Loading...
Heritage Trail Ext. - Grant AppCITY OF DUBUQUE, IOWA MEMORANDUM June 14, 2001 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Grant Application for Recreational Trails Funds Planning Services Manager Laura Carstens is recommending submittal of an application to the Iowa Department of Transportation for Recreational Trails Funds for the extension of Heritage Trail from Heron Pond to the Dubuque Jaycees Trail. The total project cost would be $400,000, with $300,000 coming from this grant. IDOT requires a 25% local match, and this $100,000 would come from a reallocation from the Highway 20 Landscaping Improvement Project. That $100,000 is budgeted for Fiscal Year 2002 and would be proposed to be re-budgeted through a future budget process as part of the Highway 20 Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Mi6hael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Laura Carstens, Planning Services Manager CITY OF DUBUQUE, IOWA MEMORANDUM June 11, 2001 TO: FROM: Michael C. Van Milligen, City Manager Laura Carstens, Planning Services Manager SUBJECT: Grant Application for Recreational Trails Funds INTRODUCTION This memo transmits for City Council approval the submission of a grant application to the Iowa Department of Transportation (IDOT) for Recreational Trails Funds for the extension of Heritage Trail from Heron Pond to the Dubuque Jaycees Trail. A map, project budget, and resolution are attached for City Council consideration. DISCUSSION The project would link two existing components of the Heritage Trail Riverfront System: the Heron Pond Wetlands Nature Trail on Schmitt Island, and the Dubuque Jaycees Trail (formerly the Northern Levee Path) along Peosta Channel. The grant would provide a one-mile off-road connection from Heron Pond along the Ski Club road, Greyhound Park Road and the 16m Street bridge to the planned Pyatigorsk Park at the southern end of Dubuque Jaycees Trail. The Heron Pond Wetlands Nature Trail, completed last spring, loops around Miller-Riverview Park, Heron Pond, and the back of the Greyhound Park. The segment along the Ski Club road was included as a bid alternate for the Heron Pond Wetlands Nature Trail last year. This alternate was not accepted because the City did not have sufficient funding. The Dubuque Jaycees Trail is scheduled for bidding and construction in 2001. The City has a Recreational Trails grant to widen this existing pathway atop the levee along Peosta Channel. City Engineering staff and consultants from Veenstra and Kimm, Inc. are working with IDOT to determine the estimated costs to relocate the sidewalk on the 16m Street bddge from the south side to the north side of the bridge. The relocated sidewalk and new off-road trail would provide a direct, off-road link from the proposed trail to Pyatigorsk Park at 16th Street and Kerper Blvd. With paving of the Ski Club road as a trail, access to the Ski Club would be shifted from Greyhound Park Road to the northwest corner of the western parking lot for the Greyhound Park Recreational Trails Grant Application page 2 and Casino, near the wetlands. These project design elements were reviewed with the Dubuque Ski Club and the Dubuque Greyhound Park and Casino last year. Both groups found them acceptable. BUDGETIMPACT The total costs for the Heritage Trail Extension from Heron Pond to the Dubuque Jaycees Trail are estimated to be $400,000. The requested grant amount is $300,000. IDOT requires a 25% local match, which is $100,000 for this project. This trail project was submitted to the IDOT for their January, 2001 round for the Recreational Trails grant program. The project was not funded, although it scored faidy well. With that grant application, the City match included Pyatigorsk Park. We believe that this match may have reduced the rating for the trail project. In addition, Pyatigorsk Park has been shifted out to FY03. We have reviewed this project with Administrative Services Manager Pauline Joyce and Leisure Services Manager Gil Spence in light of other trail and recreational projects budgeted in the FY 2002 Capital Improvement Program. They felt that the City should apply for this IDOT grant, so we have reworked the project application to exclude Pyatigorsk