Tanglewood Court Storm Sewer Extension Project Public HearingCity of Dubuque
City Council
PUBLIC HEARINGS # 1.
Copyrighted
January 5, 2026
ITEM TITLE: Tanglewood Court Storm Sewer Extension Project Public
Hearing
SUMMARY: Proof of publication on notice of public hearing to consider
City Council approve the plans, specifications, form of
contract and estimated cost of $131,501.54 for the
Tanglewood Court Storm Sewer Extension Project through
the adoption of the attached resolution, and City Manager
recommending approval.
RESOLUTION Tanglewood Court Storm Sewer Extension
Project: Approval Of Plans, Specifications, Form Of Contract,
And Estimated Cost
SUGGUESTED Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
1. MVM Memo
2. Tanglewood Ct Storm Sewer Ext - Council Staff PH MEMO
3. Tanglewood Ct Storm Sewer Ext - Council PH RESOLUTION
Page 337 of 567
THE CITY OF
DUBE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Tanglewood Court Storm Sewer Extension Project
Public Hearing
Project No. 5586500044
DATE: December 29, 2025
Dubuque
AI WIN av
2007-2012.2013
2017*2019
Assistant City Engineer Robert Schiesl is recommending City Council approve the
plans, specifications, form of contract and estimated cost of $131,501.54 for the
Tanglewood Court Storm Sewer Extension Project through the adoption of the attached
resolution.
The City has identified a failing stormwater sewer outfall that has caused significant
erosion along City property located behind residences along Thornwood Court,
Thornwood Drive, and Tanglewood Court. The increased erosion along the outfall has
created potential hazard that requires the outfall to be reconstructed and stabilized. This
project will include the extension of storm sewer, additional stormwater intakes, and the
construction of an outfall stabilization structure that would restore the eroded areas.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
k�4 S4.zn"
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Robert Schiesl, Assistant City Engineer
Maxwell O'Brien, Civil Engineer
Jenny Larson, Chief Financial Officer
Laura Bendorf, Budget Manager
Page 338 of 567
Page 339 of 567
THE CITY OF
DuB TE
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Robert Schiesl, Assistant City Engineer
DATE: December 18, 2025
SUBJECT: Tanglewood Court Storm Sewer Extension Project
Public Hearing
Project No. 5586500044
INTRODUCTION
Dubuque
*Awin qh
\%IICW1LCmC.I1-NA1
2007-2012.2013
2017*2019
This memorandum and attached resolution is in reference to the City Council public
hearing for the Tanglewood Court Storm Sewer Extension Project.
DISCUSSION
The City has identified a failing stormwater sewer outfall that has caused significant
erosion along City property located behind residences along Thornwood Court,
Thornwood Drive, and Tanglewood Court. The increased erosion along the outfall has
created potential hazard that requires outfall reconstruction and stabilization. This project
will include the extension of storm sewer, additional stormwater intakes, and the
construction of an outfall stabilization structure that would restore the eroded areas.
PROJECT SCHEDULE
The proposed schedule for the project is as follows:
Initiate Public Bidding Process
December 15, 2025
Publish Notice to Bidders, Advertise for Bids
December 17, 2025
Public Hearing
January 5, 2026
Pre Bid Meeting
January 5, 2026
Receipt of Bid Proposals (Bid -Letting)
January 8, 2026
Award Construction Contract
January 20, 2026
Substantial Completion
June 1, 2026
Final Project Completion Date
June 30, 2026
RECOMMENDATION
I recommend that the City Council conduct a public hearing and approve the plans,
specifications, form of contract and construction estimate for the Tanglewood Court Storm
Sewer Extension Project.
Page 340 of 567
BUDGETIMPACT
The estimate of probable cost for the Tanglewood Court Storm Sewer Extension Project
is summarized as follows:
Description
Estimate
Construction
$ 131,501.54
Contingency (10%)
13,150.15
Engineering (10%)
13,150.15
Total Project Cost
$ 157,801.85
The construction of the Tanglewood Court Storm Sewer Extension Project will be covered
by the funding source(s) as described below:
Project No.
Description
Amount
5586500044
Tanglewood Court Outfall Stabilization
$ 160,000.00
Total Project Funding
$ 160,000.00
ACTION TO BE TAKEN
I respectfully request the City Council approve the plans, specifications, form of contract
and estimated cost for the Tanglewood Court Storm Sewer Extension Project through the
adoption of the attached resolution.
Prepared by Maxwell O'Brien, Civil Engineer
cc: Jenny Larson, Chief Financial Officer
Laura Bendorf, Budget Manager
2
Page 341 of 567
Prepared by Kerry Bradley City of Dubuque Engineering 50 W. 13th St Dubuque IA 52001 (563)589-4270
Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 6 -26
TANGLEWOOD COURT STORM SEWER EXTENSION PROJECT: APPROVAL OF
PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST
WHEREAS, the Tanglewood Court Storm Sewer Extension Project will provide for
the extension of storm sewer, additional stormwater intakes, and the construction of an
outfall stabilization structure that would restore the eroded areas. The City has identified
a failing stormwater sewer outfall that has caused significant erosion along City property
located behind residences along Thornwood Court, Thornwood Drive, and Tanglewood
Court. The increased erosion along the outfall has created potential hazard that requires
outfall reconstruction and stabilization; and
WHEREAS, the City Council, by Resolution No. 396-25, dated December 15,
2025, preliminarily approved the plans, specifications, form of contract, and estimated
cost for the Tanglewood Court Storm Sewer Extension Project; and
WHEREAS, pursuant to published notice and published advertisement for bids, a
public hearing was held on January 5, 2026, on the plans, specifications, form of contract,
and estimated cost for the Tanglewood Court Storm Sewer Extension Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the attached plans, specifications, form of contract and estimate of total cost
for the Tanglewood Court Storm Sewer Extension Project in the estimated construction
amount of $131,501.54, are hereby approved.
Passed, adopted and approved this the 51h day of January 2026.
Attest:
Adrienne N. Breitfelder, City Clerk
Brad M. C n , Mayor
STATE OF IOWA SS:
DUBUQUE COUNTY
CERTIFICATE OF PUBLICATION
I, Kathy Goetzinger, a Billing Clerk for Woodward
Communications, Inc., an Iowa corporation, publisher
of the Telegraph Herald, a newspaper of general
circulation published in the City of Dubuque, County
of Dubuque and State of Iowa; hereby certify that the
attached notice was published in said newspaper on the
following dates:
12/19/2025
and for which the charge is 40.88
Suiscribed to before me, a Notary Publd ic i for
Dubuque County, Iowa,
this l9th day of December, 2025
K.
Notary bli in and for Dubuque Codnt � � q Y> Iowa.
� JANET K. PAPE
Z -P. Commission Number 199659
My Commission Expires
iowa 12/11/2028
Ad text :
CITY OF DUBUQUE, IOWA
OFFICIAL NOTICE
PUBLIC NOTICE is hereby given that the Dubuque City Council
will conduct a public hearing on the 5th day of January 2026,
at 6:30 p.m., in the Historic Federal Building, 350 W. 6th
Street, 2nd floor, Dubuque, Iowa, at which meeting the City
Council proposes to hold a public hearing on the proposed
plans, specifications, form of contract and estimated cost for
the Tanglewood Court Storm Sewer Extension Project.
The scope of the Project is as follows: The project
provides for the extension of storm sewer, additional
stormwater intakes, and the construction of an outfall
stabilization structure that would restore the eroded areas.
The City has identified a failing stormwater sewer outfall
that has caused significant erosion along City property
located behind residences along Thornwood Court, Thornwood
Drive, and Tanglewood Court. The increased erosion along the
outfall has created potential hazard that requires outfall
reconstruction and stabilization.
At the meeting, the City Council will receive oral and
written comments from any resident or property owner of said
City to the above action. The official City Council agenda
will be posted the Friday before the meeting and will contain
public input options. The agenda can be accessed at
https://dubuqueia.portal.civicclerk.com/ or by contacting the
City Clerk's Office at 563-589-4100,
ctyclerk@cityofdubuque.org.
Written comments on the public hearing may be submitted to
the City Clerk's Office by email at ctyclerk@cityofdubuque.org
or by mail to City Hall, 50 W. 13th St., Dubuque, IA 52001,
before the scheduled hearing. The City Council will review all
written comments at the time of the hearing.
Documents related to the public hearing are on file in the
City Clerk's Office and may be viewed Monday through Friday
between 8:00 a.m. and 5:00 p.m.
Individuals requiring special assistance should contact the
City Clerk's Office as soon as feasible. Deaf or
hard -of -hearing individuals can use Relay Iowa by dialing 711
or (800) 735-2942.
Published by order of the City Council given on the 15th day
of December 2025.
Adrienne N. Breitfelder,
CMC, City Clerk