,833.65 After reviewing the bids, it was determined the low bid was submitted by Top Grade Excavating, Inc. of Farley, Iowa, in the amount of $1,487,135.00. Top Grade Excavating has the experience, workforce and equipment to properly complete this contract. We recommend award of the North English Road Water Main Extension project to Top Grade Excavating in the amount of $1,487,135.00. The engineer's estimate was $1,700,000.00. The low bid of $1,487,135,000.00 is $212,865.00 or 13% below the engineer's estimate. Sincerely, Origin Design Co. /7�� aA, Marc Ruden, PE Water Resources Team Leader DUBUQUE OFFICE 137 Main Street, Ste. 100 Dubuque, Iowa 52001 origindesign 800 556-4491 Page 1229 of 1264 Dubuque / 430411-26 / Letting (Cons/Award) RESOLUTION NO. 327-25 Resolution awarding contract for the North English Road Water Main Extension Project WHEREAS, pursuant to notice duly posted in the manner and form prescribed by resolution of the City Council of the City of Dubuque, Iowa, and as required by law, bids and proposals were received by this Council for the North English Road Water Main Extension Project (the "Project"); and WHEREAS, all of the said bids and proposals have been carefully considered, and it is necessary and advisable that provision be made for the award of the contract for the Project; NOW, THEREFORE, Be It Resolved by the City Council of the City of Dubuque. Iowa, as follows: Section 1. The bid for the Project submitted by the following contractor is fully responsive to the plans and specifications for the Project, is heretofore approved by the City Council, and is the lowest responsible bid received, such bid being as follows: Name and Address of Contractor Amount of Bid r c vxe $00,135,00 a Section 2. The contract for the Project is hereby awarded to such contractor at the total estimated cost set out above, the final settlement to be made on the basis of the unit prices therein set out and the actual final quantities of each class of materials furnished, the said contract to be subject to the terms of the aforementioned resolution, the notice of hearing and letting, the plans and specifications and the terms of the bidder's written proposal. Section 3. The Mayor and Assistant City Clerk are hereby authorized and ordered to enter into a written contract with said contractor for the Project, but only after the contractor submits the performance and/or payment bonds which are required by the contract documents, and after the Project Engineers submit a written determination that such surety bonds and the other contract documents are satisfactory. No additional City Council action shall be required to approve the executed contract or surety bonds. Section 4. The amount of the contractor's performance and/or payment bonds is hereby fixed and determined to be 100% of the amount of the contract. -3- DORSEY & WHnNEY LLP, ATTORNEYS, DES MOINES, IOWA Dubuque / 430411-26 / Letting (Cons/Award) Section 5. All resolutions or parts of resolutions in conflict herewith are hereby repealed to the extent of such conflict. Passed and approved October 6, 2025. Mayor Attest: Assistant City Clerk • • Other Business- - On motion and vote, the meeting adjourned. ayor Attest: 'IL J �✓ Assistant City Clerk -4- DORSEY & WHITNEY LLP, ATTORNEYS, DES MOINES, IOWA Dubuque / 43041 I-26 / Letting (Cons/Award) ATTESTATION CERTIFICATE: STATE OF IOWA DUBUQUE COUNTY SS: CITY OF DUBUQUE I, the undersigned, Assistant City Clerk of the City of Dubuque, Iowa, hereby certify that the attached is a true, correct and complete transcript of the proceedings had and action taken by the City Council up to the present time in connection with the North English Road Water Main Extension Project, including a true, correct and complete copy of the resolution referred to in such minutes. WITNESS MY HAND this u� ' day of boAe} ,� , 2025. Assistant City Clerk -5- DORSEY & WHITNEY LLP, ATTORNEYS, DES MOINES, IOWA origin August 21, 2025 Chris Lester, Water Department Director City of Dubuque 1902 Hawthorne St. Dubuque, IA 52001 Re: City of Dubuque Water System Improvements 2024 North English Road Water Main Extension Award Recommendation Project No.: 21197 Dear Chris: In accordance with owner instructions, bids for the Water System Improvements 2024 North English Road Water Main Extension project were opened and read at 2:00 p.m. on August 21, 2025. Ten bids were received for this project, however when tabulating the bids it was discovered that Temperley Excavating used an incorrect bid schedule which renders their bid nonresponsive. The bid results for the nine bidders are as follows: Contractor Bid Total Top Grade Excavating $1,487,135.00 Tschiggfrie Excavating $1,571,495.00 Shift General Contracting $1,574,525.50 Midwest Concrete $1,579,545.00 Portzen Construction $1,697,319.00 Pirc-Tobin Construction $1,715,464.50 Boomerang Corp. $1,767,333.00 Connolly Construction $1,805,997.00 Eastern Iowa Excavating & Concrete $2,138,833.65 After reviewing the bids, it was determined the low bid was submitted by Top Grade Excavating, Inc. of Farley, Iowa, in the amount of $1,487,135.00. Top Grade Excavating has the experience, workforce and equipment to properly complete this contract. We recommend award of the North English Road Water Main Extension project to Top Grade Excavating in the amount of $1,487,135.00. The engineer's estimate was $1,700,000.00. The low bid of $1,487,135,000.00 is $212,865.00 or 13% below the engineer's estimate. Sincerely, Origin Design Co. /7�� aA, Marc Ruden, PE Water Resources Team Leader DUBUQUE OFFICE 137 Main Street, Ste. 100 Dubuque, Iowa 52001 origindesign 800 556-4491 Page 1229 of 1264 CITY OF DUBUQUE, IOWA WATER SYSTEM IMPROVEMENTS 2024 NORTH ENGLISH ROAD WATER MAIN EXTENSION BID SCHEDULE AUGUST 21, 2025 PAGE 1 OF 4 origin'.. TOP GRADE EXCAVATING TSCHIGGFRIE EXCAVATING SHIFT GEN. CONTRACTING MIDWEST CONCRETE PORTZEN CONSTRUCTION UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE Division 2010 - Earthwork, Subgrade, and Subbase 1 Clearing and Grubbing C 1 LS $8,000.00 $8,000.00 $21,400.00 $21,400.00 $500.00 $500.00 $7,500.00 $7,500.00 $6,500.00 $6,500.00 2 Topsoil, On -site 2420 CY $6.00 $14,520.00 $9.70 $23,474.00 $2.00 $4,840.00 $7.25 $17,545.00 $9.00 $21,780.00 3 Subbase, Granular Subbase Gr 12a (Granular Subbase Pile) 80 TON $17.00 $1,360.00 $25.00 $2,000.00 $18.00 $1,440.00 $30.75 $2,460.00 $32.00 $2,560.00 Division 3010 -Trench Excavation and Backfill 4 Rock Excavation 100 CY $65.00 $6,500.00 $42.00 $4,200.00 $70.00 $7,000.00 $150.00 $15,000.00 $75.00 $7,500.00 5 Replacement of Unsuitable Backfill Material, Gr 12a (Gran Subbase Pile) 2700 TON $17.00 $45,900.00 $19.00 $51,300.00 $15.00 $40,500.00 $16.75 $45,225.00 $14.00 $37,800.00 6 Class I, Bedding Material, Gradation 3 (ASTM 57) 200 TON $20.00 $4,000.00 $29.00 $5,800.00 $16.00 $3,200.00 $26.75 $5,350.00 $34.00 $6,800.00 7 Class II, Bedding Material Gradation 30 (Granular Base Pile) 5750 TON $17.00 $97,750.00 $19.00 $109,250.00 $15.00 $86,250.00 $9.60 $55,200.00 $14.00 $80,500.00 Division 5010 - Pipe and Fittings 8 Water Main, Trenched, DIP, 6" 110 LF $82.00 $9,020.00 $74.00 $8,140.00 $59.00 $6,490.00 $83.00 $9,130.00 $90.00 $9,900.00 9 Water Main, Trenched, DIP, 8" 55 LF $86.00 $4,730.00 $90.00 $4,950.00 $71.00 $3,905.00 $103.00 $5,665.00 $125.00 $6,875.00 10 Water Main, Trenched, DIP, 12" 3550 LF $97.00 $344,350.00 $91.00 $323,050.00 $98.00 $347,900.00 $105.00 $372,750.00 $102.00 $362,100.00 11 Water Main, Trenched, DIP, 16" 3300 LF $123.00 $405,900.00 $120.00 $396,000.00 $121.00 $399,300.00 $129.00 $425,700.00 $126.00 $415,800.00 12 Water Main, Trenchless, DIP, 8" 140 LF $121.00 $16,940.00 $260.00 $36,400.00 $204.00 $28,560.00 $194.70 $27,258.00 $225.00 $31,500.00 13 Water Main, with Casing Pipe, Trenchless, DIP, 16" 112 LF $929.00 $104,048.00 $1,300.00 $145,600.00 $1,125.00 $126,000.00 $1,100.00 $123,200.00 $1,550.00 $173,600.00 14 Fittings by Weight, DI 8100 LBS $6.30 $51,030.00 $3.90 $31,590.00 $9.00 $72,900.00 $6.00 $48,600.00 $11.00 $89,100.00 15 Joint Restraint, Bell Harness, 8" 10 EA $562.00 $5,620.00 $520.00 $5,200.00 $525.00 $5,250.00 $250.00 $2,500.00 $575.00 $5,750.00 16 Joint Restraint, Bell Harness, 12" 5 EA $911.00 $4,555.00 $870.00 $4,350.00 $850.00 $4,250.00 $1,400.00 $7,000.00 $950.00 $4,750.00 17 Joint Restraint, Bell Harness, 16" 18 EA $1,425.00 $25,650.00 $1,600.00 $28,800.00 $1,350.00 $24,300.00 $1,900.00 $34,200.00 $1,650.00 $29,700.00 18 Joint Restraint, Megalug, 6" 50 EA $55.00 $2,750.00 $250.00 $12,500.00 $30.00 $1,500.00 $225.00 $11,250.00 $260.00 $13,000.00 19 Joint Restraint, Megalug, 8" 8 EA $78.00 $624.00 $270.00 $2,160.00 $46.00 $368.00 $250.00 $2,000.00 $275.00 $2,200.00 20 Joint Restraint, Megalug, 12" 45 EA $150.00 $6,750.00 $330.00 $14,850.00 $97.50 $4,387.50 $275.00 $12,375.00 $400.00 $18,000.00 21 Joint Restraint, Megalug, 16" 70 EA $260.00 $18,200.00 $440.00 $30,800.00 $180.00 $12,600.00 $460.00 $32,200.00 $600.00 $42,000.00 22 Water Main Connection Removal, 12" 1 EA $1,100.00 $1,100.00 $1,200.00 $1,200.00 $3,500.00 $3,500.00 $800.00 $800.00 $850.00 $850.00 Division 5020 -Valves, Fire Hydrants, and Appurtenances 23 Valve, Gate, 6" 13 EA $1,742.00 $22,646.00 $1,700.00 $22,100.00 $2,400.00 $31,200.00 $2,250.00 $29,250.00 $1,740.00 $22,620.00 24 Valve, Gate, 8" 2 EA $2,349.00 $4,698.00 $2,400.00 $4,800.00 $2,980.00 $5,960.00 $2,850.00 $5,700.00 $2,340.00 $4,680.00 25 Valve, Gate, 12" 10 EA $3,993.00 $39,930.00 $4,000.00 $40,000.00 $4,600.00 $46,000.00 $4,600.00 $46,000.00 $4,015.00 $40,150.00 26 Valve, Butterfly, 16" 11 EA $6,300.00 $69,300.00 $5,600.00 $61,600.00 $7,200.00 $79,200.00 $6,800.00 $74,800.00 $5,700.00 $62,700.00 27 Fire Hydrant 13 EA $5,259.00 $68,367.00 $5,700.00 $74,100.00 $6,750.00 $87,750.00 $5,500.00 $71,500.00 $5,850.00 $76,050.00 Page 1230 of 1264 CITY OF DUBUQUE, IOWA WATER SYSTEM IMPROVEMENTS 2024 NORTH ENGLISH ROAD WATER MAIN EXTENSION BID SCHEDULE AUGUST 21, 2025 PAGE 2 OF 4 NO. DESCRIPTION Division 7030 - Sidewalks, Shared Use Paths, and Driveways 28 Removal of Driveway 29 Driveway, Paved, PCC, 6" (Thickness) 30 Driveway, Paved, HMA, 6" (Thickness) 31 Driveway, Granular by Ton Division 7040 - Pavement Rehabilitation 32 Full Depth Patches HMA Division 8030 -Temporary Traffic Control 33 Temporary Traffic Control Division 8040 - Signing Materials 34 Remove and Reinstall Traffic Signs Division 9010 - Seeding 35 Conventional - Seeding, Type 1, by AC 36 Conventional - Seeding, Type 2, by AC 37 Conventional- Seeding, Type 4, by AC 38 Conventional - Seeding, Type 5, by AC Division 9040 - Erosion and Sediment Control 39 Stormwater Pollution Prevention Plan (SWPPP) Management 40 Filter Socks, 12" 41 Filter Socks, Removal 42 Temporary Rolled Erosion Control Products (RECP) by SY 43 Silt Fence or Silt Fence Ditch Check, Installation 44 Silt Fence or Silt Fence Ditch Check, Removal of Sediment 45 Silt Fence or Silt Fence Ditch Check, Removal of Device 46 Stabilized Construction Entrance by SY 47 Inlet Production Device, Installation 48 Inlet Protection Device, Maintenance Division 11,020 - Mobilization 49 Mobilization Division 11,050 - Concrete Washout 50 Concrete Washout TOTAL OF BID origin TOP GRADE EXCAVATING TSCHIGGFRIE EXCAVATING SHIFT GEN. CONTRACTING MIDWEST CONCRETE PORTZEN CONSTRUCTION UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL QUANTITY PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE 140 SY $9.00 $1,260.00 $18.00 $2,520.00 $5.00 $700.00 $18.00 $2,520.00 $16.00 $2,240.00 60 SY $135.00 $8,100.00 $58.00 $3,480.00 $80.00 $4,800.00 $100.00 $6,000.00 $85.00 $5,100.00 80 SY $45.00 $3,600.00 $80.00 $6,400.00 $75.00 $6,000.00 $78.00 $6,240.00 $75.00 $6,000.00 250 TON $17.00 $4,250.00 $20.00 $5,000.00 $17.00 $4,250.00 $23.75 $5,937.50 $18.00 $4,500.00 110 SY $45.00 $4,950.00 $80.00 $8,800.00 $87.00 $9,570.00 $108.50 $11,935.00 $75.00 $8,250.00 1 LS $3,500.00 $3,500.00 $3,600.00 $3,600.00 $3,250.00 $3,250.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 2 EA $125.00 $250.00 $200.00 $400.00 $200.00 $400.00 $425.00 $850.00 $150.00 $300.00 0.4 AC $3,000.00 $1,200.00 $3,300.00 $1,320.00 $4,500.00 $1,800.00 $3,200.00 $1,280.00 $3,150.00 $1,260.00 2.6 AC $1,800.00 $4,680.00 $2,000.00 $5,200.00 $2,300.00 $5,980.00 $2,000.00 $5,200.00 $1,900.00 $4,940.00 0.4 AC $1,500.00 $600.00 $1,700.00 $680.00 $4,000.00 $1,600.00 $1,700.00 $680.00 $1,600.00 $640.00 2.6 AC $800.00 $2,080.00 $890.00 $2,314.00 $1,800.00 $4,680.00 $900.00 $2,340.00 $900.00 $2,340.00 1 LS $3,500.00 $3,500.00 $3,300.00 $3,300.00 $1,500.00 $1,500.00 $3,300.00 $3,300.00 $3,150.00 $3,150.00 1600 LF $2.50 $4,000.00 $2.80 $4,480.00 $2.80 $4,480.00 $2.75 $4,400.00 $2.65 $4,240.00 1600 LF $0.20 $320.00 $0.22 $352.00 $0.30 $480.00 $0.20 $320.00 $0.22 $352.00 1850 SY $1.70 $3,145.00 $1.80 $3,330.00 $1.50 $2,775.00 $1.75 $3,237.50 $1.70 $3,145.00 2100 LF $1.70 $3,570.00 $1.80 $3,780.00 $2.15 $4,515.00 $1.75 $3,675.00 $1.70 $3,570.00 2100 LF $0.10 $210.00 $0.01 $21.00 $0.60 $1,260.00 $0.02 $42.00 $0.02 $42.00 2100 LF $0.10 $210.00 $0.01 $21.00 $0.60 $1,260.00 $0.02 $42.00 $0.02 $42.00 420 SY $7.80 $3,276.00 $17.00 $7,140.00 $10.00 $4,200.00 $3.00 $1,260.00 $16.50 $6,930.00 3 EA $150.00 $450.00 $170.00 $510.00 $300.00 $900.00 $165.00 $495.00 $160.00 $480.00 3 EA $10.00 $30.00 $11.00 $33.00 $25.00 $75.00 $11.00 $33.00 $11.00 $33.00 1 LS $49,566.00 $49,566.00 $42,000.00 $42,000.00 $74,750.00 $74,750.00 $26,000.00 $26,000.00 $60,000.00 $60,000.00 1 LS $150.00 $150.00 $1,200.00 $1,200.00 $250.00 $250.00 $100.00 $100.00 $1,500.00 $1,500.00 $1,487,135.00 $1,571,495.00 $1,574,525.50 $1,579,545.00 $1,697,319.00 Page 1231 of 1264 CITY OF DUBUQUE, IOWA WATER SYSTEM IMPROVEMENTS 2024 origin NORTH ENGLISH ROAD WATER MAIN EXTENSION BID SCHEDULE AUGUST 21, 2025 PAGE 3 OF 4 EASTERN IOWA PIRC-TOBIN CONSTRUCTION BOOMERANG CORP. CONNOLLY CONSTRUCTION EXCAVATING & CONCRETE UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE Division 2010 - Earthwork, Subgrade, and Subbase 1 Clearing and Grubbing C 1 LS $5,000.00 $5,000.00 $4,000.00 $4,000.00 $20,700.00 $20,700.00 $9,400.00 $9,400.00 2 Topsoil, On -site 2420 CY $8.00 $19,360.00 $5.00 $12,100.00 $8.50 $20,570.00 $34.00 $82,280.00 3 Subbase, Granular Subbase Gr 12a (Granular Subbase Pile) 80 TON $60.00 $4,800.00 $30.00 $2,400.00 $27.80 $2,224.00 $22.25 $1,780.00 Division 3010 -Trench Excavation and Backfill 4 Rock Excavation 100 CY $75.00 $7,500.00 $160.00 $16,000.00 $80.00 $8,000.00 $100.00 $10,000.00 5 Replacement of Unsuitable Backfill Material, Gr 12a (Gran Subbase Pile) 2700 TON $15.00 $40,500.00 $34.00 $91,800.00 $21.00 $56,700.00 $23.75 $64,125.00 6 Class I, Bedding Material, Gradation 3 (ASTM 57) 200 TON $35.00 $7,000.00 $30.00 $6,000.00 $26.55 $5,310.00 $28.00 $5,600.00 7 Class II, Bedding Material Gradation 30 (Granular Base Pile) 5750 TON $15.00 $86,250.00 $22.00 $126,500.00 $15.40 $88,550.00 $19.75 $113,562.50 Division 5010 - Pipe and Fittings 8 Water Main, Trenched, DIP, 6" 110 LF $150.00 $16,500.00 $70.00 $7,700.00 $78.00 $8,580.00 $129.75 $14,272.50 9 Water Main, Trenched, DIP, 8" 55 LF $200.00 $11,000.00 $80.00 $4,400.00 $155.00 $8,525.00 $177.00 $9,735.00 10 Water Main, Trenched, DIP, 12" 3550 LF $100.00 $355,000.00 $90.00 $319,500.00 $128.00 $454,400.00 $130.50 $463,275.00 11 Water Main, Trenched, DIP, 16" 3300 LF $125.00 $412,500.00 $110.00 $363,000.00 $140.00 $462,000.00 $164.50 $542,850.00 12 Water Main, Trenchless, DIP, 8" 140 LF $175.00 $24,500.00 $200.00 $28,000.00 $250.00 $35,000.00 $280.00 $39,200.00 13 Water Main, with Casing Pipe, Trenchless, DIP, 16" 112 LF $1,150.00 $128,800.00 $800.00 $89,600.00 $1,100.00 $123,200.00 $1,125.00 $126,000.00 14 Fittings by Weight, DI 8100 LBS $14.50 $117,450.00 $20.00 $162,000.00 $6.20 $50,220.00 $7.55 $61,155.00 15 Joint Restraint, Bell Harness, 8" 10 EA $500.00 $5,000.00 $350.00 $3,500.00 $535.00 $5,350.00 $511.50 $5,115.00 16 Joint Restraint, Bell Harness, 12" 5 EA $850.00 $4,250.00 $480.00 $2,400.00 $885.00 $4,425.00 $875.00 $4,375.00 17 Joint Restraint, Bell Harness, 16" 18 EA $1,500.00 $27,000.00 $1,200.00 $21,600.00 $1,490.00 $26,820.00 $1,620.00 $29,160.00 18 Joint Restraint, Megalug, 6" 50 EA $45.00 $2,250.00 $360.00 $18,000.00 $235.00 $11,750.00 $335.00 $16,750.00 19 Joint Restraint, Megalug, 8" 8 EA $55.00 $440.00 $380.00 $3,040.00 $315.00 $2,520.00 $310.00 $2,480.00 20 Joint Restraint, Megalug, 12" 45 EA $125.00 $5,625.00 $530.00 $23,850.00 $360.00 $16,200.00 $435.00 $19,575.00 21 Joint Restraint, Megalug, 16" 70 EA $200.00 $14,000.00 $880.00 $61,600.00 $600.00 $42,000.00 $655.00 $45,850.00 22 Water Main Connection Removal, 12" 1 EA $2,000.00 $2,000.00 $1,200.00 $1,200.00 $2,400.00 $2,400.00 $3,000.00 $3,000.00 Division 5020 -Valves, Fire Hydrants, and Appurtenances 23 Valve, Gate, 6" 13 EA $2,250.00 $29,250.00 $2,000.00 $26,000.00 $1,820.00 $23,660.00 $2,635.00 $34,255.00 24 Valve, Gate, 8" 2 EA $3,050.00 $6,100.00 $2,500.00 $5,000.00 $2,500.00 $5,000.00 $3,385.00 $6,770.00 25 Valve, Gate, 12" 10 EA $4,850.00 $48,500.00 $4,600.00 $46,000.00 $4,400.00 $44,000.00 $5,555.00 $55,550.00 26 Valve, Butterfly, 16" 11 EA $6,500.00 $71,500.00 $7,200.00 $79,200.00 $6,900.00 $75,900.00 $7,850.00 $86,350.00 27 Fire Hydrant 13 EA $5,000.00 $65,000.00 $9,400.00 $122,200.00 $6,800.00 $88,400.00 $6,355.00 $82,615.00 Page 1232 of 1264 CITY OF DUBUQUE, IOWA WATER SYSTEM IMPROVEMENTS 2024 NORTH ENGLISH ROAD WATER MAIN EXTENSION BID SCHEDULE AUGUST 21, 2025 PAGE 4 OF 4 NO. DESCRIPTION Division 7030 - Sidewalks, Shared Use Paths, and Driveways 28 Removal of Driveway 29 Driveway, Paved, PCC, 6" (Thickness) 30 Driveway, Paved, HMA, 6" (Thickness) 31 Driveway, Granular by Ton Division 7040 - Pavement Rehabilitation 32 Full Depth Patches HMA Division 8030 - Temporary Traffic Control 33 Temporary Traffic Control Division 8040 - Signing Materials 34 Remove and Reinstall Traffic Signs Division 9010 - Seeding 35 Conventional - Seeding, Type 1, by AC 36 Conventional - Seeding, Type 2, by AC 37 Conventional- Seeding, Type 4, by AC 38 Conventional - Seeding, Type 5, by AC Division 9040 - Erosion and Sediment Control 39 Stormwater Pollution Prevention Plan (SWPPP) Management 40 Filter Socks, 12" 41 Filter Socks, Removal 42 Temporary Rolled Erosion Control Products (RECP) by SY 43 Silt Fence or Silt Fence Ditch Check, Installation 44 Silt Fence or Silt Fence Ditch Check, Removal of Sediment 45 Silt Fence or Silt Fence Ditch Check, Removal of Device 46 Stabilized Construction Entrance by SY 47 Inlet Production Device, Installation 48 Inlet Protection Device, Maintenance Division 11,020 - Mobilization 49 Mobilization Division 11,050 - Concrete Washout 50 Concrete Washout TOTAL OF BID PIRC-TOBIN CONSTRUCTION UNIT TOTAL QUANTITY PRICE PRICE 140 SY $15.00 $2,100.00 60 SY $115.00 $6,900.00 80 SY $75.00 $6,000.00 250 TON $30.00 $7,500.00 110 SY $112.50 $12,375.00 1 LS $10,000.00 $10,000.00 2 EA $375.00 $750.00 0.4 AC $3,000.00 $1,200.00 2.6 AC $1,800.00 $4,680.00 0.4 AC $1,500.00 $600.00 2.6 AC $800.00 $2,080.00 1 LS $3,000.00 $3,000.00 1600 LF $2.50 $4,000.00 1600 LF $0.20 $320.00 1850 SY $1.75 $3,237.50 2100 LF $1.75 $3,675.00 2100 LF $0.01 $21.00 2100 LF $0.01 $21.00 420 SY $10.00 $4,200.00 3 EA $150.00 $450.00 3 EA $10.00 $30.00 1 LS $125,000.00 $125,000.00 1 LS $250.00 $250.00 $1,715,464.50 BOOMERANG CORP. UNIT TOTAL PRICE PRICE $10.00 $1,400.00 $64.00 $3,840.00 $68.00 $5,440.00 $26.00 $6,500.00 $90.00 $9,900.00 $3,300.00 $3,300.00 $200.00 $400.00 $3,200.00 $1,280.00 $2,000.00 $5,200.00 $1,600.00 $640.00 $860.00 $2,236.00 $3,200.00 $3,200.00 $3.00 $4,800.00 $0.30 $480.00 $2.00 $3,700.00 $1.80 $3,780.00 $0.01 $21.00 $0.01 $21.00 $9.00 $3,780.00 $160.00 $480.00 $11.00 $33.00 $59,812.00 $59,812.00 $500.00 $500.00 $1,767,333.00 CONNOLLY CONSTRUCTION UNIT TOTAL PRICE PRICE $12.60 $1,764.00 $102.00 $6,120.00 $102.00 $8,160.00 $24.00 $6,000.00 $72.00 $7,920.00 $3,250.00 $3,250.00 $145.00 $290.00 $3,000.00 $1,200.00 $1,800.00 $4,680.00 $1,500.00 $600.00 $800.00 $2,080.00 $4,000.00 $4,000.00 $2.50 $4,000.00 $0.20 $320.00 $1.62 $2,997.00 $1.65 $3,465.00 $0.01 $21.00 $0.01 $21.00 $13.75 $5,775.00 $150.00 $450.00 $10.00 $30.00 $50,000.00 $50,000.00 $450.00 $450.00 $1,805,997.00 origin„_, EASTERN IOWA EXCAVATING & CONCRETE UNIT TOTAL PRICE PRICE $23.65 $3,311.00 $101.15 $6,069.00 $90.00 $7,200.00 $27.00 $6,750.00 $178.00 $19,580.00 $3,800.00 $3,800.00 $300.00 $600.00 $23,000.00 $9,200.00 $10,500.00 $27,300.00 $5,800.00 $2,320.00 $3,150.00 $8,190.00 $5,500.00 $5,500.00 $2.85 $4,560.00 $0.05 $80.00 $2.65 $4,902.50 $2.15 $4,515.00 $0.05 $105.00 $0.05 $105.00 $32.55 $13,671.00 $115.00 $345.00 $0.05 $0.15 $75,000.00 $75,000.00 $650.00 $650.00 $2,138,833.65 Page 1233 of 1264