Park as the local match. This presents us with the need for $100,000 in local funds for the required match. Gil has recommended reallocation of $100,000 of the funds budgeted in FY02 for the Highway 20 landscape improvements as the local match for this grant. Gil then will submit the Highway 20 landscaping project with $100,000 in an out year this fall as part of the FY03 CIP budgeting process. RECOMMENDATION Staff recommends that the City Council approve the attached resolution authorizing submission of the Recreational Trails grant to the IDOT for funding of the Heritage Trail Extension from Heron Pond to the Dubuque Jaycees Trail, and the reallocation of $100,000 from the Highway 20 landscaping project in FY02 as the local match. Attachments Pauline Joyce, Administrative Services Manager Gil Spence, Leisure Services Manager LSesterh/rectrails/Heron._Pond/rectrail-memo-7-01 .doc RESOLUTION NO. 258-01 RESOLUTION AUTHORIZING A GRANT APPLICATION FOR IOWA DEPARTMENT OF TRANSPORTATION RECREATIONAL TRAILS FUNDS FOR THE HERITAGE TRAIL EXTENSION FROM THE HERON POND WETLANDS NATURE TRAIL TO THE DUBUQUE JAYCEES TRAIL Whereas, the Iowa Department of Transportation (IDOT) has Recreational Trails funds available to develop recreational trails in cities; and Whereas, the City of Dubuque has adopted a Comprehensive Plan and a Riverfront Plan that include goals for development of bike/hike trails; and Whereas the City of Dubuque has adopted the Heritage Trail Master Plan that includes the Heritage Trail Extension. NOW, THEREFORE, BE tT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the Planning Services Manager is hereby authorized to sign and submit this application for Recreational Trails funds to the IDOT for the extension of Hedtage Trail from the Heron Pond Wetlands Nature Trail to the Dubuque Jaycees Trail. on behalf of the City of Dubuque. Section 2. That the City of Dubuque agrees to adequately maintain the trail for its intended use and maintain the total trail used to justify the project in public use for a minimum of 20 years following project completion. Section 3. That the City Manager is hereby authorized to reallocate $100,000 from the FY02 Capital Improvement Program from the Highway 20 Landscaping project to serve as the local match for this grant. Passed, approved and adopted this 18th day of June ,2001. Terrance M. Duggan, Mayor Atlest: Jeanne F. Schneider, City Clerk Lsesterhen/rectrails/Heron_Pond/rectrail-7-01 -budget.xls City of Dubuque Recreational Trails Fund -- itemized cost estimate Heritage Trail Extension: Heron Pond Wetlands to Dubuque Jaycees Trail No. Item Quantity Unit Unit Cost Total Cost I Staking I LS $4,650.00 ~)4,650 2 Embankment 3,500 CY (;10.00 3 Clearing and Grubbing I LS (;2,700.00 (;2,700 4 Earthwork 1 LS (;12,200.00 (;12,200 5 Excavation 145 CY (;8.00 (;1,163 6 Remove old pavement 462 SY (;4.00 (;1,848 7 Concrete Curb and Gutter -remove and replace 20 LF (; 18.00 (;360 8 Asphalt pavement, 4" 750 TON (;85.00 (;63,750 9 Granular stone subbase 1,100 TON (;18.00 (;19,800 10 Crushed Stone 464 TON (;8.00 (;3,712 11 Concrete Pavement, 9" 462 SY (;45.00 ~20,790 12 Relocate Ski Club sign 1 LS (;800.00 $800 13 Remove/Relocate fence and 1 LS (;10,000.00 ¢10,000 barrier on bridge 14 Rebuild fence barriers along I EA (;1,650.00 (;1,650 Ski Club road 15 Realign Lanes for bridge 1 LS (;40~000.00 (;40,000 16 Bridge Modifications I EA (;70,000.00 $70,000 17 Centerline striping on trail 4,582 LF (;0.26 (;1,191 18 Handicapped Ramp I EA (;800.00 (;800 19 Traffic Control I LS (;6,375.00 (;6,375 20 Street Crosswalk markings 2 EA (;500.00 (;1,000 21 Seeding 2,582 SY (;3.00 (;7,746 22 Filter fabric 670 SY (;1.50 $1,005 23 Trail signs 16 EA (;72.00 $1,152 Total Construction Estimate 15% Engineering/Construction Mgmt 15% Contingency Total Project Cost Estimate 25% City Funds 75% IDOT grant request (;307,693 $46,154 (;46,154 (;400,000 (;100,000 $300,000 Lsesterh/rect rails/H eron_Pond/rect rails-7-O 1 -budget.xls Heritage Trail Riverfront Extension: Connection Between Heron Pond Wetlands Nature Trail and Dubuque Jaycees Trail Heron Pond Jaycees BHdge Heron Pond Wetlands Nature Trail & Dubuque Jaycess Trail (Northern Levee Path) Recreational Trails Grant Proposal N