Loading...
2025 Pavement Marking Project: Acceptance of Public Improvement Construction ContractCity of Dubuque City Council CONSENT ITEMS # 7. Copyrighted February 2, 2026 ITEM TITLE: 2025 Pavement Marking Project: Acceptance of Public Improvement Construction Contract SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the improvements and to authorize the payment of the final contract amount of $201,189.39 to Ostrom Painting and Sandblasting, Inc for the 2025 Pavement Marking Project. RESOLUTION Accepting The 2025 Pavement Marking Project And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2025 Pavement Marking Project Acceptance of Public Improvement Construction Contract 2. 2025 Pavement Marking Project - Staff Acceptance MEMO 3. 2025 Pavement Marking Project - Council Acceptance RESOLUTION 4. 2025 Pavement Marking Project - Ostrom COUNCIL FINAL - Signed Page 175 of 865 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2025 Pavement Marking Project Acceptance of Public Improvement Construction Contract Project Code: 5521000013 DATE: January 22, 2026 Dubuque AI WIN av 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution to accept the improvements and to authorize the payment of the final contract amount of $201,189.39 to Ostrom Painting and Sandblasting, Inc for the 2025 Pavement Marking Project. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Justine Hull, Traffic Engineer Jenny Larson, Chief Financial Officer Robert Schiesl, Assistant City Engineer Troy Kress, Engineering Tech. Page 176 of 865 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: January 22, 2026 RE: 2025 Pavement Marking Project Acceptance of Public Improvement Construction Contract Project Code- 5521000013 INTRODUCTION Dubuque All -America City 2007-2012-2013 2017*2019 The enclosed resolution provides for the acceptance of the public improvement construction contract for the 2025 Pavement Marking Project. BACKGROUND The City contracts for a city-wide pavement marking project to furnish, install, maintain, and remove permanent pavement markings to include Lines and Symbols and Legends on City streets as directed by the Engineering Department. DISCUSSION The Pavement Marking Project is completed annually due to a more rapid deterioration on higher volume, high vehicular movement roadways. Pavement markings are applied using waterborne paint with a service life of approximately one (1) to two (2) years. As part of a cooperative Maintenance Agreement with the Iowa Department of Transportation (Iowa DOT), the City includes portions of Iowa DOT jurisdictional pavement markings with the City's annual pavement marking program. The Maintenance Agreement includes all Symbols and Legends and a portion of center Lines on Iowa DOT routes within the City. The Iowa DOT will reimburse the City for their share of project costs after the project is completed and accepted. This project included pavement markings and symbols for some City owned and maintained parking lots, including 3rd St. and Main St. Lot, 3rd St. and Locust St. Lot, 4th St. and Central Ave. Lot, 51h St. and Bluff St. Lot, 11th St. and Bluff St. Lot, 12th St. and Bluff St. Lot, 12th St. and Central Ave. (City Hall) Lot, 12th St. and Elm St. Lot, and 18th St. and Elm St. Lot. The 2025 Pavement Marking Project was completed by Ostrom Painting and Sandblasting , Inc. of Rock Island, Illinois in the final contract amount of $201,189.39 which is a 0.4% increase from the original contract amount of $200,347.77. Page 177 of 865 RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $201,189.39 to Ostrom Painting and Sandblasting, Inc for the 2025 Pavement Marking Project. BUDGETIMPACT The project cost summary for the 2025 Pavement Marking Project is summarized below: Description Cost Estimate Award Final Construction - City Pavement Markings $ 196,662.00 $ 178,002.91 $ 178,844.55 Construction - Iowa DOT Pavement Markings 22,482.37 20,345.11 20,345.11 City Owned Parking Lots 2,245.64 1,999.75 1,999.75 $ 221,390.01 $ 200,347.77 $ 201,189.39 Engineering Design and Administration 5,000.00 5,000.00 3,332.52 Total Construction Cost $ 226,390.01 $ 205,347.77 $ 204,521.91 The proposed project funding is summarized as follows: Project Code / GL Code Fund Description Fund Amount 5521000013-301-67990 Pavement Markings (FY26) $ 182,177.07 Iowa DOT Funding 20,345.11 650-46-0000-83-830-4603-00-01-63100 Transit -Parking Maintenance 1,999.72 Total Project Funding $ 204,521.90 REQUESTED ACTION The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the final contract amount of $201,189.39 to Ostrom Painting and Sandblasting, Inc for the 2025 Pavement Marking Project. Prepared by: Justine Hull, Traffic Engineer cc: Jenny Larson, Chief Financial Officer Robert Schiesl, Assistant City Engineer Troy Kress, Engineering Tech. Mitchell Wood, Janet Worrell, Iowa DOT 2 Page 178 of 865 Prepared by Justine Hull Civil Engineer - Traffic, 50 W 131' St. , Dubuque IA 52001, (563) 589-4270 Return to Adrienne N. Breiffelder, City Clerk, 50 W. 13"' St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 24-26 ACCEPTING THE 2025 PAVEMENT MARKING PROJECT AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the 2025 Pavement Marking Project (the Project) contracted for a city-wide pavement marking project to furnish, install, maintain, and remove permanent pavement markings to include Lines and Symbols and Legends on City streets; and WHEREAS, the Public Improvement Contract for the Project has been completed by the contractor, Ostrom Painting and Sandblasting, Inc. (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $201,189.39; and WHEREAS, the Contractor has previously been paid $195,153.71, leaving a balance of $6,035.68; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. SECTION 2. The Chief Financial Officer is hereby directed to pay the balance of the retainage of $6,035.68 as provided in Iowa Code Chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code Chapter 573 or Iowa Chapter 26.13. Passed, approved and adopted this 2nd day of February 2026. Brad M: -Ca agh, Mayor Attest: Adrienne N. Breitfelder, ity Clerk CITY ENGINEER's CERTIFICATE OF FINAL COMPLETION OF THE 2025 PAVEMENT MARKING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2025 Pavement Marking Project and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $ 204,521.90. Dated this 22nd day of January 2026. Gus Psihoyos, City Engirfeer Filed in the office of the City Clerk on the 22nd day of January 2026. /'I, w ; U, Adrienne N. Breitfelder, City Clerk Page 180 of 865 PAYMENT NO: ROJECT NAME: City of Dubuque - Engineering Department City Council Final Payment Form COUNCIL FINAL 2025 Pavement Marking Project Project Code: 5521000013-301-67990 CONTRACTOR: Ostrom Painting and Sandblasting ADDRESS: 1110 8th Ave. CITY, STATE, ZIP: Rock Island, IL 61201 AWARDED CONTRACT AMOUNT: $ CONTRACT RECONCILIATION: $ FINAL CONTRACT AMOUNT: $ 200,347.77 841.62 201,189.39 0.4% THE CU�fiiabE D Masterpiece on the Mississippi FINAL COST ACCEPTANCE DATE: February 2, 2025 KNO. ITEM BID ITEM DESCRIPTION CONTRACT PREVIOUS TO -DATE CURRENT PAY PERIOD FINAL NUMBER LINE UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT Division 8020 - Pavement Markings (Painted Lines) 1 8020-108-B BCY4: Broken Centerline (Yellow) 422.60 2 8020-1 88-B 6LW4: Broken Lane Line (White) 351.89 3 8020-108-B CHW8: Channelizing Line (White) 151.56 4 8020-108-B CHYB: Channelizing Line (Yellow) 615.46 5 8020-108-B CBW6: Crosswalk Bar (White) 487.50 6 8020-108-B CLW6: Crosswalk Line (White) 583.35 7 8020-108-B DCY4: Double Centerline (Yellow) 3600.43 8 8020-108-B DDY4: Double Dotted Line (Yellow) 4.68 9 8020-108-B DEW1: Dotted Entrance Line (White) 11.46 10 8020-108-B DLW4: Dotted Line (White) 12.75 11 8020-108-B DLY4: Dotted Line (Yellow) 3.27 12 8020-108-B DLW6: Dotted Line (White) 0.77 13 8020-108-B DNB6: Do Not Block Intersection Line 6" (White) 29.27 14 8020-108-B DRW8: Dotted Roundabout Line (White) 0.00 15 8020-108-B ELW4: Edge Line Right (White) 1927.18 16 8020-108-B ELY4: Edge Line Left (Yellow) 513.74 17 8020-108-B MNY4: Median Nose (Yellow) 0.00 18 8020-108-B NPY4: No Passing Zone Line (Yellow) 313.16 19 8020-108-B SLW2: Stop Line (White) 741.65 20 8020-108-B SLW4: Solid Lane Line (White) 439.33 21 8020-108-B SPW6: Sloped Curb 6" (White) 0.00 22 8020-108-B STW6: Standard Curb 6" (White) 0.00 23 8020-108-B STY& Standard Curb 6" (Yellow) 0.00 24 8020-108-B YLW2: Yield Line (White) 1.59 Division 8020 - Pavement Markings (Painted Symbols) 25 8020-108-G AHDW: Ahead Word Marking (White) 3.00 26 8020-108-G BIKW: Bike Word Marking (White) 2.00 27 8020-108-G BLSW: Bike Lane Symbol (White) 23.00 28 8020-108-G CSLW: Combined Straight and Left Turn Arrow (White) 28.00 29 8020-108-G CSLWR: Combines Straight and Left Turn Roundabout (White) 1.00 30 8020-108-G CSRW: Combined Straight and Right Turn Arrow (White) 24.00 31 8020-108-G CSTW: Combined Straight, Right, and Left Turn Arrow (White) 2.00 32 8020-108-G ENDW: Ends Word Marking (White) 1.00 33 8020-108-G LANW: Lane Word Marking (White) 1.00 34 8020-108-G LLRW: Left Lane Reduction Arrow (White) 3.00 35 8020-108-G LTAW: Left Turn Arrow (White) 563.00 36 8020-108-G LTAWR: Left Turn Roundabout (White) 4.00 37 8020-108-G ONLW: Only Word Marking (White) 227.00 38 8020-108-G RLRW: Right Lane Reduction Arrow (White) 6.00 39 8020-108-G RRCW: Railroad Crossing Symbol (White) 14.00 40 8020-108-G RTAW: Right Turn Arrow (White) 193.00 41 8020-108-G SCLW: School Word Marking (White) 1.00 42 8020-108-G SLMW: Shared Lane Markings (Sharrows (White)) 47.00 43 8020-108-G STAW: Straight Arrow (White) 35.00 44 8020-108-G STPW: Stop Word Marking (White) 10.00 45 8020-108-G XNGW: XING Word Marking (White) 3.00 46 8020-108-G YLDW: YIELD Work Marking (White) 9.00 PRINT DATE: 1/22/2026 STA $ 12.19 416.32 $ 5,074.94 $ - 416.32 $ 5,074.94 STA $ 12.19 364.60 $ 4,444.47 $ - 364.60 $ 4,444.47 STA $ 14.39 151.56 $ 2,180.95 $ - 151.56 $ 2,180.95 STA $ 14.39 617.49 $ 8,885.68 $ - 617.49 $ 8,885.68 STA $ 11.87 486.90 $ 5,779.50 $ - 486.90 $ 5,779.50 STA $ 14.17 577.80 $ 8,187.43 $ - 577.80 $ 8,187.43 STA $ 11.87 3614.45 $ 42,903.52 $ - 3614.45 $ 42,903.52 STA $ 12.19 4.68 $ 57.05 $ - 4.68 $ 57.05 STA $ 12.71 11.46 $ 145.66 $ - 11.46 $ 145.66 STA $ 12.71 17.75 $ 225.60 $ - 17.75 $ 225.60 STA $ 12.71 1.96 $ 24.91 $ - 1.96 $ 24.91 STA $ 12.42 1.29 $ 16.02 $ - 1.29 $ 16.02 STA $ 14.17 29.27 $ 414.76 $ - 29.27 $ 414.76 STA $ 15.00 0.00 $ - $ - 0.00 $ - STA $ 12.71 1928.06 $ 24,505.64 $ - 1928.06 $ 24,505.64 STA $ 12.71 513.74 $ 6,529.64 $ - 513.74 $ 6,529.64 STA $ 15.64 0.00 $ - $ - 0.00 $ - STA $ 12.71 313.16 $ 3,980.26 $ - 313.16 $ 3,980.26 STA $ 15.00 741.98 $ - $ - 741.98 $ 11,129.69 STA $ 12.71 460.77 $ 5,856.39 $ - 460.77 $ 5,856.39 STA $ 12.71 0.00 $ - $ - 0.00 $ - STA $ 15.50 0.00 $ - $ - 0.00 $ - STA $ 15.50 0.00 $ - $ - 0.00 $ - STA $ 12.71 1.59 $ 20.21 $ - 1.59 $ 20.21 City - Pavement Markings (Painted Lines) Sub Total $ 130,362.31 EA $ 41.60 3.00 $ 124.80 $ - 3.00 $ 124.80 EA $ 41.60 2.00 $ 83.20 $ - 2.00 $ 83.20 EA $ 41.60 23.00 $ 956.80 $ - 23.00 $ 956.80 EA $ 39.26 30.00 $ 1,177.80 $ - 30.00 $ 1,177.80 EA $ 38.36 1.00 $ 38.36 $ - 1.00 $ 38.36 EA $ 39.26 24.00 $ 942.24 $ - 24.00 $ 942.24 EA $ 39.26 2.00 $ 78.52 $ - 2.00 $ 78.52 EA $ 41.60 1.00 $ 41.60 $ - 1.00 $ 41.60 EA $ 41.60 1.00 $ 41.60 $ - 1.00 $ 41.60 EA $ 39.26 3.00 $ 117.78 $ - 3.00 $ 117.78 EA $ 39.26 562.00 $ 22,064.12 $ - 562.00 $ 22,064.12 EA $ 38.36 4.00 $ 153.44 $ - 4.00 $ 153.44 EA $ 41.60 227.00 $ 9,443.20 $ - 227.00 $ 9,443.20 EA $ 39.26 6.00 $ 235.56 $ - 6.00 $ 235.56 EA $ 43.68 14.00 $ 611.52 $ - 14.00 $ 611.52 EA $ 39.26 193.00 $ 7,577.18 $ - 193.00 $ 7,577.18 EA $ 41.60 1.00 $ 41.60 $ - 1.00 $ 41.60 EA $ 43.48 50.00 $ 2,174.00 $ - 50.00 $ 2,174.00 EA $ 43.48 35.00 $ 1,521.80 $ - 35.00 $ 1,521.80 EA $ 41.60 10.00 $ 416.00 $ - 10.00 $ 416.00 EA $ 41.60 3.00 $ 124.80 $ - 3.00 $ 124.80 EA $ 41.60 9.00 $ 374.40 $ - 9.00 $ 374.40 City - Pavement Markings (Painted Symbols) Sub Total $ 48,340.32 CITY - FINAL AMOUNT EARNED: $ 178,702.63 PAGE 1 of 4 Page 181 of 865 City of Dubuque - Engineering Department City Council Final Payment Form PAYMENT NO: COUNCIL FINAL ROJECT NAME: 2025 Pavement Marking Project Project Code: 5521000013-301-67990 CONTRACTOR: Ostrom Painting and Sandblasting AWARDED CONTRACT AMOUNT: $ ADDRESS: 1110 8th Ave. CONTRACT RECONCILIATION: $ 200,347.77 THE CU�fiiabE D Masterpiece on the Mississippi FINAL COST ACCEPTANCE CITY, STATE, ZIP: Rock Island, IL 61201 FINAL CONTRACT AMOUNT: $ 201,189.39 0.4% ITEM CONTRACT PREVIOUS TO -DATE CURRENT PAY PERIOD FINAL KNO. NUMBER BID ITEM DESCRIPTION QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT Division 8020 - Pavement Markings (Painted Lines) 47 8020-108-B BLW6: Broken Lane Line (White) 0.43 STA $ 12.42 0.43 $ 5.37 $ - 0.43 $ 5.37 48 8020-108-B CHW10: Channelizing Line (White) 80.61 STA $ 17.98 80.61 $ 1,449.45 $ - 80.61 $ 1,449.45 49 8020-108-B CHY10: Channelizing Line (Yellow) 55.53 STA $ 17.98 55.53 $ 998.38 $ - 55.53 $ 998.38 50 8020-108-B DEW10: Dotted Entrance Line (White) 3.59 STA $ 17.98 3.59 $ 64.61 $ - 3.59 $ 64.61 51 8020-108-B DLW6: Dotted Line (White) 3.97 STA $ 12.19 3.97 $ 48.44 $ - 3.97 $ 48.44 52 8020-108-B DRW6: Dotted Roundabout Line (White) 3.48 STA $ 12.19 3.48 $ 42.43 $ - 3.48 $ 42.43 53 8020-108-B ELW6: Edge Line Right (White) 34.80 STA $ 12.19 34.80 $ 424.17 $ - 34.80 $ 424.17 54 8020-108-B ELY& Edge Line Left (Yellow) 7.40 STA $ 12.19 7.40 $ 90.24 $ - 7.40 $ 90.24 55 8020-108-B SLW2: Stop Line (White) 14.12 STA $ 12.71 14.12 $ 179.52 $ - 14.12 $ 179.52 56 8020-108-B SLW6: Solid Lane Line (White) 179.27 STA $ 12.19 179.27 $ 2,185.25 $ - 179.27 $ 2,185.25 57 8020-108-B SPY& Sloped Curb 6" (Yellow) 10.45 STA $ 15.50 10.45 $ 162.03 $ - 10.45 $ 162.03 58 8020-108-B STW6: Standard Curb 6" (White) 0.69 STA $ 15.50 0.69 $ 10.69 $ - 0.69 $ 10.69 Iowa DOT - Pavement Markings (Painted Lines) Sub Total $ 5,660.57 Division 8020 - Pavement Markings (Painted) 59 8020-108-G CSLW: Combined Straight and Left Turn Arrow (White) 12.00 EA $ 39.26 12.00 $ 471.12 $ - 12.00 $ 471.12 60 8020-108-G CSRW: Combined Straight and Right Turn Arrow (White) 14.00 EA $ 39.26 14.00 $ 549.64 $ - 14.00 $ 549.64 61 8020-108-G LTAW: Left Turn Arrow (White) 115.00 EA $ 39.26 115.00 $ 4,514.90 $ - 115.00 $ 4,514.90 62 8020-108-G ONLW: Only Word Marking (White) 104.00 EA $ 41.60 104.00 $ 4,326.40 $ - 104.00 $ 4,326.40 63 8020-108-G RLRW: Right Lane Reduction Arrow (White) 5.00 EA $ 39.26 5.00 $ 196.30 $ - 5.00 $ 196.30 64 8020-108-G RTAW: Right Turn Arrow (White) 95.00 EA $ 39.26 95.00 $ 3,729.70 $ - 95.00 $ 3,729.70 65 8020-108-G STAW: Straight Arrow (White) 8.00 EA $ 39.26 8.00 $ 314.08 $ - 8.00 $ 314.08 66 8020-108-G YLDW: YIELD Work Marking (White) 14.00 EA $ 41.60 14.00 $ 582.40 $ - 14.00 $ 582.40 Iowa DOT - Pavement Markings (Painted Symbols) Sub Total $ 14,684.54 IOWA DOT - FINAL AMOUNT EARNED: $ 20,345.11 PRINT DATE: 1/22/2026 PAGE 2 of 4 Page 182 of 865 City of Dubuque - Engineering Department City Council Final Payment Form PAYMENT NO: COUNCIL FINAL ROJECT NAME: 2025 Pavement Marking Project Project Code: 5521000013-301-67990 CONTRACTOR: Ostrom Painting and Sandblasting AWARDED CONTRACT AMOUNT: $ ADDRESS: 1110 8th Ave. CONTRACT RECONCILIATION: $ 200,347.77 THE CU�fiiabE D Masterpiece on the Mississippi FINAL COST ACCEPTANCE CITY, STATE, ZIP: Rock Island, IL 61201 FINAL CONTRACT AMOUNT: $ 201,189.39 0.4% ITEM CONTRACT PREVIOUS TO -DATE CURRENT PAY PERIOD FINAL KNO. NUMBER ITEM DESCRIPTION QUANTITBID Y UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT Division 8020 - Parking City Lots (Painted - Lines and Symbols & Legends) 67 8020-108-B SLW4: Solid Lane Line (White) 95.06 STA $ 12.19 95.06 $ 1,158.78 $ - 95.06 $ 1,158.78 68 8020-108-G STAW: Straight Arrow (White) 10.00 EA $ 39.26 10.00 $ 392.60 $ - 10.00 $ 392.60 69 8020-108-G WCSW: Wheelchair Symbol (White) 9.00 EA $ 39.26 9.00 $ 353.34 $ - 9.00 $ 353.34 70 8020-108-G WPSB: Wheelchair Parking Symbol (Blue) 2.00 EA $ 47.50 2.00 $ 95.00 $ - 2.00 $ 95.00 Parking City Lots Sub Total $ 1,999.72 CITY - PARKING LOTS AMOUNT EARNED $ 1,999.72 LINE ITEM DESCRIPTION - CHANGE ORDER / EXTRA WORK ITEMS CONTRACT PREVIOUS TO -DATE CURRENT PAY PERIOD FINAL NO. NUMBER QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 71 8020-108-G C0#1: Jackson St. - E 24th St Intersection Stop bars - SLW2: Stop Line (White) 4.22 RTA R 1 R nn 422 R RR ?4 R - 499 A RR 24 72 8020-108-G CO#2: Fenelon PI. Curb painting - STY& Standard Curb 6" (Yellow) 1.30 73 8020-108-B CO#3: N Grandview Ave. at Kaufmann Intersection Stop Bars - SLW2: Stop 3.90 Line (White) STA $ 15.00 3.90 $ 58.50 $ 3.90 $ 58.50 FINAL TOTAL CONTRACT AMOUNT EARNED: $ 201,189.39 PRINT DATE: 1/22/2026 PAGE 3 of 4 Page 183 of 865 City of Dubuque - Engineering Department City Council Final Payment Form THE CITY OF PAYMENT NO: COUNCIL FINAL ROJECT NAME: 2025 Pavement Marking Project Project Code: 5521000013-301-67990 CONTRACTOR: Ostrom Painting and Sandblasting ADDRESS: 1110 8th Ave. CITY, STATE, ZIP: Rock Island, IL 61201 CERTIFICATE OF THE CITY MANAGER AWARDED CONTRACT AMOUNT: $ CONTRACT RECONCILIATION: $ FINAL CONTRACT AMOUNT: $ FINAL PROJECT COST SUMMARY I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligan, City Manager City of Dubuque, Iowa 200,347.77 841.62 201,189.39 0.4% DuB E Masterpiece on the Mississippi FINAL COST ACCEPTANCE DATE: February 2, 2025 AWARDED CONTRACT AMOUNT: $200,347.77 BID ITEM(S) OVER / UNDER RECONCILIATION: $ 699.70 TOTAL CONTRACT CHANGE ORDER(S): $ 141.92 FINAL CONTRACT AMOUNT / TOTAL DUE CONTRACTOR: $201,189.39 ADMIN / CONSTRUCTION ENGINEERING & INSPECTION: 3,332.52 TOTAL PUBLIC IMPROVEMENT CONSTRUCTION COST: $204,521.91 CERTIFICATE OF THE CITY ENGINEER I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. CERTIFICATE OF THE CONTRACTOR APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa The undersigned, Ostrom Painting and Sandblasting contractor for the above public improvement, does hereby accept the above "Total Due Contractor", as full settlement for all costs and claims for said puplic improvement construction project. CONTRACTOR: Ostrom Painting and Sandblasting DATE: 1 /22/2026 Robert Digitally signed by BY: Robert Walker TITLE: President Walker Date: 2026.01.22 10:05:18-06'00' PRINT DATE: 1/22/2026 PAGE 4 of 4 Page 184 of 865