Loading...
FY 13-14 Sewer Cured-in-Place Pipe (CIPP) Lining ProjectTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque kital All- America City II 111! 2012 SUBJECT: FY2013 and FY2014 Sewer Cured -in -Place Pipe (CIPP) Lining Project (CIPs FY2013 & FY2014 7101637, 7202332 and 7202333) DATE: June 10, 2013 City Engineer Gus Psihoyos is recommending approval of the plans, specifications, form of contract and estimated cost of $615,000 for the Fiscal Year 2013 and Fiscal Year 2014 Sewer Cured -in -Place Pipe Lining Project. I concur with the recommendation and respectfully request Mayor and City Council approval. btitt44 kr,„709,,, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi Dubuque lintil All-America city II 1 1 I 2012 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: FY2013 and FY2014 Sewer Cured -in -Place Pipe (CIPP) Lining Project (CIPs FY2013 & FY2014 7101637, 7202332 and 7202333) DATE: June 5, 2013 INTRODUCTION The enclosed resolution is in reference to the public hearing for the FY2013 &FY 2014 Sanitary Sewer Cured -in -Place Pipe (CIPP) Lining Project. BACKGROUND The City of Dubuque, Iowa is under a Consent Decree according to Case 2:11 -cv- 01001 -EJM, United States of America and the State of Iowa v. the City of Dubuque, IA (N.D. Iowa), Civil Action Number 2008V00041, DOJ Case Number 90 -5 -1 -1 -09339 effective June 27, 2011. The City is required to submit Corrective Action plans for each of the Sanitary Sewersheds identified in the Consent Decree. The budgets for FY2013 and FY2014 appropriated funds for sanitary sewer and manhole rehabilitative improvements identified in the Correction Action plans for Sewershed 11 and 12. Rehabilitation will be performed using a Cured -In -Place -Pipe (CIPP) method, which significantly reduces digging; however some spot repairs may be necessary. CIPP is a resin - impregnated felt tube that is installed in an existing damaged or leaking sewer. Once inserted into the pipe, it is expanded and cured by applying heat. The liner is a seamless, joint -less pipe with a smooth inner surface that restores the flow capacity of the pipe. The seamless pipe also prevents infiltration. Robotic cutters are then used to restore private sewer service connections. The high costs and inconvenience to the public associated with the excavation and restoration of pavement for sanitary sewer rehabilitation projects has led to the development of "trenchless" technologies. Cured - in -Place Pipe (CIPP) is a versatile trenchless method for restoring structural integrity to sewer mains. Further, to reduce open cut excavation in high traffic areas, the project includes cementite us spray lining of sanitary sewer manholes to significantly reduce infiltration. DISCUSSION The sewers identified in the Sewershed 11 and 12 Corrective Action Plans, and during the plan review of the Iowa DOT 151/61 Improvement project, in addition to those determined during maintenance activities associated with customer calls determine the program. The locations scheduled for rehabilitation are detailed in the attachment. The schedule for the project will be as follows: Advertisement for Bids Notice of Hearing on Plans & Specifications Public Hearing Pre - Qualification Statements Receipt of Bids Award of Contract Completion Date RECOMMENDATION June 7, 2013 June 7, 2013 June 17, 2013 June 17, 2013 June 27, 2013 July 1, 2013 November 29, 2013 I recommend that the City Council approve the construction plans and specifications for FY2013 and FY2014 Sewer Cured -in -Place Pipe (CIPP) Lining Project. BUDGET IMPACT The cost estimate for the FY2013 and FY2014 Sanitary Sewer Cured -in -Place Pipe (CIPP) Lining Project is: Phase Construction Contingency (10 %) Engineering (15 %) Total Project Cost The project will be funded as follows: CIP 7101637 7202333 7202332 Funding Source Sanitary Sewer Lining program (FY13 &FY14 Combined) FY2014 Storm I &I Prevention Program FY2013 Storm water I &I Brick MH Elimination Total Project Funding REQUESTED ACTION Estimate $492,000.00 $49,200.00 $73,800.00 $615,000.00 Amount $440,000.00 $150,000.00 $25,000.00 $615,000.00 The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the FY2013 and FY2014 Sewer Cured -in -Place Pipe (CIPP) Lining Project through adoption of the attached resolutions. 2 cc: Denise Ihrig, Environmental Engineer Deron Muehring, Civil Engineer II Jenny Larson, Budget Director 3 RESOLUTION NO. 187 -13 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR FY2013 AND FY2014 SEWER CURED -IN -PLACE PIPE (CIPP) LINING PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, and form of contract now on file in the Office of the City Clerk and estimated cost for FY2013 &FY 2014 Sewer Cured -in -Place Pipe (CIPP) Lining Project, in the estimated amount $615,000.00, are hereby approved. Passed, adopted and approved this 17th day of Attest: Kevin it stahl, CM , City Clerk June , 2013. Roy D. Buol, Mayor Code of Iowa, at 6:30 2013. modified by the City of p.m., on the 17th day of Kevin S. Firnstahl, Dubuque standard sup- June, 2013, in the His - CMC, City Clerk plemental specifics- toric Federal Building NOTICE TO DiDDERS bons and special provi Council Chambers CITY OF DUSUQUE lions. Copies of the (second floor), 350 ! P91BUC plans and specifica- Weost'6th Street, Dubu llulPROVE�AENT bons prepared by the' que, >Iowa. Said pro - PROJECT City of Dubuque are posed plans, specifica- ;1E- WER CURED-9N- available online at tons form of contract ACE'PiPE(CiPP) www.cityofdubuque- and estimated cost are LiNiNG PROJECT .org or can be picked now on file in the office Tame and Place for up! in the Engineering of the City Clerk. At Filing Sealed bids fceac- Department located at sand hearing any inter als. Sealed bids for the 50 W. 13th Street, Du ested person may ap- work comprising each bupue, IA 52001. No pear and file objections improvement as stated plan deposit is re- thereto• below must be filed be- quired. The scope of the pro,'" fore 2:00 p.m. on the Preference for Iowa ect is as follows: 27th day of June, 2013, Prodeeces and Labor. Project involves the in the Office of the City By virtue of statutory installation of an esti- Clerk, City Hail - First authority, !preference mated 15,300 feet of Floor, 50 West 13th will be given to prod cured -in -place pipe ! Street, Dubuque, jowa. ucts and ;provisions (CIPP) st various loca- Time and Place grown andl coal pro - bons within the City of Sealed Proposals duced within the State Dubuque's Sewer- WW be` Opened and of fovea, and to Iowa' sheds, with specific at- Considered. Sealed domestic labor, to the tendon focused on the proposals will be extent lawfully re- Consent Decree areas opened and bids tabu- quired under Iowa stat- of 11 and 12. CIPP is a ' lated at 2:00 p.m. on utes. resin- impregnated June 27 2013, at City SalesTaxThebidder' • tube that is installed in Hall - Conference Room should not include an existing sewer. B, 50 West 13th Street, sales tax n its bid. 'A Once inserted into the Dubuque, lows,' for sales tax exemption pipe, the tube is ex- f consideration by the certificate will be avail - panded and cured by City Council (Council) able for all -material applying heat. The tin- a.t its meeting on July 1, purchased for incorpo er, is a seamless, joint- 2013. The City of Dubu- ration in the project. less pipe with a que, Iowa, reserves the general Nature of smooth inner surface right to reject any and Public Improvement that increases the flow all bids. Project involves the capacity of the pipe.' Tune for Com- installation' of an esti- The seamless pipe also mencement and mated 15 300 feet of prevents infiltration.' Completion of 9lasork cured in -p ace pipe Robotic cutters are Work shall be com- (CIPP) at various loca- then used to restore! menced within 10 days bons with n the Cityrof private sewer service' after the Notice to Pro Dubuque's' Sewer connections. I Rehabili ceed has been issued sheds, with specific at tation is scheduled to' and shall be fully com- tendon focused on the occur on sanitary sew- pleted by November consent Decree areas er pipe diameters rang 29, 2013. of 11 and 12. CIPP is a ing from6to12inches. Pre- Qtalification resin- impregnated The protect' also in Statements. Pre -Quaff- tube that s installed m cludes lining approxi ification statements an existing sewer. mately 714 feet of a 24 shall be received no Once inserted into the inch diameter storm! later than close of pipe, the 'tube is ex sewer and approxi -' business, 5p.m. on the panded and cured by mately 150 vertical feet 17th day of June, 2013 applying heat. The tin of sanitary sewer and be placed on file in er is a seamless, joint - manholes. the office of the City less pipe with a Pre Qualification of Clerk, + City Hall, 50 smooth inner surface Bidders is a requisite of West 13th Street, Du- that increases the flow this contract. Pre buque, lowa52001. capacity of the pipe. Qualification state- Rid Security. Each The seamless pipe also menu shall be re- bidder'shall accompa- prevents infiltration. ceived no later than ny its bid with a bid se- Robotic cutters are close of business, curity as security that then used to restore 5P. m. on the 17th day the successful bidder private sewer service of June,,„ 2013 and be will enter into a con- connections. Rehabili placed o file in the of tract for the work bid tation is scheduled' to five of the City Clerk, upon and will furnish occur an sanitary sew - City Hall, 50 West 13th after the award of con- er pipe diameters rang - Street, Dubuque, Iowa tract a corporate sure- ing from 6 to 12 inches. 52001. ty bond, acceptable to The protect also in- At the meeting, the the governmental enti- cludes lining approxi - City Council will re- ty, for the faithful per- mately 714 feet of a 24 ceive oral and written form in of the con- inch tliameter storm comments from any tract, in an amount sewer and n1.1r.?exet resident or property equal to one hundred mately 150 vert owner of said City to percent of the amount 'of sanitary the above action. Writ- of the contract. The bid manholes. ten comments regard'- security shall be in the 1t 6/7 ing the above public amount of ten percent hearing may be sub- (10 %)I of the amount of CITY OP DUBUQU , mitted to the City the contract and shall IOWA Clerk's Office on or be- be in the form of a OFFiCiAL NOTICE fore said time of public cashier's check or cer- NOTICE OF PUBLIC hearing. tified check drawn on a HEARING ON PLANS, Copies of supporting state- chartered<or fed" 5PEC9ElCATiO'NS, documents for the pub- erallyi chartered bank, FORM OF CONTRACT, tic hearings are on file or a? certified share AND ESTiMATE0 in the City Clerk's Qf- draft drawn on a state - COST FOR THE flee, 50 W. 13th Street, chartered or federally FY2013 and FY2014 and may be viewetl chartered credit union, SEWER CURED 1N- during normal working or the governmental PLACE PIPE (CI PP) hours. entity may provide for LINING PROJECT Any visual'or hearing- s bidder's bond with NOTICE IS HEREBY impaired persons corporate surety satin - GIVEN: The City Coun- needing special sniffs factory to the govern - cil of the City of Dubu- tance or persons with mental entity. The bid que, Iowa will hold a special accessibility bond'shali contain no public hearing on the needs should contact conditions excepted as proposed plans, specs- the City Clerk's office provided in this sec - fications, form of con- at (563) 589 -4120 or tion. tract and estimated TDD at (563) 690 -6678 Contract Docu- cost for the FY2013 and at least 48 hours prior meats. The specifica FY2014 . Sewer Cured- to the. meeting. tion for this protect will in- Place Pipe (CIPP) Publshed by order of be 5UDAS (Statewide Lining Project, in ac the City Council given Urban Design and cordance with the pro on the 3rd day ,of June, Specifications) 2013, as visions of Chapter 26, STATE OF IOWA DUBUQUE COUNTY {SS: CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: June 07, 2013, and for which the charge is $93.11. Subscribed to before me, a Notary Public in and for Dubuque County, Iowa, this /0 day of " _..1,v , 20 / . Notary Public in and for Dubuque County, Iowa. MARY K. WESTERMEYER Comminlon Number 154885 ., COa