San Sewer Alley Rhomberg & GarMEMORANDUM December 12, 2001 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Sanitary Sewer Reconstruction -Alley between Rhomberg and Garfield, from Dock to Fengler Public Works Director Mike Koch is recommending acceptance of the Sanitary Sewer Reconstruction Project -Alley between Rhomberg and Garfield, from Dock to Fengler Street, as completed by Tschiggfrie Excavating, Inc., in the final contract amount of $104,713.82. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director TO: FROM: SUBJECT: CITY OF DUBUQUE, IOWA MEMORANDUM December 10, 2001 Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director Sanitary Sewer Reconstruction - Alley between Rhomberg and Garfield, from Dock to Fengler INTRODUCTION The enclosed resolutions provide for the Sanitary Sewer Reconstruction Project - Alley between Rhomberg and Garfield, from Dock to Fengler Street. DISCUSSION The project involved the construction of approximately 834 feet of 12"- diameter sanitary sewer pipe located in the alley between Rhomberg and Garfield, from Dock to Fengler Street. The work has been completed on the project by Tschiggfrie Excavating, Inc. in the amount of $104,713.82. RECOMMENDATION I would recommend that the City Council accept the improvement and recommend that the final contract amount be established at $104,713.82. BUDGET IMPACT The project cost for the Sanitary Sewer Reconstruction Project - Alley between Rhomberg and Garfield, from Dock to Fengler Street is as follows: Bid Final Construction Contract Contingency Engineering $117,238.89 $104,713.82 12,025.50 0 19,842.08 15,707.07 $149,106.47 $120,420.89 The project will be funded with the Sanitary Sewer Construction Fund from a Fiscal Year 2002 appropriation in the amount of $126,500. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final contract amount. MAK/vjd Prepared by Todd Irwin, Engineering Assistant cc: Gus Psihoyos, Assistant City Engineer Prepared bv: Michael A. Koch, Public Works Director Address: 50 W. 13® Street, Dubuque, IA 52001-4864 RESOLUTION NO. 529-01 ACCEPTING IMPROVEMENT Whereas, the contract for the Sanitary Sewer Reconstruction Project - Alley between Rhomberg and Garfield, from Dock to Fengler has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Sanitary Sewer Construction Fund in amount equal to the amount of this contract, less any retained percentage provided for therein. 'Passed, approved and adopted this 17th Attest: Jeanne F. Schneider, City Clerk dayof December ,2001. Terrance M. Duggan, Mayor prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO. 530-01 FINAL ESTIMATE Whereas, the contract for the Sanitary Sewer Reconstruction Project - Alley between Rhomberg and Garfield, from Dock to Fengler has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $120,420.89 and the said amount shall be paid from the Sanitary Sewer Construction Fund of the City of Dubuque, Iowa. Passed, approved and adopted this. 17th Attest: Jeanne F. Schneider, City Clerk day of December ,2001. Terrance M. Duggan, Mayor City of Dubuque ENGINEERING DIVISION Date: 04-Dec-01 FINAL CONTRACT AMOUNT FOR: RHOMBERG - GARFIELD ALLEY ( DOCK TO FENGLER) SANITARY SEWER RECONSTRUCTION PROJECT DESCRIPTION I MI..___ScELLANEOUS t Seed, Mulch and Fertilize (Urban Mix) Traffic Control QTY UNIT COST 57.00 SY $5.00 1.00 LS $680.00 -.SANITARY SEWER Tie into Existing Sewer 4' Dia. Manhole Base 4' Dia. Manhole Sidewall Manhole Frame & Cover 12" DIP w/VVrap 12x4 DiP Tee 4" CISP Lateral 1" Clean Bedding Stone Sand Backfill 4 EA 324.70 2.00 EA $290.85 17.00 LF $101.70 2.00 EA $290.15 696.00 LF $72.25 31.00 EA $280.90 319.50 LF $23.35 59.30 Ton $9.75 75.55 Ton $6.50 I PAVEMENT REPAll ~j 3 ACC Pavement 381.62 Ton $62.10 6" PCC Aprons 0.00 SF $6.75 3/4" Base Stone (8" Depth) 660.34 Ton $8.95 Additional Matedal Cost for 4" DIP Laterals 1.00 LS Manhole Base Put Into City Stock 1.00' LS Down Time for Investigation of Exist. 8" Sew( 1.00' LS $1,278.00 $225.00 $924.00 rOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: Michael Van Milligen, City Manager '~-, City of Dubuque, iowa The Undersigned, , contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement· CONTRACTOR: TOTAL COST $285.00 $680.00 Sub Total $1,298.80 $581.70 $1,728.90 $58O.3O $50,286.00 $8,707.90 $7,460.33 $578.18 $491.08 Sub Total~ $23,698.60 $0.00 $5,910.04 Sub Total~ $1,278.00 $225.00 $924.00 Sub Total~ $104,713.82 $15,707.07 $120,420.89 Michael A. ~och Public Works Director BY: