Loading...
Minutes Housing C Appeals 8 21CITY CLERK MINUTES OF HOUSING CODE APPEALS BOARD TUESDAY, AUGUST 21, 2001 4:30 P.M. 1805 CE~TFUAL AVENUE DUBUQLrE, IOWA 52001 MEMBERS PRESENT: Bob Schaub, and Bob Sampson MEbIBERS ABSENT: STAFF PRESENT: PUBLIC PRESENT: AFFIDAVIT OF COMPLIANCE: Tom Hannah, Ed Swift Tom Swift, Bill Kinsella and Dave Althaus Kathy Lanfo, Tom Smith, Wade Heineman and Bobbi Delaney Eric Schulz, Mike O'Neill, Dick Henkel and Dawn Ede. Staff verified that the meeting was being held in compliance with Iowa Open Meeting Laws. CERTIFICATION OF MINUTES: Ed Swift motioned to certify the minutes as amended (correct typo "obstained" to "abstained") from July 17, 2001 meeting. Tom Hannan seconded. Motion passed 4-0. PROGRESS REPORT BY DICK HENKEL ON 542 W liT}{ ST : He had a LeadAbatement person over to give him an estimate on lead removal and to finish the interior work. Liz Kemp is getting him some information about a pilot program on encapsulant paint for exterior painted surfaces. Ward Window and Siding is supposed to give him an estimate next week for the windows. There are 54 remaining violations, 34 are peeling paint on windows. These windows will be replaced and complete the peeling paint problems. His extension on this project is up on September 1, 2001. He will come in before the next appeals meeting to file an extension because he knows he will not have the 'work completed. ALL DEFICIENCIES AtqD MOTIONS ARE IN ACCORDANCE WITH THE DUBUQUE RESIDENTIAL HOUSING CODE I/NLESS OTHERWISE STATED. EXTENSIONS OF TIME ARE GR3kNTED IN ACCORDANCE WITH SECTION 26-9.(f) (1) AND VARIANCES ARE GRANTED IN ACCORDANCE WiTH SECTION 26-9. (f) (2) . ......... OLD BUSINESS ......... CASE 01-00113 1428 IOWA ST DUBUQUE, IA 52001 MOTION: TOM HA_NNAN SECOND: BOB SAMPSON --4 THE FINDINGS OF THE BOARD WERE: The owners, John and Jane Dolter, requested a variance on making certain repairs on the exterior fire escape. This appeal was tabled at the May 15, 2001 meeting with the understanding the repairs, agreed upon by Housin9 Services, would be completed within 60 days. The Board would then grant a variance on stairwell height. John Dolter appeared at the July 17, 2001 meeting. He stated he had a contractor lined up to do the job, but the contractor had not started the job yet. This appeal was tabled until the August 17, 2001 meeting. The repairs, agreed upon by Housin9 Services, were completed by the August 17, 2001 meeting. TOM HANNAN MOTIONED TO GRANT THE VARIANCE ON THE EXTERIOR FIRE ESCAPE FOR THE DEFICIENT DOOR HEIGHT OF 4' 10" AND THE SECOND FLOOR HEADROOM HEIGHT OF 5' 8 1/2 " EASED ON CODE OF ORDINANCE CITY OF DUBUQUE C~LAPTER 26-9,(2)a THAT THERE ARE PRACTICAL DIFFICULTIES OR UNNECESSARY HARDSHIPS IN CARRYING OUT THE STRICT LETTER OF ANY NOTICE AND ORDER. BOB SAMPSON SECOArDED. MOTION PASSED 4-0. BOARD COMMENTS (IF ANY): ......... NEW BUSINESS ......... CASE #: 01~00344 2145 WHITE ST DUBUQUE, IA 52001 MOTION: ED SWIFT SECOND: BOB SAMPSON THE FINDINGS OF THE BOARD WERE: The manager, Eric Schulz, requested an extension of time until September 20, 2001 for repairs to a common porch and stairwell exit for the building. The manager stated that peelin9 paint, handrail, and window safety issues will be addressed when repairs to a fire damaged unit are repaired. ED SWIFT MOTIONED TO GRANT THE EXTENSION OF TIME LrNTIL SEPTEMBER 20, 2001 FOR REPAIRS TO A COMMON PORCH AND STAIRWELL EXIT. BOB SAMPSON SECONDED. MOTION PASSED 4-0. BOA_RD COMMENTS (IF ANY): CASE #: 01-00345 2108 JACKSON ST DUBUQUE, IA 52001 MOTION: BOB SAMPSON SECOND: TOMHANNAN THE FINDINGS OF THE BOARD WERE: The owners, Joe and Dawn Ede, requested an extension of time until September 15, 2001 to complete exterior painting. BOB SAMPSON MOTIONED TO GRANT THE EXTENSION OF TINIE UNTIL SEPTEMBER 15, 2001 TO COMPLETE EXTERIOR PAINTING. TOM M3LNNA/~ SECONDED. MOTION PASSED BOARD COMMENTS (IF ANY): CASE #: 01-00346 2164 WASHINGTON ST, 1/2 DUBUQUE, IA 52001 MOTION: TOM HAAINAN SECOND: ED SWIFT THE FINDINGS OF THE BOARD WERE: The owner, New Dawn Inc, requested an extension of time until October 26, 2001 to co~plete exterior painting. TOM PIA~NAN MOTIONED TO GR3kNT THE EXTENSION OF TIME I~TIL OCTOBER 26, 2001 TO COMPLETE EXTERIOR PAINTING. ED SWIFT SECONDED. MOTION PASSED 4-0. BOARD COMMENTS (IF ANY): CASE 01-00347 1479 JACKSON ST DUBUQUE, IA 