Loading...
Third Street Overpass Lighting Project AcceptanceDubuque THE CITY OF ~~~Q ~,, All-An~ticaCity j„) :; H Masterpiece an the Mississippi ~~ zoos TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Third Street Overpass Light Replacement Project DATE: December 27, 2007 City Engineer Gus Psihoyos is recommending acceptance of the Third Street Overpass Light Replacement Project, as completed by Giese Sheet Metal Co., Inc., in the final contract amount of $45,223.49, which is a 14.56% increase from the original contract in the amount of $39,474.60. This overage of $5,748.89 was due to a problem with the streetlight base design. The City is working with the manufacturer of the streetlights to get this amount refunded to the City. I concur with the recommendation and respectfully request Mayor and City Council approval. G~ u v r~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E MEMORANDUM Masterpiece on the Mississi~api TO: Michael C. Van Milligen, City Mana FROM: Gus Psihoyos, City Engineer . SUBJECT: Third Street Overpass Light Replacement Project CIP 1001918 DATE: December 26, 2007 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Third Street Overpass Light Replacement Project. BACKGROUND This project provided for the replacement of 25 lights (poles and fixtures) on the Third Street overpass that extends from Main Street to Bell Street. Twenty-four of the 25 lights were replaced with new fixtures that allows for holiday lighting. (Note: The one remaining light at the southeast corner of Third and Main had already been replaced as part of the Main Street Lighting Project.) DISCUSSION The Third Street Overpass Light Replacement Project was completed by Giese Sheet Metal Co., Inc. of Dubuque, Iowa, in the final contract amount of $45,223.49, which is a 14.56% increase from the original contract in the amount of $39,474.60. This overage of $5,748.89 was due to a problem with the streetlight base design. The City is working with the manufacturer of the streetlights to get this amount refunded back to the city. RECOMMENDATION I recommend that the City Council accept the improvements and to authorize the payment of the contract amount of $45,223.49 to Giese Sheet Metal Co., Inc. for the Third Street Overpass Light Replacement Project. BUDGET IMPACT The estimate of final costs for the Third Street Overpass Light Replacement Project is summarized as follows: Construction Contingency Construction Engineering & Inspection Total Project Cost The project funding summary is as follows: CIP No. Fund Description 1001918 3`d Street Overpass Light Replacement Project Fund Amount $49,438.26 Because of the necessary lead time, the lighting equipment for this project was a separate purchase in the amount of $105,840.00; therefore, the total project was $155,278.26. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $45,223.49 to Giese Sheet Metal Co., Inc. for the Third Street Overpass Light Replacement Project. Prepared by: David Ness, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Operations & Maintenance Supervisor Bob Schiesl, Assistant City Engineer Bid Award Final $39,474.60 $45,223.49 3,325.25 9,975.75 4,214.77 $52,775.60 49 438.26 RESOLUTION NO. 7-08 ACCEPTING THE THIRD STREET OVERPASS LIGHT REPLACEMENT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Third Street Overpass Light Replacement Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and tho Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Third Street Overpass Light Replacement Capital Improvement Project appropriation for the contract amount of $45,223.49 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 7th day of January, 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE THIRD STREET OVERPASS LIGHT REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Third Street Overpass Light Replacement Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $49,438.26. Dated this 3rd day of January, 2008. City Engineer Filed in the office of the City Clerk on 3rd day of January, 2008 Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: December 19th, 2007 PROJECT NAME: 3rd Street Overpass Light Replacement Project CIP 100-1918: 3rd Street Overpass Streetlight Replacement CONTRACTOR: Giese Sheet Metal Co. CONTRACT AMOUNT: $39,474.60 BID ITEM DESCRIPTION UNIT QUANTITY BID UNIT COST ~ O DATE ~OTO DAFTENED Existing Lighting Control Equipment, Remove and SaNa LS 1 $ 850.00 1 $ 850.00 PC Concrete Sidewalk, 4" Remove and Construct SF 50 $ 10.00 50 $ 500.00 Historic Street Light Remove, Salvage and Replace Each 24 $ 680.00 24 $ 18,320.00 3" Sch 40 PVC Conduit -Trenched LF 45 $ 13.30 45 $ 598.50 Electrical Cable, #6 XHHW LF 10950 $ 1.05 10950 $ 11,497.50 Electrical Cable, #8 XHHW LF 5220 $ 0.78 5220 $ 4,071.80 Electrical Cable, #8 Bare for Ground LF 800 $ 0.85 800 $ 520.00 Electrical Cable, #10 XHHW LF 2000 $ 0.62 2000 $ 1,240.00 Pull Box, 11"X18" Each 2 $ 588.00 2 $ 1,172.00 Traffic Control 8 Safety Control LS 1 $ 1,455.00 1 $ 1,455.00 Mobilization LS 1 $ 1,250.00 1 $ 1,250.00 TOTAL AMOUNT EARNED TO DATE : $ 39 474.60 ~+ Provide and install new adaptor plates (24) LS 1.00 5,748.89 1.00 $ 5,748.89 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 5 748.89 GRANT TOTAL AMOUNT EARNED TO DATE : $ 45 223.49 TOTAL DUE CONTRACTOR: $ 45,223.49 PREPURCHASED STREETLIGHT EQUIPMENT: $ 105,840.00 ENGINEERING: $4,214.77 TOTAL CONSTRUCTION COST: $ 166,278.26 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligan, C' Manager City of Dubuq e, low , APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Giese Sheet Metal Co. contractor for the above improvement, does hereby accept the above "Total Due Cygtractor", as full settlement for all Gaims for said improvement. ~ ~ _ CONTRACTOR: Giese BY: TITLE: / ,, 6 DATE: ~~ / City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL PROJECT NAME: 3rd Street Overpass Light Replacement Project CIP 100-1918: 3rd Street Overpass Streetlight Replacement CONTRACTOR: Giese Saae Metal Co. DATE: December 19th, 2007 CONTRACT AMOUNT: 539,474.60 BID ITEM DESCRIPTION uNlr punNTlrv BID UNIT COST Q O DATE AMOTO DATENED Existing Lighting Control Equipment, Remove and SaNa LS 1 $ 850.00 1 $ 850.00 PC Concrete Sidewalk, 4" Remove and Construct SF 50 $ 10.00 50 $ 500.00 Historic Street Light Remove, Salvage and Replace Each 24 $ 680.00 24 $ 16,320.00 3" Sch 40 PVC Conduk -Trenched LF 45 $ 13.30 45 $ 598.50 Electrical Cable, #6 XHHW LF 10950 $ 1.05 10950 $ 11,497.50 Electrical Cable, #8 XHHW LF 5220 $ 0.78 5220 $ 4,071.60 Electrical Cable, #8 Bare for Ground LF 800 $ 0.65 800 $ 520.00 Electrical Cable, #10 XHHW LF 2000 $ 0.62 2000 $ 1,240.00 Pull Box, 11"X18" Each 2 $ 586.00 2 $ 1,172.00 Traffic Control & Safety Control LS 1 $ 1,455.00 1 $ 1,455.00 Mobilization LS 1 $ 1,250.00 1 $ 1,250.00 TOTAL AMOUNT EARNED TO DATE : $ 39,474.60 Provide and install new adaptor plates (24) LS 1.00 5,748.89 1.00 $ 5,748.89 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 5 748.89 GRANT TOTAL AMOUNT EARNED TO DATE : $ 45 223.49 TOTAL DUE CONTRACTOR: $ 45,223.49 PREPURCHASED STREETLIGHT EQUIPMENT: $ 105,840.00 ENGINEERING: $4,214.77 TOTAL CONSTRUCTION COST: $ 766,278.26 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van M' ige pager City of ub q owa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Giese Sheet Metal Co. contractor for the above improvement, does hereby accept the abov all daims for said improvement. CONTRACTOR: BY: TITLE: DATE: City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: December 19th, 2007 PROJECT NAME: 3rd Street Overpass Ltght Replacement Protect CIP 100.1918: 3rd Street Overpass Streetlight Replacement CONTRACTOR: Giese Sheet Metal Co. CONTRACT AMOUNT: $39,474.60 BID ITEM DESCRIPTION UNI7 pUANTI7Y BID UNIT COST (TO DATE AMOTO DATENED Existing Lighting Control Equipment, Remove and SaNa LS PC Concrete Sidewalk, 4" Remove and ConsVuct SF Historic Street Light Remove, Salvage and Replace Each 3" Sch 40 PVC Conduit -Trenched LF Electrical Cabfe, #6 XHHW LF Electrical Cable, #8 XHHW LF Electrical Cable, #8 Bare for Ground LF Electrical Cable, #10 XHHW LF Pull Box, 11"X18" Each Traffic Control & Safety Control LS Mobilization LS Provide and install new adaptor plates (24) LS 1 $ 850.00 1 $ 850. 00 50 $ 10.00 50 $ 500. 00 24 $ 680.00 24 $ 16,320. 00 45 $ 13.30 45 $ 598. 50 10950 $ 1.05 10950 $ 11,497. 50 5220 $ 0.78 5220 $ 4,071. 60 800 $ 0.65 800 $ 520. 00 2000 $ 0.62 2000 $ 1,240. 00 2 $ 586.00 2 $ 1,172. 00 1 $ 1,455.00 1 $ 1,455. 00 1 $ 1,250.00 1 $ 1,250. 00 TOTAL AMOUNT EARNED TO DATE : $ 39 474.60 5,748.89 1.00 $ 5,748.89 1 00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 5 748.89 GRANT TOTAL AMOUNT EARNED TO DATE : $ 45 223.49 TOTAL DUE CONTRACTOR: $ 45,223.49 PREPURCHASED STREETLIGHT EQUIPMENT: $ 105,840.00 ENGINEERING: $4,214.77 TOTAL CONSTRUCTION COST: $ 166,278.26 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Mil' n, City Manage City of D u u a l~ APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Giese Sheet Metal Co. contractor for the above improvement, does hereby accept the above "Total Due tractof', as full settlement r all daims for said improvement. CONTRACTOR: Giese Metal Co. BY: ~`~ TITLE: !~- ~ ~/l~ lI__!~~~2y~ DATE: ~~ ~~ O