City Hall Remodeling ExteriorMEMORANDUM December 12, 2001 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager City Hall Remodeling - Exterior. Work Public Works Director Mike Koch is recommending acceptance of the City Hall Remodeling - Exterior Work Project, as completed by Kluck Construction, in the final contract amount of $308,356.21. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM December 10, 2001 TO: Michael C. Van Milligen, City Manager FROM: Michael A. Koch, Public Works Director SUBJECT: City Hall Remodeling - Exterior Work INTRODUCTION The enclosed resolutions provide for the City Hall Remodeling - Exterior Work Project. DISCUSSION The project provided for the east and west exterior brickwork, steps and handicapped ramp, patio, sign, landscaping, irrigation system, and snow melt system. The work has been completed on the project by Kluck Construction in the amount of $308,356.21. The project was 17% over the original bid. Twenty-five (25) change orders from the original plans and specifications were developed during the construction process. These orders involved significant modifications, changes, and additions to the original plans. RECOMMENDATION I would recommend that the City Council accept the improvement and recommend that the final contract amount be established at $308,356.21. BUDGET IMPACT The project cost for the City Hall Remodeling - Exterior Work Project is as follows: Construction Contract Contingency Architectural Fees Bid Final $262,600.00 $308,356.21 16,250.00 0 13,942.00 17,520.70 $292,792.00 9325,876.91 The project was funded from the City Hall Remodeling CIP. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final contract amount. MAK/vjd Prepared by Gus Psihoyos, Assistant City Engineer cc: Pauline Joyce, Administrative Services Manager Para Myhre, Planning Services Rich Russell, Building Services Prepared by: Michael A. Koch, Public Works Dire~or Address: 50 W. 13m Street, Dubuque, IA 52001-4864 RESOLUTION NO. 523-01 ACCEPTING IMPROVEMENT Whereas, the contract for the City Hall Remodeling Project- Exterior Work has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CiTY COUNCIL OF THE CiTY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the City Hall Remodeling ClP in amount equal to the amount of this contract, less any retained percentage provided for therein. Passed, approved and adopted this 17th day of Attest: f Jeanne F. Schneider, City Clerk December ,2001. Terrance M. Duggan, Mayor Prepared by: Michael A. Koch1 Public Works Director Address: 50 W. 13~ Street, Dubuque, IA 52001-4864 RESOLUTION NO. 524-01 FINAL ESTIMATE Whereas, the contract for the City Hall Remodeling Project- Exterior Work has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $325,876.91, and the said amount shall be paid from the City Hall Remodeling CIP of the City of Dubuque, Iowa. Passed, approved and adopted this 17th day of December ,2001. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Design Center And Associates Date: 10-Dec-01 FINAL CONTRACT AMOUNT FOR: City Hall Remodeling - Exterior Work DESCRIPTION QTY UNIT COST TOTAL COST Extra Wod( 1.00 1.00 LS $262,600.00 LS $45,756.21 Change Order 1: Widen Ramp & East Deck Change Order 2: Concrete color, strength. Thickness, bdck repair add room under east entry, add conduit & wiring for future lighting Change Order 3: Snow melt revision $262,600.00 $45,756.21 Sub Total~ TOTAL DUE CONTRACTOR: ARCHITECTURAL SERVICES: $ 308,356.21 $ 17,520.70 TOTAL CONSTRUCTION COST: I hereby certify that the above/}state~ment shows, in detail, the correct amount of all work re/q¥~ed t~.cor~/~e~he above improvement. A.P.ovEo: i Michae~l Van Mi~ligen, City Manager City of Dubuque, iowa $ 325,876.91 Jerry An ~rsor~/ Project Architect The Undemigned, , contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Mich~,~l A. Koch Public Works Director BY: