Loading...
Decorative Concrete Repair_Maintenance AcceptanceTHE CITY OF ~,,,. Dubuque SUB E ~'~-'~;~~~ h~ Masterpiece on the 1Vlississippi :~ 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Decorative Concrete Repair and Maintenance Project DATE: January 15, 2008 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Decorative Concrete Repair and Maintenance Project, as completed by Tschiggfrie Excavating, in the final contract amount of $159,175.12, which is a 30% decrease from the original contract. I concur with the recommendation and respectfully request Mayor and City Council approval. V Michael C. Van Mil igen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque ~3~ DuB E ~I-AmericaCitY i I Masterpiece on tl~e Mississippi 2007 TO: Michael C. Van Milligen, City Ma r~--~ FROM: Gus Psihoyos, City Engineer ~ l SUBJECT: Decorative Concrete Repair and Maintenance Project CIP 3001630 DATE: January 14, 2008 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Decorative Concrete Repair and Maintenance Project. BACKGROUND The Decorative Concrete Repair and Maintenance Project provided for minor repairs, joint sealing, and the removal of dirt, oils, stains and the application of a new protective sealer on the decorative concrete surface at the following locations: • Mississippi Riverwalk • River's Edge Plaza • Alliant Amphitheater • Ice Harbor Park • Ice Harbor West Road • 4th Street Parking Ramp • Washington Park • Flat Iron Park • Chamber Building, Plaza Area • Peosta Channel Trail, Rest Areas • Pyatigorsk Park • Historic Federal Building DISCUSSION The Decorative Concrete Repair and Maintenance Project was completed by Tschiggfrie Excavating, Inc. of Dubuque, Iowa, in the final contract amount of $159,175.12, which is a 30.0% decrease from the original contract in the amount of $227,449.45. The cost decrease was due to work not performed on Main Street (between 5th and 9th Street) and at City Hall. Due to the broomed concrete surface and the incompatibility with the cleaning and finish sealer process, these locations will be included in a future decorative concrete maintenance project. RECOMMENDATION I recommend that the City Council accept the improvements and to authorize the payment of the contract amount of $159,175.12 to Tschiggfrie Excavating, Inc. for the Decorative Concrete Repair and Maintenance Project. BUDGET IMPACT The estimate of final costs for the Decorative Concrete Repair and Maintenance Project is summarized as follows: Construction Contract Contingency Construction Engineering & Inspection Total Project Cost: The project funding summary is as follows: CIP No. Fund Description 3001630 FY2007 Decorative Concrete Maintenance Bid Award Final $ 227,449.45 $ 159,175.12 21,100.00 0 23,210.00 23,584.87 $ 271,759.45 $ 182,759.99 Private Participation -Port of Dubuque Development, LLC Total Project Funding: Fund Amount $ 177,259.99 5,500.00 $ 182,759.99 Due to the heavy use of the Alliant Amphitheater for the staging of equipment and materials during the restoration of the Star Brewery building, the Port of Dubuque Development, LLC has agreed to participate in a 50% cost share ($5,500) for the cleaning and resealing of the Amphitheater decorative concrete surface. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $159,175.12 to Tschiggfrie Excavating, Inc. for the Decorative Concrete Repair and Maintenance Project. Prepared by Bob Schiesl, Assistant Civil Engineer cc: Jenny Larson, Budget Director Gil Spence, Leisure Services Manager Tim Horsfield, Parking Division Manager John Klostermann, Street & Sewer Maintenance Supervisor Chris Lyons, Engineering Technician RESOLUTION NO. 17-08 ACCEPTING THE DECORATIVE CONCRETE REPAIR AND MAINTENANCE PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Decorative Concrete Repair and Maintenance Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Fiscal Year 2007 Decorative Concrete Maintenance Capital Improvement Project appropriation and private participation from the Port of Dubuque Development, LLC for the contract amount of $159,175.12 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 22nd day of January, 2008. Ric W. Jones, Mayor Pro-Tem Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE DECORATIVE CONCRETE REPAIR AND MAINTENANCE PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Decorative Concrete Repair and Maintenance Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $182,759.99. Dated this 22nd of January, 2008 Gus Psihoyos, City Engineer Filed in the office of the City Clerk Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL PROJECT NAME: DECORATIVE CONCRETE REPAIR AND MAINTENANCE PROJECT CONTRACTOR: TSCHIGGFRIE EXCAVATING. INC. DATE: December 27, 2007 CONTRACT AMOUNT: $227,449.45 NT L FI~ BID ITEM DESCRIPTION UNIT UN T COST QUANTITY EA RNED EXTRACTION CLF~AN & SEAL, _. ; 1 ALLIANT AMPHITHEATER SF $ 0.80 13,644.0 $ 10,915.20 2 RIVERS EDGE PLAZA SF $ 0.80 13,941.0 $ 11,152.80 3 RIVERS EDGE PLAZA -CASCADING STAIRS SF $ 0.80 $ - 4 5TH STREET 8 BELL STREET INTERSECTION SF $ 1.00 $ - 5 MAIN STREET 8 5TH STREET INTERSECTION SF $ 1.00 $ - 6 MAIN STREET 8 6TH STREET INTERSECTION SF $ 1.00 $ - 7 MAIN STREET 8 7TH STREET INTERSECTION SF $ 1.00 1,593.0 $ 1,593.00 8 MAIN STREET 8 8TH STREET INTERSECTION SF $ 1.00 $ - 9 MAIN STREET & 9TH STREET INTERSECTION SF $ 1.00 $ - 10 MAIN STREET, 5TH TO 9TH -PARKING AREAS SF $ 1.00 5,655.0 $ 5,655.00 11 6TH STREET 8 LOCUST STREET INTERSECTION SF $ 1.00 $ - 12 7TH STREET 8 LOCUST STREET INTERSECTION SF $ 1.00 $ - 13 8TH STREET & LOCUST STREET INTERSECTION SF $ 1.00 $ - 14 8TH STREET & LOCUST STREET /ALLEY INTERSECTION SF $ 1.00 $ - 15 8TH STREET & IOWA STREET INTERSECTION SF $ 1.00 $ - 16 8TH STREET & IOWA STREET I ALLEY INTERSECTION SF $ 1.00 $ - 17 8TH STREET, LOCUST TO IOWA STREET -PARKING AREAS SF $ 1.00 1,989.0 $ 1,989.00 18 CLEAN'&'S,EAL ~; , ~ RIVERWALK-ALL SIDEWALK y SF 19 20 RIVERWALK -STAIR 1 RIVERWALK -STAIR 2 SF SF 21 RIVERWALK -STAIR 3 SF 22 RIVERWALK -SHADE STRUCTURE FOUNDATIONS SF 23 RIVERWALK -CASINO PORT SIDE BUILDING SF 24 RIVERWALK -ICE HARBOR PARK SF 25 RIVERWALK -ICE HARBOR WEST ROAD SF 26 BELL STREET DECORATIVE SIDEWALK SF 27 5TH STREET DECORATIVE SIDEWALK SF 28 CHAMBER OF COMMERCE PATIO SF 29 4TH STREET PARKING RAMP DECORATIVE SIDEWALK SF 30 MAIN STREET, 5TH TO 9TH -DECORATIVE SIDEWALK SF 31 WASHINGTON PARK SF 32 CITY HALL SF 33 FLAT IRON PARK gF 34 PEOSTA CHANNEL JAYCEE'S BIKE TRAIL SF 35 PYATIGORSK PARK SF $ ;Y 0.45 39,775.0 $ 17,898.75 $ 0.45 958.0 $ 431.10 $ 0.45 1,134.0 $ 510.30 $ 0.45 1,481.0 $ 666.45 $ 0.45 183.0 $ 82.35 $ 0.45 36,636.0 $ 16,486.20 $ 0.35 14,941.0 $ 5,229.35 $ 0.35 7,900.0 $ 2,765.00 $ 0.35 9,142.0 $ 3,199.70 $ 0.35 19,587.0 $ 6,855.45 $ 0.45 3,400.0 $ 1,530.00 $ 0.35 6,500.0 $ 2,275.00 $ 0.35 2,884.0 $ 1,009.40 $ 0.35 20,110.0 $ 7,038.50 $ 0.45 $ - $ 0.35 4,600.0 $ 1,610.00 $ 0.35 1,900.0 $ 665.00 $ 0.35 5,614.0 $ 1,964.90 RIVERS EDGE PLAZA - Cq~SC}~QING STAIRS y , 36 STAIR RISER SURFACE PREP, SANDBLAST SF $ 15.00 400.0 $ 6,000.00 37 REPAIR AND RESURFACE, PASTE AND TEXTURE SF $ 15.00 $ - RIVEI~WALK;STAIR 1, REP IR AN,D RESURFACE .. ., ,.a. ,. . ; 38 SURFACE PATCH REPAIRS, COMPLETE LUMP SUM $ 4,500.00 1.0 . $ 4,500.00 39 RESURFACE COATING, COMPLETE LUMP SUM $ 3,800.00 1.0 $ 3 800 00 , . R~V~~~!~.~*K,~TA,~~Z.,.R~PAIR AND. RES~J,~tFACE ` 40 DECORATIVE CONCRETE, BOTTOM LANDING, REMOVE & REPLACE SF $ 85.00 36.0 $ 3,060.00 41 SURFACE PATCH REPAIRS, COMPLETE LUMP SUM $ 2,900.00 1.0 $ 2,900.00 42 RESURFACE COATING, COMPLETE LUMP SUM $ 2,200.00 1.0 $ 2 200 00 , . IVERW,14L.K - D CORAT~VE C NCRETE REPAIRS R a_.. .mow Er ~ _ .~. ,... ~ ~ ~~ 43 LIGHT BASE N0.1, DECORATIVE CONCRETE -REMOVE & REPLACE SF $ 100.00 24.0 $ 2,400 00 44 LIGHT BASE N0.2, DECORATIVE CONCRETE -REMOVE & REPLACE SF $ 100.00 24.0 $ 2,400.00 45 LIGHT BASE N0.3, DECORATIVE CONCRETE -REMOVE & REPLACE SF $ 100.00 24.0 $ 2,400.00 46 LIGHT BASE N0.4, DECORATIVE CONCRETE -REMOVE & REPLACE SF $ 100.00 24.0 $ 2,400.00 47 LIGHT BASE N0.5, DECORATIVE CONCRETE -REMOVE 8 REPLACE SF $ 100.00 24.0 $ 2,400.00 48 SIGN BASE, DECORATIVE CONCRETE -REMOVE & REPLACE SF $ 400.00 $ - 49 ICE HARBOR PARK, SURFACE PATCH REPAIR EACH $ 300.00 5.0 $ 1 500 00 , . JOIMT SEALING _ . ' i .~, , , . 50 RIVERS EDGE PLAZA, REMOVE & REPLACE LF $ 11.50 DELETE 51 RIVERWALK, NEW LF $ 11.50 DELETE 52 RIVERWALK -STAIR 1, NEW LF $ 17.50 DELETE 53 RIVERWALK -STAIR 2, NEW LF $ 17.50 DELETE DECC~~tATIVE,CON~CRETE, 8' PAV~EMENT,=SECTION REP IRS , ~ ` . ~ '" _ 54 8TH STREET, GRAND OPERA HOUSE, REMOVE & REPLACE SF $ 43.50 DELETE 55 DECORATIVE CONCRETE SF $ _ $ 1 566 00 , . M~,I,SCE4'LIV~OUS .. 56 MOBILIZATION LUMP SUM $ 17,000.00 0.672 $ 11,424.00 57 TRAFFIC CONTROL & SAFETY CONTROL LUMP SUM $ 3,500.00 0.672 $ 2,352.00 TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 152,824.45 ~h,A.NOE QRQE,~~s? - E>XTi~A ~,~ORK IT~M$ ' ~ ~ ,;,~r 58 CLEAN 8 SEAL, FEDERAL BUILDING SIDEWALK SF $ 0.35 3,078.0 $ 1,077.30 59 CLEAN, CITY HALL SIDEWALK SF $ 0.20 5,300.0 $ 1,060.00 60 SAFETY SEAL -REMAINING PRODUCT GAL $ 40.67 95 $ 3,863.37 61 SURFACE PATCH REPAIRS, COMPLETE, AMPHITHEATER EACH $ 175.00 2.0 $ 350.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 6,350.67 TOTAL AMOUNT EARNED TO DATE: $ 159,175.12 TOTAL DUE CONTRACTOR: $ 159,175.12 ENGINEERING: ~y 23,584.87 TOTAL CONSTRUCTION COST: $ 182,759.99 CERTIFICATE OF THE CITY MANAGER: 1 hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen anager City of D tit~q owa l i ~ ~ ~ APPROVED: ~~ Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, TSCHIGGFRIE EXCAVATING, INC. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: TSCHIGGFRIE EXCAVATING, INC BY: TITLE: