429 Rhomberg Avenue Project Acceptance Copyright 2014 City of Dubuque Consent Items # 24. ITEM TITLE: 429 Rhomberg Avenue Project Acceptance SUMMARY: City Manager recommending acceptance of the construction contract for the 429 Rhomberg Building Stabilization Project as completed by R&W Restoration. RESOLUTION Accepting the 429 Rhomberg Demolition and Building Stabilization Project and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ 429 Rhomberg Stabilization Project-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions ❑ Engineer's Certificate of Completion Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Upper Bee Branch Creek Restoration Project 429 Rhomberg Stabilization Project (CIP #3401654) DATE: July 1, 2015 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 429 Rhomberg Building Stabilization Project, as completed by R&W Restoration, in the final contract amount of $177,208.00, which is a 3.8% increase from the original contract in the amount of $170,750.00. The cost increase is attributed to additional work related to removal and replacement of fire damaged roof deck, additional brick replacements above the estimated base contract quantity, and selective staining of building fagade. The staining was requested by the City in order to maintain the aesthetics of the historic building by blending the new brick with the original brick. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque AII-Ame1 rica Ciiy DUBgkE r Masterpiece on the Mississippi 2007.2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: June 29, 2015 SUBJECT: Upper Bee Branch Creek Restoration Project 429 Rhomberg Stabilization Project (CIP# 3401654) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 429 Rhomberg Building Stabilization Project (Project). BACKGROUND In April of 2010 the City Council adopted Resolution 92-10 authorizing the City to enter into a Programmatic Agreement (PA) among the U.S. Army Corp of Engineers (USACE), the Iowa Department of Natural Resources (IDNR), the State Historic Preservation Officer (SHPO), and the City of Dubuque regarding the construction of the Bee Branch Creek Restoration Project. The PA outlines the manner in which the City can proceed with the Bee Branch Creek Restoration Project in accordance with the requirements set forth in 36 CFR Part 800, Section 106 (Section 106 Process) which ensures that no unnecessary harm comes to historic properties. As outlined in the PA, "the City shall ensure that all historic architectural properties . . . whose removal is not necessary for the project will be protected from both direct and indirect adverse effects produced by activities associated with (construction of the project)." On November 18 of 2013 the City Council adopted Resolution 327-13 authorizing the acquisition of 427-429 Rhomberg as necessary for the Bee Branch Creek Restoration Project. DISCUSSION The acquisition of 429 Rhomberg was necessary to enable the City to stabilize and protect the historic building to prevent and repair damage that might occur as a result of the construction activity associated with the Upper Bee Branch Creek Restoration Project. To that end, contract documents were prepared for the Project. The Project involved the removal (deconstruction) of the steel sided building addition and to stabilize or otherwise "mothball" the original 3-story masonry building to a weatherproof condition that can be maintained until such time when it will be fully redeveloped following construction of the Upper Bee Branch Creek Restoration Project. The stabilization was done in conformance with the U. S. Department of the Interior's guidelines to ensure the building retains its eligibility for historic rehabilitation tax credits. The work included masonry repair (patching and/or limited replacement) and tuckpointing, a new roof membrane and insulation system removal and replacement, temporary infill of existing openings, and other selective building envelop repairs. The work also included removal and salvage of the existing metal cornice at the top of the parapet, and the steel fire escape for potential future restoration and reinstallation. The 429 Rhomberg Demolition and Building Stabilization was completed by R&W Restoration of East Dubuque, IL, in the final contract amount of $177,208.00, which is a 3.8% increase from the original contract in the amount of $170,750.00. The cost increase can be attributed additional work related to removal and replacement of fire damaged roof deck, additional brick replacements above the estimated base contract quantity and selective staining of building facade. The staining was requested by the City in order to maintain the aesthetics of the historic building by blending the new brick with the original brick. On June 18, 2015 Consulting Engineers IIW, P.C. recommended final payment to the Contractor. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract amount at $177,208.00. BUDGETIMPACT The project cost summary for the 429 Rhomberg Demolition and Building Stabilization is as follows: Bid Award Final Construction Contract 170,750.00 177,208.00 Contingency 36,564.00 0.00 Construction Engineering & Inspection 36,500.00 $36,500.00 Total Project Cost $243,814.00 $213,708.00 The work was completed using funds established for the $200 million Bee Branch Watershed Flood Mitigation Project. The project funding summary is as follows: CIP No. Fund Description Fund Amount 340-1654 Bee Branch Creek Restoration $213,708.00 Total Project Funding $213,708.00 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the final payment for the contract amount of $177,208.00 to R&W Restoration for the 429 Rhomberg Demolition and Building Stabilization. Prepared by Steve Sampson Brown cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Alexis Steger, Senior Budget Analyst Deron Muehring, Civil Engineer II F:\PROJECTS\Bee Branch - Channel-Streets-Utilities #1\_Construction Admin\429 Rhomberg Stabilization Project\Council Documents\4_Acceptance\Acceptance Memo.doc RESOLUTION NO. 219-15 ACCEPTING THE 429 RHOMBERG DEMOLITION AND BUILDING STABILIZATION PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 429 Rhomberg Demolition and Building Stabilization Project (the Project) has been completed has been completed by the Contractor, R&W Restoration (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $177,208.00; and WHEREAS, the Contractor has previously been paid $168,34T60, leaving a balance of $8,860.40; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $8,860.40 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 6th day of July, 2015. Attest: Kevin S. Firnstahl, CMC, City Clerk Roy D.uol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 429 Rhomberg Stabilization Project The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 429 Rhomberg Stabilization Project, and the said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $177,208.00. Dated this 1st day of July, 2015 Gus Psihoyos, City Engineer Filed in the office of the City Clerk in the day of 2015. Kevin S.;F(rnstahl, C C, City Clerk