Wilbricht Lane Storm Sewer FnlMEMORANDUM September 25, 2001 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Wilbricht Lane Storm Sewer Improvements Project Public Works Director Mike Koch is recommending acceptance of the Wdbricht Lane Storm Sewer Improvements Project, as completed by Connolly Construction, in the final contract amount of $21,489.80. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director TO: FROM: SUBJECT: CITY OF DUBUQUE, IOWA MEMORANDUM September 24, 2001 Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director Wilbricht Lane Storm Sewer Improvements Project INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Wilbricht Lane Storm Sewer Improvements Project. DISCUSSION The work has been completed on the project by Connolly Construction of Peosta, Iowa. The final contract amount is $21,489.80. RECOMMENDATION I would recommend that the City Council accept the improvement and recommend that the final contract amount be established at $21,489.80. BUDGET IMPACT The project cost for the Wilbricht Lane Storm Sewer Improvement Project is as follows: Bid Final Total Project Cost $22,971.29 $21,489.80 The project will be funded from a Fiscal Year 2001 General Fund appropriation in the amount of $41,000. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final contract amount. MAK/vjd Prepared by Deron L. Muehring, Civil Engineer cc: Gus Psihoyos, Assistant City Engineer Prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO.424-01 ACCEPTING IMPROVEMENT Whereas, the contract for the Wilbricht Lane Storm Sewer Improvements Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Fiscal Year 2001 General Fund in amount equal to the amount of this contract, less any retained percentage provided for therein. Passed, approved and adopted this 1 st Attest: Jeanne F. Schneider, City Clerk dayof October ,.,, 2001. Terrance M. Duggan Mayor Prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO. 425-01 FINAL ESTIMATE Whereas, the contract for the Wilbricht Lane Storm Sewer Improvements Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $21,489.80 and the said amount shall be paid from the Fiscal Year 2001 General Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 1st Attest: Jeanne F. Schneider, City Clerk day of October, 2001/ Terrance M. Duggan, Mayor City of Dubuque ENGINEERING DIVISION FINAL ESTIMATE FOR: Wilbricht Lane Storm Sewer Improvements Project DATE: 9-18-01 ITEM QTY. 15" RCP 55.00 18" RCP 207.00 4' Dia. MH Base 4.00 4' Dia. MH Sidewall 23.50 Manhole Frame & Cover R-2501 1.00 Manhole Frame & Cover R-1916-D 3.00 CB 101-B 2.00 Neenah Grate R-4342 1.00 Bedding Stone, 1" Clean 73.32 Limestone Backfill 245.19 3/4" Rolled Stone Base 73.25 5" ACC Street Patch w/Full Depth (5") Saw Cut 13.27 3" ACC Driveway Patch w/Full Depth (3") Saw Cut 10.86 Sodding 700.00 4" PC Sidewalk 37.00 PC Curb & Gutter (Remove & Replace) 16.00 PC Residential Drive Approach (#2525 St.Anne Drive', 1.00 Traffic Control 1.00 Other Work Tap existing CB 1.00 Placement of Fiat top MH 2.00 UNIT UNIT COST TOTAL COST $19.45 $23.45 $270.00 $64.OO $245.00 $285.OO $1,450.00 $22O.O0 $9.7O $4.68 $8.5O $68.OO $68.OO $3.8O $3.5O $14.00 $17O.OO $517.00 $520.00 $2O9.62 $1,069.75 $4,854.15 $1,080.00 $1,504.00 $245.O0 $855.00 $2,900.00 $220.00 $711.20 $1,147,49 $622.63 $902.36 $738.48 $2,660.00 $129.50 $224.00 $170.00 $517.00 $520.00 $419.24 TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST I hereby certify that the ab~)ve statementAh~)ws in detail the Correct amount of all worJ~ revered to com/~,~te the above improvement. Michael 'Can Milligen, City Manager City of Dubuque, Iowa Michael A. Koch Public Works Director The undersigned, , contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: BY: ~. ,~,z,.Z~ ~_..Z~-- /~ ¢ $21,489.80 $21~489.80