30-Inch Force Main Relocation Project Phase I (9th to 11th Sts.)Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
Dubuque
kital
All- America City
II 111!
2012
SUBJECT: 30 Inch Force Main Relocation Project from 7th Street to 12th Street
around the former Public Works Garage Site and the Alliant Energy Site
DATE: June 10, 2013
City Engineer Gus Psihoyos recommends City Council approval of the plans,
specifications, form of contract and the estimated cost of $1,185,437.50 for Phase 1 of
the 30 Inch Force Main Relocation Project from 7th Street to 12th Street, and the water
main on Elm Street from 9th Street to 11th Street.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
brit44 krt., italy,
Michael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
Masterpiece on the Mississippi
TO:
FROM: Gus Psihoyos, City Engineer
SUBJECT: 30 Inch Force Main Relocation Project from 7th Street to 12th Street around
the former Public Works Garage Site and the Alliant Energy Site
Michael C. Van Milligen, City Manager
Dubuque
bittd
All- America City
'1 1►
2012
DATE: June 5, 2013
INTRODUCTION
The enclosed resolution is in reference to the public bidding for Phase I of the 30 inch
Force Main Relocation Project from 9th Street to 11th Street. There will be two additional
phases of this project. Phase II will be between 7th and 9th Streets. Phase III will be
between 11th and 12th Streets.
BACKGROUND
In 1969 the existing 30 inch force main was constructed from the Cedar Street lift
station to the Terminal Street lift station.
The route went through the former A.Y. McDonald site, the former City Public Works
site, and the Alliant Energy site. During the early 1990's highway 151/61 was
constructed through Dubuque. During the highway construction portions of the 30 inch
force main were relocated and the portion running through the A.Y. McDonald site was
abandoned. However the portion running through the old Public Works Site and the
Alliant Energy site remained in place.
In October of 2011, the City experienced a significant failure in the existing force main.
Two breaks occurred simultaneously, one at the former Public Works garage site and
the other at the Alliant Energy site. After repairs were completed, a third break was
experienced at the former Public Works garage site. The cost to repair the breaks,
which occurred on the former Public works site, was significant as the site is a super
fund site. During the repair work some corrosion of the pipe was noted and it was also
found that when constructed the pipe was set on blocking prior to bedding, and the
blocking was not removed. The areas of corrosion and the failed sections of pipe were
near the old blocking that was found to be still in place. Soil and ground water
contamination has been identified on or near the existing 30 inch force main route that
may be a contributing factor to its deterioration.
The adopted budget for FY 2013- FY2017 includes $849,124.00 for the design of the
entire force main relocation from 7th Street to 12th Street, and constructing the first
phase from 9th Street to 11 th Street.
Prior to initiating the public bidding process, test results from soil samples did not
indicate anything significant. Ground water samples were also taken, however the
testing period was of longer duration and the results were not available until after the
project was initiated at the March 4, 2013 Council meeting and notice to bidders had
been published. After the Notice to Bidders publication it was brought to our attention
that there are environmental issues with the groundwater in the construction area.
At the March 18, 2013 Public Hearing for Phase I of the 30 inch Force Main Relocation
Project, the Engineering Department concluded it was in our best interest to rescind the
initiating of the project. This was accepted through Resolution No. 91 -13. The
Engineering staff and the consultant IIW, P.C. needed time to evaluate the results and
determine the best way to move forward on the project.
The Engineering Department will require that all personnel involved with excavation,
dewatering and hauling operations on the construction site, take a 40 hour Hazwoper
Certification Training Course. Due to the proposed construction schedule, the
completion of this training will need to be completed prior to or at the time of bid
submission. The City of Dubuque Engineering Department has published an
Information Notice on March 28, 2013 to allow contractors ample time to complete the
certification requirements prior to submitting a bid for construction of the 30 inch Force
Main Relocation Project.
The project was planned to utilize the 1996 City of Dubuque Standard Specifications
(current) along with the current standard form of contract and other ancillary standard
forms and project specific documents. A thorough legal review of the current General
Conditions and form of contract, as it related to the hazardous materials, could not be
completed prior to Council initiating the project on May 6, 2013 and was planned to be
completed by May 9, 2013, so that plans would be available for contractors on the
following day. Engineering and Legal staff met and determined that many changes
were needed to the 1996 City of Dubuque Standard Specification, General Conditions,
to address the complexities of this project and that it would not be completed in time to
be available to contractors for bidding.
Engineering, Finance and Legal staff have been working diligently, over the last six
months, to review the Statewide Urban Design and Specification (SUDAS) and develop
supplemental specifications so that the Council Priority of adopting SUDAS can be
implemented. Legal staff has also been working on updating the standard form of
contract and other contract documents to correlate with SUDAS. This process is nearly
complete and will be completed and ready for implementation on several upcoming
projects. Staff determined that it would be more productive to spend the time needed to
finish up with SUDAS and implement it as the project specification rather than revising
the current City of Dubuque specifications which we will no longer be using. Utilizing
the new specifications and contract documents will better address the complexities of
2
this project.
IIW, P.C. was asked to provide an amendment to their contract, to adapt the project to
SUDAS specification. Engineering staff will work closely with IIW, P.C. to make the
transition and in an effort to reduce costs.
The City will be purchasing 1188 LF of 30" CL51 Ductile Iron pipe, 66 - 30" nitrite
gaskets and 200 LF of 42" Permalock casing pipe. This is being done to expedite the
project due to a 4 to 5 week delivery time for those particular items.
DISCUSSION
With the adoption of the FY2013- FY2017 Five Year Capital Improvement Program
Budget, $849,124.00 has been established to begin the Relocation of the 30 inch Force
Main around the former Public Works Garage Site.
A description of the force main relocation is as follows:
Construct Phase I: The first phase will encompass constructing the force main pipe
from Northeast corner of the Elm Street and 11th Street intersection to the Southwest
corner of the 9th Street and Washington Street intersection. Also, an 8 inch water
main will be constructed along Elm Street to provide an additional connection
between the 20" transmission water main, on 11th Street, and the existing water
main on 9th Street. This phase completes the section of pipe adjacent to: the
planned intermodal facility, on Elm Street; thru future intersection improvements for
the two way conversion of 9th and 11th Streets; and along the future Elm Street
reconstruction project.
Construct Phase II & III (Future Projects): Phase II is the section of force main on
Washington Street, 7th Street to 9th Street. This section is planned to be completed
in conjunction with the reconstruction of Washington Street from 7th to 9th Streets.
Phase III is the section of force main from the Northeast corner of the 11th Street and
Elm Street intersection, to the tie -in point near 12th Street. Phase III would also
include the tie -in, at 12th Street and 7th street, and the abandonment of the existing
force main through the old Public Works Garage and the Alliant Energy Site.
Completing phase II and III will complete the re- routing project.
PROJECT SCHEDULE
The proposed development schedule for Phase I of the 30 Inch Force Main Relocation
improvement projects is as follows:
Initiate Public Bidding Process
Publish Notice to Bidders, Advertise for Bids
Publish Public Hearing Notice on Plans & Specs
Pre Bid Meeting
3
June 3, 2013
June 7, 2013
June 7, 2013
June 12, 2013
Public Hearing on Plans & Specifications
Receipt of Bid Proposals (Bid Letting)
Award Construction Contract
Project Completion Date
RECOMMENDATION
June 17, 2013
June 20, 2013
July 1,2013
October 11, 2013
I recommend that the City Council approve the construction plans and specifications for
Phase I of the 30 inch Force Main Relocation Project from 7th Street to 12th Street, the
water main on Elm Street from 9th Street to 11th Street.
BUDGET IMPACT
The estimate of probable cost for Phase I of the 30 Inch Force Main Relocation Project
from 7th Street to 12th Street Project is summarized as follows:
Construction Cost Estimate
Pipe Material — Purchased by City
Contingency (10 %)
Engineering & Inspection
Sanitary Sewer
$703,967.00
150,198.00
85,416.50
128,124.75
Total Estimate Project Cost $1,067,706.25
The project funding summary is as follows:
Water Main
$94,185.00
9,418.50
14,127.75
$117,731.25
CIP No. FY Fund Description Fund Amount
7102413 2013 Relocation of 30" Force Main Around $849,124.00
Old Public Works Garage
7101899 2013 Southfork Interceptor $397,314.37
7402261 2013 Watermain Extension with Elm St $430,209.59
Total Project Funding $1,676,647.96
Phase I of the 30 inch force main relocation project will be funded through the FY2013
capital improvement project appropriation in the amount of $849,124.00 and the
FY2013 appropriation in the amount of $397,314.37 which will be used as reserves
pending actual project costs incurred. Future funding for this project was initially
available through CIP 7102413 in the amount of $705,831.76 in FY 2014, but moved to
FY 2015.
4
The water main improvements along EIm Street, from 9th Street to 11th Street, will be
funded through the FY2013 appropriation in the amount of $430,209.59.
REQUESTED ACTION
The City Council is requested to approve the plans, specifications, form of contract and
estimated cost for Phase I of the 30 Inch Force Main Relocation Project from 7th Street
to 12th Street, and the water main on Elm Street from 9th to 11 thStreets.
Prepared by Todd Irwin
cc: Jenny Larson, Budget Director
Jonathan Brown, Water Pollution Control Manager
Tim Horsfield, Parking Division Manager
Ken TeKippe, Finance Director
John Klostermann, Street and Sewer Maintenance Supervisor
Nate Steffen, Engineering Technician
Todd Irwin, Engineering Technician
5
RESOLUTION NO. 188 -13
APPROVAL OF PLANS, SPECIFICATIONS, FORM . OF CONTRACT, AND
ESTIMATED COST FOR PHASE I OF THE 30 INCH FORCE MAIN RELOCATION
PROJECT FROM 9TH TO 11TH STREETS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the proposed plans, specifications, and form of contract now on file in the
Office of the City Clerk and estimated, cost for Phase I of the 30 Inch Force Main
Relocation Project From 9th To 11th Streets, in the estimated amount $1,185,437.50,
are hereby approved.
Attest:
Passed, adopted and approved this 17th day of
Kevin • Firnstahl, MC, ity Clerk
June , 2013.
Roy D. Buol, Mayor
OF DUBUQUE,
JOWA
OFFICIAL NOTICE
NOTICE OF PUBLIC
HEARING ON PLANS,
SPECIFICATIONS,
FORM OF CONTRACT,
AND ESTIMATED
COST FOR THE 30
INCH FORCE MAIN
RELOCATION PROJ-
ECT - PHASE 1 FROM
9TH STREET TO 11TH
STREET
NOTICE IS HEREBY
GIVEN that the City
Council of the City of
Dubuque, Iowa, will
hold a public hearing
on the proposed plans,
specifications, form of
contract and estimated
cost for the 30 inch
Force Main Relocation
Project - Phase 1 from
9th Street to llth
Street, in accordance
with the provisions of
Chapter 26, Code of Io-
wa, at 6:30 p.rn., on the
17th day of June, 2013,
in the Historic Federal
Building Council Cham-
bers (second floor),
350 West 6th Street,
Dubuque, Iowa. Said
proposed plans, speci-
fications, form of con-
tract and i' estimated
cost are now on file in
the office of the City
Clerk. At said hearing
any interested person
may appear and file
objections thereto.
The scope of the Proj-
ect is as follows:
The 30 inch Sanitary
Sewer Force Main Re-
location Phase -1 9th
Street to llth Street
project includes 1,150
LF of 30 -inch DIP force
main (provided by the
City), 163 LF of 42 -inch
bored and jacked steel
casing, 775 LF of 8 -inch
water main along with
fittings and miscellane-
ous water main com -
ponents. Pavement re-
placement on the proj-
ect includes 490 tons of
6 -inch thick hot mix as-
phalt, 990 SY of 9 -inch
thick Portland cement
concrete Class C, 145
SY of 11 -inch thick
Portland cement con -
crete Class M, miscel-
laneous sidewalk, curb
and gutter. The project
will also include a
multi -stage traffic con-
trol plan. A 40 hour
Hazwoper Certification
Training Course is re-
quired to be completed
for all personnel in-
volved with excavat-
ing, dewatering, and
hauling operations, pri-
or to bidding. A list of
certified personnel and
their position will need
to r be provided as a
condition of award.
At the meeting, the
City Council will re-
ceive oral and written
comments from any
resident or property
owner of said City to
the above action. Writ-
ten comments regard-
ing the above public
hearing may be sub-
mitted to the City
Clerk's Office on or be-
fore said time of public
hearing.
Copies of supporting
documents for the pub-
lic hearings are on file
in the City Clerk's Of
fice, 50 W. 13th Street,
and may be viewed
during normal working
hours.
Any visual or hearing -
impaired persons
needing special assis-
tance or persons with
special accessibility
needs should' contact
the City Clerk's office
at (563i- 5S9 4120 or
TDD at (563) 690-6678
at least 48 hours prior
to the meeting.
Published by order of
the City Council given
on the 3rd day of June,
2013.
Kevin S. Firnstahl,
CMC, City Clerk
NOTICE TO BIDDERS
CITY OF DUBUQUE
PUBLIC IMPROVE-
MENT PROJECT
30 INCH SANITARY
SEWER FORCE MAIN
RELOCATION -
PHASE I
9Th STREET TO 11TH
STREET
Time and Mace for
Filing Sealed Propos-
als. Sealed bids for the
work comprising each
improvement as stated
below must be filed be-
fore 2:00 p.m. on the
20th day of June, 2013,
in the Office of the City
Clerk, City Hall - First
Floor, 50 West 13th
Street, Dubuque, Iowa.
