Loading...
Eagle Point Water Treatment Plant Roof Rehabilitation Project - Project AcceptanceCity of Dubuque City Council CONSENT ITEMS # 12. Copyrighted July 20, 2026 ITEM TITLE: Eagle Point Water Treatment Plant Roof Rehabilitation Project - Project Acceptance SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the improvements and authorize the final payment to the construction contractor Poly Vinyl Roofing, Inc. in the amount of $16,421.01, for the Eagle Point Water Treatment Plant Roof Rehabilitation Project (CIP No. 4281000044). RESOLUTION Accepting The Eagle Point Water Treatment Plant Roof Rehabilitation Project And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo Eagle Point Water Treatment Plant Roof Rehabilitation Project — Project Acceptance and Resolution 2. EP WTP Roof Rehab Project Acceptance Memo 3. EP WTP Roof Rehab Certificate of Final Completion - signed 4. EP WTP Roof Rehab Accepting the Project and Auth FP Res Page 723 of 1061 Dubuque THE C D!Uj-!B AII-America Ciq 11111.1 II Masterpiece on the Mississippi YP PP zoo�•*o 13 2017202019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Eagle Point Water Treatment Plant Roof Rehabilitation Project — Project Acceptance and Resolution DATE: July 16, 2026 Water Department Director Christopher Lester is recommending City Council adopt the attached resolution to accept the improvements and authorize the final payment to the construction contractor Poly Vinyl Roofing, Inc. in the amount of $16,421.01, for the Eagle Point Water Treatment Plant Roof Rehabilitation Project (CIP No. 4281000044). The City Council approved Bid Initiation proceedings at the Council Meeting on October 6, 2025, and the project was publicly advertised on October 8, 2025. Sealed bids for the Eagle Point Water Treatment Plant Roof Rehabilitation Project contract were received and publicly opened on October 23, 2025. Poly Vinyl Roofing, Inc. of Mount Vernon, Iowa submitted the apparent low bid in the amount of $357,068.00. The City Council approved Bid Award at the Council Meeting on December 15, 2025. During construction activities, an adjacent portion of the Eagle Point Water Treatment Plant roof has displayed failure and leaks. The areas include the Administrative Offices and Plant Filter Motor Control Room previously identified as being included in Phase 4. Change Order No. 1 added this scope to this phase of the project. During work on the Lime Silo roof, portions of metal roof decking required replacement due to material deterioration. Additionally, the roof hatches for the Lime Silo roof and Administration Building 3rd Floor roof were degraded and replacement was required for operability and maintenance. As a part of discussions on -site during construction, it was also determined that safety rail at key maintenance locations on the roofs would be beneficial. Approximately 150-If of non -penetrating safety rail was requested. Change Order No. 2 added this scope. The Eagle Point Water Treatment Plant Roof Rehabilitation Project construction project was started in March of 2025 with construction completed by the end of June of 2026. A site review was conducted on July 14, 2026, to confirm acceptability. Final construction costs are $547,367.00 which is 53% greater than the original bid amount due to the approved change orders to increase the roof replacement scope. Page 724 of 1061 I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Christopher Lester, Water Department Director Jenny Larson, Chief Financial Officer Laura Bendorf, Budget Manager Eldon Schneider, Water Project Supervisor Nick Connolly, Water Plan Operations Supervisor 2 Page 725 of 1061 Dubuque THE CITY OF All- teriea Cip DUB E vanca�ai c rvk u v z;r I I� r Masterpiece on the Mississippi 2007.2012*2013 pp 2017*2019 TO: Michael C. Van Milligen, City Manager FROM: Christopher J. Lester, Water Department Director DATE: July 14, 2026 RE: Eagle Point Water Treatment Plant Roof Rehabilitation Project — Project Acceptance and Resolution INTRODUCTION The purpose of this memorandum is to request Project Acceptance and to authorize the final payment to the construction contractor for the Eagle Point Water Treatment Plant Roof Rehabilitation Project (CIP No. 4281000044). BACKGROUND The City of Dubuque's Water Department has identified a phased replacement of roofing systems at the Eagle Point Water Treatment Plant. The membrane roofing systems were inspected in 2020, and noticeable failures were identified. The systemic, phased replacement of the aging roofing systems were included as improvements recommended in the Water Treatment Plant Condition Assessment prepared by Strand Associates, issued June 2023. Phase 1 of roof replacements include the North Plant Clarifiers, Lime Silo, and Administration Building 3rd Floor. Phase 2 of roof replacements will include the Sludge Plant, Sludge Plant Wet Well Walkway between Sludge Clarifiers, and Sludge Plant Electrical Room. Phase 3 of roof replacements will include the North Plant Filters. Phase 4 roof replacements includes the South Plant Clarifiers, Administrative Offices, Plant Filter Motor Control Room, and East Clearwell. Water Department staff completed the bidding documents, specifications, and drawings for the roof replacements in Phase 1. Construction for Phase 1 was originally planned for the spring of 2025. However, due to anticipated project costs, bidding for the project was timed for Fall of 2025 to allow for additional funds within FY26 to complete the project. The City Council approved Bid Initiation proceedings at the Council Meeting on October 6, 2025, and the project was publicly advertised on October 8, 2025. Sealed bids for the Eagle Point Water Treatment Plant Roof Rehabilitation Project contract were received and publicly opened on October 23, 2025. Poly Vinyl Roofing, Inc. of Mount Vernon, Iowa submitted the apparent low bid in the amount of $357,068.00. The City Council approved Bid Award at the Council Meeting on December 15, 2025. During construction activities, an adjacent portion of the Eagle Point Water Treatment Plant roof has displayed failure and leaks. The areas include the Administrative Offices and Plant Filter Page 726 of 1061 Motor Control Room previously identified as being included in Phase 4. Change Order No. 1 added this scope to this phase of the project. During work on the Lime Silo roof, portions of metal roof decking required replacement due to material deterioration. Additionally, the roof hatches for the Lime Silo roof and Administration Building 3rd Floor roof were degraded and replacement was required for operability and maintenance. As a part of discussions on -site during construction, it was also determined that safety rail at key maintenance locations on the roofs would be beneficial. Approximately 150-If of non -penetrating safety rail was requested. Change Order No. 2 added this scope. DISCUSSION The Eagle Point Water Treatment Plant Roof Rehabilitation Project construction project was started in March of 2025 with construction completed by the end of June of 2026. A site review was conducted on July 14, 2026 to confirm acceptability. Final construction costs are $547,367.00 which is 53% greater than the original bid amount due to the approved change orders to increase the roof replacement scope. The contract adjustments are recorded under Change Order Nos. 1 through 2, which were approved separately to this communication. BUDGET IMPACT The estimate of probable cost for the Eagle Point Water Treatment Plant Roof Rehabilitation Project (CIP No. 4281000044) is provided as follows: Description Cost Estimate Legal Expenses $0.00 Land and Easements $0.00 Professional Services (Report or Planning) $0.00 Professional Services (Design) $0.00 Professional Services (Construction) $0.00 Construction $1,275,000.00 Phase 1 $350, 000.00 Phase 2 $515, 000.00 Phase 3 (FY28 — future funding request) $110, 000.00 Phase 4 (FY29 — future funding request) $300, 000.00 Equipment $0.00 Contingency $100,000.00 Total Estimated Project Cost $1,375,000.00 2 Page 727 of 1061 FY26 Budgeted Expenses for the Eagle Point Water Treatment Plant Roof Rehabilitation Project (CIP No. 4281000044) to construct Phases 1 and 2 and a portion of the contingency are provided as follows. Due to other project priorities, reallocations of most of the FY25 carry-over funds have been previously approved and these are deducted from the currently available budgeted funds. CIP Fund Budgeted Expenses Amount 4281000044 Water Construction Other Capital Outlay $590,000.00 4281000044 Water Construction Other Capital Outlay $309,190.00 FY25 Carry -Over) 4281000044 Water Construction Other Capital Outlay -$226,500.00 (Reallocation) 4281000044 Water Construction Other Capital Outlay -$71,800.00 Reallocation Total Project Budgeted Expenses $600,890.00 The Phase 1 Construction estimate can be further broken down as follows: Description Award Roofing Contractor (Accepting under this Memo) Original Contract $357,068.00 Change Order No. 1 $160,754.00 Change Order No. 2 $29,545.00 Asbestos Abatement Contractor Original Contract $1,265.00 Contract No. 2 $1,720.00 Miscellaneous Materials and Repairs HVAC Repairs Contract $15,000.00 Other Miscellaneous Materials and Repairs $5,000.00 Contingency $0.00 Total Project Cost $570,352.00 3 Page 728 of 1061 REQUESTED ACTION I respectfully request the City Council to adopt the attached resolution to accept the improvements and authorize the final payment to the construction contractor for the Eagle Point Water Treatment Plant Roof Rehabilitation Project (CIP No. 4281000044). Prepared by Eldon Schneider, Water Project Supervisor cc: Jenny Larson, Chief Financial Officer Eldon Schneider, Water Project Supervisor Nick Connolly, Water Plan Operations Supervisor F:\Users\Water\ENGINEERING\Projects\City\Active\EP WTP Roof Rehab (2022)\01 - Water Project Supervisor\Progress Reports and Memos\Water Department\Construction Acceptance\EP WTP Roof Rehab Project Acceptance Memo.docx 0 Page 729 of 1061 Prepared by Christopher Lester Water Department 1902 Hawthorne Street Dubuque IA 52001 (563) 589-4291 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 1311 St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 278-26 ACCEPTING THE EAGLE POINT WATER TREATMENT PLANT ROOF REHABILITATION PROJECT AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the Eagle Point Water Treatment Plant Roof Rehabilitation Project (the Project) consisted a phased replacement of roofing systems at the Eagle Point Water Treatment Plant and the first phase of roof replacements included the North Plant Clarifiers, Lime Silo, and Administration Building 3rd Floor; and WHEREAS, the Public Improvement Contract for the Project has been completed by the contractor, Poly Vinyl Roofing, Inc. (Contractor), and the Water Department Director has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $547,367.00; and WHEREAS, the Contractor has previously been paid $530,945.99, leaving a balance of $16,421.01; and WHEREAS, the City Council finds that the recommendation of the Water Department Director should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the Water Department Director is approved and the Project is hereby accepted on this 20th day of July, 2026. Section 2. The Chief Financial Officer is hereby directed to pay the balance of the retainage of $16,421.01 as provided in Iowa Code Chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code Chapter 573 or Iowa Chapter 26.13. Section 3, No later than 14 calendar days after this final acceptance of the improvement, the City Clerk shall send a copy of this resolution by certified mail to the principal contractor, the surety on any bond given for the performance of the contract, and any claimant for labor or material who has filed a claim, in accordance with Iowa Code Section 573.16(1)(b). Principal Contractor: Poly Vinyl Roofing, Inc. Address: 785 Elbow Creek Road Mt. Vernon, Iowa 52314 Surety: IMT Insurance Company Address: 7825 Mills Civic Parkway West Des Moines, Iowa 50266 Claimants: None Address: N/A Passed, approved and adopted this 20th day of July, 2026. Attest: �� 0 4'��''lC, &197 Adrienne N. Breitfelder, City Clerk .•d 0— M.• • WATER DEPARTMENT DIRECTOR CERTIFICATE OF FINAL COMPLETION OF THE EAGLE POINT WATER TREATMENT PLANT ROOF REHABILITATION PROJECT The undersigned Water Department Director of the City of Dubuque, Iowa, hereby certifies that he has inspected the Eagle Point Water Treatment Plant Roof Rehabilitation Project and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $547,367.00. Dated this 1,�_ day of , la . c L. � L':&- Christ pher Lester, Water Department Director Filed in the office of the City Clerk on the _� day of � 0 , -t) Adrienne N. Breitfelder, City Clerk THE CITY OF DUB TE Masterpiece on the Mississippi Poly Vinyl Roofing, Inc. 785 Elbow Creek Road Mt. Vernon, Iowa 52314 Dubuque City Clerk's Office 50 West Street Dubuquee,, Iowa 52001-4805 AIRY WIcaClty Office (563) 589-4120 1 TT I V Y (563) 690-6678 ctyclerk@cityofdubuque.org H ww.cityofdubuque.org 2007.2012.2013 July 23, 2026 Re: Eagle Point Water Treatment Plant Roof Rehabilitation Project Acceptance To whom it may concern, Enclosed is a copy of City of Dubuque Resolution No. 278-26 Accepting the Eagle Point Water Treatment Plant Roof Rehabilitation Project and Authorizing Final Payment to the Contractor. This correspondence satisfies the notice requirement in Iowa Code Section 573.16(1)(b) and meets the directive in the resolution to provide that notice. Thank you. Adrienne N. Breitfelder City Clerk Enclosure: Resolution No. 278-26 cc: Christopher Lester, Water Department Director Eldon Schneider, Water Project Supervisor Service People Integrity Responsibility Innovation Teamwork THE CITY OF DUB E Masterpiece 017 the Mississippi IMT Insurance Company 7825 Mills Civic Parkway West Des Moines, Iowa 50266 Dubuque City Clerk's Office 50 West Street Dubuquee,, Iowa 520014805 All-Amedca CRY Office (563) 5894120 TPY (563) 690-6678 ctyclerk@cityofdubuque.org www.cityofdubuque.org 2007.2012.2013 July 23, 2026 Re: Eagle Point Water Treatment Plant Roof Rehabilitation Project Acceptance To whom it may concern, Enclosed is a copy of City of Dubuque Resolution No. 278-26 Accepting the Eagle Point Water Treatment Plant Roof Rehabilitation Project and Authorizing Final Payment to the Contractor. This correspondence satisfies the notice requirement in Iowa Code Section 573.16(1)(b) and meets the directive in the resolution to provide that notice. Thank you. Adrienne N. Breitfelder City Clerk Enclosure: Resolution No. 278-26 cc: Christopher Lester, Water Department Director Eldon Schneider, Water Project Supervisor 5ervice People Integrity Responsibility Innovation Teamwork