Loading...
2025 ADA Sidewalk Curb Ramp Project One Acceptance of Public Improvement Construction ContractCity of Dubuque City Council CONSENT ITEMS # 5. Copyrighted March 16, 2026 ITEM TITLE: 2025 ADA Sidewalk Curb Ramp Project One Acceptance of Public Improvement Construction Contract SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $89,477.53 to Midwest Concrete, Inc. for the 2025 ADA Sidewalk Curb Ramp Project One. RESOLUTION Accepting The 2025 ADA Sidewalk Curb Ramp Project One And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: MVM Memo 2025 ADA Sidewalk Curb Ramp Project One Acceptance 2. 2025 ADA Sidewalk Curb Ramp Project One - Council Acceptance Staff MEMO 3. 2025 ADA Sidewalk Curb Ramp Project One - Accept Project Authorize Final Payment RESOLUTION Page 146 of 811 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2025 ADA Sidewalk Curb Ramp Project One Acceptance of Public Improvement Construction Contract Project Number: 5421000002 — PW Curb Ramp Program DATE: March 10, 2026 Dubuque AI WIN av 2007-2012.2013 2017*2019 Assistant City Engineer Robert Schiesl is recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $89,477.53 to Midwest Concrete, Inc. for the 2025 ADA Sidewalk Curb Ramp Project One. The 2025 ADA Sidewalk Curb Ramp Project One provided for the replacement of access curb ramps on Asbury Road from John F. Kennedy Road to Avalon Street in conjunction with the Public Works Asphalt Overlay program at the following locations: • Asbury Road and John F. Kennedy Road, three directional ADA sidewalk curb ramps and one non -directional ADA sidewalk curb ramp. • Asbury Road and Crissy Street, two directional ADA sidewalk curb ramps. • Asbury Road and Evergreen Street, two directional ADA sidewalk curb ramps. • Asbury Road and Woodlawn Street, two directional ADA sidewalk curb ramps. • Asbury Road and Avalon Street, two directional ADA sidewalk curb ramps. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Page 147 of 811 Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer Jenny Larson, Chief Financial Officer Arielle Swift, Public Works Director Nathan Steffen, Civil Engineer Brian Wulfekuhle, Public Works 2 Page 148 of 811 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael Van Milligen, City Manager FROM: Robert Schiesl, Assistant City Engineer DATE: March 9, 2026 RE: 2025 ADA Sidewalk Curb Ramp Project One Acceptance of Public Improvement Construction Contract Project Number- 5421000002 — PW Curb Ramp Program INTRODUCTION Dubuque All -America City 2007.2012.2013 2017*2019 The enclosed resolution provides for the acceptance of the Public Improvement Construction Contract for the 2025 ADA Sidewalk Curb Ramp Project One. BACKGROUND The 2025 ADA Sidewalk Curb Ramp Project One provided for the replacement of access curb ramps on Asbury Road from John F. Kennedy Road to Avalon Street in conjunction with the Public Works Asphalt Overlay program at the following locations: • Asbury Road and John F. Kennedy Road, three directional ADA sidewalk curb ramps and one non -directional ADA sidewalk curb ramp. • Asbury Road and Crissy Street, two directional ADA sidewalk curb ramps. • Asbury Road and Evergreen Street, two directional ADA sidewalk curb ramps. • Asbury Road and Woodlawn Street, two directional ADA sidewalk curb ramps. • Asbury Road and Avalon Street, two directional ADA sidewalk curb ramps. DISCUSSION The 2025 ADA Sidewalk Curb Ramp Project One was completed by Midwest Concrete, Inc. of Peosta, Iowa in the final contract amount of $89,477.53 which is a 9.7% increase from the original contract amount of $81,602.58. The added costs incurred were a result of additional work required for traffic control at the intersection of Asbury and JFK, to modify traffic signal conduits and handholes at the Asbury and JFK intersection, and groundwater bypass pumping that was required to construct a deep storm sewer intake structure. RECOMMENDATION I recommend that the City Council accept the Public Improvements and authorize the payment of $89,477.53 to Midwest Concrete, Inc. for the 2025 ADA Sidewalk Curb Ramp Project One. Page 149 of 811 BUDGET IMPACT The final project cost for the 2025 ADA Sidewalk Curb Ramp Project One is summarized in the following table: Description Cost Estimate Award Final Cost Construction Contract $ 96,486.84 $ 81,602.58 $ 89,477.53 Contingency 14,473.03 14,473.03 Engineering Design and Administration 16,643.98 16,643.98 11,165.00 Total Construction Cost 1 $ 127,603.85 $ 112,719.59 $ 100,642.53 The proposed funding for this project is summarized as follows: Project Number Fund Description Fund Amount 5421000002-301-67990 PW Curb Ramp Program $ 95,842.53 5524000006-301-67990 Traffic Signal Conduit Replace 4,800.00 Total Project Funding $ 100,642.53 REQUESTED ACTION The City Council is requested to adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $89,477.53 to Midwest Concrete, Inc. for the 2025 ADA Sidewalk Curb Ramp Project One. Prepared by Robert Schiesl, Assistant City Engineer cc: Gus Psihoyos, City Engineer Jenny Larson, Chief Financial Officer Arielle Swift, Public Works Director Nathan Steffen, Civil Engineer Brian Wulfekuhle, Public Works FA0row\0-Projects\2025Wsphalt Overlay Sidewalk Program\PROJECT ONE\Council & Staff Documents\Acceptance 2 Page 150 of 811 Prepared by Robert Schiesl, Asst City Engineer, City of Dubuque, 50 W. 13th St. Dubuque IA 52001 (563) 589-4270 Return to Adrienne N. Breitfelder, City Clerk, City of Dubuque, 50 W. 13th St. Dubuque IA 52001 (563) 589-4100 RESOLUTION NO. 76-26 ACCEPTING THE 2025 ADA SIDEWALK CURB RAMP PROJECT ONE AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the 2025 ADA Sidewalk Curb Ramp Project One (the Project) provided for the replacement of access curb ramps on Asbury Road from John F. Kennedy Road to Avalon Street in conjunction with the 2025 Public Works Asphalt Overlay program); and WHEREAS, the Public Improvement Contract for the Project has been completed by the contractor, Midwest Concrete, Inc. of Peosta, Iowa (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $89,477.53; and WHEREAS, the Contractor has previously been paid $86,793.21, leaving a retainage balance of $2,684.32; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. SECTION 2. The Chief Financial Officer is hereby directed to pay the balance of the retainage of $2,684.32 as provided in Iowa Code Chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code Chapter 573 or Iowa Chapter 26.13. Passed, approved, and adopted this 16th day of March 2026. c L David T. Resnick, Mayor Pro Tern Attest: aes =� k' Adrienne N. Breitfelde ,'City Clerk CITY ENGINEER CERTIFICATE OF FINAL COMPLETION OF THE 2025 ADA SIDEWALK CURB RAMP PROJECT ONE The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2025 ADA Sidewalk Curb Ramp Project One and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $100,642.54. Dated this 9th day of March 2026. Gus Psihoyos, City Engin er Filed in the office of the City Clerk on the 9th day of March 2026. Adrienne N. Breitfelder, City Clerk Page 152 of 811