Althauser_Stafford Streets Sanitary Sewer Acceptance DUIJUgU@ THE CITY OF --~~ DUB E ~.~;~~~ Ts a Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project (CIP #7101289) DATE: January 30, 2008 Assistant City Engineer Bob Schiesl is recommending acceptance of the Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project, as completed by Connolly Construction, in the final contract amount of $49,978.10, which is a 15.07% increase from the original contract in the amount of $42,445.20. The primary reason for the cost increase was due to rock excavation. I concur with the recommendation and respectfully request Mayor and City Council approval. l~ ~' ~~ ~~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Bob Schiesl, Assistant City Engineer THE CITY OF Dubuque --~.. ~T 7~ ~ All-AmericaCity U Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Bob Schiesl, Assistant City Engineer IZ ~ 5 SUBJECT: Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project (CIP# 7101289) DATE: INTRODUCTION January 29, 2008 The enclosed resolution provides for the acceptance of the construction contract for the Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project. BACKGROUND The Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project provided for the replacement of 550 feet of 6-inch clay pipe with 8-inch PVC from the alley south of Stafford Street to Stafford Street and up Althauser Street another 400 feet. This replacement was necessary due to continuing maintenance issues of offset pipe and broken joints. Under State of Code 26.14, the City can seek competitive quotations if the competitive bid threshold of the public improvement is greater than $25,000 but less than $99,999. Sealed bids were received on the project on September 11, 2007. Of the five bids submitted, Connolly Construction, Inc. of Peosta, Iowa submitted the low bid in the amount of $42,445.20. This amount was 8.25% below the engineer's estimate of public cost of $46,263.50. DISCUSSION The Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project was completed by Connolly Construction, Inc. of Peosta, Iowa, in the final contract amount of $49,978.10, which is a 15.07% increase from the original contract in the amount of $42,445.20. The primary reason for the cost increase was due to rock excavation. Award Final Construction Contract $42,445.20 $49,978.10 Contingency ~ 4,626.32 0.00 Construction Engineering & Inspection 7,633.43 3,966.27 Total Project Cost $54,704.95 53 944.37 RECOMMENDATION recommend that the City Council accept the improvements and authorize the payment of the contract amount of $49,978.10 to Connolly Construction, Inc. for the Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Description Fund Amount 7101289 General Sanitary Sewer Repairs $53,944.37 Total Project Funding $53,944.37 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $49,978.10 to Connolly Construction, Inc. for the Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director RESOLUTION NO. 36-08 ACCEPTING THE ALTHAUSER STREET -STAFFORD STREET SANITARY SEWER RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the General Sanitary Sewer Repairs Capital Improvement Project appropriation for the contract amount of $49,978.10 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 4th day of February , Roy D. Bubl, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE A~LTHAUSER STREET -STAFFORD STREET SANITARY SEWER RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Althauser Street -Stafford Street Sanitary Sewer Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $53,944.37. Dated this~~ day o , 2008. ~~~~ 5~~i City Engineer Filed in the office of the City Clerk on the~/,~ day o , 2008. ~~ .~ anne F. Schneider, CMC, City Clerk THE CITY OFR ~B City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563)589-4270 PROJECT CLOSE OUT FORM -Pf07lC anlB: ALTFiAU R STf.-~S~TAFFtSRD~T.- ~- -~~ SANITARY SEWER PROJECT CIP Number: 7101289 ;Protect Contract Amount: Sa2.4as.2o :'Pro act Com tattoo Date: s-Nov-07 ~onfrac~or Name: ~ONNSLLY CONSTRUCTION COntractOr Address: 18409 N Cascade RD Clty, State, 2Ip: Peosta, IA 52088 Contractor Tele hone: 563.878.3225 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL OUANTITV TOTAL PERCENT COMPLETE 1 8'PVC 554.19 LF f 27.00 562.50 S 15,187.50 101.50% 2 8' x 4' PVC W 12 Each S 88.40 12.00 S 1,036.80 100.00% 3 4' PVC Lateral 120 LF S 11.85 37.50 S 444.38 31.25% d 48' Diameter Manhole Base 4 Each S 307.00 4.00 S 1,228.00 100.00% 5 48' Diameter Sidewakl 22 VF f 114.00 22.00 S 2.508.00 100.00% 6 Mantale Frame antl Cover d Each S 245.00 4.00 S 980.00 100.00% 7 Beddi Stine, 1' Clean 135 Ton S 12.95 155.22 S 2,010.10 114.98% 8 Backfill, Limesbne 535 Ton S 7.65 485.15 S 3,711.40 90.68% 9 Graded Stine Base 215 Ton S 12.x5 253.17 $ 3,151.97 117.75% 10 HMA Surface Course 125 Ton S 75.75 217.66 $ 18,487.75 174.13% 11 PC Curb & Gutter 20 LF S 21.8(1 13.00 $ 283.40 65.00% 12 4' PCC Sidewalk 80 SF $ 4.15 50.00 S 207.50 62.50% 13 Landsca Restoration 375 SY S 1.50 388.88 S 583.32 103.70% 14 Traffic Contrd And Pni act Sara 1 L$ S 990.00 1.00 S 990.00 100.00% HAN ORO R Rock Excavedon 21.48 CY S 50.00 21.46 S 1,073.00 100.00% Water Box Top SecBOn 1 Ea S 95.00 1.00 $ 95.00 100.00% Pa rtrnt Totals E 49,978.10 Total Contract Work Performed to Date: S 18,870.10 Total Charge Order Work Performed b Dale: S 1.168.00 Taal Contract and Chanpa Ordrrr Work ParformW to Dab: S 49,978.10 Miscellaneous Cosffi S E ineen S 3988.27 TOTAL FINAL PROJECT COSTS: L:5~,~7J j I hereby cenlty that Me above statemerd shows, in detail, the mrrect amount of all work required to complete the above improvement. APPROVED: Michael Van Miiligen, Ciry Manager Dubuque, Iowa ' / I I~ ~ CJ~ Gus Psihoyos, City Engineer Dubuque, Iowa The Undersigned. , contractor for the above improvement, does hereby accept the above'fotal Due Contrackl~, as full settlement for all claims for said improvement. APPROVED: ~_. ~ S--y G. ar: THE CITY OFR ~B City of Dubuque Engineering 50. W. 131h Street Dubuque,lA 52001 (563)589-4270 PROJECT CLOSE OUT FORM -~roTec~F>-anie: AL AU ER 5~~~0~6~T. SANITARY SEWER PROJECT CIP Number: 71o126s ProfeCt Contract ARtoUM: 542.445.20 ::Pro act Com tattoo Date: s-Nov-07 ~:0~4G~f~N71I1Q: Z`DNNOIIY CONSTRU~TI~N ConVaetof Addre9s: 18409 N Cascade RD Clty, State, Zip: Peosta, IA 52088 COntfaGtor Tele bone: 553-978.3225 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNR UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 8• PVC 554.19 LF S 27.00 582.50 S 15.187.50 701.50% 2 8" x a• PVC W 12 Each S 88.40 12.00 S 7,036.80 100.00% 3 4' PVC Lateral 120 LF S 11.85 37.50 S 441.38 31.25% 4 48' Diameter Manhole Base 4 Each S 307.00 4.00 S 7,228.00 100.00% 5 48' Diameter Sidewakl 22 VF S 114.00 22.00 S 2,508.00 100.00% 8 Manhole Frame and Cqver 4 Each S 245.00 4.00 S 980.00 100.00% 7 Bedd' Stone, 1' Dean 135 Ton S 12.95 155.22 S 2,010.10 114.98% 8 Back811, Limestone 535 Ton S 7.65 485.15 S 3,711.40 90.68% 9 Graded Stone Base 215 Ton S 12.45 253.17 S 3,151.97 117.75% 70 HMA Surface Course 125 Ton S 75.75 217.68 $ 18,487.75 174.13% t 1 PC Curb 8 Gutter 20 LF S 27.80 13.00 S 283.40 85.00% 12 4• PCC Sidewalk 80 SF S 4.15 50.00 S 207.50 82.50% 13 Landsw Restoretlon 375 SV f 1.50 388.88 S 583.32 103.70% 14 Traffic Control ArM Pro act Safe 1 LS S 990.00 1.00 S 990.00 100.00% CHAN E ORDER Rock Excavation 21.46 CY S 50.00 21.48 S 1,073.00 100.00% Water Box lop Sectlon 1 Ea S 95.00 1.00 S 95.00 100.00% P rn Totals S 49,978.10 Total Contract Work Perforred b Date: S 48.810.10 Total Charge Order Work Performed to Date: 5 1,188.00 TaW t:omraet and Change Order Work PerformW to Dab: f 49,979.10 Miscellaneous Costs E ineen S 3988.27 TOTAL FINAL PROJECT COSTS: ~,1 I hereby certlty that the above statement shows, in detail, Bre wrrect amount of all vgrk requke0 b complete the above improvement APPROVED: Michael Van Milligan, City Manager Dubuque, IOwa The UMersipned. contractor for the above improvement, does hereby accept the atgve •1'otal Due Contractor, as full settlement for all Geims for said improvement. APPROVED: ~' ~ ~ - U BY: 2 S~~ ~~ ~ ~ ~I -~. Gus Psiho ~ a. yos, City Engineer Dubuque, Iowa