Loading...
SRF Green Alley Project Bid Set 3 - Year 2_Award Copyright 2014 City of Dubuque Action Items # 2. ITEM TITLE: SRF Green Alley Project Bid Set 3 - Year 2 Award SUMMARY: City Manager recommending award of the SRF Green Alley Bid Set 3 — Year 2 Project construction contract to the low bidder Portzen Construction. RESOLUTION Awarding Public Improvement Contract for the SRF Green Alley Bid Set 3 - Year 2 Project SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ SRF Green Alley Bid Set 3-Year 2-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions ❑ Bid tab Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: SRF Green Alley Bid Set 3 —Year 2 (CIP 7102450) DATE: February 20, 2015 Sealed bids were received for the SRF Green Alley Bid Set 3 —Year 2 Project. City Engineer Gus Psihoyos recommends award of the construction contract to the low bidder, Portzen Construction, in the amount of$1,475,768.50, which is 4.43% over the engineer's estimate of probable cost. The higher cost is due to the confined space for working and the depth of sewer. As a result, special assessments for residents will be held at the preliminary assessment average of $1,252.55 for the public improvements assessment, including engineering and contingency. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF /� Duque DUB E -AAm•eedccaClClty 0 11111.1 Masterpiece on the Mississippi 2007,2017, 1 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Enginee ,`�_ -/e-,� DATE: February 19, 2015 SUBJECT: SRF Green Alley Bid Set 3 - Year 2 (CIP 7102450) INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the SRF Green Alley Bid Set 3 -Year 2 Project. DISCUSSION Bid Set 3 - Year 2 will involve the reconstruction of seven alleys in the Bee Branch Watershed. The alley locations are as follows: • Alley between Ventura Dr. and Broadway St. from Pleasant View Dr. to Putnam St. • Alley between Fulton St. and Kane St. from King St. to Monroe St. • Alley between Jackson St. and Washington St. from 25th St. to 26th St. • Alley between Washington St. and Elm St. from 25th St. to 26th St. • Alley between Francis St. and Valeria St. from Kaufmann Ave. to W. 23rd St. • Alley between Kaufmann Ave. and W. 23rd St. from Valeria St. to Francis St. • Alley between Ashton PI. and Avoca St. from Decorah St. to Delaware St. This project will reconstruct the third bid set of green alleys slated for year 2 in the Bee Branch Watershed. This bid set was developed by WHKS Engineers, Planners and Surveyors. The Engineering Department retained three private consulting firms to work on the design and construction documents for the year 2 alleys. The reconstruction of the alleys will include: - Removal of the existing alley pavement - Excavation of the subgrade to allow the placement of clean washed stone for a storage medium - Installation of a concrete border for the brick pavers — Installation of concrete headers at the alley intersection with the intersecting streets. — Reconstruction of the pavement surface with interlocking concrete pavers — Reconstruction of the sanitary sewer main in two alleys — Replacement of water main valves and hydrants — Replacement of lead water services with copper water services in two alleys — Replacement of sanitary sewer laterals in two alleys This project will reconstruct the alleys into green alleys. These alleys allow rainwater to infiltrate into the pavement rather than runoff into the storm sewers. This infiltration allows for filtering of the water and recharge back into the aquifer. Monitoring wells are also planned to be installed so that water quality improvements can be documented. The project construction documents will follow the Statewide Urban Design and Specifications (SUDAS) in the development of the construction documents. The Iowa Department of Natural Resources (IDNR) have reviewed and approved the plans so that the City cost can be covered with SRF funds. This project will have special assessments. BID RESULTS The City of Dubuque received the following bids for the SRF Green Alley Project - Bid Set 3 - Year 2, on February 19, 2015: Contractor Bid Results Portzen Construction $ 1,475,768.50 Tschiggfrie Excavating $ 1,477,896.01 Portzen Construction of Dubuque, Iowa, submitted the low bid in the amount of $1,475,768.50. This amount is 4.43% over the estimate of probable cost. The additional bid price is primarily due to the higher than anticipated sanitary sewer costs. This higher cost is due to the confined space for working and the depth of sewer. As a result, special assessments for residents will be held at the preliminary assessment average of $1,252.55 for the public improvements assessment, including engineering and contingency. RECOMMENDATION I recommend that the contract for the for the SRF Green Alley Bid Set 3 —Year 2 Project be awarded to Portzen Construction of Dubuque, Iowa in the amount of $1,475,768.50 which is 4.43% over the engineer's estimate of probable cost. 2 BUDGETIMPACT The summary of cost for the SRF Green Alley Bid Set 3 --- Year 2 Project is as follows: Estimate Award Construction Contract $1 ,413,229.00 $1,475,768.50 Contingency 136,263.25 136,263.25 Construction Engineering & Inspection 224,834.36 224,834.36 Total Project Cost $1,774,326.61 51.836.866.11 The project funding summary is as follows: CIP No. Fund Description Fund Amount 7102450 SRF Green Alley Project $ 1,347,047.63 7402526 SRF Green Alley - Water 63,500.47 7101638 Street Program Related Sanitary Sewer 227,629.00 Special Assessment— Alley Improvement, Residential 145,306.01 Special Assessment — Alley Improvement, Commercial 0.00 Special Assessment — Residential Deficiency 0.00 Private Lead Water Service Replacement 16,445.00 Private Sewer Lateral Replacement 36.938.00 Total Project Funding $1.836.866.11 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding for the SRF Green Alley Project Bid Set 3 — Year 2 to Portzen Construction in the amount of $1,475,768.50. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Deron Muehring, Civil Engineer II Denise Ihrig, Environmental Engineer Bob Green, Water Department Manager Brant Schueller, Water Distribution Ken TeKippe, Finance Director 3 RESOLUTION NO. 71-15 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE SRF GREEN ALLEY BID SET 3 — YEAR 2 PROJECT Whereas, sealed proposals have been submitted by contractors for the SRF Green Alley Bid Set 3 — Year 2 Project (the Project) pursuant to Resolution No. 21-15 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 23rd day of January, 2015. Whereas, said sealed proposals were opened and read on the 19th day of February, 2015, and it has been determined that Portzen Construction of Dubuque, Iowa, with a bid in the amount of $1,475,768.50, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Portzen Construction and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 2nd day of March, 2015. Attest: Trish L. Gleason, CMC, Asst. City Clerk D. Buol, Mayor DUB E "❑° EHE I BID FEM DESCRIPTION 11—0. d'i�'- 74D Sy 18 500 ON 150 11 10000 250 18 500 ON A.NPoa�1.-oaa.oa=wnMn 16 CPC LF 9. 2 700 ON 20DO 6.0. 21 DO 554000 — �.a0 X170. .waa D.N,7010-m .;no�P� 44 o 8AB 2154 s 4 TNIC,—) a.a4iw—b) 176 PC 4000 704000 35DO 6 160. 35DO 6 160. jL7140 111 IT I Sy 1 3433200 12DO 58.400 1— .126. 7111 111 E 1 2C.1 .i>n�- Pmleot Name: SRF Green Alley Project 19 Feb 1e Engineeh Eaiimare Portzen Conatrudion Tacbigg(rie Exc Co. 1415 LINNE REM NBMBER BIO ITEM DESCRIPTION OOpNiltt BNIi ONIT PRICE IEEE] OTNL PRICE ONIT PRICE IEEE] OTNL PRICE ONIF PRICE IEEE] IDOT DNieion 2528-T�c COMrrI 60 IDOT 252804A Trento Control 1 LS $ 14,00000 $ 1400000 $ 710000 $ 7 100 00 $ 640000 $ 6,40000 Sub Total $ 1400000 Sub Total $ 710000 Sub Total $ 6,40000 DNieion 9020Sodding 61 902010&A-0 eon 109 SO $ 15000 $ 2535000 $ 16000 $ 27 040 00 $ 145.00 $ 2450500 Sub Total $ 25350.00 Sub Total $ 2704000 Sub Total $ 24,50500 Personnel Project and Sediment Career 62 904010&A-2 SWPPPManagement 1 LS $ 3,00000 $ 300000 $ 250000 $ 2 500 00 $ 600000 $ 6,80000 H 9040108 D1 Eder Socks,8" 1100 LF $ 600 $ 650000 $ 300 $ 3 300 00 $ 350 $ 3,85000 or 904010&0.2 Eder Socks,Removal 1100 LF $ 250 $ 2750.00 $ 150 $ 1,65000 $ 150 $ 1,65000 05 9040108 P-1 Dust Control Water 50 MGAL $ 5000 $ 250000 $ 10000 $ 5,00000 $ 50.00 $ 250000 66 9040.10&T-1 Inlet Protection Device, gype) 9 EA $ 11000 $ 99000 $ 30000 $ 2,70000 $ 250.00 $ 2,25000 6! 904010&T-2 Inlet Protection Device,Maintenance 9 EA $ 5000 $ 450.00 $ 10000 $ 90000 $ 10000 $ 90000 Sub Total $ 1620000 Sub Total $ 16,05000 Sub Total $ 17,95000 DNtetot 9071SegmentalBlock command Walls 08 Remove and Reconstruct Modular Redding Wall 100 SF $ 3500 $ 350000 $ 25.00 $ 2 500 00 $ 2200 $ 220000 Sub Total $ 350000 Sub Total $ 2,50000 Sub Total $ 220000 Total Est. $ 1413229.00 Total Bid $ 1,475,76850 Total Bid $ 1 477 896 01 or War lUnder t-1 443% 458%