52001 MOTION: TOM HAh-NAN SECOND: ED SWIFT THE FINDINGS OF THE BOARD WERE: The owners, Larry and Mag~ie Vize, requested an extension of time until October 14, 2001 to repair loose soffit and fascia. Tom Smith, Inspector, stated the work is now finished. TOM HANNAN MOTIONED TO TAKE NO ACTION ON THIS APPEAL SINCE THE WORK IS COMPLETED. ED SWIFT SECONDED. MOTION PASSED 4-0. - 3 - BOARD COMMENTS (IF ANY): CASE #: 01-00348 534 LINCOLN AV DUBUQUE, IA 52001 MOTION: ED SWIFT SECOND: BOB SAMPSON The owners, Winger Construction Co, requested an extension of time until September 30, 2001 to complete exterior repairs. The building needs minor tuckpointing. The owners are waiting for a program through Rehab for stripping of paint. The tuckpointing will be done at the same time. ED SWIFT MOTIONED TO GRAIg~ THE EXTENSION OF TIME D/~TIL SEPTEMBER 30, 2001 TO COMPLETE EXTERIOR REPAIRS. BOB SAMPSON SECONDED. MOTION PASSED 4-0. BOARD COMMENTS (IF ANY): CASE #: 01-00349 2205 EAGLE ST DUBUQUE, IA 52001 MOTION: ED SWIFT SECOND: TOMHANNILN THE FINDINGS OF THE BOARD WERE: The owner, Jacob Hoesley, requested an extension of time until December 24, 2001 to cover the soffits and fascia with metal or vinyl, instead of painting. ~e is also planning to replace the siding and the roof. The notice and order only required scraping and painting of the soffits and fascia. There appears to be no hazard as all the peeling paint is above ten feet. ED SWIFT MOTIONED TO GRILNT THE EXTENSION OF TIME UNTIL DECEMBER 24, 2001 TO COVER TH SOFFITS AND FASCIA WITH METAL OR VINYL, INSTEAD OF PAINTING. TOM HAiTNAI~ SECONDED. MOTION PASSED 4-0. BOARD COMMENTS (IF Alkry): - 4 - CASE #: 01-00350 1611 MAIN ST, #3 DUBUQUE, IA 52001 MOTION: TOMPiANNAN SECOND: BOB SAMPSON TME FINDINGS OF THE BOARD WERE: The owner, Peter Eck, requested an extension of time until September 28, 2001 to complete scraping and painting exterior wood areas. NO work had been completed at this time. This is a Section 8 Initial inspection; no children are in this apartment. TOM PiANNAN MOTIONED TO GRANT THE EXTENSION OF TIME UNTIL SEPTEMBER 28, 2001 TO COMPLETE EXTERIOR PAIN'rlNG. BOB SAMPSON SECONDED. MOTION PASSED 4-0. BOARD COMMENTS (IF ANY): CASE #: 01-00351 2312 CENTRAL AV DUBUQUE, IA 52001 MOTION: ED SWIFT SECOND: BOB SAMPSON THE FINDINGS OF THE BOARD WERE: The ova~er, Leslie Brotzman, requested an extension of time until Auqust 25, 2001 to complete the exterior repairs. He has to replace missing rear porch, provide steps for the rear door, the North attic windows are c~acked or missing and need to be repaired. It appears there has been no attempt to start the work. This is a winter extension for a Section 8 Initial inspection; he was automatically extended to June 15, 2001. Due to our workload, he received another six weeks before we were able to reinspect. ED SWIFT MOTIONED TO GRANT THE EXTENSION OF TIME UAV~IL AUGUST 25, 2001 TO COMPLETE EXTERIOR REPAIRS. BOB SAMPSON SECONDED. MOTION PASSED 4-0. BOARD COMMENTS (IF ANY): CASE #: 01-00352 601 GARFIELD AV DUBUQUE, IA 52001 MOTION: ED SWIFT SECOND: TOM MANNAN THE FINDINGS OF THE BOARD WERE: The owner, Leslie Brotzman, requested an extension of time until August 25, 2001 to complete the exterior repairs. The soffit and fascia have peeling paint and some units have cracked or broken windows. It appears there has been no attempt to start the work. ED SWIFT MOTIONED TO GRANT THE EXTENSION OF TIME UNTIL AUGUST 25, 2001 TO COMPLETE THE E~T~RIOR REPAIRS. TOM HANNAN SECONDED. BOARD COMMENTS (IF ANY): CASE MOTION PASSED 4-0. 01-00353 1990 ELLIS ST DUBUQUE, IA 52001 MOTION: ED SWIFT SECOND: BOB SAMPSON THE FINDINGS OF THE BOARD WERE: The owner, Michael O'Neill, requested and extension of time until October 1, 2001 to complete the work. He has hired a contractor to replace the porch floor. He is hoping this will be completed in 30 to 60 days; it is up to the contractor's schedule. This is a Section 8 Annual inspection. ED SWIFT MOTIONED TO GRANT THE EXTENSION OF TIME UNTIL OCTOBER 1, 2001 TO COMPLETE REPAIRS TO THE PORCH FLOOR. BOB SAMPSON SECONDED. MOTION PASSED 4-0. BOARD COMMENTS (IF ANY): ADJOURNMENT: Bob Sampson motioned to adjourn the meeting at 5:05. seconded. Motion passed with a unanimous voice vote. Tom Ham/an MINUTES TAKEN BY: BOBBI DELANEY PERMIT CLERK RESPECTFULLY SUBMITTED: SENIOR HOUSING INSPECTOR /bd - 7 -