Loading...
Jackson Street 2005 2005 Jackson St. 0- St. Paul Lutheran Church C- Ceisler Pros. Hereof Brick Church 716e. H.P. 563 1 ®/1546 11,500.00 C— Cletus PaJ.m Enclose rear outside Stairway to Brick Church Building B.P. 620 9 - 1 -59 1,500.00 C— Hartmann Bros. Const. Co. 1 lteratnon to Basement of Brick Church Bldg. B.P. 399 4-4-66 16,000.00 2005 Jackson 10 St. Paul's Lutheran Church C= Edward's Concrete Lontr. ,install ftgs. & subwall for new entryway, church BP 14669 111/15/88 $N /A 0 -St. Paul's Lutheran Church C -Dave Reno construct encl. entryway on exist fndn, church BP 14714 12/2/88 $22,500.00 0 -St. Paul's Lutheran Church C -Jeff Arensdorf exter. & inter. remodeling, church BP 14842 2/22/89 N/A Board of Adjustment Docket 6 -89 for variance in frt yd setback to allow addition 7' from front prop. line. Approved 2/23/89 1