Loading...
Lowell Street Water Main, Sanitary and Storm Sewer Improvements_Hearing Copyright 2014 City of Dubuque Public Hearings # 3. ITEM TITLE: Lowell Street Water Main, Sanitary and Storm Sewer Improvements SUMMARY: Proof of publication on notice of public hearing to consider approval of the construction plans, specifications, form of contract and the estimated cost for the Lowell Street (Abbott to Woodworth) Water Main, Sanitary and Storm Sewer Improvements Project 2015 and the City Manager recommending approval. RESOLUTION Approval of plans, specifications, form of contract, and estimated cost for the Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015 SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ Lowell Street Water Main-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015 DATE: June 7, 2015 City Engineer Gus Psihoyos recommends City Council approval of the construction plans, specifications, form of contract and the estimated cost of $280,798.65 for the Lowell Street (Abbott to Woodworth) Water Main, Sanitary and Storm Sewer Improvements Project 2015. 1 concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Uli� rri DUB &E Masterpiece on the Mississippi 21107.7012.2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: June 5, 2015 SUBJECT: Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015 INTRODUCTION The enclosed resolution is in reference to the public hearing for the Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015. BACKGROUND The water main on Lowell Street between Woodworth and Abbott Streets has experienced a number of breaks leading to private property damage; undermining of road base materials; and causing sanitary sewer flooding and overflows leading to claims against the City. The most recent main break on February 27, 2015 caused debris to enter the sanitary sewer system causing a sanitary sewer overflow in the 2400 block of Hempstead Street. The sanitary sewer portion of the project was originally scheduled for CIPP lining rehabilitation in FY2015 between Abbott and Woodworth on Lowell, however it has been determined the very poor condition of the 6 inch diameter pipe is beyond CIPP rehabilitation and it is recommended the pipe be replaced. These improvements are in Consent Decree Sewershed 7 and were identified in the Sewershed 7 Corrective Action Plan as a source of inflow and infiltration. DISCUSSION The improvements proposed included the replacement of approximately 400 LF of 6-inch diameter sanitary sewer between Abbott and Woodworth Streets, approximately 515 LF of 6-inch diameter water main, and approximately 140 LF of 15-inch diameter storm sewer, along with ancillary street pavement and ADA curb ramp replacements. The sanitary will be upgraded to 8" diameter piping. RECOMMENDATION I recommend that the City Council approve construction plans and specifications for the Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015. BUDGET IMPACT The project is an unplanned capital improvement therefore project funding is being requested from three funding sources, water utility, sewer utility and storm sewer utility funds. I am requesting the water main replacement funds come from the English Mill Water Main Extension capital improvement, through fund code 7402504. This project is currently on hold and will be subject to funding in later fiscal years. I am also requesting re-prioritization of funded sanitary and storm sewer capital improvements including the sanitary sewer improvements on King Street and Fox & Blackhawk Streets along with the storm sewer improvements at Windsor Avenue. The estimate of probable cost for the Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015 is as follows: Estimate Construction Contract $ 223,920.00 Contingency $22,392.00 Construction Engineering & Inspection $34,486.65 Total Project Cost $280,79845 The project funding summary is as follows: CIP No. Fund Description Amount 7402504 English Mill Water Main Extension $ 113,976.50 7102406 Fox Blackhawk Sanitary Sewer $ 78,398.55 7102407 King Street Sanitary Sewer $ 50,467.00 7202414 Windsor Storm Sewer Extension $ 37,956.60 Total Project Funding $280,798.65 REQUESTED ACTION The City Council is requested to approve plans, specifications, form of contract and the estimated cost for the Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015. Prepared by Denise Ihrig, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Brant Schueller, Water Distribution 2 RESOLUTION NO. 213-15 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE LOWELL STREET (ABBOTT TO WOODWORTH) WATER MAIN, SANITARY & STORM SEWER IMPROVEMENTS PROJECT 2015 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015, in the estimated amount $280,798.65, are hereby approved. Passed, adopted and approved this 15th day of June, 2015. Attest: Kevin Firnstahl, ' MC, ity Clerk