Loading...
East 9th Street 0220 220 East 9th vt. 0- Kretschmer Tred; 0o. ------ ----- ----__ S C-LUbaque Roofing Co. F.eroof warehouse E.P. 661 2/21/33 ic -------- - - - - -- l /aS 397,50 0 -Owner. Construct --- _-_ canopy, b/ __________.____ - -• 50 4 /17 /39 _ _ _ 100 00 Alteration tsation interior of 1st fl 0- H eitzman_ Const_ Co. int oor B • P _ 4 -22 -60 - - - _ Brgck Bldg, — -- _-- ___ --_-- 12000.00 - -- - - - - -- • 220 E. 9th St. 2 ! 0- Kretschmer - Iredway C -John Schwendinger Const. inter. -- alter. - -to- showroom , -- comma -bldg. BP 11528 4/2/87 $600.00 0- Kretschmer - Tredway C -Larry Weitz Sign Syst. install new 3'-x6' dbl_face sign BP 14118 8/11/88 O-Kretschmer Tredway C- Geisler Bros. Co. reroef warehouse BP18364 4/15/91 $9800.00 o- Kretschmer.. Tredway C- Portzen Const. remodel inter. (bathrms) brk comm. bldg BP21491 1/12/93 $40657.00 0- Kretschmet Tredway C- John Schwendinger Const. f inish inter of showroom,comm b1dg.BP21685 4/1/93 $10000.00 re 220 E. 9th St. 3 0- Kretschmer - Tredway C- Portzen Const. nseal -1 stairway - -in -ter remodel i -ng-, comm. 8 27684 1/3 - $7700.00 0- Krestschmer Tredway C - Portzen Const Enlarge gar door open, east side, Comm BP 53307 10 13/ $3 7 -- O- K- ret- schmer— Tredway G Coi- sler- -Bres. C-o:— - - - - -_ _ t /o, install new epdm roof system, comm. BP38310 3/5/98 $16,750.00 So-arch-of Adjustmeft- Docket -86 -00 for tlaa erect - b.0 proj sign in HT 7aaa. Approved w /sond that 2 exist _ proj. signs be removed 10/26/2000 • •