2025 Maintenance Dredging Project - Acceptance of Public Improvement Construction ContractCity of Dubuque City Council CONSENT ITEMS # 13. Copyrighted December 15, 2025 ITEM TITLE: 2025 Maintenance Dredging Project - Acceptance of Public Improvement Construction Contract SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $261,416.21 to Newt Marine Service for the 2025 Maintenance Dredging Project. RESOLUTION Accepting The 2025 Maintenance Dredging Project And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 2025 Maintenance Dredging Project - Council Acceptance Staff MEMO 3. 2025 Maintenance Dredging Project - Council Accept Final Payment RESOLUTION Page 314 of 1019 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2025 Maintenance Dredging Project Acceptance of Public Improvement Construction Contract Dubuque AI WIN av 2007-2012.2013 2017*2019 Project Number: 5546000001-304-67990 - Harbor Area Dredging DATE: December 10, 2025 Assistant City Engineer Robert Schiesl is recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $261,416.21 to Newt Marine Service for the 2025 Maintenance Dredging Project. The 2025 Maintenance Dredging Project was completed by Newt Marine Service of Dubuque Iowa in the final contract amount of $261,416.21 which is a 9.7% increase from the original contract amount of $238,385.50. The added costs incurred were a result of payment for over depth dredging. In accordance with the contract documents to cover inaccuracies of the dredging process, material removed below the design dredge elevation to a depth of not more than 6 inches is measured and paid for at the contract unit price. I concur with the recommendation and respectfully request Mayor and City Council approval. Y Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer Jenny Larson, Chief Financial Officer Laura Bendorf, Budget Manager Nathan Steffen, Civil Engineer Page 315 of 1019 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Robert Schiesl, Assistant City Engineer DATE: December 10, 2025 RE: 2025 Maintenance Dredging Project Acceptance of Public Improvement Construction Contract Dubuque All -America City 2007.2012.2013 2017*2019 Project Number: 5546000001-304-67990 - Harbor Area Dredging INTRODUCTION The enclosed resolution provides for the acceptance of the Public Improvement Construction Contract for the 2025 Maintenance Dredging Project. BACKGROUND The Sportfishing and Boating Safety Act - BIG Tier 1 grant funding supports boating as a popular recreational activity; there are approximately 11.8 million registered recreational boats in the United States. Of this total, an estimated 584,000 are at least 26 feet long. The Sportfishing and Boating Safety Act of 1998 (Public Law 105-178) established the Boating Infrastructure Grants (BIG) Program (16 U.S.C. 777g-1) to provide funding to the 50 States, for the construction, renovation, and maintenance of boating infrastructure facilities for transient recreational vessels at least 26 feet long that are operated, leased, rented, or chartered primarily for pleasure. On September 5th, 2023, the City Council authorized, and staff submitted a Boating Infrastructure Grant (BIG Tier 1) application to the US Fish and Wildlife Service and Iowa Department of Natural Resources for dredging the marina to provide transient boaters, and boaters who operate vessels 26 feet or larger, access to docking and safe harbor facilities, including fueling, pump -out, bathroom and shower facilities, access to clean water, electricity, and other utilities. In July 2024, the City received the Notice of Award from the Iowa DNR / USFWS for the BIG Tier 1 Grant, and per Resolution 307-24, the City Council authorized the execution of the BIG Tier 1 Subrecipient Grant Agreement. DUBUQUE MARINA FUNDING AGREEMENT On July 7t", 2025, per Resolution 242-25, the City Council authorized the execution of a Funding Agreement between the City and Dubuque Marina, Inc. for the partnership agreement to provide the required local match funding ($100,000) for the 2024 BIG Tier 1 Grant to perform maintenance dredging at Dubuque Marina BIG TIER 1 GRANTS - DREDGING PLAN Page 316 of 1019 The objective and scope of work for the 2025 Maintenance Dredging Project, utilizing the 2024 BIG TIER 1 Grant funding that was awarded is to perform maintenance dredging within the approximate area shown in Figure 1, to an approximate river bottom elevation of 586.5-Ft., which will provide adequate depth for transient boats 26 feet in length or greater and will create a safe open water for navigating vessels from the Peosta Channel to and from the existing transient dock for fuel, water, and holding tank pump -out. 0 Deep 4, N Kip < - 5 Deep � i q�_3IENT JOC A�� --� , O 2022 BIG GRANT DREDGE AREA DREDGEARE, � � 1 Figure 1 - Dubuque Marina Area to be Dredged 2024 Maintenance Dredging Project No. 1 2022 BIG Tier 1 Grant Funding was used to perform dredging within the area outlined in RED, this project was complete in 2024. 2025 Maintenance Dredging Project 2024 BIG Tier 1 Grant Funding to be used to perform dredging within the area outlined in GREEN. The dredging project will provide adequate depth and an improved open waterway for safely navigating transient vessels. By dredging and creating the open waterway from the Peosta Channel to the marina transient docks, this will create improved water flow and water circulation which will reduce the potential for future sediment siltation within the proposed dredge location. The proposed dredged open waterway will be more sustainable long-term and will maximize the return on the investment of federal BIG funding with a long-term solution in providing safe harbor access for daily and overnight transient boaters. DISCUSSION With the completion of the current 2025 Maintenance Dredging Project alongside previous dredging efforts in 2023 and 2024, the Dubuque Marina now benefits from adequate depth and enhanced open waterway access at its highest priority areas for recreational and transient boating. By dredging additional zones beyond the City's maintenance obligations and establishing open channels from the Peosta Channel has created safe open water for navigating vessels to and from the existing transient dock for fuel, water, and holding tank pump -out. 2 Page 317 of 1019 The 2025 Maintenance Dredging Project was completed by Newt Marine Service of Dubuque Iowa in the final contract amount of $261,416.21 which is a 9.7% increase from the original contract amount of $238,385.50. The added costs incurred were a result of payment for over depth dredging. In accordance with the contract documents to cover inaccuracies of the dredging process, material removed below the design dredge elevation to a depth of not more than 6 inches is measured and paid for at the contract unit price. RECOMMENDATION I recommend that the City Council accept the Public Improvements and authorize the payment of $261,416.21 to Newt Marine Service for the 2025 Maintenance Dredging Project. BUDGETIMPACT The project cost for the 2025 Maintenance Dredging Project is summarized in the following table: Description Cost Estimate Award Final Cost Dredge Construction - Dubuque Marina $ 202,700.00 $ 211,455.50 $ 234,665.23 Alternate 1 - Remove and Replace Dock Spuds 18,000.00 20,000.00 20,000.00 Alternate 2 - Lift Well Dredging 14,400.00 6,930.00 6,750.98 Contingency 35,000.00 31,714.50 0.00 Total Construction Cost (Newt Marine) $ 270,100.00 $ 270,100.00 $ 261,416.21 Bathometric Survey (Mohn Surveying, Inc.) - - 3,276.00 Total Construction Cost $ 270,100.00 $ 270,100.00 $ 264,692.21 The proposed funding for this project is summarized as follows: Project Number Fund Description Fund Amount 5546000001-304-67990 Harbor Area Dredging (BIG TIER 1 Grant) $ 164,692.21 Private Participation - Dubuque Marina 100,000.00 Total Project Funding $ 264,692.21 REQUESTED ACTION The City Council is requested to adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $261,416.21 to Newt Marine Service for the 2025 Maintenance Dredging Project. cc: Jenny Larson, Chief Financial Officer Nathan Steffen, Civil Engineer George Scholten, Iowa DNR Dubuque Marina FAPROJECTS\DREDGING PROJECTS\2025 Maintenance Dredge\Council & Staff Documents\Award 3 Page 318 of 1019 Prepared by Nathan Steffen, Civil Engineer, City Clerk, 50 W. 13th St., Dubuque IA 52001, (563) 589-4270 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 13"' St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 388-25 ACCEPTING THE 2025 MAINTENANCE DREDGING PROJECT AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the 2025 Maintenance Dredging Project (the Project) to perform maintenance dredging at Dubuque Marina; and WHEREAS, the Public Improvement Contract for the Project has been completed by the contractor, Newt Marine Service (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $261,416.21; and WHEREAS, the Contractor has previously been paid $253,573.72, leaving a balance of $7,842.49; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. SECTION 2. The Chief Financial Officer is hereby directed to pay the balance of the retainage of $7,842.49 as provided in Iowa Code Chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code Chapter 573 or Iowa Chapter 26.13. Passed, approved and adopted this 151h day of December , 2025. Brad M. Cavanagh, Mayor Attest: Rom, Adrienne N. Breitfelder, City Clerk CITY ENGINEER CERTIFICATE OF FINAL COMPLETION OF THE 2025 MAINTENANCE DREDGING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2025 Maintenance Dredging Project and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $264,692.21. Dated this the loth day of December , 2025. Gus Psihoyos, City Engin er Filed in the office of the City Clerk on the 10th day of December , 2025. �� ""rt r A'v�"-" Adrienne N. Breitfelder, City Clerk Page 320 of 1019