Loading...
Bee Branch Trail Project - Phase 3 (12th to 9th Street) Award Copyrighted June 1, 2026 City of Dubuque ACTION ITEMS # 9. City Council ITEM TITLE: Bee Branch Trail Project - Phase 3 (12th to 9th Street) Award SUMMARY: City Manager recommending award of the public improvement construction contract to Valentine Construction Co., LLC in the amount of$205,741.89, which is 13.1% below the estimate of probable cost, subject to lowa DOT concurrence and approval of award for the Bee Branch Creek Trail Project— Phase 3 Project. RESOLUTION Awarding Public Improvement Contract for the Bee Branch Creek Trail Project— Phase 3 lowa Dot Tap-U- 2100(711)-81-31 SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo Bee Branch Trail Project - Phase 3 (12th to 9th Street) Award Public Improvement Constr Contract 2. Bee Branch Trail Phase 3 (711) - Award Memo 3. Bee Branch Trail Phase 3 (711) - Award RESOLUTION Page 988 of 1000 Dubuque THE CITY OF � uhA�eMa cin DuB E ; . � , I � � I. Maste iece on the Mississi t 2oo�•zoiz•zois �P Pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Bee Branch Trail Project - Phase 3 (12th to 9th Street) Award Public Improvement Construction Contract (lowa DOT Project Number TAP-U-2100--(711)-81-31) DATE: May 27, 2026 City Engineer Gus Psihoyos is recommending City Council concur on the award of the public improvement construction contract to Valentine Construction Co., LLC in the amount of $205,741.89, which is 13.1% below the estimate of probable cost, subject to lowa DOT concurrence and approval of award for the Bee Branch Creek Trail Project — Phase 3 Project, lowa DOT Project No. TAP-U-2100(711) --81-31. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Justine Hull, Traffic Engineer Bob Schiesl, Asst City Engineer Nathan Steffen, Civil Engineer John Krayer, Civil Engineer Adam Decker, Engineering Design Technician Page 989 of 1000 Dubuque THE CITY OF � All•Merioa Ciry D V L L xn�xai�n � I �,���� � � Maste iece on the Mississi i zoa��zolz'2013 rP pp zoi��zoi9 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: May 27, 2026 RE: Bee Branch Trail Project - Phase 3 (12t" to 9th Street) Award Public Improvement Construction Contract (lowa DOT Project Number TAP-U-2100--(711)-81-31) INTRODUCTION The purpose of this memorandum is to provide the City Council with information related to the recommended concurrence for the lowa Department of Transportation to award the public improvement construction project for the for the Bee Branch Creek Trail Project— Phase 3 Project, lowa DOT Project No. TAP-U-2100(711) --81-31. BACKGROUND This project was originally bid to include bicycle and pedestrian connectivity along Pine Street from the Lower Bee Branch Trail located at 12t" Street, southward towards E. 11tn Street, along Pine Street, with bike lane connections on both E. 11t" Street and E. gtn Street. Engineering has solicited bids through the lowa DOT for the project for May 19, 2026. During the development of the original bid documents, Engineering staff developed in- house concepts where the trail would connect from 12t" Street and use green space between the northbound on-ramp for US 151/61 and Tucker Freight's property to allow a crossing on E. 11th Street to the upgraded mixed-used trail along Pine Street. Some considerations for cyclists traveling westbound on E. 11t" Street for crossing the on- ramp was finalized with lowa DOT staff. During the design process, coordination with the lowa DOT identified the need to accommodate the planned reconstruction of the Pine Street and E. 9th Street/Kerper Boulevard intersection. To avoid future removal of newly constructed improvements, the trail design has been adjusted accordingly. As a result, bicycle connectivity through this area will be provided via an on-street lane extending from the intersection to the limits of the future reconstruction project. DISCUSSION Engineering staff worked in-house to create this trail connection while working diligently with the lowa DOT. The project will include the construction of a 10' wide mixed-use PCC concrete trail from along Pine Street from E. 11t" Street to E. 9t" Street, with on-street bike lane connectivity on E. 9th Street and E. 11t" Street. The project will include the following: - 943 LF of PCC Concrete Trail 1 Page 990 of 1000 - 1,400 LF of On-Street Bike Lanes - Rectangular Rapid Flashing Beacon (RRFB) Crosswalk on E. 11th Street BID RESULTS The lowa DOT received five (5) bids on May 19, 2026, for the Bee Branch Creek Trail Project — Phase 3 Project, lowa DOT Project No. TAP-U-2100(711) --81-31. Valentine Construction Co., LLC of Dubuque, IA, submitted the low bid in the base bid of $205,741.89 which is 13.1% below the estimate of probable cost. A summary of the bid proposal received is as follows: Contractor Name Total Bid Valentine Construction Co., LLC $ 205,741.89 Midwest Concrete, Inc. $ 245,370.80 Eastern lowa Excavating & Concrete, LLC $ 273,906.82 Tschiggfrie Excavating Co. $ 290,513.85 Portzen Construction, Inc. $ 312,922.48 RECOMMENDATION I recommend that the City Council concur on the award of the public improvement construction contract to Valentine Construction Co., LLC in the amount of $205,741.89 subject to lowa DOT concurrence and approval of award for the Bee Branch Creek Trail Project— Phase 3 Project, lowa DOT Project No. TAP-U-2100(711) --81-31 BUDGET IMPACT The estimate of probable cost for the Bee Branch Creek Trail Project — Phase 3 Project are as follows: Description Cost Estimate Award Amount Construction $ 236,750.10 $ 205,741.89 Contingency 31,485.90 31,485.90 Engineering Design and Administration 40,186.00 40,186.00 Total Construction Cost Estimate $308,422.00 $277,413.79 The current project funding is summarized as follows: Project Code Description Funding Amount DMATS TAP Grant (80%) $ 214,589.00 City Funds - Local Match (20%) 53,647.00 5544000006 Construction Subtotal $ 268,236.00 City Funds - Engineering Services 40,186.00 Total Construction Cost Estimate $ 308,422.00 REQUESTED ACTION I recommend that the City Council adopt the attached resolution to award the public improvement contract for the Bee Branch Creek Trail Project — Phase 3 Project, lowa 2 Page 991 of 1000 DOT Project No. TAP-U-2100(711) --81-31 to Valentine Constructions Co., LLC in the amount of$205,741.89 subject to lowa DOT concurrence and approval of award. Prepared By Justine Hull, Traffic Engineer cc: Bob Schiesl, Asst City Engineer Nathan Steffen, Civil Engineer John Krayer, Civil Engineer Adam Decker, Engineering Design Technician 3 Page 992 of 1000 Prepared by Justine Hull City of Dubuque Engineering, 50 W. 13th St. Dubuque, IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 13th St., Dubuque, IA 52001, (563)589-4100 RESOLUTION NO. 228-26 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE BEE BRANCH CREEK TRAIL PROJECT — PHASE 3 IOWA DOT TAP-U-2100(711)-81-31 WHEREAS, sealed proposals have been submitted by contractors for the Bee Branch Creek Trail Project — Phase 3 Project, Iowa DOT Project No. TAP-U-2100(711) - -81-31 , (the Project) pursuant to Resolution No. 168-26 and Notice to Bidders published by the Iowa Department of Transportation; and WHEREAS, said sealed proposals were opened and read by the Iowa Department of Transportation on the 19th day of May 2026 and it has been determined that Valentine Construction Co., LLC, of Dubuque, IA submitted low bid in the amount of $205,741 .89, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1 . That the City concurs with awarding a Public Improvement Contract for the Project subject to Iowa Department of Transportation concurrence and approval of award to Valentine Construction Co., LLC and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved, and adopted this 1st day of June 2026. Brad M. n , Mayor Attest: Trish L. Gleason, Assistant City Clerk