Jule Transit Facility Roof & Sprinkler Repair Project Acceptance Copyright 2014 City of Dubuque Consent Items # 11. ITEM TITLE: Jule Transit Facility Roof& Sprinkler Repair Project Acceptance SUMMARY: City Manager recommending acceptance of the construction contract for The Jule Facility Roof Repair Project, as completed by Bel Aire Home Improvement, and acceptance of the construction contract for The Jule Facility Sprinkler Repair Project, as completed by Continental Fire & Sprinkler. RESOLUTION Accepting the Jule Transit Facility Roof Repair Project and authorizing the payment of the contract amount to the contractor RESOLUTION Accepting the Jule Transit Facility Sprinkler Repair Project and authorizing the payment of the contract amount to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ Jule Transit Facility Roof&Sprinkler Repair Project-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Acceptance Resolution-Roof Repair Resolutions ❑ Acceptance Resolution-Sprinkler Repair Resolutions ❑ Roof-Certificate of Substantial Completion Supporting Documentation ❑ Sprinkler-Certificate of Substantial Completion Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Jule Transit Facility Roof & Sprinkler Repair Project DATE: January 8, 2015 Director of Transit Operations Candace Eudaley-Loebach recommends acceptance of the construction contract for The Jule Facility Roof Repair Project, as completed by Bel Aire Home Improvement, in the final contract amount of $146,957.52, which is below the original contract amount of $148,968.80. Candace further recommends acceptance of the construction contract for The Jule Facility Sprinkler Repair Project, as completed by Continental Fire & Sprinkler, in the final contract amount of $56,875, which is above the original contract amount of $541925. A five year sprinkler test was an additional item required following inspection by the Fire Department and is the source of the additional cost. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Candace Eudaley-Loebach, Director of Transit Operations THE CITY OF Dubuque AII4meric11 a City DUBgkE r Masterpiece on the Mississippi 2007-2012-2013 TO: Michael C. Van Milligen, City Manager FROM: Candace Eudaley-Loebach, Director of Transit Operations DATE: January 8, 2015 RE: Jule Transit Facility Roof & Sprinkler Repair Project (CIP 6001613) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for The Jule Transit Facility Roof& Sprinkler Repair Project. BACKGROUND The Jule was awarded a Public Transit Infrastructure Grant (PTIG) for$257,800 in October 2011. The PTIG grant will fund 80% of the costs of the project with the City funding the 20% local match as required by the grant. Local match will be paid through an Urban Renewal General Obligation Bond paid by the Greater Downtown TIF, subject to a budget amendment in FY15 totaling $64,450. FEH Associates, Inc. was awarded the contract for construction document preparation and construction management December 16, 2014. This project included upgrades to the sprinkler system, structural repairs related to the roof replacement and full roof replacement. The roof and sprinkler components were bid as separate contracts. The construction work involved gutter and downspout replacement, masonry repair, parapet caps and metal flashing, rough lumber and sheathing with sprinkler head replacement, updated fire department connection, 5-year sprinkler system testing, wood beam replacement, wall sub-drain system, tuckpointing and sealing, and column bollards. DISCUSSION The Jule Facility Roof Repair Project was completed by Bel Aire Home Improvement of Platteville, Wisconsin in the final contract amount of$147,957.52, which is below the original contract amount of$148,968.80. The Jule Facility Sprinkler Repair Project was completed by Continental Fire & Sprinkler of Davenport, Iowa in the final contract amount of $56,875, which is above the original contract amount of$54,925.00. A 5 year sprinkler test was additional item required following inspection by the Fire Department and is the source of the additional cost. RECOMMENDATION I recommend that the City Council accept the public improvements and authorize the final payment of the contract amount of$147,957.52 to Bel Aire Home Improvement for The Jule Facility Roof Repair Project. I recommend that the City Council accept the public improvements and authorize the final payment of the contract amount of$56,875 to Continental Fire & Sprinkler for The Jule Facility Sprinkler Repair Project. BUDGETIMPACT The project cost summary for Jule Transit Facility Roof & Sprinkler Repair Project is as follows: Award Final Roof Construction Contract $ 148,968.80 $ 147,957.80 Contingency (10%) $14,896.88 $0.00 Sprinkler Replacement Contract $54,925.00 $54,925.00 Contingency (10%) $5,492.50 $1,950.00 Design & Management 27,000.00 $27,000.00 Total Project Cost 5251.238.18 $231,832.80 The project funding summary is as follows: CIP No. Fund Description Fund Amount 6001613 Public Transit Infrastructure Grant $185,466.24 Greater Downtown TIF Urban Renewal General Obligation Bond $46,366.56 Total Project Funding 5231.832.80 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution to accept the public improvements for and to authorize the final payment of the contract amount of$147,957.80 to Bel Aire Home Improvement for The Jule Facility Roof Repair Project. I respectfully request that the City Council adopt the attached resolution to accept the public improvements for and to authorize the final payment of the contract amount of$56,875 to Continental Fire & Sprinkler for The Jule Facility Sprinkler Repair Project. cc: Jenny Larson, Budget Director Maurice Jones, Economic Development Director 2 RESOLUTION NO. 14-15 ACCEPTING THE JULE TRANSIT FACILITY ROOF REPAIR PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Jule Transit Facility Roof Repair Project (the Project) has been completed and the consulting engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the consulting engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the consulting engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Public Transit Infrastructure Grant (PTIG) for the contract amount of $147,957.80 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 20th day of January, 2015. ct4t. a Karla A. Braig, Mayor P:o Tern Attest: Kevin . Firnstahl, City lerk AIA Document G7O4TM — 2000 Certificate of Substantial Completion PROJECT: (Name and address) Dubuque Jule Transit Facility Improvements 24th street and Central Avenue, Dubuque, Iowa 52001 TO OWNER: (Name and address) City off Dubuque 30 West 13th Street Dubuque, Iowa 52001 PROJECT NUMBER: 2013322/ CONTRACT FOR: General Construction CONTRACT DATE: TO CONTRACTOR: (Name and address) Bel -Aire Home Improvement Co. LLC 64 Means Drive Platteville, WI 53818 OWNER: 0 ARCHITECT: CONTRACTOR: 0 FIELD: 0 OTHER: 0 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Dubuque Jule Transit Facility The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Conuact Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty Date of Commencement Kevin J. Eipperle ARCHITECT By 12/30/14 DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $000 The Contractor will complete or correct the Work on the list of items attached hereto within Zero (0) days from the above date of Substantial Completion Bel -Aire Home Improve LLC CONTRACTOR The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 8:00 a,m. (time) on 12/30/14 (date). , (c) City of Dubuque OWNER BY „?. 12/30/14 DATE The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note.- (hiller's and Contractor's legal and iris u ran c e counsel should determine and review insurance requirements and coverage.) MA Document G704TM — 2000. Copyright© 1963, 1978, 1992 and 2000 by The American Institute of Architects. Ail rights reserved. WARNING; This AM' Document is pretested by U.S. Copyright Law illd International Treaties. Unauthorized reproduction or distribution of this ALA® Document, or any portion a 3, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law This document was produced by AIA software at 14:34:17 on 12/30/2014 under Order No,6930343850_1 which expires on 04/14/2015, and is not for resale. User Notes: (1833787755) RESOLUTION NO. 15-15 ACCEPTING THE JULE TRANSIT FACILITY SPRINKLER REPAIR PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Jule Transit Facility Sprinkler Repair Project (the Project) has been completed and the consulting engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the consulting engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the consulting engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Public Transit Infrastructure Grant (PTIG) for the contract amount of $56,875.00 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Kevi S. irnstahl,rCity dirk Passed, approved and adopted this 20th day of January, 2015. 1. 4,1(.4,- GO aria A. Braig, Mayor Pry Tem ��J IA Document G704" - 2000 Certificate of Substantial Completion PROJECT: (Name and address) Dubuque Jule Transit Facility Improvements 24th street and Central Avenue, Dubuque, Iowa 52001 TO OWNER: (Name and address) City of Dubuque 30 West 136 Street Dubuque, Iowa 52001 PROJECT NUMBER: 2013322/ CONTRACT FOR: General Construction CONTRACT DATE: TO CONTRACTOR: (Name and address) Continental Fire Sprinkler Company 1216 West 76th Street Davenport, Iowa 52806 OWNER: 0 ARCHITECT: CONTRACTOR 0 FIELD: 0 OTHER: 0 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Dubuque Jule Transit Facility The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge„ information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the, Work or designated portion is sufficiently complete n accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use, The date a Substantial Completion of the Project or portion designated above is the date of issuance established by this Certilleate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty Kevin 3: Eipperle ARCHITECT Date of Commencement 12/30/14 DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The Failure to include any items or such list does not alter thc responsibility ofthe Contractor to complete ail Work in accordance with the Contract Documents, Unless otherwise agreed to in writing, the date of commencement of warranties For items on the attached list will be the date of issuance of the final Certificate of Payment or the date (Whoa' payment, Cost estimate of Work that is incomplete or defective: 50,00 The Contractor will complete or cone:et the Work -flint tit fitems attached hereto within Zero (0) day, from the above date of Substantial Completion, Continental Fire Sprinkler Company CONTRACTOR The Owneraccepts the Work or designated 12/30/14 (date), City of Dubuque OWNER 12/30/14 DATE .isbatantiaLly comp1ete and will assume hill possession at 8:00 aim, ti m) on 12/30/14 DATE The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damageto the Work and insurance shall be as follows (Note: Oit-wer'.v and Contractor 's legal curd /nsurance counsel .shouid de;o7nine, and reViMS' insurance requirements and coverage.) MA Document G70422 — moo, copyright© 1963, 1978, 1992 and 2000 by The American institute of Architects. Ali rights reserved. LAIAR.,-34k3' Pbs„ 333,3 3,3cbmsi3 brotectal by ki 3 Copy33Y3 yro..$ bitsfbab33 T4310A tprodecarta di404)00401 A4A0 f)4L04:4100% 14 / ;444404 a A, bay b13331 Ytobbol.isY Y33 w w33,3 3y33,3 40d 444 k01 43,33,sbuty3 .ffly,11144ffium 0Alvni swysiwks 44d0,4 //0, LIW This &cosiest was prodLced by ALA software at 1517119 on 12130/2014 under Order No.8930343850_I which expires en 04/14/2015, and is not tor resale.. User Notes: (1113319398