Bee Branch Trail Project - Phase 3 (12th to 9th Street) Concurrence to Initiate Public Bidding Process through Iowa DOT Project Copyrighted
May 4, 2026
City of Dubuque ITEMS SET FOR PUBLIC HEARING # 2.
City Council
ITEM TITLE: Bee Branch Trail Project - Phase 3 (12th to 9th Street)
Concurrence to Initiate Public Bidding Process through lowa
DOT Project
SUMMARY: City Manager recommending City Council concurrence with
initiating the public bidding procedure through the lowa DOT
and set May 18, 2026, as the date for a public hearing on the
Bee Branch Creek Trail Project - Phase 3 Project.
RESOLUTION Bee Branch Creek Trail Project— Phase 3,
lowa Dot Tap-U-2100(711)-8i-31, Preliminary Approval of
Plans, Specifications, Form of Contract, And Estimated Cost;
Setting Date of Public Hearing on Plans, Specifications, Form
of Contract, And Estimated Cost; and Ordering the
Advertisement of Bids
SUGGUESTED Receive and File; Adopt Resolution(s), Set Public Hearing for
DISPOSITION: May 18, 2026
ATTACHMENTS:
1. MVM Memo Bee Branch Trail Project - Phase 3 (12th to 9th Street) Concurrence to
Initiate Publid Bidding IDOT
2. Bee Branch Trail Phase 3 (711) - Initiate Set PH Staff Memo
3. Bee Branch Trail Phase 3- Council Initiate Set PH RESOLUTION
4. Bee Branch Trail Phase 3 - Notice of Public Hearing
5. Bee Branch Trail Project Phase 3 (711) - Location Exhibit
Page 277 of 668
Dubuque
THE CITY OF �
uhA�eMa cin
DuB E ; . � ,
I � � I.
Maste iece on the Mississi t 2oo�•zoiz•zois
�P Pp zoi�*zoi9
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Bee Branch Trail Project - Phase 3 (12th to 9th Street)
Concurrence to Initiate Public Bidding Process thru lowa DOT and Setting
Date for a Public Hearing
(lowa DOT Project Number TAP-U-2100--(711)-81-31)
DATE: April 24, 2026
City Engineer Gus Psihoyos is recommending City Council concurrence with initiating
the public bidding procedure through the lowa DOT and set May 18, 2026, as the date
for a public hearing on the Bee Branch Creek Trail Project - Phase 3 Project.
The project will include the construction of a 10' wide mixed-use PCC concrete trail from
along Pine Street from E. 11t" Street to E. 9t" Street, with on-street bike lane
connectivity on E. 9th Street and E. 11t" Street. The project will include the following:
- 943 LF of PCC Concrete Trail
- 1,400 LF of On-Street Bike Lanes
- Rectangular Rapid Flashing Beacon (RRFB) Crosswalk on E. 11t" Street
I concur with the recommendation and respectfully request Mayor and City Council
approval.
v
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Justine Hull, Traffic Engineer
Bob Schiesl, Asst City Engineer
Nathan Steffen, Civil Engineer
John Krayer, Civil Engineer
Adam Decker, Engineering Design Technician
Page 278 of 668
Dubuque
THE CITY OF �
All•Merioa Ciry
D V L L xn�xai�n
� I �,����
� �
Maste iece on the Mississi i zoa��zolz'2013
rP pp zoi��zoi9
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
DATE: April 24, 2026
RE: Bee Branch Trail Project - Phase 3 (12t" to 9th Street)
Concurrence to Initiate Public Bidding Process thru lowa DOT and Setting
Date for a Public Hearing
(lowa DOT Project Number TAP-U-2100--(711)-81-31)
INTRODUCTION
The purpose of this memorandum is to provide the City Council with information related
to the Bee Branch Creek Trail Project — Phase 3 Project, lowa DOT Project No. TAP-U-
2100(711) --81-31 and request concurrence to initiate the public bidding procedure and
set a public hearing for May 18, 2026.
BACKGROUND
This project was originally bid to include bicycle and pedestrian connectivity along Pine
Street from the Lower Bee Branch Trail located at 12th Street, southward towards E. 11tn
Street, along Pine Street, with bike lane connections on both E. 11t" Street and E. gtn
Street. Engineering has solicited bids through the lowa DOT for the project for May 19,
2026.
During the development of the original bid documents, Engineering staff developed in-
house concepts where the trail would connect from 12t" Street and use green space on
between the northbound on-ramp for US 151/61 and Tucker Freight's property to allow
a crossing on E. 11t" Street to the upgraded mixed-used trail along Pine Street. Some
considerations for cyclists traveling westbound on E. 11th Street for crossing the on-
ramp was finalized with lowa DOT staff.
During the design process, coordination with the lowa DOT identified the need to
accommodate the planned reconstruction of the Pine Street and E. 9th Street/Kerper
Boulevard intersection. To avoid future removal of newly constructed improvements, the
trail design has been adjusted accordingly. As a result, bicycle connectivity through this
area will be provided via an on-street lane extending from the intersection to the limits of
the future reconstruction project.
DISCUSSION
Engineering staff worked in-house to create this trail connection while working diligently
with the lowa DOT.
The project will include the construction of a 10' wide mixed-use PCC concrete trail from
along Pine Street from E. 11th Street to E. 9th Street, with on-street bike lane
connectivity on E. 9t" Street and E. 11t" Street. The project will include the following:
1
Page 279 of 668
- 943 LF of PCC Concrete Trail
- 1,400 LF of On-Street Bike Lanes
- Rectangular Rapid Flashing Beacon (RRFB) Crosswalk on E. 11t" Street
PROJECT SCHEDULE
The schedule for the Bee Branch Creek Trail Phase I II Project is as follows:
lowa DOT Advertisement for Bids May 1, 2026
City Initiate Concurrence in Public Bidding Process May 4, 2026
City Publish Public Hearing Notice on Plans & Specs May 8, 2026
City Public Hearing on Plans & Specifications May 18, 2026
lowa DOT Receipt of Bids Proposals (Bid Letting) May 19, 2026
City Award Construction Contract (Subject to IDOT Approval) June 1, 2026
lowa DOT Late Start Date July 1, 2026
Contract Completion Date 30-60 Working Days
The project will be let by the lowa DOT and will be constructed on a working day
contract. The number of working days will be defined by the Office of Contracts at the
lowa DOT in Ames, IA.
BUDGET IMPACT
The original estimate prior to bidding for the Bee Branch Creek Trail Project — Phase 3
Project are as follows:
Description Estimate
Construction $ 236,750.10
Contingency 31,485.90
Subtotal $ 268,236.00
Engineering Design and Administration 40,186.00
Total Construction Cost Estimate $308,422.00
The proposed project funding is summarized as follows:
Project Code Description Funding Amount
DMATS TAP Grant (80%) $ 214,589.00
City Funds - Local Match (20%) 53,647.00
5544000006 Construction Subtotal $ 268,236.00
City Funds - Engineering Services 40,186.00
Total Construction Cost Estimate $ 308,422.00
RECOMMENDATION
I respectfully request the City Council concurrence with initiating the public bidding
procedure through the lowa DOT and set May 18, 2026, as the date for a public hearing
on the Bee Branch Creek Trail Project - Phase 3 Project.
Prepared By Justine Hull, Traffic Engineer
cc: Bob Schiesl, Asst City Engineer Nathan Steffen, Civil Engineer
John Krayer, Civil Engineer Adam Decker, Engineering Design Technician
2
Page 280 of 668
Prepared by Justine Hull City of Dubuque Engineering,50 W. 13th St. Dubuque, IA 52001 (563)589-4270
Return to Adrienne N. Breitfelder, City Clerk, 50 W. 13th St., Dubuque, IA 52001, (563)589-4100
RESOLUTION NO. 168-26
BEE BRANCH CREEK TRAIL PROJECT— PHASE 3 IOWA
DOT TAP-U-2100(711)-81-31
PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT,
AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS,
SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST;AND ORDERING
THE ADVERTISEMENT OF BIDS
WHEREAS, the Bee Branch Creek Trail Project — Phase 3 Project, Iowa DOT
Project No. TAP-U-2100(711) --81-31 will provide for the construction of a 10'wide mixed-
use PCC concrete trail along Pine Street from E. 11th Street to E. 9th Street, with on-street
bike lane connectivity on E. 9th Street and E. 11th Street. The project will include the
following:
- 943 LF of PCC Concrete Trail
- 1,400 LF of On-Street Bike Lanes
- Rectangular Rapid Flashing Beacon (RRFB) Crosswalk on E. 11th Street
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
The proposed plans, specifications, form of contract and estimated cost for the
Bee Branch Creek Trail Project — Phase 3 Project, Iowa DOT Project No. TAP-
U2100(711)--81-31 in the estimated construction amount $236,750.10, are hereby
preliminarily approved and ordered filed in the office of the City Clerk for public inspection.
A public hearing will be held on the 18th day of May, 2026, at 6:30 p.m. in the
Historic Federal Building Council Chambers 350 W. 6th Street, Dubuque, Iowa, at which
time interested persons may appear and be heard for or against the proposed plans and
specifications, form of contract and estimated cost of said Project, and the City Clerk be
and is hereby directed to cause the attached notice of the time and place of such hearing
to be published in a newspaper having general circulation in the City of Dubuque, Iowa,
which notice shall be published not less than four days nor more than twenty days prior
to the date of such hearing. At the hearing, any interested person may appear and file
objections to the proposed plans, specifications, form of contract, or estimated cost of the
Project.
Passed, approved and adopted this 41h day of May 2026.
rad avanagh, Mayor
Attest:
7
....ae,,szk..,-
Trish L. Gleason, Assistant City Clerk
CITY OF DUBUQUE, IOWA
OFFICIAL NOTICE
PUBLIC NOTICE is hereby given that the Dubuque City Council will conduct a public
hearing on the 18t" day of May 2026, at 6:30 p.m., in the Historic Federal Building, 350
W. 6th Street, 2�d floor, Dubuque, lowa, at which meeting the City Council proposes to
hear the plans, specifications, form of contract and estimated cost for the for the Bee
Branch Creek Trail Project — Phase 3 Project, lowa DOT Project No. TAP-U-2100(711) -
-81-31.
Scope of the project will include the construction of a 10' wide mixed-use PCC concrete
trail from along Pine Street from E. 11th Street to E. 9th Street, with on-street bike lane
connectivity on E. 9t" Street and E. 11t" Street. The project will include the following:
- 943 LF of PCC Concrete Trail
- 1,400 LF of On-Street Bike Lanes
- Rectangular Rapid Flashing Beacon (RRFB) Crosswalk on E. 11t" Street
At the meeting, the City Council will receive oral and written comments from any resident
or property owner of said City to the above action. The official City Council agenda will be
posted the Friday before the meeting and will contain public input options. The agenda
can be accessed at https://dubuqueia.portal.civicclerk.com/ or by contacting the City
Clerk's Office at 563-589-4100, ctyclerk@cityofdubuque.org.
Written comments on the public hearing may be submitted to the City Clerk's Office by
email at ctyclerk@cityofdubuque.org or by mail to City Hall, 50 W. 13t" St., Dubuque, IA
52001, before the scheduled hearing. The City Council will review all written comments
at the time of the hearing.
Documents related to the public hearing are on file in the City Clerk's Office and may be
viewed Monday through Friday between 8:00 a.m. and 5:00 p.m.
Individuals requiring special assistance should contact the City Clerk's Office as soon as
feasible. Deaf or hard-of-hearing individuals can use Relay lowa by dialing 711 or (800)
735-2942.
Published by order of the City Council given on the 4t" day of May 2026.
Trish L. Gleason, Assistant City Clerk
Page 283 of 668
„ :�, r..; , _ _ � ,_ � .- •�.- _ t�
��' City of Dubuque TAPApplication 2023 �.�� -� - s'
. .,. � a � , , Bee Branch Trail
� : • Extend Bee Branch Trail �- - : - - -
.>
� • Create on-street bike lanes to meet Cit 's �� � '�--- - _ � �
y �� /� ' _ - ='`�� ,
�� planned bike lanes on Elm, 9th, and 10th �:;;�-. � ,r ,. �� ,,,� +��� ��, �
� -Solar Field Trail a
;1 � h�-� i � , _i ,, _ �.� /� + -- _ _
.. j�,. `�� .� .,�'��,,,� �� !.'�. fi���,� .�'.r.-��� :�; t"-�r �� ���►�� - �_ ' - •c�
'��-, � � ��:, _.�r��, `� �, �� :� � , �.¢ f , N ew Trai I ��� �' c�
� � ��” ���d ` . • ,r�=� � �� � � .Westbound � J� !'
���: Fs- � ,'�.. r�, ;' , ' ���
o ��� . ` o�� y�. ,�; ��r'�:` f�6� � �-' - �bike lane �' �,� . ��'
� � . a . ° ,�'� a
•s. �: , �-- ;��� ' I�3 � �� ,�,g �_ � - on 11th St .r�— Crosswalk: 11th St""
.- � ., �+�+ �� 1,� ' 1� ,.� ` ,: ,� � � i .
_ ' ;,. �`. �^',� `�� .�Ir � -�- � r.
�,�:,r.� o �'�' � '"�, �r �, , � ��'� '��. '-, � � ' ' � Widen from 5' to 10', �.� � �
� �
� ',-. � �—
��:�"��: <:� .��, �.��. ,,�. i,� � ��;� Bike lanes.� - � - l, �
��� �� •� ' � �� � �. �. �` n �'
`",'.- .+ � ,� � �� �,,� ,; yon Elm St ����. ��` `� . N
., .
_ , �
q. � " `- o o ' - `,_: 1 �� 151
.. �� �
�, � _.,� � � �� '�` ,Westbound �, - ` . .
, , - � �' 0 0 1 0 2
° ' � �'' � !!k`�-'� �!�-- bike lane � � �� �� ` � �' / . , Miles�
� � . - ; �?.,' � r , .. . , . ; � . �
,,� �. .� �. ,� ., ..
� , ;�j,�- �on 10th St � ��, ��y ': TAP Project
4-/" � ,i�"` /' i i� ' ' E o j�► - ��
�a -- y- � �� �, ' '� ; �s , r ���� Existing Trail
� � � �� � �►, �,��� ,, Eastbound
- g' �F , '�'.."�: ' ��• '' �' �� �� ;�' � � bike lane Proposed Trail
� ��, �• .,�,.• . — ��,'►� � - r''' , � — —
,. '� � ,�,j � �r.. � Proposed Bike Lane
�� I - �`' - ri�►• ' on 9th St
Q�j� � , :< ' , .
� �.. �'� .�.� .��� ' � '� - �f ��� --- Planned Bike Lane
r" ' ' -
�p. � � �'� ��..' '.rI . ��� � ,\+�., � �� �` �
�'1-' � �� �� �y � • .
� ! / �'� ��� . . . '� J `�
� � U" i .y� � {�' '.'i�� � �s 1 . � � . � �.� 1
i{ri �!d�'l� • � I � r l
�� .� �:iO�,f/ I ' \� \ '�,�'� . �` � � � —� ���a� 1 r \
� V� .. �r ' �
� �
=�, . • � . � . � �
�'� � /��� . '' <:q� � �
e , ', ,., � . � � ' � �5b�rY�J n �
" �� '\ � � ., � ��. � . _ _ ^
�' � �� � '
\A +�,�` �• t� � /` `�,� �t� �`�r �,• •� , j �J� _ �r^ti � �� p'��. _�{e
.� ��� ` � �..,�...�1.
w' �� �, � �� � J I I
\ Y, � .) L
�} .�:� ,.ca�1� �,� l��, ' �. ,y.' �� �� �ti,.— —�., �
,I'
+ �/ '. •9 �• �'�" � � 61 /��� _ �1 ` i \
� ui�crrvoF � - R�� . ' • ��� ` � � � ► � � �r� Ca�isk6r�ek
DT TR E., � �� y i� � ' r � L _J 1_.�� StESte Preserve
lJ L t o
�' I — � � � ��
��� � �..' � � J
� \i,+;t��n�iccc rn�the Mi��i�:i����i ' A' , � J `�
. ..� / �G�i w ��� ti.,
�' � '��►', • ��
age