Loading...
West 32nd St. Detention Basin Plans_Specs~rxE ci-rY o~ Dubuque -"`' ~~"~ SUB ~t-~;~~~ E Mc~ster~iec~ i~~n the Missi~si~pi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: West 32nd Street Detention Basin Project DATE: February 21, 2008 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and the estimated cost of $4,288,809.35 for the West 32"d Street Detention Basin Project. I concur with the recommendation and respectfully request Mayor and City Council approval. /-~~ ~% ~' ~1/ C.~~~ t,~- ~ ' ~2,/ ~. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUB E All-AmericaCily Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager '~ FROM: Gus Psihoyos, City Engineer ~ ,~ . SUBJECT: West 32"d Street Detention Basin Project (CIP 7201357) DATE: February 18, 2008 INTRODUCTION The purpose of this memo is to seek approval of the plans, specifications, form of contract and the estimated cost for the West 32"d Street Detention Basin Project. DISCUSSION The construction of the West 32nd Street Detention Basin involves the excavation of approximately 105,000 cubic yards of soil of which about 75,000 cubic yards must be hauled from the site. Work includes the construction of an earthen embankment and installation of large diameter storm sewer: 96 feet of 108-inch diameter, 190 feet of 96-inch diameter, and 235 feet of 66-inch diameter RCP. It also includes the installation of 328 feet of 24-inch diameter DIP sanitary sewer. Finally, it includes the construction of a twin, 9-foot wide by 8-foot high box culvert to replace the bridge just east of Wildwood. BUDGET IMPACT The estimate of probable cost for the West 32"d Street Detention Basin Project is as follows: Estimate Construction Contract $1,820,920.00 Contingency 109,255.23 Engineering Design & Inspection 270,224.60 Property Acquisitions 2,088,409.02 Total Project Cost $4,288,809.35 The project funding summary is as follows: CIP No. Fund Description Fund Amount 7201357 W 32nd Street Detention Basin Project (FY04, 05, & 06) $4,034,974.00 7101289 General Sanitary Sewer Repairs 24,480.00 7201368 Clifford-Rosemont Storm Sewer Reconstruction 229,355.35 Total Project Funding $4,288,809.35 Funding for the reconstruction of the Clifford-Rosemont storm sewer will be considered with the FY2010 budget. ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution approving the plans, specifications, form of contract and the estimated cost for the West 32"d Street Detention Basin Project. Prepared by Deron Muehring, Civil Engineer cc: Jenny Larson, Budget Director Tom Freund, Engineering Technician RESOLUTION NO. 82-08 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE WEST 32ND STREET DETENTION BASIN PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the West 32"d Street Detention Basin Project, in the estimated amount $4,288,809.35, are hereby approved. Passed, adopted and approved this 3rd day of March , 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk