Loading...
Asbury Road Pavement Rehabilitation Project Acceptance Copyright 2014 City of Dubuque Consent Items # 10. ITEM TITLE: Asbury Road Pavement Rehabilitation Project Acceptance SUMMARY: City Manager recommending acceptance of the public improvement construction contract for the 2015 Asbury Road Pavement Rehabilitation Project as completed by Iowa Erosion Control, Inc. RESOLUTION Accepting the 2015 Asbury Road Pavement Rehabilitation Project and authorizing the payment of the contract amount to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ 2015 Asbury Road Pavement Rehabilitation Project-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2015 Asbury Road Pavement Rehabilitation Project CI P 3002482 DATE: October 14, 2015 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the 2015 Asbury Road Pavement Rehabilitation Project, as completed by Iowa Erosion Control, Inc., in the final contract amount of $354,821.83, which is an 11.7% increase from the original contract amount of$317,619.47. The increase was due to the fact that the City added more work to rehab the center turn lane which was not part of the original contract and was added later because the City received favorable bids. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer 'i'HF'CITY OF Dubuque DUB E II NI rIa RI 1II Masterpiece oti the Mississippi 2007.<<,,,.,011 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2015 Asbury Road Pavement Rehabilitation Project CIP 3002482 DATE: October 16, 2015 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the 2015 Asbury Road Pavement Rehabilitation Project. BACKGROUND The 2015 Asbury Road Pavement Rehabilitation Project provided the following improvements: • The placement of dowel bars at the transverse joints for traffic load transfer, which will extend the life of the pavement. • Diamond grind the existing concrete pavement to provide a smoother ride. • Concrete panel replacement. • Re-sealing the transverse and longitudinal joints to extend the life of the pavement. • Storm sewer intake top reconstruction. DISCUSSION The 2015 Asbury Road Pavement Rehabilitation Project was completed by Iowa Erosion Control, Inc. of Victor, Iowa in the final contract amount of $354,821.83, which is a 11.7% increase from the original contract amount of $317,619.47. The increase was due to the fact that the City added more work to rehab the center turn lane which was not part of the original contract and was added later because the City received favorable bids. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $354,821.83 to Iowa Erosion Control, Inc., for the 2015 Asbury Road Pavement Rehabilitation Project. BUDGET IMPACT The project cost summary for the 2015 Asbury Road Pavement Rehabilitation Project is as follows: Award Final Construction Contract $317,619.47 $354,821.83 Contingency 33,451.03 0.00 Admin, Design, Construction Engineering & Inspection 55,194.20 45,969.10 Total Project Cost $406,264 $400.790.93 The project funding summary is as follows: CIP No. Fund Description Fund Amount 3002482 Asbury Road Grinding $400,790.93 Total Project Funding $400,790.93 Since the City received favorable bids, within budget, additional work was approved and completed and included installing dowel bars in the center turn lane, diamond grinding the center turn lane and additional concrete panel replacement where needed. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $354,821.83 to Iowa Erosion Control, Inc., for the 2015 Asbury Road Pavement Rehabilitation Project. Prepared by: Robert Schiesl, Assistant City Engineer Greg Doeden, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works John Klostermann, Public Works Jon Dienst, Civil Engineer FAPROJECTS\Asbury Road Dowel Bar Retrofit\Council and Staff Documents\Acceptance RESOLUTION NO. 355-15 ACCEPTING THE 2015 ASBURY ROAD PAVEMENT REHABILITATION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2015 Asbury Road Pavement Rehabilitation (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the 2015 Asbury Road Pavement Rehabilitation Project (CIP 3002482), for the contract amount of $354,821.83 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 19th day of October, 20 5. Roy D. Buol, Mayor Attest: Kevin (S. Firnstahl, CIBC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2015 ASBURY ROAD PAVEMENT REHABILITATION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the, 2015 Asbury Road Pavement Rehabilitation Project that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $400,790.93. Dated this day of October, 2015. Gus Psihoyos, P.E. City Engineer 46 Filed in the office of the City Clerk on the day of October, 2015. Kevin S. Firn tahl, City Clerk