Loading...
2026 Catherine Street Storm Sewer Project: Award Public Improvement ContractCity of Dubuque City Council ACTION ITEMS # 2. Copyrighted March 16, 2026 ITEM TITLE: 2026 Catherine Street Storm Sewer Project: Award Public Improvement Contract SUMMARY: City Manager recommending the public improvement contract for the 2026 Catherine Street Storm Sewer Project be awarded to Top Grade Excavating, Inc. for both the Base Bid and Alternate Bid No. 1 in the amount of $232,657.70. RESOLUTION Awarding Public Improvement Contract For The 2026 Catherine Street Storm Sewer Project SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2026 Catherine Street Storm Sewer Project Award PIC 2. 2026 Catherine St Storm Sewer Project - Award Staff MEMO 3. 2026 Catherine St Storm Sewer Project - Award Council RESOLUTION 4. 2026 Catherine Street Storm Sewer Project - Bid Tabulation Results Page 655 of 811 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2026 Catherine Street Storm Sewer Project Award Public Improvement Contract Project No. 5586500002, 5521000012, 5521000018 DATE: March 12, 2026 Dubuque AI WIN av 2007-2012.2013 2017*2019 Assistant City Engineer Robert Schiesl is recommending the public improvement contract for the 2026 Catherine Street Storm Sewer Project be awarded to Top Grade Excavating, Inc. for both the Base Bid and Alternate Bid No. 1 in the amount of $232,657.70. The Base Bid of $188,144.45 is 7.3% below estimate of probable cost. If during construction it is determined in the field that the existing Catherine Street pavement held up adequately as a result of the construction work, and the pavement condition is acceptable, the Alternate Bid No. 1 items could be removed from the contract scope of work. Properties along Catherine Street have experienced flooding during heavy rainfall events. This is partially a result of the underground storm sewer system on Catherine Street being undersized, minimal storm sewer intake catch basins in the street to capture and convey the storm water, along with shallow curb and gutter along the street which overtops with storm water during heavy rainfall events. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer Jenny Larson, Chief Financial Officer Luke Steger, Engineering Technician Laura Bendorf, Budget Manager Page 656 of 811 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Robert Schiesl, Assistant City Engineer SUBJECT: 2026 Catherine Street Storm Sewer Project Award Public Improvement Contract Project No. 5586500002, 5521000012, 5521000018 DATE: March 12, 2026 INTRODUCTION Dubuque M[Amirin ply �ncxy��rnr: i cu �.r 2007-2012.2013 2017*2019 The purpose of this memorandum is to provide the City Council with information related to the recommendation for awarding the Public Improvement Construction Contract for the 2026 Catherine Street Storm Sewer Project. BACKGROUND Properties along Catherine Street have experienced flooding during heavy rainfall events. This is partially a result of the underground storm sewer system on Catherine Street being undersized, minimal storm sewer intake catch basins in the street to capture and convey the storm water, along with shallow curb and gutter along the street which overtops with storm water during heavy rainfall events. DISCUSSION The 2026 Catherine Street Storm Sewer Project will include providing all labor, equipment, and materials to install five (5) new storm sewer intakes, install approximately 375 L.F. of concrete pipe storm sewer, one (1) new manhole, asphalt pavement removal and replacement, concrete curb and gutter removal and replacement, concrete sidewalk removal and replacement. BID RESULTS The City received sealed bids on March 12, 2026, for the 2026 Catherine Street Storm Sewer Project. Top Grade Excavating, Inc. of Farley, IA submitted the low base bid in the amount of $188,114.45 which is 7.3% below the estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Base Bid Alternate Base + Alternate Top Grade Excavating, Inc. $188,114.45 $44,543.25 $232,657.70 Offset Construction, LLC. $216,528.00 $45,072.50 $261,600.50 McDermott Excavating $223,538.00 $47,790.00 $271,328.00 Tschiggfrie Excavating Co. $225,543.40 $48,052.50 $273,595.50 Eastern Iowa Excavating & Concrete, LLC. $228,967.50 $46,977.75 $275,945.25 Connolly Construction, Inc. $268,076.20 $54,891.75 $322,967.95 Page 1 of 2 Page 657 of 811 ALTERNATE BID NO. 1 As part of the project, the bid documents included Alternate Bid No. 1 to remove and replace all the asphalt pavement on Catherine Street, between 16t" to 171" Street. The base bid includes placing asphalt patches to restore the pavement areas disturbed due to the underground utility construction work. Staff believe it is warranted to evaluate the cost difference between providing numerous street patching versus the removal and replacement of the entire street pavement. Additionally, staff is uncertain on how the existing pavement on Catherine Street will hold up during construction and the heavy equipment operating during construction. Alternate Bid No. 1 provides a contingency plan if necessary. RECOMMENDATION I recommend that the public improvement contract for the 2026 Catherine Street Storm Sewer Project be awarded to Top Grade Excavating, Inc. for both the Base Bid and Alternate Bid No. 1 in the amount of $232,657.70. If during construction it is determined in the field that the existing Catherine Street pavement held up adequately as a result of the construction work, and the pavement condition is acceptable, the Alternate Bid No. 1 items could be removed from the contract scope of work. BUDGETIMPACT The estimate of probable cost for the 2026 Catherine Street Storm Sewer Project is summarized in the following table: PROJECT COSTS ESTIMATE AWARD Construction Contract + Alternate Bid No. 1 $ 250,000.00 $ 232,657.70 Contingency 25,000.00 25,000.00 Engineering Design and Administration 13,750.00 13,750.00 Total Project Cost $ 288,750.00 $ 271,407.70 The proposed funding for the project is summarized in the following table: Project Number Fund Description Fund Amount 5586500002 Catch Basin Reconstruction $ 50,000.00 5521000012 General Street Construction Repairs 50,000.00 5521000018 Pavement Rehabilitation 171,407.70 Total Construction Project Funding $ 271,407.70 ACTION TO BE TAKEN I respectfully request that the City Council award the Public Improvement Construction Contract for the 2026 Catherine Street Storm Sewer Project to Top Grade Excavating, Inc. in the amount of $232,657.70 through adoption of the attached resolution. Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Chief Financial Officer Luke Steger, Engineering Technician F:\PROJECTS\Storm\Catherine Street\Council & Staff Documents\Award Page 2 of 2 Page 658 of 811 Prepared by Robert Schiesl, Assistant City Engineer, City of Dubuque, 50 W. 13th St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 92-26 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE 2026 CATHERINE STREET STORM SEWER PROJECT WHEREAS, sealed proposals have been submitted by contractors for the 2026 Catherine Street Storm Sewer Project, (the Project) pursuant to Resolution No. 44-26 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 20th day of February 2026; and WHEREAS, said sealed bid proposals were opened and read on the 12th day of March 2026 and it has been determined that Top Grade Excavating, Inc. of Farley, IA, in the Base Bid and Alternate Bid No. 1 amount of $232,657.70, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. That a Public Improvement Contract for the Project is hereby awarded to Top Grade Excavating, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved, and adopted this 16th day of March 2026. Attest: Adrienne Breitfelder, CM City Clerk avid T. Resnick, Mayor Pro Tern THE CHY OF DT T� City of Dubuque, Iowa V Bid Tabulation Masterpiece on the Mississippi Project Title: 2026 Catherine 5t. Storm Sewer Project Bid Date Engineer's Esti 12-Mar-26mate LINE REFERENCE BID ITEM DESCRIPTION PLAN UNIT ESTIMATED TOTAL PRICE NO. NUMBER QUANTITY UNIT PRICE 1 2010-108-C-0 Division 2010 - Earthwork, Subgrade, and Subbase Clearing and Grubbing C 1.00 LS $ 600.00 $ 600.00 2 2010-108-D-0 Topsoil, Off -Site 18.00 CY $ 75.00 $ 1,350.00 3 2010-108-E-0 Excavation, Class 13 90.00 CY $ 24.00 $ 2,160.00 4 2010-108J-0 Subbase, Modified Subbase - Gr 14 (Modified Subbase Pile) 162.00 TON $ 23.00 $ 3,726.00 5 2010-108-K-1 Removal of Structure 3.00 EA $ 525.00 $ 1,575.00 6 3010-108-13-0 Division 3010 - Trench Excavation and Backfill Rock Excavation 20.00 CY Sub Total $ 50.00 17 $ 9,411.00 1,000.00 7 3010-108-D-0 Replacement of Unsuitable Backfill Material, Gr 32, (Modified Subbase Pile) 1210.00 TON $ 24.00 $ 29,040.00 8 3010-108-G-0 Class I, Bedding Material, 1" Commercial Clean Stone 240.00 TON $ 24.00 $ 5,760.00 9 4020-108-A-1 Division 4020 - Storm Sewers Storm Sewer Gravity Main, Trenched, 15' RCP 80.00 LF Sub Total $ 75.00 $ $ 35,800.00 6,000.00 10 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 18" RCP 87.00 LF $ 70.00 $ 6,090.00 11 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 30" RCP 176.00 LF $ 130.00 $ 22,880.00 12 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 24" PVC 32.00 LF $ 190.00 $ 6,080.00 13 4020-108-D-0 Removal of Storm Sewer, 24" RCP 198.00 LF $ 20.00 $ 3,960.00 14 4020-108-E-2 Concrete Collar Pipe Connection - Type PC-2 1.00 EA $ 950.00 $ 950.00 15 SP- See C.01 Storm Sewer Structure Modifications 1.00 ALLOWANCE $ 10,000.00 $ 10,000.00 Sub Total $ 55,960.00 Top Grade Excavating, Inc BID TOTAL PRICE UNIT PRICE $ 100.00 $ 100.00 $ 44.00 $ 792.00 $ 18.00 $ 1,620.00 $ 18.50 $ 2,997.00 $ 500.00 $ 1,500.00 Sub Total $ 7,009.00 Offset Construction, LLC BID TOTAL PRICE UNIT PRICE $ 11000.00 $ 11000.00 $ 113.00 $ 2,034.00 $ 1900. $ 1,710.00 $ 23.00 $ 3,726.00 $ 400.00 $ 1,200.00 Sub Total $ 9,670.00 McDermott Excavating BID TOTAL PRICE UNIT PRICE $ 100.00 $ 100.00 $ 110.00 $ 1,980.00 $ 30.00 $ 2,700.00 $ 28.00 $ 4,536.00 $ 550.00 $ 1,650.00 Sub Total $ 10,966.00 $ 2.50 $ 50.00 $ 10.00 $ 200.00 $ 120.00 $ 2,400.00 $ 17.00 $ 20,570.00 $ 29.00 $ 35,090.00 $ 28.00 $ 33,880.00 $ 22.50 $ 5,400.00 $ 22.00 $ 5,280.00 $ 26.00 $ 6,240.00 Sub Total $ 26,020.00 Sub Total $ 40,570.00 Sub Total $ 42,520.00 $ 85.00 $ 6,800.00 $ 87.50 $ 7,612.50 $ 138.00 $ 24,288.00 $ 202.00 $ 6,464.00 $ 16.50 $ 3,267.00 $ 850.00 $ 850.00 $ 10,000.00 $ 10,000.00 Sub Total $ 59,281.50 $ 44.00 $ 3,520.00 $ 46.00 $ 4,002.00 $ 110.00 $ 19,360.00 $ 130.00 $ 4,160.00 $ 3.00 $ 594.00 $ 750.00 $ 750.00 $ 10,000.00 $ 10,000.00 Sub Total $ 42,386.00 $ 77.00 $ 6,160.00 $ 83.00 $ 7,221.00 $ 149.50 $ 26,312.00 $ 175.00 $ 51600.00 $ 16.00 $ 3,168.00 $ 1,600.00 $ 1,600.00 $ 10,000.00 $ 10,000.00 Sub Total $ 60,061.00 Division 4040 - Subdrains and Footing Drain Collectors 16 4040-108-A-0 Subdrain, 6" Perforated 65.00 LF $ 2000. $ 1,300.00 $ 26.00 $ 1,690.00 $ 10.00 $ 650.00 $ 15.00 $ 975.00 Sub Total $ 1,300.00 Sub Total $ 1,690.00 Sub Total $ 650.00 Sub Total $ 975.00 Division 4050 - Pipe Rehabilitation 17 4050-108-G-0 Bypass Pumping 10.00 DAY $ 250.00 $ 2,500.00 $ 30.00 $ 300.00 $ 1,200.00 $ 12,000.00 $ 725.00 $ 7,250.00 Sub Total 17 2,500.00 Sub Total $ 300.00 Sub Total $ 12,000.00 Sub Total $ 7,250.00 Division 6010 - Structures for Sanitary and Storm Sewers 18 6010-108-A-0 Manhole Type, 60" SW-401 8.00 VF $ 1,000.00 $ 8,000.00 $ 928.00 $ 7,424.00 19 6010-108-13-0 Intake Type, SW-501 16.30 VF $ 1,200.00 $ 19,560.00 $ 1,120.00 $ 18,256.00 20 6010-108-13-0 Intake Type, SW-503 6.05 VF $ 750.00 $ 4,537.50 $ 579.00 $ 3,502.95 21 6010-108-G-3 Concrete Collar Structure Connection - Pipes Greater than 12" Diameter 1.00 EA $ 750.00 $ 750.00 $ 801.00 $ 801.00 Sub Total $ 32,847.50 Sub Total $ 29,983.95 Division 7010 - Portland Cement Concrete Pavement 22 7010-108-E-0 Curb and Gutter, 30" (Width), 6" (Thickness) 310.00 LF $ 40.00 $ 12,400.00 $ 41.00 $ 12,710.00 Sub Total $ 12,400.00 Sub Total $ 12,710.00 Division 7030 - Sidewalks, Shared Use Paths, and Driveways 23 7030-108-A-1 Removal of Sidewalk 92.00 SY $ 15.00 $ 1,380.00 $ 15.00 $ 1,380.00 24 7030-108-A-3 Removal of Driveway 13.00 SY $ 20.00 $ 260.00 $ 13.00 $ 169.00 25 7030-108-E-0 PCC, Sidewalk, 4" (Thickness) 92.00 SY $ 65.00 $ 5,980.00 $ 61.00 $ 5,612.00 26 7030-108-E-0 PCC, Sidewalk, 6" (Thickness) 6.00 SY $ 100.00 $ 600.00 $ 91.00 $ 546.00 27 7030-108-G-0 Detectable Warning 18.00 SF $ 55.00 $ 990.00 $ 51.00 $ 918.00 28 7030-108-H-1 Driveway, Paved, PCC, 6" (Thickness) 13.00 SY $ 115.00 $ 1,495.00 $ 150.00 $ 1,950.00 Sub Total $ 10,705.00 Sub Total $ 10,575.00 Division 7040 - Pavement Rehabilitation 29 7040-108-A-0 Full Depth Patches HMA, 6" (Thickness) 300.00 SY $ 70.00 $ 21,000.00 $ 58.50 $ 17,550.00 30 7040-108-1-0 Curb and Gutter - Removal 310.00 LF $ 7.00 $ 2,170.00 $ 10.00 $ 3,100.00 Sub Total $ 23,170.00 Sub Total $ 20,650.00 Division 8030 - Temporary Traffic Control 31 8010-108-A-0 Traffic Control 1.00 LS $ 6,000.00 $ 6,000.00 $ 5,400.00 $ 5,400.00 Sub Total 17 6,000.00 Sub Total $ 5,400.00 Division 8040 - Signing Materials 32 8040-108-1-0 Remove and Reinstall Traffic Signs 3.00 EA $ 100.00 $ 300.00 $ 150.00 $ 450.00 Sub Total $ 300.00 Sub Total $ 450.00 Division 9010 - Seeding 33 9010-108-B-0 Hydraulic - Seeding, Fertilizing, and Mulching, Type 1, by SF 2600.00 SF $ 1.50 $ 3,900.00 $ 1.25 $ 3,250.00 Sub Total $ 3,900.00 Sub Total $ 3,250.00 $ 900.00 $ 7,200.00 $ 1,100.00 $ 17,930.00 $ 1,250.00 $ 7,562.50 $ 750.00 $ 750.00 Sub Total $ 33,442.50 $ 36.50 $ 11,315.00 Sub Total $ 11,315.00 $ 4.00 $ 368.00 $ 4.00 $ 52.00 $ 67.50 $ 6,210.00 $ 150.00 $ 900.00 $ 67.00 $ 1,206.00 $ 122.00 $ 1,586.00 Sub Total $ 10,322.00 $ 90.00 $ 27,000.00 $ 2.25 $ 697.50 Sub Total $ 27,697.50 $ 5,550.00 $ 5,550.00 Sub Total $ 5,550.00 $ 155.00 $ 465.00 Sub Total $ 465.00 $ 1.30 $ 3,380.00 Sub Total $ 3,380.00 $ 815.00 $ 6,520.00 $ 11100.00 $ 17,930.00 $ 1,200.00 $ 7,260.00 $ 2,100.00 $ 2,100.00 Sub Total $ 33,810.00 $ 36.75 $ 11,392.50 Sub Total $ 11,392.50 $ 7.00 $ 644.00 $ 30.00 $ 390.00 $ 68.25 $ 6,279.00 $ 73.50 $ 441.00 $ 30.50 $ 549.00 $ 73.50 $ 955.50 Sub Total $ 9,258.50 $ 73.25 $ 21,975.00 $ 3.00 $ 930.00 Sub Total $ 22,905.00 $ 6,500.00 $ 6,500.00 Sub Total $ 6,500.00 $ 200.00 $ 600.00 Sub Total $ 600.00 $ 1.00 $ 2,600.00 Sub Total $ 2,600.00 PAGE 1 of 4 Page 660 of 811 THE CTl'Y OF DT T'B T..I City of Dubuque, Iowa v L Bid Tabulation Masterpiece on the Mississippi Project Title: 2026 Catherine St. Storm Sewer Project F Bid Date Engineer's Estimate Top Grade Excavating, Inc Offset Construction, LLC McDermott Excavating 12-Mar-26 Division 9040 - Erosion and Sediment Control 34 9040-108-D-1 Filter Socks, 8" 400.00 LF $ 2.75 $ 1,100.00 $ 2.50 $ 1,000.00 $ 2.50 $ 1,000.00 $ 4.00 $ 1,600.00 35 9040-108-D-2 Filter Socks, Removal 400.00 LF $ 0.25 $ 100.00 $ 0.20 $ 80.00 $ 0.20 $ 80.00 $ 1.00 $ 400.00 Sub Total $ 1,200.00 Sub Total $ 1,080.00 Sub Total $ 1,080.00 Sub Total $ 2,000.00 Division 11020 - Mobilization 36 11020-108-A-0 Mobilization 1.00 LS $ 7,500.00 $ 7,500.00 $ 9,715.00 $ 9,715.00 $ 18,000.00 $ 18,000.00 $ 12,700.00 $ 12,700.00 Sub Total $ 7,500.00 Sub Total $ 9,715.00 Sub Total $ 18,000.00 Sub Total $ 12,700.00 Base Bid $ 202,993.50 Base Bid $ 188,114.45 Base Bid $ 216,528.00 Base Bid $ 223,538.00 Engineer's Eslimale Top Grade Excavating, Inc Offset Constroction, LLC McDermott Excavating Alternate Bid Items ITEM NUMBER BID ITEM DESCRIPTION UNI7 TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE NOE QUANTITY UNIT PRICE UNIT PRICE UNIT PRICE UNIT PRICE Division 2010 - Earthwork, Subgrade, and Subbase A-37 2010-108-E-0 Excavation, Class 13 180.00 CY $ 24.00 $ 4,320.00 $ 15.00 $ 2,700.00 $ 1900. $ 3,420.00 $ 30.00 $ 5,400.00 A-38 2010-108J-0 Subbase, Modified Subbase - Gr 14 (Modified Subbase Pile) 330.00 TON $ 23.00 $ 7,590.00 $ 18.50 $ 6,105.00 $ 23.00 $ 7,590.00 $ 28.00 $ 9,240.00 Sub Total $ 11,910.00 Sub Total $ 8,805.00 Sub Total $ 11,010.00 Sub Total $ 14,640.00 Division 7020 - Asphalt Pavement A-39 7020-108-A-0 Asphalt Pavement by Ton, 6" (Thickness) 255.00 TON $ 120.00 $ 30,600.00 $ 114.95 $ 29,312.25 $ 118.00 $ 30,090.00 $ 118.00 $ 30,090.00 A-40 7040-108-H-0 Pavement - Removal 765.00 SY $ 6.00 $ 4,590.00 $ 8.40 $ 6,426.00 $ 6.50 $ 4,972.50 $ 4.00 $ 3,060.00 Sub Total $ 35,190.00 Sub Total $ 35,738.25 Sub Total $ 35,062.50 Sub Total $ 33,150.00 Alternate Bid $ 47,100.00 Alternate Bid $ 44,543.25 Alternate Bid $ 46,072.50 Alternate Bid $ 47,790.00 Total Base Bid Amount $ 202,993.50 $ 188,114.45 $ 216,528.00 $ 223,538.00 % Over / Under (-) -7.3% % Over /Under (-) 6.67% % Over / Under (-) 10.12% Total Base Bid + Alternate Bid Amount $ 250,093.50 $ 232,657.70 $ 262,600.50 $ 271,328.00 % Over /Under(-) -7.0% % Over /Under (-) 5.00% % Over / Under (-) 8.49% PAGE 2 of 4 Page 661 of 811 THE CHY OF DT T� City of Dubuque, Iowa V Bid Tabulation Masterpiece on the Mississippi Project Title: 2026 Catherine St. Storm Sewer Project Bid Date Engineer's Esti 12-Mar-26mate LINE REFERENCE BID ITEM DEBCRIPTION PLAN UNIT ESTIMATED TOTAL PRICE NO. NUMBER QUANTITY UNIT PRICE 1 2010-108-C-0 Division 2010 - Earthwork, Subgrade, and Subbase Clearing and Grubbing C 1.00 LS $ 600.00 $ 600.00 2 2010-108-D-0 Topsoil, Off -Site 18.00 CY $ 75.00 $ 1,350.00 3 2010-108-E-0 Excavation, Class 13 90.00 CY $ 24.00 $ 2,160.00 4 2010-108J-0 Subbase, Modified Subbase - Gr 14 (Modified Subbase Pile) 162.00 TON $ 23.00 $ 3,726.00 5 2010-108-K-1 Removal of Structure 3.00 EA $ 525.00 $ 1,575.00 6 3010-108-B-0 Division 3010 - Trench Excavation and Backfill Rock Excavation 20.00 CY Sub Total $ 50.00 $ $ 9,411.00 11000.00 7 3010-108-D-0 Replacement of Unsuitable Backfill Material, Gr 32, (Modified Subbase Pile) 1210.00 TON $ 24.00 $ 29,040.00 8 3010-108-G-0 Class I, Bedding Material, 1" Commercial Clean Stone 240.00 TON $ 24.00 $ 5,760.00 9 4020-108-A-1 Division 4020 - Storm Sewers Storm Sewer Gravity Main, Trenched, 15' RCP 80.00 LF Sub Total $ 75.00 $ $ 35,800.00 6,000.00 10 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 18" RCP 87.00 LF $ 70.00 $ 6,090.00 11 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 30" RCP 176.00 LF $ 130.00 $ 22,880.00 12 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 24" PVC 32.00 LF $ 190.00 $ 6,080.00 13 4020-108-D-0 Removal of Storm Sewer, 24" RCP 198.00 LF $ 20.00 $ 3,960.00 14 4020-108-E-2 Concrete Collar Pipe Connection - Type PC-2 1.00 EA $ 950.00 $ 950.00 15 SP- See C.01 Storm Sewer Structure Modifications 1.00 ALLOWANCE $ 10,000.00 $ 10,000.00 Sub Total $ 55,960.00 Tschiggfrie Excavating Co. BID TOTAL PRICE UNIT PRICE $ 520.00 $ 520.00 $ 40.00 $ 720.00 $ 37.00 $ 3,330.00 $ 27.00 $ 4,374.00 $ 680.00 $ 2,040.00 Sub Total $ 10,984.00 Eastern Iowa Excavating & Concrete, LLC BID TOTAL PRICE UNIT PRICE $ 525.00 $ 525.00 $ 122.25 $ 2,200.50 $ 59.50 $ 5,355.00 $ 25.25 $ 4,090.50 $ 700.00 $ 2,100.00 Sub Total $ 14,271.00 Connolly Construction Inc. BID TOTAL PRICE UNIT PRICE $ 1,600.00 $ 1,600.00 $ 56.75 $ 1,021.50 $ 33.00 $ 2,970.00 $ 24.75 $ 4,009.50 $ 1,975.00 $ 5,925.00 Sub Total $ 15,526.00 $ 120.00 $ 2,400.00 $ 100.00 $ 2,000.00 $ 100.00 $ 2,000.00 $ 23.00 $ 27,830.00 $ 18.85 $ 22,808.50 $ 31.50 $ 38,115.00 $ 27.00 $ 6,480.00 $ 24.25 $ 5,820.00 $ 22.65 $ 5,436.00 Sub Total $ 36,710.00 Sub Total $ 30,628.50 Sub Total $ 45,551.00 $ 56.00 $ 4,480.00 $ 59.00 $ 5,133.00 $ 110.00 $ 19,360.00 $ 180.00 $ 5,760.00 $ 11.00 $ 2,178.00 $ 800.00 $ 800.00 $ 10,000.00 $ 10,000.00 Sub Total $ 47,711.00 $ 92.75 $ 7,420.00 $ 57.25 $ 4,980.75 $ 130.00 $ 22,880.00 $ 237.00 $ 7,584.00 $ 47.50 $ 9,405.00 $ 1,000.00 $ 1,000.00 $ 10,000.00 $ 10,000.00 Sub Total $ 63,269.75 $ 89.00 $ 7,120.00 $ 85.00 $ 7,395.00 $ 140.00 $ 24,640.00 $ 192.00 $ 6,144.00 $ 18.25 $ 3,613.50 $ 650.00 $ 650.00 $ 10,000.00 $ 10,000.00 Sub Total $ 59,562.50 Division 4040 - Subdrains and Footing Drain Collectors 16 4040-108-A-0 Subdrain, 6" Perforated 65.00 LF $ 2000. $ 1,300.00 $ 35.00 $ 2,275.00 $ 23.00 $ 1,495.00 $ 33.00 $ 2,145.00 Sub Total $ 1,300.00 Sub Total $ 2,275.00 Sub Total $ 1,495.00 Sub Total $ 2,145.00 Division 4050 - Pipe Rehabilitation 17 4050-108-G-0 Bypass Pumping 10.00 DAY $ 250.00 $ 2,500.00 $ 560.00 $ 5,600.00 $ 1,125.00 $ 11,250.00 $ 650.00 $ 6,500.00 Sub Total $ 2,500.00 Sub Total $ 5,600.00 Sub Total $ 11,250.00 Sub Total $ 6,500.00 Division 6010 - Structures for Sanitary and Storm Sewers 18 6010-108-A-0 Manhole Type, 60" SW-401 8.00 VF $ 1,000.00 $ 8,000.00 19 6010-108-13-0 Intake Type, SW-501 16.30 VF $ 1,200.00 $ 19,560.00 20 6010-108-13-0 Intake Type, SW-503 6.05 VF $ 750.00 $ 4,537.50 21 6010-108-G-3 Concrete Collar Structure Connection -Pipes Greater than 12" Diameter 1.00 EA $ 750.00 $ 750.00 Sub Total $ 32,847.50 $ 1,100.00 $ 8,800.00 $ 1,600.00 $ 26,080.00 $ 1,900.00 $ 11,495.00 $ 1,100.00 $ 1,100.00 Sub Total $ 47,475.00 Division 7010 - Portland Cement Concrete Pavement 22 7010-108-E-0 Curb and Gutter, 30" (Width), 6" (Thickness) 310.00 LF $ 40.00 $ 12,400.00 $ 41.00 $ 12,710.00 Sub Total $ 12,400.00 Sub Total $ 12,710.00 Division 7030 - Sidewalks, Shared Use Paths, and Driveways 23 7030-108-A-1 Removal of Sidewalk 92.00 SY $ 15.00 $ 1,380.00 24 7030-108-A-3 Removal of Driveway 13.00 SY $ 20.00 $ 260.00 25 7030-108-E-0 PCC, Sidewalk, 4" (Thickness) 92.00 SY $ 65.00 $ 5,980.00 26 7030-108-E-0 PCC, Sidewalk, 6" (Thickness) 6.00 SY $ 100.00 $ 600.00 27 7030-108-G-0 Detectable Warning 18.00 SF $ 55.00 $ 990.00 28 7030-108-H-1 Driveway, Paved, PCC, 6" (Thickness) 13.00 SY $ 115.00 $ 1,495.00 Sub Total $ 10,705.00 $ 9.70 $ 892.40 $ 21.00 $ 273.00 $ 67.00 $ 6,164.00 $ 86.00 $ 516.00 $ 48.00 $ 864.00 $ 63.00 $ 819.00 Sub Total $ 9,528.40 Division 7040 - Pavement Rehabilitation 29 7040-108-A-0 Full Depth Patches HMA, 6" (Thickness) 300.00 SY $ 70.00 $ 21,000.00 $ 85.00 $ 25,500.00 30 7040-108-1-0 Curb and Gutter - Removal 310.00 LF $ 7.00 $ 2,170.00 $ 4.60 $ 1,426.00 Sub Total $ 23,170.00 Sub Total $ 26,926.00 Division 8030 - Temporary Traffic Control 31 8010-108-A-0 Traffic Control 1.00 LS $ 6,000.00 $ 6,000.00 Sub Total 17 6,000.00 Division 8040 - Signing Materials 32 8040-108-1-0 Remove and Reinstall Traffic Signs 3.00 EA Division 9010 - Seeding 33 9010-108-13-0 Hydraulic - Seeding, Fertilizing, and Mulching, Type 1, by SF 2600.00 SF $ 5,800.00 $ 5,800.00 Sub Total $ 5,800.00 $ 100.00 $ 300.00 $ 160.00 $ 480.00 Sub Total $ 300.00 Sub Total $ 480.00 $ 1.50 $ 3,900.00 $ 1.30 $ 3,380.00 Sub Total $ 3,900.00 Sub Total $ 3,380.00 $ 1,125.00 $ 9,000.00 $ 875.00 $ 14,262.50 $ 1,165.00 $ 7,048.25 $ 1,200.00 $ 1,200.00 Sub Total $ 31,510.75 $ 37.00 $ 11,470.00 Sub Total $ 11,470.00 $ 15.00 $ 1,380.00 $ 33.50 $ 435.50 $ 69.00 $ 6,348.00 $ 135.00 $ 810.00 $ 59.50 $ 1,071.00 $ 106.00 $ 1,378.00 Sub Total $ 11,422.50 $ 96.00 $ 28,800.00 $ 14.00 $ 4,340.00 Sub Total $ 33,140.00 $ 5,800.00 $ 5,800.00 Sub Total $ 5,800.00 $ 160.00 $ 480.00 Sub Total $ 480.00 $ 0.65 $ 1,690.00 Sub Total $ 1,690.00 $ 1,145.00 $ 9,160.00 $ 2,550.00 $ 41,565.00 $ 1,750.00 $ 10,587.50 $ 865.00 $ 865.00 Sub Total $ 62,177.50 $ 51.00 $ 15,810.00 Sub Total $ 15,810.00 $ 23.35 $ 2,148.20 $ 36.00 $ 468.00 $ 80.50 $ 7,406.00 $ 203.50 $ 1,221.00 $ 44.50 $ 801.00 $ 150.00 $ 1,950.00 Sub Total $ 13,994.20 $ 67.00 $ 20,100.00 $ 5.00 $ 1,550.00 Sub Total $ 21,650.00 $ 7,500.00 $ 7,500.00 Sub Total $ 7,500.00 $ 250.00 $ 750.00 Sub Total $ 750.00 $ 1.25 $ 3,250.00 Sub Total $ 3,250.00 PAGE 3 of 4 Page 662 of 811 THE CHY OF DT T'B T..I City of Dubuque, Iowa v L Bid Tabulation Masterpiece on the Mississippi Project Title: 2026 Catherine St. Storm Sewer Project Bid Date Engineer's Estimate Tschiggfrie Excavating Co. Eastern Iowa Excavating 8 Connolly Construction Inc. 12-Mar-26 I Concrete, LLC Division 9040 - Erosion and Sediment Control 34 9040-108-D-1 Filter Socks, 8" 400.00 LF $ 2.75 $ 1,100.00 $ 2.70 $ 1,080.00 $ 2.75 $ 1,100.00 $ 5.65 $ 2,260.00 35 9040-108-D-2 Filter Socks, Removal 400.00 LF $ 0.25 $ 100.00 $ 0.21 $ 84.00 $ 1.10 $ 440.00 $ 1.00 $ 400.00 Sub Total $ 1,200.00 Sub Total $ 1,164.00 Sub Total $ 1,540.00 Sub Total $ 2,660.00 Division 11020 - Mobilization 36 11020-108-A-0 Mobilization 1.00 LS $ 7,500.00 $ 7,500.00 $ 14,800.00 $ 14,800.00 $ 11,000.00 $ 11,000.00 $ 11,000.00 $ 11,000.00 Sub Total $ 7,500.00 Sub Total $ 14,800.00 Sub Total $ 11,000.00 Sub Total $ 11,000.00 Base Bid $ 202,993.50 Base Bid $ 225,543.40 Base Bid $ 228,967.50 Base Bid $ 268,076.20 Engineer's Estimate Tschiggfrie Excavating Co. Eastern Iowa Excavating & Connolly Construction Inc. Alternate Bid Items Concrete, LLC ITEM NUMBER BID ITEM DESCRIPTION UNI7 TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE NOE QUANTITY UNIT PRICE UNIT PRICE UNIT PRICE UNIT PRICE Division 2010 - Earthwork, Subgrade, and Subbase A-37 2010-108-E-0 Excavation, Class 13 180.00 CY $ 24.00 $ 4,320.00 $ 3200. $ 5,760.00 $ 18.75 $ 3,375.00 $ 34.60 $ 6,228.00 A-38 2010-108J-0 Subbase, Modified Subbase - Gr 14 (Modified Subbase Pile) 330.00 TON $ 23.00 $ 7,590.00 $ 25.00 $ 8,250.00 $ 18.50 $ 6,105.00 $ 27.50 $ 9,075.00 Sub Total $ 11,910.00 Sub Total $ 14,010.00 Sub Total $ 9,480.00 Sub Total $ 15,303.00 Division 7020 - Asphalt Pavement A-39 7020-108-A-0 Asphalt Pavement by Ton, 6" (Thickness) 255.00 TON $ 120.00 $ 30,600.00 $ 120.00 $ 30,600.00 $ 125.00 $ 31,875.00 $ 131.25 $ 33,468.75 A-40 7040-108-H-0 Pavement - Removal 765.00 SY $ 6.00 $ 4,590.00 $ 4.50 $ 3,442.50 $ 7.35 $ 5,622.75 $ 8.00 $ 6,120.00 Sub Total $ 35,190.00 Sub Total $ 34,042.50 Sub Total $ 37,497.75 Sub Total $ 39,588.75 Alternate Bid $ 47,100.00 Alternate Bid $ 48,052.50 Alternate Bid $ 46,977.75 Alternate Bid $ 54,891.75 Total Base Bid Amount $ 202,993.50 $ 225,543.40 $ 228,967.50 $ 268,076.20 % Over / Under (-) 11.11% % Over /Under (-) 12.80% % Over / Under (-) 32.06% Total Base Bid + Alternate Bid Amount $ 250,093.50 $ 273,595.90 $ 275,945.25 $ 322,967.95 %Over l Untler(-) 9.40% % Over /Under (-) 10.34% % Over / Under (-) 29.14% PAGE 4 of 4 Page 663 of 811