Loading...
Acceptance of Public Improvements in South Pointe Phase 2 SubdivisionCity of Dubuque City Council CONSENT ITEMS # 6. Copyrighted November 3, 2025 ITEM TITLE: Acceptance of Public Improvements in South Pointe Phase 2 Subdivision SUMMARY: City Manager recommending City Council adopt the attached resolution accepting the public improvements completed by the owners, Dubuque South Pointe, LLC, in South Pointe #2 Subdivision. RESOLUTION Accepting Public Improvements In South Pointe #2 In The City Of Dubuque, Iowa SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. Staff Memo 3. Resolution 4. South Pointe Phase 2 Area and Roadway Acceptance 5. South Pointe Phase 2 Utilities Page 82 of 525 THE CITY OF Dubuque DuBE uFA�a9a av Masterpiece on the Mississippi rP PP zoo�•*o 13 2017202019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Acceptance of Public Improvements in South Pointe #2 Subdivision DATE: October 29, 2025 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution accepting the public improvements completed by the owners, Dubuque South Pointe, LLC, in South Pointe #2 Subdivision. On October 20, 2025, the owners, requested City's acceptance of the public improvements in South Pointe Subdivision. Upon inspection by the City, it has been determined that the public improvements required by Resolution 163-24 have been completed in accordance with plans approved by the City Council and in conformance with City specifications. A maintenance guarantee covering said public improvements shall be provided by the owners, Dubuque South Pointe, LLC, for a period of two (2) years from the date of acceptance by City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. k�4 Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Nate Kieffer, PE/PLS Page 83 of 525 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: October 24, 2025 Dubuque NI -America City 11,F 2007 • 2012 • 2013 SUBJECT: Acceptance of Public Improvements in South Pointe #2 Subdivision INTRODUCTION The enclosed material provides for City Council acceptance of the public improvements that the developers, Dubuque South Pointe, LLC, have recently completed in South Pointe #2 Subdivision. BACKGROUND As a condition of subdivision plat approval through Resolution No. 163-24, the developer of South Pointe #2 Subdivision was required to install certain public improvements including street paving with curb, curb underdrain, storm sewer and catch basins, sanitary sewer main, water main, fiber optic conduit, accessible sidewalk ramps, and street lighting and to dedicate these improvements to the City upon completion. The Farm Subdivision Phase 1 public improvements are as shown on the attached exhibit. DISCUSSION The Subdivision Ordinance requires that upon completion of all the required public improvements, the subdivider shall notify the City in writing of the completion of the improvements, requesting that the City either approve or reject the acceptance of the improvements, together with a statement of reasons for any rejection. On October 20, 2025 the owners requested City's acceptance of the public improvements in South Pointe Subdivision. Upon inspection by the City, it has been determined that the public improvements required by Resolution 163-24 have been completed in accordance with plans approved by the City Council and in conformance with City specifications. RECOMMENDATION I would, therefore, recommend that the City Council accept the public improvements in the subdivision. A maintenance guarantee covering said public improvements shall be Page 84 of 525 provided by the owners, Dubuque South Pointe, LLC, for a period of two (2) years from the date of acceptance by City Council. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution accepting the public improvements in South Pointe #2 Subdivision. Prepared by Nate Kieffer, PE/PLS Page 85 of 525 Prepared by: Nate Kieffer, City of Dubuque, 50 W. 13th Street, Dubuque IA 52001 (563) 589-4270 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 13"' St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 351-25 ACCEPTING PUBLIC IMPROVEMENTS IN SOUTH POINTE #2 IN THE CITY OF DUBUQUE, IOWA Whereas, pursuant to Resolution 163-24, certain public improvements including street paving with curb, curb underdrain, storm sewer and catch basins, sanitary sewer main, water main, fiber optic conduit, accessible sidewalk ramps, and street lighting were installed by the developer of South Pointe #2 Subdivision in the City of Dubuque, Iowa; and Whereas, the improvements have been completed and the City Manager has examined the work and has filed a certificate stating that the same has been completed in accordance with the plans approved by the City Council and in conformance with City specifications, and has recommended that the improvements be accepted by the City Council. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said public improvements in South Pointe #2 Subdivision be and the same is hereby accepted. Section 2. That a maintenance guarantee covering said public improvements shall be provided by the owners, Dubuque South Pointe, LLC, for a period of two (2) years from the date of this resolution. Passed, approved and adopted this 3rd day of November, 2025. Attest: Adrienne N. Breitfelder, Giify Clerk THE CITY OF DUB E Masterpiece on the Mississippi South Pointe Subdivision Phase 2 Area and Roadway Acceptance Dubuque AlfAmrrio City 2007-2012-2013 2017+2019 Am 1 —w u� , , N ,` k W 11• ' J f y PHASE 1 Y � r 1.D e �i+• 1 ' . e R a ¢-. 4 i ClwtiwlFAuw>L.w DISCLAIMER: This information was compiled using various data 1]�� X 11�� Sheet sources from third parties or maintained by the City of Dubuque 1 IIICh I,., equals 200 feet �V A I City of Dubuque Map Prepared by: TWK (the City). By use of this information, the user acknowledges that, while the City utilizes the most current and accurate information 1 !1 available, the City does not warrant the accuracy or currency of the Engineering Division information or data contained therein. By use of this information, W E 50 West 13th Street the user agrees the City is not responsible for the misuse or Dubuque, Iowa 52001 misinterpretation of any information displayed in this map and that 0 100 200 the user will not hold the City liable for any loss, damage, or Phone: (563) 589-4270 inconvenience caused as a result of reliance on the information. Feet c Fax: (563) 589-4205 Page 87 of 525 THE CITY OF DUB E Masterpiece on the Mississippi s d Ulal..CJ.9L1 'i .. t' z.t •.' South Pointe Subdivision Phase 2 Utilities Donated to the City of Dubuque i` r.]A. � ` `,F �4� �5 2 O �O f y PHASE 1 f 4.q, nT aSf'4fi a A, 'T" '? +'r /y i on 0 r� C Dubuque AIIAm�rio City 2007-20124013 2017*2019 D A Z 0 LEVON CT i 1 � r F _ F TOWER.DR HetDI CT HORSESHOE DR -- PHAS&2 ay •� EDENBN iJ Lu J _ u v Z ® PHASE 1 AUTUMN RIDGELN Clwtiwl►ALAw>L.w DISCLAIMER: This information was compiled using various data PUBLIC IMPROVEMENTS sources from third parties or maintained by the City of Dubuque 17" x 11" sheet A I Map Prepared by: TWK (the City). By use of this information, the user acknowledges that, 1 1,., i inch I equals IS ZOO feet � V CURRENTLY BEINGACCEPTED BY CITY EXISTING UTILITIES City of Dubuque while the City utilizes the most current and accurate information the City does the the Engineering Division available, not warrant accuracy or currency of information or data contained therein. B use of this information, v Ulty Sanitary Sewer W p City Electric V V E City Electric 50 West 13th Street the user agrees the City is not responsible for the misuse or misinterpretation of any information displayed in this map and that O 1 OO 200 City Fiber Conduit City Storm Sewer City Storm Sewer Dubuque, Iowa 52001 the user will not hold the City liable for any loss, damage, or Feet City Water Main City Water Main Phone: (563) 589-4270 inconvenience caused as a result of reliance on the information. S Fax: (563) 589-4205 Page 88 of 525