Loading...
Eleventh Street Stair and Handrailing Repair Project Acceptance TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 11th Street Stair and Handrail Repair Project C I P: 3501432 DATE: September 20, 2012 City Engineer Gus Psihoyos is recommending acceptance of the public improvements for the 11th Street Stair and Handrail Repair Project, as completed by Drew Cook & Sons Excavating, in the final contract amount of $20,462.84. This is a 4.8% increase from the original contract amount of $19,527.14 due to the addition of 10 feet of railing to the project. I concur with the recommendation and respectfully request Mayor and City Council approval. /7AAh kt1&1 Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: September 20, 2012 RE: 11th Street Stair and Handrail Repair Project CI P: 3501432 INTRODUCTION Dubuque kital awamaracftr 2012 The purpose of this memorandum is to recommend final acceptance of the public improvements and authorize final payment to the contractor for 11th Street Stair & Rail Repair Project through the adoption of the enclosed resolution. BACKGROUND Staff observed deteriorated conditions to the existing steps, sidewalk and railing on 11th Street and in the interest of pedestrian safety; a project was initiated to repair the noted conditions. In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, on May 31, 2012 the City solicited informal bids for the 11th Street Stair & Rail Repair Project. Drew Cook & Sons of Dubuque, Iowa, submitted the low bid in the amount of $19,527.14. DISCUSSION The project provided for the removal and reconstruction of 23 concrete steps, the replacement of 56 lineal feet of sidewalk and the removal and replacement of 210 lineal feet of pedestrian railing. The 11th Street Stair & Rail Repair Project was completed by Drew Cook & Sons of Dubuque, Iowa, in the final contract amount of $20,462.84, which is a 4.8% increase from the original contract amount of $19,527.14. The additional cost was primarily due to the 10 feet of additional railing that was added to the project. RECOMMENDATION I recommend that the City Council accept the improvements and authorize final payment of the contract amount of $20,462.84 to Drew Cook & Sons Excavating for the 11th Street Stair and Handrail Repair Project. BUDGET IMPACT The cost summary for the 11th Street Stair and Handrail Repair Project is as follows: The Project funding summary is as follows: CIP Award Final Construction Contract $19,527.14 $20,462.84 Contingency 1,952.00 0 Construction Engineering & Inspection 3,222.00 3,069.43 Total Project Cost $24,701.14 $23,532.27 The Project funding summary is as follows: CIP Fund Description Fund Amount 3501432 Steps, Railings, Fencing $23,532.27 Total Project Funding $23,532.27 REQUESTED ACTION I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorize final payment of the contract amount of $20,462.84 to Drew Cook & Sons Excavating for the 11th Street Stair and Handrail Repair project. Prepared by: Bob Schiesl, Assistant City Engineer cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Jon Dienst, Civil Engineer F: \PROJECTS \Stairs & Steps \2012 \11th Street Stair & Rail \Council & Staff Documents RESOLUTION NO. 263 -12 ACCEPTING THE 11TH STREET STAIR AND HANDRAILING REPAIR PROJECT, AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 11TH Street Stair and Handrailing Repair Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Steps, Railing, Fencing CIP appropriation for the contract amount of $20,462.84 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this ist day of October 12. (Y. Roy D. Buol, Mayor diPber---W2171 Kevir . Firnstahl, CM y Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 11TH STREET STAIR AND HANDRAILING REPAIR PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the, that the 11TH Street Stair and Handrail Repair Project, has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $20,462.84. Dated thisv� day of , 2012. Filed in the office of the City Clerk on thei day of %, , 2012. Kevin :. irnstahl, MCY Clerk Gus Psihoyos, City Engineer CITY OF DUBUQUE ENGINEERING CONTRACTOR: Drew Cook & Sons Excavating FINAL PAYMENT ( #3) PROJECT NAME: 11th Street Stair & Railing Repair ITEM 08/23/2012 Contract Amount $19,527.14 QTY. AMOUNT QTY. AMOUNT QTY. UNIT UNIT COST this Period EARNED this Pe to Date EARNED to Date DEMOLITION & REMOVAL 1. Removal of Existing Steps, Sidewalk 326.00 S.F. $8.00 0.00 0.00 326.00 $2,608.00 EXCAVATION & STONE 2. Excavation, Unclassified 3. Graded Stone Base 4. Backfll, Topsoil 12.07 CY 7.90 TON 13.50 SY SIDEWALK & STEPS 5. PCC Steps, Treads (includes Footing & Reinforcement 6. PC Concrete Sidewalk, 6 ", Construct 23.08 LF 220.00 SF MISCELLANEOUS 7. Install New Stair Railing 8. Seeding, Mulching, and Watering 9. Erosion Control Plan, Operating Procedures 10. Traffic Control and Safety Control 11. Mobilization 200.00 L.F. 13.50 SY 1.00 Lump Sum 1.00 Lump Sum 1.00 Lump Sum EXTRA WORK: 12. Excelsior Mat Construction Total $12.00 0.00 0.00 12.07 $144.84 $25.00 0.00 0.00 5.65 $141.25 $40.00 0.00 0.00 13.50 $540.00 $60.00 0.00 0.00 29.80 $1,788.00 $7.00 0.00 0.00 225.00 $1,575.00 $55.00 0.00 $0.00 208.25 $11,453.75 $12.00 0.00 $0.00 13.50 $162.00 $250.00 0.00 $0.00 1.00 $250.00 300.00 0.00 $0.00 1.00 $300.00 $1,400.00 0.00 $0.00 1.00 $1,400.00 Lump Sum $100.00 0.00 $0.00 1.00 $100.00 Payments previously approved: 1 $7,654.24 7. 2 $11,785.46 8. 3 9. 4 10. 5 11. 6 12. prices of work and material shown on the face of this Partial Payment form are correct that all work has been performed and materials supplied in full accordance with the terms and conditions of the contract documents and authorized changes thereto: that the following is a true and correct statement of the contract account up to and including the last day of the period covered by this payment and that no part of the "Total Amount Due" has been received: $0.00 $20,462.84 TOTAL $19,439.70 TOTAL AMOUNT EARNED TO DATE $20,462.84 RETAINED PERCENTAGE $0.00 TOTAL EARNED LESS RETAINED PERCENTAGE $20,462.84 TOTAL PREVIOUSLY APPROVED $19,439.70 TOTAL AMOUNT DUE $1,023.14 I further certify that all claims outstanding as of this date against the under- signed as contractor for labor, materials, and expendable equipment employed in the perfor- mance of said contract up to this date have been paid in full accordance with the require- ments of said contract. CO TOR: DREW COOK SONS EXCAVATING BY: - DATE: - -)3- - pp TITLE: CC 1/QL'� CERTIFICATE OF THE CITY ENGINEER I certify that I have verified this payment, and that to the best of my knowledge and belief it is a true and correct statement of work performed and materials supplied by the Contractor, and that the Contractor's certified statement of the account and the amount due is correct and just, and that all work and material included in this Partial Payment have been performed in full accordance with the terms and conditions of the contract documents and authorized changes thereto. DATE: TITLE: - ✓ r . ,'Vr� / /. U'1..+ ti FINAL CONTRACT PROJECT NAME: 11th Street Stair & Railing Repair CONTRACTOR: Drew Cook & Sons Excavating ITEM DEMOLITION & REMOVAL 1. Removal of Existing Steps, Sidewalk EXCAVATION & STONE 2. Excavation, Unclassified 3. Graded Stone Base 4. Backfill, Topsoil City of Dubuque QTY UNIT UNIT COST 326.00 S.F. $8.00 12.07 CY 7.90 TON 13.50 SY SIDEWALK & STEPS 5. PCC Steps, Treads (includes Footing & Reinforc 6. PC Concrete Sidewalk, 6 ", Construct 23.08 LF 220.00 SF MISCELLANEOUS 7. Install New Stair Railing 8. Seeding, Mulching, and Watering 9. Erosion Control Plan, Operating Procedures 10. Traffic Control and Safety Control 11. Mobilization 200.00 L.F. 13.50 SY 1.00 Lump Sum 1.00 Lump Sum 1.00 Lump Sum EXTRA WORK: 12. Excelsior Mat $12.00 $25.00 $40.00 $60.00 $7.00 $55.00 $12.00 $250.00 300.00 $1,400.00 Lump Sum $100.00 I hereby certify that the above statement shows in detail the correct amount of all wojk required to complete the above improvement. APPROVED: Michael Van'Milligen, City Manager City of Dubuque,lowa The undersigned, , contractor for the above improvement, does hereby accept the above "Total Due Contractor ", as full settlement for all claims for said improvement. CONTRACTOR: BY: Date: 8/23/12 Contract Amount $19,527.14 QTY. TOTAL TO DATE COST 326.00 $2,608.00 12.07 $144.84 5.65 $141.25 13.50 $540.00 29.80 $1,788.00 225.00 $1,575.00 208.25 $11,453.75 13.50 $162.00 1.00 $250.00 1.00 $300.00 1.00 $1,400.00 1.00 $100.00 TOTAL DUE CONTRACTOR $20,462.84 ENGINEERING $3,069.43 TOTAL CONSTRUCTION COS" $23,532.27 ■.-/ Gus Psihoyos City Engineer