Loading...
White Street HMA Resurfacing with Milling Project from 11th to 21st. Copyright 2014 City of Dubuque Consent Items # 11. ITEM TITLE: White Street HMA Resurfacing with Milling Project from 11th to 21st Streets - Project Acceptance SUMMARY: City Manager recommending acceptance of the public improvement construction contract for the White Street HMA Resurfacing with Milling Project from 11 th to 21 st Streets, as completed by River City Paving, a Division of Mathy Construction Company. RESOLUTION Accepting the White Street HMA Resurfacing with Milling Project, from 11th to 21st Streets, Iowa DOT Project No. NHSN-52-2(132)- -2R-31 and authorizing the payment of the contract amount to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ Acceptance of White Street HMA Resurfacing-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: White Street HMA Resurfacing with Milling Project, from 11 th to 21 st Street Iowa DOT Project No. NHSN-52-2(132)--2R-31 Iowa DOT Agreement No. 2014-16-271 CI P 3602483, 7201081, 3001615, 7401405 DATE: January 29, 2015 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the White Street HMA Resurfacing with Milling Project from 11th to 21St Street, as completed by River City Paving, a Division of Mathy Construction Company, in the final contract amount of $1,063,771.84, which is a 2.3% decrease from the original contract amount of $1,088,819.59. 1 concur with the recommendation and respectfully request Mayor and City Council approval. Micliael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE cDubuque DUUL E au-amWcaCRY Masterpiece ori the Mississippi 2007.2012.2073 TO: Michael C. Van Milligen, City Manag r FROM: Gus Psihoyos, City Engineer SUBJECT: White Street HMA Resurfacing with Milling Project, from 11th to 21St Street Iowa DOT Project No. NHSN-52-2(132)--2R-31 Iowa DOT Agreement No. 2014-16-271 CI P 3602483, 7201081, 3001615, 7401405 DATE: January 28, 2015 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the White Street HMA Resurfacing with Milling Project, from 11th to 21St Street, Iowa DOT Project No. NHSN-52-2(132)--2R-31. BACKGROUND The White Street HMA Resurfacing with Milling Project, from 11th to 21St Street, was completed in a joint partnership project between the City and the Iowa Department of Transportation (Iowa DOT). The pavement rehabilitation project on White Street provided the following improvements: • Pavement milling on U.S. 52 (White Street) between 11th and 21St Street. • Transverse and longitudinal joint repair as needed. • Pavement sub-base repair and patching as needed. • Placing a 1-inch lift of a crack relief membrane HMA mix. • Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. • Spot curb, driveway, and sidewalk replacement. • Storm sewer intake reconstruction. • Installation of ADA pedestrian access curb ramps (37 total). • Water main improvements. • Traffic signal improvements at 14th, 17th and 20th. Through the cooperative agreement, the Iowa DOT is responsible for the eligible construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each direction from roadway centerline) and 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street). The City will be responsible for the costs associated with pavement rehabilitation of the parking lanes and the costs for curb and sidewalk replacement, underground utility work, 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street) and landscape restoration. All other associated costs, such as engineering design, contract administration, construction engineering and inspection will be funded solely with City funding. DISCUSSION The White Street HMA Resurfacing with Milling Project, from 11th to 21St Street was completed by River City Paving, A Division of Mathy Construction Company, of Dubuque, Iowa, in the final contract amount of$1,063,771.84, which is a 2.3% decrease from the original contract amount of$1,088,819.59. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $1,063,771.84 to River City Paving, A Division of Mathy Construction Company, for the White Street HMA Resurfacing with Milling Project, from 11th to 21 st Street. BUDGETIMPACT The protect cost summary for the White Street HMA Resurfacing with Milling Project, from 11t to 21St Street, Iowa DOT Project No. NHSN-52-2(132)--2R-31 is as follows: Award Final Construction Contract $ 1,088,819.59 $ 1,063,771.84 Pre-Purchased Traffic Signal Equipment 60,101.00 60,101.00 Contingency 108,881.96 0.00 Design, Construction Engineering & Inspection 108 881.96 166.762.13 Total Project Cost $ 1,366,684.51 SjZHJU4.97 The costs incurred for design, construction engineering and inspection services increased due to the additional staff resources that were required for the design and construction inspection of the 37 ADA pedestrian access curb ramps installed as part of the project. The project funding summary is as follows: CIP No. Fund Description Fund Amount 3602483 Iowa DOT Funding $ 424,886.34 3602483 Hwy 52 -White Street Pavement Rehabilitation 501,790.23 7201081 Storm Sewer Catch Basin Replacement 46,631.83 3001615 Pre-purchased Traffic Signal Equipment - Mastarms 14,384.00 3602442 Pre-purchased Traffic Signal Equipment - Cabinets 45,717.00 3001615 Traffic Signal Intersection Reconstruction 178,943.02 7401405 Water Main Replacement 78s282.55 Total Project Funding $ 1,290,634.97 ACTION TO BE TAKEN -Flee City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $1,063,771.84 to River City Paving, A Division of Mathy Construction Company, for the White Street HMA Resurfacing with Milling Project, from 11"' to 2V1 Street, Iowa Do-r Project No. NHSN-- 52-2(132)--2R-31. Prepared by Robert Schiesl, Assistant City Engineer Greg Doeden, Civil Engineer cc: Jenny Larson, Budget Director Art Gourley, Iowa DOT District Engineer Dave Ness, Civil Engineer Duane Richter, Civil Engineer Deron Muehring, Civil Engineer Brant Schueller, Water Department FAPROJECT"S\White Street(11th - 21st Street)\Council & Staff DOCufnerltatlon\Acceptarice RESOLUTION NO.31-15 ACCEPTING THE WHITE STREET HMA RESURFACING WITH MILLING PROJECT, FROM 11TH TO 21ST STREET, IOWA DOT PROJECT NO. NHSN-52-2(132)--2R-31 AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the White Street HMA Resurfacing with Milling Project, from 11th to 21st Street, Iowa DOT Project No. NHSN- 52-2(132)--2R-31 (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the White Street Pavement Rehabilitation (CIP 3602483), Storm Sewer Catch Basin Replacement (CIP 7201081), Traffic Signal Intersection Reconstruction (CIP 3001615), and Water Main Replacement (CIP 7401405) appropriation for the contract amount of $1,063,771.84 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 2nd day of February, .015. Attest: Kevin SFirnstahl, CMC; Gity Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE WHITE STREET HMA RESURFACING PROJECT, FROM 11TH TO 21ST STREET, IOWA DOT PROJECT NO. NHSN-52-2(132)--2R-31 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the White Street HMA Resurfacing Project, from 11th to 21st Street, Iowa DOT Project No. NHSN-52-2(132)--2R-31, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,290,634.97. Dated this 30th day of January, 2015. City Engineer Filed in the office of the City Clerk on the 30th day of January, 2015. ellor evin S. Firnstahl,wity Clerk Form 649003 03-04 wd 0 Iowa Department of Transportation CERTIFICATE of COMPLETION and FINAL ACCEPTANCE of AGREEMENT WORK COMPANY: City of Dubuque COUNTY/CITY: Dubuque ADDRESS: 50 West 13th Street PROJECT NO.: NHSN-052-2(132)--2R-31 KIND OF WORK: HMA Resurfacing with Milling AGREEMENT DATE: March 17th, 2014 FIELD COMPLETION DATE: October 21st, 2014 This is to certify that the work covered by the above referenced agreement has been completed in accordance with said agreement and is hereby accepted, subject to final audit of costs. SIGNATURE: *SIGNATURE: + Project Engineer (Res. Construction) (Area Engineer) (County) (City) (Consultant) District (Construction) (Maintenance) (Local Systems) Engineer DATE: February 2nd 2015 DATE: Year Year Approved and work accepted by the Board of Supervisors/City Council of Dubuque this 2nd day of February 2015 Year SIGNATURE: 11/16-iar, Chairman/Mayor Acknowledge completion of project in accordance with referenced agreement by the Iowa Department of Transportation this day of 2015 Year SIGNATURE: Iowa Department of Transportation *On Local State Assisted DO NOT WRITE IN THIS BOX. CENTRAL OFFICE USE ONLY. Projects District does NOT certify but acknowledges completion of project. ['Office of Audits ri Copy to Company (Check or Initial Appropriate Box) Copies to District n Original to Files Form 830436wd 10-01 ��Iowa Department of Transportation FINAL PAYMENT Contractor River City Paving Address: City of Dubuque Kind of Work: HMA Resurfacing with Milling (Grading, Paving, Bridges, etc.) Letting Date: Anril in ?n14 County: Dubuque Contract ID No.: Locally Let Project No(s).: NHSN-52-2(132)--2R-31 Accounting ID No.: The project tests, measurements and material reports of the above project have been reviewed and indicate construction in reasonably close conformity with the plans and specifications except as noted below. The work and test reports have been reviewed (check appropriate box): ® A price adjustment, as provided by the specifications, has been made in the amount of $ 7,152.85 (HMA PWL Disincentive) (See attachment) ❑ No price adjustment. All the test results and measurements are within specifications. I�.OJ--)4 (Project Engineer) Signature Date: January 29, 2015 ❑ District Materials has reviewed project/contract ❑ District Materials did not review the above contract. I acknowledge acceptance by the project engineer. Signature Date: (District Materials Engineer) Upon settlement of claims against the contractor, including assessed liquidated damages, if any, payment in the amount shown on the final estimate is recommended. Signature Date: (District Construction Engineer/District Local Systems Engineer) DO NOT WRITE IN THIS BOX. (CENTRAL OFFICE USE ONLY.) Recorded Finance Office Recorded Construction Office Project Engineer — Send Original to District District— Forward Original With Final Papers to Office of Construction and 2 copies back to Project Engineerfor Primary and Interstate Projects - Fo wand Original With Final Papers to Office of Finance and 2 copies back to Project Engineer for Local Systems Projects