Time and Place
Sealed Proposals
Will be Opened and
Considered. Sealed
proposals will be
opened and bids tabu-
lated at 2:00 p.m. on
June 20, 2013, at City
Hall - Conference Room
B, 50 West 13th Street,
Dubuque, Iowa, for
consideration by the
City Council (Council)
at its meeting on July 1,
2013. The City of Dubu-
que,''lowa, reserves the
right to reject any and
all bids.
Time for Com-
mencement and
Completion of Work.
Work shall be com-
menced within 10 days
after the Notice to Pro -
ceed has been issued
and shall be fully com-
pleted by October 11,
2013.
Mandatory Pre-Bid
Conference. A manda-
tory pre -bid confer-
ence will be held at
10:00 a.m. on June 12,
2013 in Conference
Room A, City Hall, 50
W. 13th Street, Dubu-
que, :Iowa.
Bid Security. Each
bidder shall accompa-
ny its bid with a bid se-
curity as security that
the successful bidder
will enter into a con -
tract for the work bid
upon and will furnish
after the award of con-
tract a corporate sure-
ty bond, acceptable to
governmental enti-
ty, for the faithful per-
formance of the con-
tract, ! in an amount
equal to one hundred
percent of the amount
of the contract. The bid
security shall be in the
amount of ten percent
(10 %) of the amount of
the contract and shall
be in the form of a
cashier's check or cer-
tified check drawn on a
state - chartered or fed-
erally chartered bank,
or a certified share
draft drawn on a state -
chartered or federally
chartered credit union,
or the governmental
entity may provide for
a bidder's bond with
corporate surety satis-
factory to the govern-
mental entity. The bid
bond shall contain no
conditions excepted as
provided in this sec-
tion.
Contract Docu-
ments.iThe specifica-
tion for this project will
be SUDAS (Statewide
Urbah Design and
Specifications) 2013, as
modified by, the City of
Dubuque standard sup-
plemental specifica-
tions and special provi-
sions. Copies of the
plans and specifica-
tions prepared by IIW,
P.C., may be obtained
from Tri -State Blue-
print, 696 Central Ave-
nue, Dubuque, Iowa
52001, phone 563- 556 -
3030. No plan deposit is
required.
Preference for Iowa
Products and Labor.
By virtue of statutory
authority, preference
will be given to prod -
ucts and provisions
grown and coal pro -
duced within the State
of Iowa, and to Iowa
domestic labor, to the
extent lawfully re-
quired under Iowa stat-
utes.
Sales Tax. The bidder
should + not include
sales tax in its bid. A
sales tax exemption
certificate will be avail -
able for all material
purchased for incorpo-
ration in the project.
General Nature of
Public Improvement.
The 30 Inch Sanitary
Sewer Force Main Re-
location - Phase 11 9th
Street to llth Street
project consists of
three stages along with
a corresponding multi
stage traffic control
plan. The project in-
cludes 1,150 LF of 30-
inch DIP force main
(provided by the City),
163 LF of 42-inch bored
and jacked steel r?cas-
ing, 775 LF of 8-inch
water main along with
fittings and miscellane-
ous water main com-
ponents. Pavement re-
placement on the proj-
ect includes 490 tons of
6 -inch thick hot mix as-
phalt, 990 SY of 9 -inch
thick Portland cement
concrete Class C, 145
SY of 11-inch thick
Portland % cement '; con-
crete Class M, miscel-
laneous sidewalk,, and
curb and gutter. A 40
hour Hazwoper Certifi
cation Training Course
is required to be com -
pleted for all personnel
involved with exca-
vating,
dewatering,
and hauling opera-
tions, prior to bidding.
A list of certified per-
sonnel and their posi-
tion will need to be
provided as a condition
of award.
It 6/9
STATE OF IOWA {SS:
DUBUQUE COUNTY
CERTIFICATION OF PUBLICATION
I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa
corporation, publisher of the Telegraph Herald,a newspaper of general circulation
published in the City of Dubuque, County of Dubuque and State of Iowa; hereby
certify that the attached notice was published in said newspaper on the following
dates: June 09, 2013, and for which the charge is $88.58.
Subscribed to before me a Notary Public in and for Dubuque County, Iowa,
this i day o� m _�� , 20 .
Notary Public in and for Dubuque County, Iowa.
Pte', PI MARY K. WESTERr.AEYER
Commission Number 1548665 li