D. oy D. Buol, Mayor STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: June 05, 2015, and for which the charge is $57.33. Subscribed to before this day o a Notary Public in and for Dubuque County, Iowa, ,20/1 . otary Public in and for Dub ''"' e County, Iowa. *P' rMARY K. WESTERAAEYER mmission Number 154885 U H'" !rty Comm, Exp, FEB. 1, 2017 o�v CITY OF DUBUQUE, • IOWA OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST tFOR THE LOWELL STREET (AB- BOTT TO WOOD - WORTH) WATER MAIN, SANITARY '& STORM SEWER IM- PROVEMENTS PRO- JECT 2015 NOTICE IS HEREBY GIVEN: The, City Coun- ell ' of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications; form of contract and estimated cost for Lowell Street (Abbott to Woodworth) Water Main, San itary,; & Storm Sewer Improve- ments.Project 2015, in accordance with the provisions of Chapter 26, Cade of Iowa, at -6:30 p.m.,- on the 15th day of. June, 2015, in the Historic Federal Building Council Cham- bers . (second floor), 350 West 6th Street, Dubuque, ;Iowa. Said proposed plans, speci- fications, ;form of contractand estimated cost are now on file in the office Of the City Clerk. At said hearing any interested person may appear and file objections thereto. The, scope of the Project is as follows: Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015 CIP' # 7402504, 7102406, 7102407, 7202414 The improvements proposed included the replacement of approx` I imately 400 LF of 6 -inch diametersanitary sew- er between; Abbott and Woodworth Streets, approximately 515 LF of 6 -inch diameter water main, ' and approximately 140 LF of 15 -inch, 'diameter storm sewer, along with ancillary street pavement and ADA curb ramp replace- ments. Any visual or hearing- impaired persons need- ing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 af least 48 hours °prior to the meeting. Published by order of the City Council given ;I on the 1st day of June, 2015. Kevin S. Firnstahl, City Clerk 1t 6/5 NOTICE TO BIDDERS SECTION 00120 CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project 2015 Dubuque, Iowa 120.1 Time and Place for Filing Sealed Proposals Sealed Bids for the work comprising each !, improvement as stated below must :be filed before 2:00 p.m. on June 18, 2015, in the Office of the City Clerk, City Hall, - First Floor, 50 West 13th Street, Dubuque, Iowa. 120.2 Time and Placed Sealed Pro- posals Will be Opened and Consi- dered Sealed proposals will be opened and Bids tabulated at '2:OOp.m. - on June 18, 2015, at City Hall - Office of the City Clerk, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council at its meeting on July 6, 2015. The City of Dubu- que, Iowa,reserves the right to reject any and -all Bids.. 120.3 Time' for Com- mencement and Completion of Work Work on the Project mustbe commenced within ten (10) calendar days after the Notice to Proceed has been issued and shall be fully completed by November 1, 2015. 120.4 Bid Security Each.. Bidder must accompany its Bid with a Bid security as security that the suc- cessful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful perfor- mance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid•. security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier's check or certified check drawn on a state -chartered or federally chartered bank, or a certified share draft drawn on a state -chartered or fed- erally chartered credit union, .or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental enti- ty. The Bid Bond must contain no conditions' except as provided in this section. 120.5 Contract Do cu -I menta Copies of the Contract Documents may be , obtained at the Engi- neering Department,' City Hall Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. The Contract Documents will also be available on the City's website at www.cityof dubuque.org/bids.aspx. No, plan deposit is required. 120.6 Preference for Iowa Products and Labor By virtue of statutory authority, preference will be given to pro- ducts and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under , Iowa statutes. 120.7 Sales Tax The Bidder should not include State of Iowa sales tax in its Bid. A sales tax exemption certificate will be avail- able for all.material purchased in Iowa for incorporation into the Project. 120.8 General Nature' of 'Public Improve- meritProject Lowell Street (Abbott to Woodworth) Water Main, Sanitary & Storm Sewer Improvements Project2015 CIP # 7402504, 7102406, 7102407, 7202414 The improvements proposed included the replacement of approx-i imately 400 LF of 6 -inch diameter sanitary sew- er between Abbott and Woodworth Streets, approximately 515 LF of 6 -inch diameter water main, and approximately, 140 LF of 15 -inch diameter I storm ` sewer, along with ancillary street pavement and ADA curb ramp replace - Published in the Telegraph Herald, on June 5, 2015 1t 6/\ 5