IDOT Fed Aid Spruce to Delhi StMEMORANDUM
November 13, 2001
TO:
FROM:
SUBJECT:
The Honorable Mayor and City Council Members
Michael C. Van Milligen, City Manager
Iowa Department of Transportation for Federal Aid Surface Transportation
Project (STP)
The City has requested federal aid assistance in the form of STP funds (Surface
Transportation Program) in the cost to reconstruct University Avenue from Spruce
Street to Delhi Street. This concept has been approved by the Dubuque Metropolitan
Area Transportation Study. This federal assistance allows the City to recover 80% of
the street construction cost, exclusive of inspection fees. Public Works Director Mike
Koch is recommending approval of the federal aid grant agreement.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Michael A. Koch, Public Works Director
CITY OF DUBUQUE, IOWA
MEMORANDUM
November 13, 2001
TO:
FROM:
SUBJECT:
Michael C. Van Milligen, City Manager
Michael A. Koch, Public Works Director
Iowa Department of Transportation for Federal
Transportation Project (STP)
Aid Surface
INTRODUCTION
Enclosed is the proposed agreement between the City of Dubuque and the Iowa
Department of Transportation (IDOT) relating to the funding for the reconstruction
of University Avenue from Spruce Street to Delhi Street.
DISCUSSION
The City has requested federal aid assistance in the form of STP funds (Surface
Transportation Program) in the cost to reconstruct University Avenue from Spruce
Street to Delhi Street. This federal assistance allows the City to recover eighty
percent (80%) of the street construction cost, exclusive of inspection fees.
The budgeted funds for the project are as follows:
STP Funds
Special Assessments
City Share
874,000
150,000
226,000
TOTAL $1,250,000
RECOMMENDATION
The agreement has been reviewed, and I would recommend that the City Council
approve the federal aid grant agreement.
ACTION TO BE TAKEN
The City Council should approve the attached resolution authorizing the City
Manager to execute two copies of the agreement.
MAK/vjd
cc: Michael Felderman, Civil Engineer
Steve Williams, DMATS
Prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13~ Street, Dubuque, IA 52001-4864
RESOLUTION NO. 490-01
RESOLUTION APPROVING THE PROJECT AGREEMENT WITH THE IOWA
DEPARTMENT OF TRANSPORTATION FOR FEDERAL-AID SURFACE
TRANSPORTATION PROGRAM (STP) PROJECT 6-01-STPU-13 WITH THE
IOWA DEPARTMENT OF TRANSPORTATION RELATING TO THE
CONSTRUCTION OF UNIVERSITY AVENUE FROM DELHI TO SPRUCE
Whereas, the Iowa Department of Transportation (IDOT) is proposing to fund
eighty percent (80%) of the cost for the reconstruction of University Avenue from
Delhi to Spruce Street.
Whereas, IDOT has prepared an agreement outlining the terms under which
Federal-Aid STP funds may be made available to the City for the reconstruction of
University Avenue from Delhi to Spruce Street; and
Whereas, the City Council of the City of Dubuque approves the terms and
conditions of said agreement.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA: .
Section 1. That the Iowa Department of Transportation Agreement 6-01-
STPU-13 consisting of the agreement providing for IDOT's reimbursement to the
City for a portion of the cost of the reconstruction of University Avenue from Delhi
to Spruce Street be approved.
Section 2. That the Mayor be authorized and directed to execute two
copies of the agreement.
Passed, approved and adopted this 19th
Attest:
/s/ Jeanne F. Schneider, City Clerk
day of November ~ ,2001.
/s/ Terrance M. Duggan, Mayor
Iowa Department of Transportation
District 6
430 Sixteenth Avenue SW
P,O, Box 3t50, Cedar Rapids, IA 52406-3150
3t9-364-0235
FAX: 319-364-9614
rog~er.walton@dot.state.ia.us
November 6, 2001
Reft
STP-U-2100(621 )--70-31
Dubuque County
City of Dubuque
Agreement 6-01-STPU- 13
Mike Koch, P.E.
City Engineer
50 West 13th Stret
Dubuque, IA 52001-4845
SUBJECT: STP Project
Dear Mike:
I have attached two (2) copies of an agreement between the city of Dubuque and the Iowa
Department of Transportation for the above referenced project. The project involves PCC pave
University Avenue from Spruce Street to Delhi Street.
Please secure the necessary approvals and signatures of your city council and return both signed
copies of the agreement to this office for further processing. After I receive the signed copies of the
agreement, I will sign the agreement, and I will have the fully executed agreement returned to you
office.
You and/or any engineer involved with the project should carefully review both the exhibit sections
that pertain to project right of way acquisition and the agreement paragraph pertaining to the amount
of federal funds.
If you have any questions concerning this agreement, please contact me ar the above listed phone
number.
Very truly yours,
Roger R. Walton, P.E.
Local SysTems Engineer
RRW:keh
Attachment
January 2001
IOWA DEPARTMENT OF TRANSPORTATION
AGREEMENT FOR FEDERAL-AID
SURFACE TRANSPORTATION PROGRAM (STP) PROJECT
RECIPIENT: City of Dubuque
PROJECT NO.: STP-U-2100(621)--70-31
IOWA DOT
AGREEMENT NO.: 6-01-STPU-13
This is an agreement between the City of Dubuque, Iowa (hereinafter referred to as the
RECIPIENT) and the Iowa Department of Transportation (hereinafter referred to as the
DEPARTMENT). Iowa Code Sections 306A and 307.44 provide for the RECIPIENT and the
DEPARTMENT to enter into agreements with each other for the purpose of financing
transportation improvement projects on streets and highways in Iowa with Federal funds. The
RECIPIENT proposes a Surface Transportation Program (STP) project for funding under
Sec. 133 (b) of Title 23, United States Code.
The Transportation Equity Act for the 21st Century (TEA-21), enacted in 1998, reestablished
the Surface Transportation Program (STP). Federal regulations provide that the STP funds
are to be administered by the DEPARTMENT.
The OMB (Office of Management and Budget) Circular A-133 requires the RECIPIENT to
report the CFDA (Catalog of Federal Domestic Assistance) number and title on all Federal-
Aid Projects. The RECIPIENT will use CFDA #20.205 and rifle, "Highway Planning and
Construction" for this project. This information should be reported in "The Schedule of
Expenditures of Federal Awards".
Pursuant to the terms of this agreement, applicable statutes, administrative rules, and
Programming by the Department and the East Central Intergovernmental Association, the
DEPARTMENT agrees to provide STP funding to the RECIPIENT for the authorized and
approved costs for eligible items associated with said improvements.
In consideration of the foregoing and the mutual promises contained in this agreement, the
parties agree as follows:
The RECIPIENT shall be the lead local governmental agency for carrying out the
provisions of this agreement.
All notices required under this agreement shall be made in writing to the
DEPARTMENT and the RECIPIENT's contact person. Tire DEPARTMENT's
contact person shall be the District 6 Local Systems Engineer. The RECIPIENT's
contact person shall be the City Engineer.
Agreement No.: 6-01-STPU-13
Page 2
The RECIPIENT shall be responsible for the development and completion of the
following described STP project:
To portland cement concrete (PCC) pave University Avenue from Spruce Street to
Delh/Street.
The RECIPIENT shall receive reimbursement of Federal STP funds for authorized
and approved project costs o£eligible items. The portion of the eligible project costs
paid by Federal STP funds shall be limited to a maximum of either 80 percent of
eligible costs or the amount stipulated in the
East Central Intergovernmental Association current Transportation Improvement
Program (TIP) and approved in the current Statewide Transportation Improvement
Program (STIP), whichever is less.
This agreement will become null and void if the project described in Section 3. drops
out of the East Central Intergovernmental Association current TIP or the approved
current STIP prior to obligation of Federal funds.
6. The attached EXHIBIT 1 will apply and is hereby made a part of this agreement.
Agreement No.: 6-01 -STPU- 13
Page 3
IN WITNESS WHEREOF, each of the parties hereto has executed this Agreement Number
6-01-STPU-13 as of the date shown opposite its signature below.
RECIPIENT: City of Dubuque
By
Title
Date
I, , certify that I am the Clerk of the CITY, and
that ~ who signed said Agreement for and on behalf of
the CITY was duly authorized to execute the same by virtue of a formal Resolution duly
passed and adopted by the CITY, on the day of ~.__
Signed Date _, __
City Clerk of Dubuque, Iowa
IOWA DEPARTMENT OF TRANSPORTATION
Highway Division
By_ Date .,
Roger R. Walton, P.E.
Local Systems Engineer
District 6
July 1999
EXHIBIT 1
Standard Provisions for Federal-Aid
Project Agreement
Since this project is to be financed with local and Federal funds, the RECIPIENT
shall take the necessary actions to comply with applicable State and Federal laws and
regulations.
In all programs and activities of Federal-aid recipients, subrecipients, and
contractors, no person in the United States shall be excluded from
participation in, be denied the benefits of, or be otherwise subjected to
discrimination on the grounds of race, color, national origin, sex, age or
handicap/disability. The DEPARTMENT will determine a Disadvantage
Business Enterprise (DBE) Commitment on all Federal-aid projects.
The RECIPIENT shall take the appropriate actions and prepare the necessary
documents to fulfill the requirements of the DEPARTMENT's Action Plan for project
environmental studies including historical/cultural reviews and location/design
approval. If farmland is to be acquired, whether for use as project right-of-way or
permanent easement, the RECIPiENT shall submit the U.S. Department of
Agriculture Farmland Conversion Impact Rating form, when required, to the U.S.
Natural Resources Conservation Service (NRCS).
The RECIPIENT shall obtain agreements, as needed, from railroad and utility
companies and shall obtain project permits and approvals, when necessary, from the
Iowa Department of Cultural Affairs (State Historical Society of Iowa; State Historic
Preservation Officer), Iowa Department of Natural Resources, U.S. Coast Guard,
U.S. Army Corps of Engineers and the DEPARTMENT, etc.
The project plans, specifications and project cost estimate (PS&E) shall be prepared
and certified by a professional engineer licensed to practice in the State of Iowa. The
RECIPIENT shall submit the plans, specifications and other contract documents to
the DEPARTMENT for review and authorization to let the project.
If Federal-aid is requested for in-house engineering services, the RECIPIENT will
follow the procedure outlined by the DEPARTMENT. The RECIPIENT, desiring to
claim indirect costs under Federal awards, must prepare an indirect cost rate proposal
and related documentation in accordance with the requirements of Office of
Management and Budget (OMB) Circular A-87 - Cost Principles for State, Local,
and Indian Tribal Governments. Reimbursement eligibility requires an indirect cost
rate proposal to be certified by the governmental unit designated cognizant agency or
the Federal agency providing the largest amount of Federal funds to the governmental
unit.
If Federal-aid is requested for preliminary and/or construction engineering costs, the
RECIPIENT will select a consultant(s) in accordance with the DEPARTMENT's
consultant selection process.
1
-2-
The RECIPIENT and the Consultant shall prepare a consultant contract for
engineering services in accordance with Title 23, Code of Federal Regulations, Part
172 - Administration of Negotiated Contracts (23 CFR 172). This is required only if
the RECiPIENT uses federal funds for engineering services.
After the contents of the consultant contract have been mutually approved, the
RECIPIENT shall execute the contract and forward the same to the DEPARTMENT
for authorization only if federal funds are used for engineering services.
If preliminary engineering is federally funded, if the "do nothing" alternate is not
selected, and if right-of-way acquisition for or actual construction of the road is not
started by the close of the tenth fiscal year following the fiscal year in which the
Federal-Aid Project agreement is executed, the RECIPIENT will repay to the
DEPARTMENT an amount equal to the amount of Federal funds made available for
such engineering.
10.
The RECIPIENT shall acquire the project right-of-way, whether by lease, easement
or fee title and shall provide relocation assistance benefits and payments in
accordance with the procedures set forth in the DEPARTMENT's Right of Way
Manual. The RECIPIENT shall contact the DEPARTMENT for assistance, as
necessary, to ensure compliance with the required procedures, even if no federal
funds in Right of Way purchase are involved. The RECIPIENT will need to get
environmental concurrence before acquiring any needed right-of-way. With prior
approval, hardship and protective buying is possible. If the RECIPIENT requests
Federal-aid participation for right-of-way acquisition, the RECiPIENT will need to
get environmental concurrence and Federal Highway Administration's (FHWA)
authorization before purchasing any needed right-of-way.
11.
The RECiPIENT shall comply with the Policy for Accommodating Utilities on City
and County Federal-aid Highways Right of Way and the Policy for Accommodating
Utilities on Primary Road System when on State's right of way. Certain utility
relocation, alteration, adjustment, or removal costs to the RECIPIENT for the project
may be eligible for Federal-aid reimbursement in accordance with the FHWA rules
applicable to the type of utility involved and Iowa Code Chapter 306A.
12.
Traffic control devices, signing, or pavement markings installed within the limits of
this project shall conform to the "Manual on Uniform Traffic Control Devices for
Streets and Highways" per 761 Iowa Administrative Code (IAC) Chapter 130. The
safety of the general public shall be assured through the use of proper protective
measures and devices such as fences, barricades, signs, flood lighting, and warning
lights as necessary.
13.
The RECIPIENT shall forward a Federal-aid Project Development Certification and
final PS&E to the DEPARTMENT. Following FHWA's authorization, the
DEPARTMENT will advertise the projects for letting and furnish the RECIPIENT
with a sample letting package. The RECIPIENT shall comply with the public
hearing requirements of the Iowa Code Section 384.102.
EXHIBIT i
-3-
14.
If the project is to be accomplished via a contract awarded by competitive bidding,
the project will be let by the DEPARTMENT in accordance with its normal letting
procedures. After bids are received and reviewed, the DEPARTMENT will furnish
the RECIPIENT with a tabulation of responsive bids received.
15.
When let by the DEPARTMENT, the DEPARTMENT will prepare an Iowa DOT
Staff Action for concurrence to award the contract. The DEPARTMENT will mail
three (3) originals of the unexecuted contract(s) to the RECIPIENT.
i6.
The RECIPiENT shall take action to award the contract or reject all bids. Following
award of contract and signature by the lowest responsive bidder, the RECIPiENT
shall forward to the DEPARTMENT two (2) copies of the fully executed contract,
two (2) copies of the performance bond, and two (2) copies of the certificate of
17.
If Federal-aid is requested for rome account construction, the RECIPIENT will
follow the procedure outlined by the DEPARTMENT.
18.
The DEPARTMENT will prepare the Federal-aid Project Agreement and submit it
for Federal Highway Administration (FHWA) approval and obligation of Federal-aid
funds.
19.
The RECIPiENT shall comply with the procedures and responsibilities for materials
testing and construction inspection according to Department's Instructional
Memorandums (I.M.'s). The DEPARTMENT will bill the RECIPIENT for testing
services according to its normal policy.
20.
The project shall be constructed under the DEPARTIVlENT's Standard Specifications
and applicable special provisions. Prior to their use in the PS&E, specifications
developed by the RECIPIENT for individual construction items shall be approved by
the DEPARTMENT.
21.
If the project right-of-way is federally funded and if the actual construction is not
undertaken by the close of the twentieth fiscal year following the fiscal year in which
the Federal-Aid Project agreement is executed, the RECIPIENT will repay the sum or
sums of Federal funds in the right of way to the DEPARTMENT.
22.
The RECIPIENT may submit to the DEPARTMENT periodic itemized claims for
reimbursement for eligible project costs. Reimbursement claims shall include
certification that all eligible project costs, for which reimbursement is requested, have
been completed in substantial compliance with the terms of this agreement.
23.
The DEPARTMENT shall reimburse the RECIPIENT for properly documented and
certified claims for eligible project costs, either by state warrant, or by crediting other
accounts from which payment may have been initially made. If, upon audits of
contracts, the DEPARTMENT determines the RECIPiENT is overpaid, the
RECIPIENT shall reimburse the overpaid amount to the DEPARTMENT.
EXHIBIT 1
-4-
24.
Upon completion of the project described in this agreement, a professional engineer
licensed to practice in the State of Iowa shall certify in writing to the
DEPARTMENT that the project was completed in substantial compliance with the
plans and specifications set out in this agreement. Final reimbursement of Federal
funds shall be made only after the DEPARTMENT accepts the project as complete.
25.
The RECIPIENT shall maintain all books, documents, papem, accounting records,
reports and other evidence pertaining to costs incurred for the project. The
RECIPIENT shall also make such materials available at all reasonable times during
the construction period and for three years from the date of final Federal
reimbursement, for inspection by the DEPARTMENT, FHWA, or any authorized
representatives of the Federal Government. Copies of said materials shall he
furnished by the RECIPIENT if requested.
26.
The RECIPIENT agrees to indemnify, defend and hold the DEPARTMENT harmless
from any action or liability arising out of the design, construction, maintenance,
placement of traffic control devices, inspection or use of this project. This agreement
to indemnify, defend and hold harmless applies to all aspects of the
DEPARTMENT's application review and approval process, plan and construction
reviews, and funding participation.
27.
The RECIPIENT shall maintain, or cause to be maintained, the completed
improvement in a manner acceptable to the DEPARTMENT and the FHWA.
28.
Implementation of Clean Air Act and Federal Water Pollution Control Act
(Applicable to Contracts and Subcontracts which exceed $100,000):
The RECIPIENT stipulates that any facility to be utilized in
performance under or to benefit from this agreement is not listed on
the Environmental Protection Agency (EPA) List of Violating
Facilities or is under consideration to be listed. This is issued
pursuant to the requirements of the Clean Air Act, as amended, and
the Federal Water Pollution Control Act, as amended.
The RECIPIENT agrees to comply with all of the requirements of
Section 114 of the Clean Air Act and Section 308 of the Federal
Water Pollution Control Act, and all regulations and guidelines issued
thereunder.
29.
If any part of this agreement is found to be void and unenforceable, the remaining
provisions of this agreement shall remain in effect.
30.
It is the intent of both parties that no third party beneficiaries be created by this
agreement.
EXHIBIT 1
-5-
31.
If the RECIPIENT elects to levy special assessments as a means of raising the local
share of the total project costs, the RECIPIENT shall reimburse the DEPARTMENT
in the amount that payments of Federal-aid and collections of special assessments,
excluding interest and penalties, exceed the total cost of the public improvement as
established by the provisions of Iowa Code Chapter 384. The RECIPIENT agrees
that at such time as its collections (exclusive of interest and penalties which shall be
retained by the RECIPIENT) from special assessments levied for this project exceed
the local share of total projects costs, the RECIPIENT shall refund to the
DEPARTMENT all funds collected in excess of the total project costs (including
interest and penalties associated with the amount of the excess) within sixty (60) days
of the receipt of any special assessment payments. The RECIPIENT shall notify the
DEPARTMENT when any lands specially assessed no longer qualify for an
agricultural deferment of the special assessment have been satisfied. The
DEPARTMENT shall credit reimbursement billings to the FHWA in the amount of
refunds received from the RECIPIENT.
32.
This agreement shall be executed and delivered in two or more copies, each of which
so executed and delivered shall be deemed to be an original and shall constitute but
one and the same instrument.
33.
This agreement, as set forth in items 1 through 6 and EXHIBIT 1 paragraphs 1
through 33 herein, constitutes the entire agreement between the DEPARTMENT and
the RECIPIENT concerning this project. Representations made before the signing of
this agreement are not binding, and neither party has relied upon conflicting
representations in entering into this agreement. Any change or alteration to the terms
of this agreement must be made in the form o£an addendum to this agreement. Said
addendum shall become effective only upon written approval of the DEPARTMENT
and the RECIPIENT.
January2001
IOWA DEPARTMENT OF TRANSPORTATION
AGREEMENT FOR~FEDERAL-AID
SURFACE TRANSPORTATION PROGRAM (STP) PROJECT
RECIPIENT: City of Dubuque
PROJECT NO.: STP-U-2100(621)--70-31
IOWA DOT
AGREEMENT NO.: 6-01-STPU-13
This is an agreement between the City of Dubuque, Iowa (hereinafter referred to as the
RECIPIENT) and the Iowa Department of Transportation (hereinafter referred to as the
DEPARTMENT). Iowa Code Sections 306A and 307.44 provide for the RECIPIENT and the
DEPARTMENT to enter into agreements with each other for the purpose of financing
transportation improvement projects on streets and highways in Iowa with Federal funds. The
RECIPIENT proposes a Surface Transportation Program (STP) project for funding under
Sec. 133 (b) of Title 23, United States Code.
The Transportation Equity Act for the 2tst Century (TEA-21), enacted in 1998, reestablished
the Surface Transportation Program (STP). Federal regulations provide that the STP funds
are to be administered by the DEPARTMENT.
The OMB (Office of Management and Budget) Circular A-t33 requires the RECIPIENT to
report the CFDA (Catalog of Federal Domestic Assistance) number and title on all Federal-
Aid Projects. The RECIPIENT will use CFDA #20.205 and rifle, "Highway Planning and
Construction" for this project. This information should be reported in "The Schedule of
Expenditures of Federal Awards".
Pursuant to the terms of this agreement, applicable statutes, administrative roles, and
Programming by the Department and the East Central Intergovernmental Asso. ciation, the
DEPARTMENT agrees to provide STP funding to the RECIPIENT for the authorized and
approved costs for eligible items associated with said improvements.
In consideration of the foregoing and the mutual promises contained in this agreement, the
parties agree as follows:
The RECIPIENT shall be the lead local governmental agency for carrying out the
provisions of this agreement.
All notices required under this agreement shall be made in writing to the
DEPARTMENT and the RECIPIENT's contact person. The DEPARTMENT's
contact person shall be the District 6 Local Systems Engineer. The RECIPIENT's
contact person shall be the City Engineer.
Agreement No.: 6-01 -STPU- 13
Page 2
The RECIPIENT shall be responsible for the development and completion of the
following described STP project:
To portland cement concrete (PCC) pave University Avenue from Spruce Street to
Delhi Street.
The RECIPIENT shall receive reimbursement of Federal STP funds for authorized
and approved project costs of eligible items. The portion of the eligible project costs
paid by Federal STP funds shall be limited to a max/mum of either 80 percent of
eligible costs or the amount stipulated in the
East Central Intergovernmental Association current Transportation Improvement
Program (TIP) and approved in the current Statewide Transportation Improvement
Program (STIP), whichever is less.
This agreement will become null and void if the project described in Section 3. drops
out of the East Central Intergovernmental Association current TIP or the approved
current STIP prior to obligation of Federal funds.
6. The attached EXHIBIT 1 will apply and is hereby made a part of this agreement.
Agreement No.: 6-01-STPU- 13
Page 3
IN WITNESS WHEREOF, each of the parties hereto has executed this Agreement Number
6-01-STPU-13 as of the date shown opposite its signature below.
RECIPIENT: City of Dubuque
By
Title
Date
I,_ , certify that I am the Clerk of the CITY, and
that ., who signed said Agreement for and on behalf of
the CITY was duly authorized to execute the same by virtue of a formal Resolution duly
passed and adopted by the CITY, on the day of
Signed Date , __
City Clerk of Dubuque, Iowa
IOWA DEPARTMENT OF TRANSPORTATION
Highway Division
By_ Date
Roger R. Walton, P.E.
Local Systems Engineer
District 6
July 1999
EXHIBIT 1
Standard Provisions for Federal-Aid
Project Agreement
Since this project is to be financed with local and Federal funds, the RECIPIENT
shall take the necessary actions to comply with applicable State and Federal laws and
regulations.
In all programs and activities of Federal-aid recipients, subrecipients, and
contractors, no person in the United States shall be excluded from
participation in, be denied the benefits of, or be otherwise subjected to
discrimination on the grounds of race, color, national origin, sex, age or
handicap/disability. The DEPARTMENT will determine a Disadvantage
Business Enterprise (DBE) Commitment on all Federal-aid projects.
The RECIPIENT shall take the appropriate actions and prepare the necessary
documents to fulfill the requirements of the DEPARTMENT's Action Plan for project
environmental studies including historical/cultural reviews and location/design
approval. If farmland is to be acquired, whether for use as project right-of-way or
permanent easement, the RECIPIENT shall submit the U.S. Department of
Agriculture Farmland Conversion Impact Rating form, when required, to the U.S.
Natural Resources Conservation Service (NRCS).
The RECIPIENT shall obtain agreements, as needed, from railroad and utility
companies and shall obtain project permits and approvals, when necessary, from the
Iowa Department of Cultural Affairs (State Historical Society of Iowa; State Historic
Preservation Officer), Iowa Depamnent of Natural Resources, U.S. Coast Guard,
U.S. Army Corps of Engineers and the DEPARTMENT, etc.
The project plans, specifications and project cost estimate (PS&E) shall be prepared
and certified by a professional engineer licensed to practice in the State of Iowa. The
RECIPIENT shall submit the plans, specifications and other contract documents to
the DEPARTMENT for review and authorization to let the project.
If Federal-aid is requested for in-house engineering services, the RECIPIENT will
follow the procedure outlined by the DEPARTMENT. The RECIPIENT, desiring to
claim indirect costs under Federal awards, must prepare an indirect cost rate proposal
and related documentation in accordance with the requirements of Office of
Management and Budget (OMB) Circular A-87 - Cost Principles for State, Local,
and Indian Tribal Governments. Reimbursement eligibility requires an indirect cost
rate proposal to be certified by the governmental unit designated cognizant agency or
the Federal agency providing the largest amount of Federal funds to the governmental
anit.
If Federal-aid is requested for preliminary and/or construction engineering costs, the
RECIPIENT will select a consultant(s) in accordance with the DEPARTMENT's
consultant selection process.
EXHIBIT 1
-2-
The RECIPIENT and the Consultant shall prepare a consultant contract for
engineering services in accordance with Title 23, Code of Federal Regulations, Part
172 ~ Administration of Negotiated Contracts (23 CFR 172). This is required only if
the RECIPIENT uses federal funds for engineering services.
After the contents of the consultant contract have been mutually approved, the
RECIPIENT shall execute the contract and forward the same to the DEPARTMENT
for authorization only if federal funds are used for engineering services.
If preliminary engineering is federally funded, if the "do nothing" alternate is not
selected, and if right-of-way acquisition for or actual construction of the road is not
started by the close of the tenth fiscal year following the fiscal year in which the
Federal-Aid Project agreement is executed, the RECIPIENT will repay to the
DEPARTMENT an amount equal to the amount of Federal funds made available for
such engineering.
10.
The RECIPIENT shall acquire the project right-of-way, whether by lease, easement
or fee title and shall provide relocation assistance benefits and payments in
accordance with the procedures set forth in the DEPARTMENT's Right of Way
Manual. The RECIPIENT shall contact the DEPARTMENT for assistance, as
necessary, to ensure compliance with the required procedures, even if no federal
funds in Right of Way purchase are involved. The RECIPIENT will need to get
environmental concurrence before acquiring any needed right-of-way. With prior
approval, hardship and protective buying is possible. If the RECIPIENT requests
Federal-aid participation for right-of-way acquisition, the RECIPIENT wilt need to
get environmental concurrence and Federal Highway Administration's (FHWA)
authorization before purchasing any needed right-of-way.
11.
The RECIPIENT shall comply with the Policy for Accommodating Utilities on City
and County Federal-aid Highways Right of Way and the Policy for Accommodating
Utilities on Primary Road System when on State's right of way. Certain utility
relocation, alteration, adjustment, or removal costs to the RECIPIENT for the project
may be eligible for Federal-aid reimbursement in accordance with the FHWA rules
applicable to the type of utility involved and Iowa Code Chapter 306A.
12.
Traffic control devices, signing, or pavement markings installed within the limits of
this project shall conform to the "Manual on Uniform Traffic Control Devices for
Streets and Highways" per 761 Iowa Administrative Code (LAC) Chapter 130. The
safety of the general public shall be assured through the use of proper protective
measures and devices such as fences, barricades, signs, flood lighting, and warning
lights as necessary.
13.
The RECIPIENT shall forward a Federal-aid Project Development Certification and
final PS&E to the DEPARTMENT. Following FHWA's authorization, the
DEPARTMENT will advertise the projects for letting and furnish the RECIPIENT
with a sample letting package. The RECIPIENT shall comply with the public
hearing requirements of the Iowa Code Section 384.102.
EXHIBIT 1
-3-
14.
If the project is to be accomplished via a contract awarded by competitive bidding,
the project will be let by the DEPARTMENT in accordance with its normal letting
procedures. After bids are received and reviewed, the DEPARTMENT will furnish
the RECIPIENT with a tabulation of responsive bids received.
15.
When let by the DEPARTMENT, the DEPARTMENT will prepare an Iowa DOT
Staff Action for concurrence to award the contract. The DEPARTMENT will mail
three (3) originals of the unexecuted contract(s) to the RECIPIENT.
I6.
The RECIPIENT shall take action to award the contract or reject all bids. Following
award of contract and si~aature by the lowest responsive bidder, the RECIPIENT
shall forward to the DEPARTMENT two (2) copies of the fully executed contract,
two (2) copies of the performance bond, and two (2) copies of the certificate of
insurance.
17.
If Federal-aid is requested for force account construction, the RECIPIENT will
follow the procedure outlined by the DEPARTMENT.
I8.
The DEPARTMENT will prepare the Federal-aid Project Agreement and submit it
for Federal Highway Administration (FHWA) approval and obligation of Federal-aid
funds.
I9.
The RECIPIENT shall comply with the procedures and responsibilities for materials
testing and construction inspection according to Department's Instructional
Memorandums (I.M.'s). The DEPARTMENT will bill the RECIPIENT for testing
services according to its normal policy.
20.
The project shall be constructed under the DEPARTMENT's Standard Specifications
and applicable special provisions. Prior to their use in the PS&E, specifications
developed by the RECIPIENT for individual construction items shall be approved by
the DEPARTMENT.
21.
If the project right-of-way is federally funded and if the actual consWaction is not
undertaken by the close of the twentieth fiscal year following the fiscal year in which
the Federal-Aid Project agreement is executed, the RECIPIENT will repay the sum or
sums of Federal funds in the right of way to the DEPARTMENT.
22.
The RECIPIENT may submit to the DEPARTMENT periodic itemized claims for
reimbursement for eligible project costs. Reimbursement claims shall include
certification that all eligible project costs, for which reimbursement is requested, have
been completed in substantial compliance with the terms of this agreement.
23.
The DEPARTMENT shall reimburse the RECIPIENT for properly documented and
certified claims for eligible project costs, either by state warrant, or by crediting other
accounts from which payment may have been initially made. If, upon audits of
contracts, the DEPARTMENT determines the RECIPIENT is overpaid, the
RECIPIENT shall reimburse the overpaid amount to the DEPARTMENT.
EXHIBIT 1
-4-
24.
Upon completion of the project described in this agreemeht, a professional engineer
licensed to practice in the State of Iowa shall 'certify in writing to the
DEPARTMENT that the project was completed in substantial compliance with the
plans and specifications set out in this agreement. Final reimbursement of Federal
funds shall be made only after the DEPARTMENT accepts the project as complete.
25.
The RECIPIENT shall maintain all books, documents, papers, accounting records,
reports and other evidence pertaining to costs incurred for the project. The
RECIPIENT shall also make such materials available at all reasonable times during
the construction period and for three years from the date of final Federal
reimbursement, for inspection by the DEPARTMENT, FHWA, or any authorized
representatives of the Federal Government. Copies of said materials shall be
furnished by the RECIPIENT if requested.
26.
The RECIPIENT agrees to indemnify, defend and hold the DEPARTMENT harmless
from any action or liability arising out of the design, construction, maintenance,
placement of traffic control devices, inspection or use of this project. This agreement
to indemnify, defend and held harmless applies to all aspects of the
DEPARTMENT's application review and approval process, plan and construction
reviews, and funding participation.
27.
The RECIPIENT shall maintain, or cause to be maintained, the completed
improvement in a manner acceptable to the DEPARTMENT and the FHWA.
28.
Implementation of Clean Air Act and Federal Water Pollution Control Act
(Applicable to Contracts and Subcontracts which exceed $100,000):
The RECIPIENT stipulates that any facility to be utilized in
performance under or to benefit from this agreement is not listed on
the Environmental Protection Agency (EPA) List of Violating
Facilities or is under consideration to be listed. This is issued
pursuant to the requirements of the Clean Air Act, as amended, and
the Federal Water Pollution Control Act, as amended .... ~
The RECIPIENT agrees to comply with all of the requirements of
Section 114 of the Clean Air Act and Section 308 of the Federal
Water Pollution Control Act, and all regulations and guidelines issued
thereunder.
29.
If any part of this agreement is found to be void and unenforceable, the remaining
provisions of this agreement shall remain in effect.
30.
It is the intent of both parties that no third party beneficiaries be created by this
agreement.
EXHIBIT 1
31.
If the RECIPIENT elects to levy special assessments as ~ m4~ms of raising the local
share of the total project costs, the RECIPIENT shall reimb~se the DEPARTMENT
in the amount that payments of Federal-aid and collections of special assessments,
excluding interest and penalties, exceed the total cost of the public improvement as
established by the provisions of Iowa Code Chapter 384. The RECIPIENT agrees
that at such time as its collections (exclusive of interest and penalties which shall be
retained by the RECIPIENT) from special assessments levied for this project exceed
the local share of total projects costs, the RECIPIENT shall refund to the
DEPARTMENT all funds collected in excess of the total project costs (including
interest and penalties associated with the amount of the excess) within sixty (60) days
of the receipt of any special assessment payments. The RECIPIENT shall notify the
DEPARTMENT when any lands specially assessed no longer qualify for an
agricultural deferment of the special assessment have been satisfied. The
DEPARTMENT shall credit reimbursement billings to the FHWA in the amount of
refunds received from the RECIPIENT.
32.
This agreement shall be executed and delivered in two or more copies, each of which
so executed and delivered shall be deemed to be an original and shall constitute but
one and the same instrument.
33.
This agreement, as set forth in items 1 through 6 and EXHIBIT 1 paragraphs 1
through 33 herein, constitutes the entire agreement between the DEPARTMENT and
the RECIPIENT concerning this project. Representations made before the signing of
this agreement are not binding, and neither party has relied upon conflicting
representations in entering into this agreement. Any change or alteration to the terms
o£this agreement must be made in the form of an addendum to this agreement. Said
addendum shall become effective only upon written approval of the DEPARTMENT
and the RECIPIENT.