Mt Carmel Sanitary Sewer ProCITY OF DUBUQUE, IOWA MEMORANDUM March 14, 2001 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Public Works Director Mike Koch is recommending acceptance of the construction contract for the Florence, Villa and Mountain Lane Sanitary Sewer Extension Project as completed by W,C, Stewart Construction in the final contract amount ors 153,327,88. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM/jh Attachment CC: Mlchael'C, Van Mflligen Barry Lindahl, Corporation Counsel Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM March 13, 2001 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director '~/~ Florence, Villa, and Mountain Lane Sanitary Sewer Extension INTRODUCTION The enclosed resolutions provides for the acceptance of the construction contract for the Florence, Villa, and Mountain Lane Sanitary Sewer Extension project, ' DISCUSSION Work has been completed on the project by W. C. Stewart Construction in the final contract amount of $153,327.88. The final contract price is under the original contract amount by $48,64-4.37. The final assessable portion of the contract was $30,902.62 below the original project estimate. Therefore, as a result of the lower overall cost, the final assessments were reduced by approximate 23.08%, decreasing the assessment from $86.60 per foot to $66.62 per foot. The project provided for sanitary sewer to 13 homes currently on septic system and 1 vacant lot. All but three homes have connected to the sewer, The remaining three homes will be required to connect this year. RECOMMENDATION I would recommend the project be accepted and the final sewer assessment levy be approved. BUDGET IMPACT A summary of the project costs is as follows: Construction Contract Contingency Miscellaneous Engineering Total Project Cost Estimate $184,749.00 18,474.94 30 483.55 $233,707.49 The project will be funded as follows: Bid 8201,972.25 18,474.94 30 483.55 $250,930.74 Final 8153,327,88 2,991.71 23 447.94 $179,767.53 City Share Special Assessments - Deficiencies Paid by City Special Assessments to 99,814.68 $117,037.93 3,513.28 3,513.28 8 76,777.33 2,164.07 Private Property 130 379.53 130 379.53 100 826.13 Total Project Funding $233,707.49 $250,930.74 $179,767.53 The total City share for the project as outlined is now $76,777.34. The City share for the project will be funded from a Fiscal Year 1998 appropriation for the project, with 8120,000 designated as the City share. ACTION TO i~E TAKEN The City Council is requested to adopt the final attached resolutions accepting the improvement and establishing the final construction cost. MAK/vjd Prepared by Gus Psihoyos, Assistant City Engineer Prepared by: Gus Psihoyos, Assistant City Eng neer Address: 50 W. 13t~ Street, Dubuque, IA 52001-4864 RESOLUTION NO. 107-01 PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Mt. Carmel Sanitary Sewer Extension Project, in the estimated amount of $315,644.07, are hereby approved and ordered filed in the office of the City Clerk for public inspection. Attest: Passed, approved and adopted this __ 19th day of March ,2001. Terrance M. Duggan, Mayor Jeanne F. Schneider, City Clerk Prepared by: Gus Psihoyos, Assistant City En~ineerAddress: 50 W. 13~ Street, Dubuque, IA 52001~864 RESOLUTION NO. 108-01 FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the Mt. Carmel Sanitary Sewer Extension Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 16th day of April, 2001, a public hearing will be held at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for its consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, approved and adopted this __ 19th day of March , 2001. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Prepared by: Gus Psihoyos, Assistant City En~qineerAddress: 50 W. 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO. 109-01 RESOLUTION OF NECESSITY Whereas, proposed plans have been duly prepared and approved by the City Council of the City of Dubuque and are now on file in the office of City Clerk showing among other things the plans, specifications, form of contract, estimated cost and preliminary plat and schedule showing the amount proposed to be assessed against each lot and the valuation of each lot as filed by the City Council, for the Mt. Carmel Sanitary Sewer Extension Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements, and unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the resolution of necessity, they shall be deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed and done in accordance with the plans and specifications which have been approved by the City Council and now on file with the City Clerk. That the cost and expense of making such improvement will be assessed partially or totally against privately owned property lying with the assessment limits, and in an amount not to exceed that provided by law, and in proportion to the special benefits conferred. The portion of the cost which shall be borne by the City will be paid from the capital improvement project for the City share of special assessments, and special assessment bonds may be issued in anticipation of deferred payments of assessments when a contract has been performed and accepted, and the proceeds thereof used to pay the contractor. The above resolution was introduced, approved and ordered placed on file with the City Clerkthis 19th dayof March ,2001. Approved and placed on file for final action. Attest: Terrance M. Duggan, Mayor Jeanne F. Sch-neider, City Clerk Prepared by: Gus Psihoyos, Assistant City Engineer Address: 50 W, 13~ Street, Dubuque, IA 52001-4864 RESOLUTION NO.109-01 RECORD OF FINAL ADOPTION The foregoing Resolution was finally passed and adopted as proposed by the City Council this 19th day of March ., 2001. Attest: Jeanne F. Schneider, City Clerk Terrance M. Duggan, Mayor Prepared by: Gus Psihoyos, Assistant City EngineerAddress: 50 W, 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO. 110-01 FIXING DATE OF HEARING ON RESOLUTION OF NECESSITY Whereas, the City Council of the City of Dubuque, Iowa, has given its preliminary approval on the proposed plans, specifications and form of contract and placed same on file in the office of the City Clerk for public inspection, for the Mt. Carmel Sanitary Sewer Extension Project, and, Whereas, the proposed Resolution of Necessity for said improvement has been introduced and is now on file in the City Clerk's office for public inspection. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 16th day of April, 2001, a public hearing will be held at 6:30 o'clock p.m. in the Public Library Auditorium in the City of Dubuque at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a resolution of necessity and the City Clerk be and is hereby authorized and directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published once each week for two consecutive weeks, the first publication of which shall be not less than ten days prior to the day fixed for its consideration. Unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the Resolution of Necessity they shall be deemed to have waived all objections thereto. Passed, adopted and approved this 19th day of March ,2001. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, Clerk Prepared by: Gus Psihoyos, Assistant City Enq[neer Address: 50 W. 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO. 111-01 RESOLUTION APPROVING PRELIMINARY SCHEDULE OF ASSESSMENTS NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheets, 1 to 1 inclusive, are hereby determined to be the schedule of proposed assessments for the Mt. Carmel Sanitary Sewer Extension Project and the valuations set out herein are hereby approved. Passed, approved and adopted this 19th day of March, 2001. Attest: lgthday of March Terrance M. Duggan, Mayor Jeanne F. Schneider, City Clerk "FLORENCE, VILLA & MOUNTAIN LANE Cll~f OF 0UBUQUE, IOWA · SANITARySEIA~RFINAL$CHEDULEOFVALUATIONANDFiNALASSE$SMENTS .. ,,.,,,.- _-~;,,~, ..... _ ~.~,;..,;,;o, - _ ........ s ,~.~,,,~*.~1~,z .......... Prepared by: Gus Psihoyos, Assistant City Engineer Address: 50 W. 13th Street, Dubuque, IA 5200%4864 RESOLUTION NO.112-01 ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the Mt. Carmel Sanitary Sewer Extension Project is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the notice to bidders hereby approved as a part of the plans and specifications heretofore adopted. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. on 5th day of April, 2001. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 16th day of April, 2001. Passed, approved and adopted this __ 19th day of March ,2001. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Prepared by: Gus Psihoyos, Assistant Cib/Eng neer Address: 50 W. 13th Street, Dubuque, IA 52001~,864 RESOLUTION NO. 113-01 A RESOLUTION AUTHORIZING EMINENT DOMAIN PROCEEDINGS TO BE INITIATED TO ACQUIRE SANITARY SEWER EASEMENTS FOR CONSTRUCTION OF THE ~ Whereas, the City of Dubuque has been negotiating with the owners of record for right-of-way necessary for the construction of the Mt. Carmel Sanitary Sewer Extension Project; and Whereas, the City of Dubuque finds and determines that eminent domain proceedings should be instituted to acquire the needed right-of-way if easements cannot be acquired through the negotiation process. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That eminent domain proceedings be instituted forthwith by the City of Dubuque, Iowa, for acquisition of the following lots or portions thereof if easements cannot be acquired through the negotiation process: Lot 1-2-2-2-1-2,2-2-1-1 1-2-2 2-2-2 1-1-1-1-1-2-1 2-1-1-1-1-2-1 Lot 2, Sub. 1-1-2-1-1, Sub. 1-1-1-2-1 Sub. 1-1-2-1, Sub. 1-2-1-1 Sub. 2-1-1, Lot 2 Sub 1-2-1, Lot 2 Sub 2-2-1 2-1-1-1-1-1-1-5, 2-2-2-1 2-1-1-1-1-1-6 1&2, N 110' of 7, 1&2-14, 2-13, 2-S207' of 6, 1-2-8 Laurel Place Laurel Place Laurel Place Mineral Lot 38 Mineral Lot 38 Mineral Lot 38 Mineral Lot 38 Mineral Lot 38 Linhein's Subdivision & Mineral Lot 38 Linhein's Subdivision Linhein's Subdivision And that Corporation Counsel proceedings forthwith for and negotiations fail. be directed to institute said eminent domain on behalf of the City of Dubuque, Iowa if Section 2. That the Corporation Counsel be and is hereby directed and empowered to do any and all things necessary and incidental to said eminent domain proceedings if negotiations fail. Passed, approved and adopted this 19th day of March ,2001 Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk