North Cascade Road SW Arterial Bridge Construction Project Acceptance Copyright 2014 City of Dubuque Consent Items # 10. ITEM TITLE: North Cascade Road SW Arterial Project Acceptance SUMMARY: City Manager recommending acceptance of the public improvement construction contract for the North Cascade Road Bridge Construction Project (Southwest Arterial), as completed by Minnowa Construction, Inc., RESOLUTION Accepting the North Cascade Road Bridge Construction Project (Southwest Arterial) Iowa DOT Project No. HDP-2100 (661)--71-31 and authorizing the payment of the contract amount to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ SW Arterial-North Cascade Road Bridge Construction Project-MVM City Manager Memo Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Southwest Arterial Project North Cascade Road Bridge Construction Project Iowa DOT Project No. HDP-2100 (661)-71-31 DATE: January 26, 2015 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the North Cascade Road Bridge Construction Project (Southwest Arterial), as completed by Minnowa Construction, Inc., in the final contract amount of $1,459,065.01, which is a 3.6% increase ($50,522.51) from the original contract amount of$1,408,542.50. The primary reason for the additional cost was the result of a severe storm event that occurred on July 27-28, 2011, which caused the North Cascade roadway embankment to fail, which was located within the construction project work area. As a result of the Presidential Disaster Declaration for public assistance, the City received Emergency Repair funding in the amount of$42,496.40 to repair the embankment slide I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF _ Dubuque UB E p1I America .t Masterpiece on the Mississippi 2007.2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Southwest Arterial Project North Cascade Road Bridge Construction Project Iowa DOT Project No. HDP-2100 (661)--71-31 DATE: January 26, 2015 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the North Cascade Road Bridge Construction Project (Southwest Arterial), Iowa DOT Project No. HDP-2100 (661)--71-31. BACKGROUND Following the execution of the Memorandum of Understanding (MOU) between the City and the State, the City is continuing as the lead agency for the development and advancement of the Southwest Arterial project; including the completion of the final engineering design phase, right-of-way property acquisition, utility relocations, and archaeological and cultural resource phase III mitigation work. Additionally, per the conditions outlined in the MOU, the City is responsible for completing several side road construction projects which include English Mill Road reconstruction, North Cascade Road reconstruction (completed), and the Military Road reconstruction projects. The completed North Cascade Road Bridge Construction Project provided for the construction of a new bridge which will allow the future Southwest Arterial to cross under North Cascade Road. The new bridge is a 272 ft. x 44 ft. pre-tensioned, pre-stressed concrete beam bridge which includes a 10-foot wide paved shoulder that would accommodate bicycle and pedestrian use. The new bridge also includes architectural enhancement treatments that include native Dubuque limestone textured piers, pier caps, abutment walls and barrier rails. The bridge also has architectural piers that extend above the bridge deck, and provides accommodations for future decorative LED roadway lighting and decorative bridge railing. Once the North Cascade Road, English Mill and Military Road projects are completed and construction of the Southwest Arterial begins, citizens and vehicular traffic using those side roads will not be impacted while construction work occurs under each of those side roads. DISCUSSION The North Cascade Road Bridge Construction Project was completed by Minnowa Construction, Inc. of Harmony, MN, in the final contract amount of $1,459,065.01, which is a 3.6% increase from the original contract amount of $1,408,542.50. The cost increase ($50,522.51) is within the contingency amount ($156,000.00) budgeted for this phase of the Southwest Arterial project. The primary reason for the additional cost ($42,496.40) was a result of the severe storm event that occurred on July 27-28, 2011, which caused the North Cascade roadway embankment to fail which was located within the construction project work area. As a result of the Presidential Disaster Declaration (DR-4018-IA) for public assistance, the City received Emergency Repair (ER) funding of the $42,496.40 to repair the embankment slide. The ER funding is shown below as a funding source. RECOMMENDATION I recommend that the City Council accept the public improvements and authorize final payment of the final contract amount of $1,459,065.01 to Minnowa Construction, Inc. for the North Cascade Bridge Construction Project (Iowa DOT Project No. HDP-2100 (661)-- 71-31). BUDGET IMPACT The summary of project costs for the North Cascade Road Bridge Construction Project is as follows: Description Estimate Award Final Construction Contract $ 1,560,000 $ 1,408,542.50 $ 1,459,065.01 Contingency 156,000 156,000.00 0.00 Consultant - Engineering Design Services 218,860 218,860.00 218,859.75 Consultant -Admin / Construction Services 171,600 171,600.00 153,600.00 Total Project Cost 2.106.460 $ 1.955.002.50 1.831}524.76 The project funding summary is as follows: CIP Funding Source Amount 3001287 Federal SAFETEA-LU Funding (80%) $ 359,596.29 3001287 Omnibus 2009 Appropriations Act (loo%) 950,000.00 3001287 THUD 2010 Appropriations (loo%) 389,533.00 3001287 ER Program (100%) ER-EMER (112)--9R-00 42,496.40 3001287 Local Funding (20%) 89,899.07 Total Project Funding 1,831.524.76 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution to accept the public improvements and to authorize the final payment for the final contract amount of $1,459,065.01 to Minnowa Construction, Inc. for the North Cascade Bridge Construction Project (Iowa DOI' Project No. FIDP-2150 (661)--71..31). Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Kent Ellis, Iowa DOT r---:\PROJECTS\SOUI-I-IWLS`I'AftTF:RIAL\North Cascade Road (661) - Bridge\Council & Staff Docu ments\Acceplance RESOLUTION NO. 30-15 ACCEPTING THE NORTH CASCADE ROAD BRIDGE CONSTRUCTION PROJECT (SOUTHWEST ARTERIAL) IOWA DOT PROJECT NO. HDP -2100 (661)--71-31 AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the North Cascade Road Bridge Construction Project (Southwest Arterial), Iowa DOT Project No. HDP -2100 (661)--71-31 (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Southwest Arterial Capital Improvement appropriation for the contract amount of $1,459,065.01 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 2nd day of February, 2015. Keqin S. Firnstahl; City (Clerk D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE NORTH CASCADE ROAD BRIDGE CONSTRUCTION PROJECT (SOUTHWEST ARTERIAL) IOWA DOT PROJECT NO. HDP -2100 (661)--71-31 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the North Cascade Road Bridge Construction Project (Southwest Arterial), Iowa DOT Project No. HDP -2100 (661)--71-31, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is 1,831,524.76. Dated this day of //1 F, 2015. Filed in the office of the City Clerk on the day of City Engineer 2015. evin S. Firnstahl, c.4 y Clerk