Loading...
Bee Branch Trail Project - Phase 3 (12th to 9th Street) Iowa DOT Project Copyrighted May 18, 2026 City of Dubuque PUBLIC HEARINGS # 5. City Council ITEM TITLE: Bee Branch Trail Project - Phase 3 (12th to 9th Street) lowa DOT Project SUMMARY: Proof of Publication on notice of public hearing to approve the plans, specifications, form of contract and estimated cost for the Bee Branch Creek Trail Project — Phase 3 Project and City Manager recommending approval. RESOLUTION Bee Branch Creek Trail Project— Phase 3, lowa DOT TAP-U-2100(711)-81-31, Approval of Plans, Specifications, Form of Contract, and Estimated Cost SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo Bee Branch Trail Project - Phase 3 (12th to 9th Street) Public Hearing 2. Bee Branch Trail Phase 3 (711) - Initiate Set PH Staff Memo 3. Bee Branch Trail Phase 3- PH Approve Plans Specs Contract Cost RESOLUTION Page 791 of 890 Dubuque THE CITY OF � uhA�eMa cin DuB E ; . � , I � � I. Maste iece on the Mississi t 2oo�•zoiz•zois �P Pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Bee Branch Trail Project - Phase 3 (12th to 9th Street) Public Hearing (lowa DOT Project Number TAP-U-2100--(711)-81-31) DATE: May 13, 2026 City Engineer Gus Psihoyos is recommending City Council approve the plans, specifications, form of contract and construction estimate of$236,750.10 for the Bee Branch Creek Trail Project— Phase 3 Project, lowa DOT Project No. TAP-U-2100(711) - -81-31. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Justine Hull, Traffic Engineer Bob Schiesl, Asst City Engineer Nathan Steffen, Civil Engineer John Krayer, Civil Engineer Adam Decker, Engineering Design Technician Page 792 of 890 Dubuque THE CITY OF � All•Merioa Ciry D V L L xn�xai�n � I �,���� � � Maste iece on the Mississi i zoa��zolz'2013 rP pp zoi��zoi9 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: May 12, 2026 RE: Bee Branch Trail Project - Phase 3 (12t" to 9th Street) Public Hearing (lowa DOT Project Number TAP-U-2100--(711)-81-31) INTRODUCTION This memorandum requests the City Council conduct a public hearing for the Bee Branch Creek Trail Project — Phase 3 Project, lowa DOT Project No. TAP-U-2100(711) - -81-31. BACKGROUND This project was originally bid to include bicycle and pedestrian connectivity along Pine Street from the Lower Bee Branch Trail located at 12th Street, southward towards E. 11tn Street, along Pine Street, with bike lane connections on both E. 11t" Street and E. gtn Street. Engineering has solicited bids through the lowa DOT for the project for May 19, 2026. During the development of the original bid documents, Engineering staff developed in- house concepts where the trail would connect from 12t" Street and use green space on between the northbound on-ramp for US 151/61 and Tucker Freight's property to allow a crossing on E. 11t" Street to the upgraded mixed-used trail along Pine Street. Some considerations for cyclists traveling westbound on E. 11th Street for crossing the on- ramp was finalized with lowa DOT staff. During the design process, coordination with the lowa DOT identified the need to accommodate the planned reconstruction of the Pine Street and E. 9th Street/Kerper Boulevard intersection. To avoid future removal of newly constructed improvements, the trail design has been adjusted accordingly. As a result, bicycle connectivity through this area will be provided via an on-street lane extending from the intersection to the limits of the future reconstruction project. DISCUSSION Engineering staff worked in-house to create this trail connection while working diligently with the lowa DOT. The project will include the construction of a 10' wide mixed-use PCC concrete trail from along Pine Street from E. 11th Street to E. 9th Street, with on-street bike lane connectivity on E. 9t" Street and E. 11t" Street. The project will include the following: - 943 LF of PCC Concrete Trail - 1,400 LF of On-Street Bike Lanes 1 Page 793 of 890 - Rectangular Rapid Flashing Beacon (RRFB) Crosswalk on E. 11t" Street PROJECT SCHEDULE The schedule for the Bee Branch Creek Trail Phase III Project is as follows: lowa DOT Advertisement for Bids May 1, 2026 City Initiate Concurrence in Public Bidding Process May 4, 2026 City Publish Public Hearing Notice on Plans & Specs May 8, 2026 City Public Hearing on Plans & Specifications May 18, 2026 lowa DOT Receipt of Bids Proposals (Bid Letting) May 19, 2026 City Award Construction Contract (Subject to IDOT Approval) June 1, 2026 lowa DOT Late Start Date July 1, 2026 Contract Completion Date 30-60 Working Days The project will be let by the lowa DOT and will be constructed on a working day contract. The number of working days will be defined by the Office of Contracts at the lowa DOT in Ames, IA. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and construction estimate for the Bee Branch Creek Trail Project — Phase 3 Project, lowa DOT Project No. TAP-U-2100(711) --81-31. BUDGET IMPACT The original estimate prior to bidding for the Bee Branch Creek Trail Project — Phase 3 Project are as follows: Description Estimate Construction $ 236,750.10 Contingency 31,485.90 Subtotal $ 268,236.00 Engineering Design and Administration 40,186.00 Total Construction Cost Estimate $308,422.00 The proposed project funding is summarized as follows: Project Code Description Funding Amount DMATS TAP Grant (80%) $ 214,589.00 City Funds - Local Match (20%) 53,647.00 5544000006 Construction Subtotal $ 268,236.00 City Funds - Engineering Services 40,186.00 Total Construction Cost Estimate $ 308,422.00 ACTION TO BE TAKEN I respectfully request the City Council conduct a public hearing to approve the plans, specifications, form of contract and estimated cost for the Bee Branch Creek Trail 2 Page 794 of 890 Project — Phase 3 Project, lowa DOT Project No. TAP-U-2100(711) --81-31 through the adoption of the enclosed resolution. Prepared By Justine Hull, Traffic Engineer cc: Bob Schiesl, Asst City Engineer Nathan Steffen, Civil Engineer John Krayer, Civil Engineer Adam Decker, Engineering Design Technician 3 Page 795 of 890 Prepared by Justine Hull City of Dubuque Engineering, 50 W. 13th St. Dubuque, IA 52001 (563)589-4270 Return to Trish L. Gleason, City Clerk, 50 W. 13eh St., Dubuque, IA 52001, (563)589-4100 RESOLUTION NO. 202-26 BEE BRANCH CREEK TRAIL PROJECT — PHASE 3 IOWA DOT TAP-U-2100(711)- 81-31 , APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST WHEREAS, the Bee Branch Creek Trail Project — Phase 3 Project, Iowa DOT Project No. TAP-U-2100(711) --81-31 will provide for the construction of a 10' wide mixed-use PCC concrete trail along Pine Street from E. 11th Street to E. 9th Street, with on-street bike lane connectivity on E. 9th Street and E. 11th Street. The project will include the following: • 943 LF of PCC Concrete Trail • 1,400 LF of On-Street Bike Lanes • Rectangular Rapid Flashing Beacon (RRFB) Crosswalk on E. 11th Street WHEREAS, the City Council, by Resolution No. 168-26, dated the 4th day of May 2026, gave preliminarily approved the plans, specifications, form of contract, and estimated cost for the Bee Branch Creek Trail Project — Phase 3 Project, Iowa DOT Project No. TAP-U-2100(711) --81-31 ; and WHEREAS, pursuant to published notice and published advertisement for bids, a public hearing was held on 18th day of May 2026 on the plans, specifications, form of contract, and estimated cost for the Bee Branch Creek Trail Project — Phase 3 Project, Iowa DOT Project No. TAP-U-2100(711) --8I-31 . NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1 . That the attached plans, specifications, form of contract and estimate of total cost for the Bee Branch Creek Trail Project — Phase 3 Project, Iowa DOT Project No. TAP-U-2100(711) --81-31 in the estimated construction amount of $236,750.10, are hereby approved. Passed, approved and adopted this 18th day of May 2026. Brad avanagh, Mayor Attest: Trish L. Gleason, Assistant City Clerk STATE OF IOWA SS: DUBUQUE COUNTY CERTIFICATE OF PUBLICATION I, Kathy Goetzinger, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald, a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: 05/08/2026 and for which the charge is 39.71 Subscribed to before me, a Notary Public i • . nd for Dubuque County, Iowa, this 8th day of May, 2026 Notar; 1ic in and for Dubuque County, Iowa. SZOZ/ll/ZL saaidx3 uoissiwwoo d4 6S9664 JegwnN uoissiww03 3dYd 'N 13Nvr tlM0 Ad text : CITY OF DUBUQUE, IOWA OFFICIAL NOTICE PUBLIC NOTICE is hereby given that the Dubuque City Council will conduct a public hearing on the 18th day of May 2026, at 6:30 p.m., in the Historic Federal Building, 350 W. 6th Street, 2nd floor, Dubuque, Iowa, at which meeting the City Council proposes to hear the plans, specifications, form of contract and estimated cost for the Bee Branch Creek Trail Project Phase 3 Project, Iowa DOT Project No. TAP-U-2100(711) --81-31. Scope of the project will include the construction of a 10 wide mixed -use PCC concrete trail from along Pine Street from E. l lth Street to E. 9th Street, with on -street bike lane connectivity on E. 9th Street and E. l lth Street. The project will include the following: -"943 LF of PCC Concrete Trail -"1,400 LF of On -Street Bike Lanes -"Rectangular Rapid Flashing Beacon (RRFB) Crosswalk on E. l lth Street At the meeting, the City Council will receive oral and written comments from any resident or property owner of said City to the above action. The official City Council agenda will be posted the Friday before the meeting and will contain public input options. The agenda can be accessed at https://dubuqueia.portal.civicclerk.com/ or by contacting the City Clerk's Office at 563-589-4100, ctyclerk@cityofdubuque.org. Written comments on the public hearing may be submitted to the City Clerk's Office by email at ctyclerk@cityofdubuque.org or by mail to City Hall, 50 W. 13th St., Dubuque, IA 52001, before the scheduled hearing. The City Council will review all written comments at the time of the hearing. Documents related to the public hearing are on file in the City Clerk's Office and may be viewed Monday through Friday between 8:00 a.m. and 5:00 p.m. Individuals requiring special assistance should contact the City Clerk's Office as soon as feasible. Deaf or hard -of -hearing individuals can use Relay Iowa by dialing 711 or (800) 735-2942. Published by order of the City Council given on the 4th day of May 2026. /s/Trish L. Gleason, Assistant City Clerk It 5/8