Loading...
2015 SCADA Manhole Installation Project - Public Hearing Copyright 2014 City of Dubuque Public Hearings # 3. ITEM TITLE: 2015 SCADA Manhole Installation Project SUMMARY: Proof of publication on notice of public hearing to approve the plans, specifications, form of contract, and estimated cost for the 2015 SCADA Manhole Installation Project and the City Manager recommending approval. RESOLUTION Approval of plans, specifications, form of contract, and estimated cost for the 2015 SCADA (Flow Metering Stations) Manhole Installation Project SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ 2015 SCADA Manhole Installation Project-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2015 SCADA (Flow Metering Stations) Manhole Installation Project CI P 7101335 DATE: November 10, 2015 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and the estimated cost of$131,250 for the 2015 SCADA (Flow Metering Stations) Manhole Installation Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer 'I'E-IE CITY OIa Dubuque DUBUE All-Amedca CRY Masterpiece on the Mississippi 20117 20 1 _,,,,, TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2015 SCADA(flow metering stations) Manhole Installation Project CIP 7101335 DATE: November 10, 2015 INTRODUCTION The enclosed resolution is in reference to the public hearing for the 2015 SCADA (flow metering stations) Manhole Installation Project. BACKGROUND The City of Dubuque, Iowa has entered into a Consent Decree in the case of The United States of America, and the State of Iowa v. The City of Dubuque, Iowa, Civil Action No. Case 2:11-cv- 01011-EMJ, Civil Action Number 2008V00041, DOJ Case Number 90-5-1-1-09339, United States District Court for the Northern District of Iowa. The provisions of the Consent Decree apply to and are binding upon the City and its officers, directors, employees, agents, servants, successors, assigns, and all persons, firms and corporations under contract with the City to perform the obligations of the Consent Decree. The City is required to perform collection system flow monitoring per a schedule established in the Consent Decree, the City is flow monitoring beyond the schedule using supervisory control and data acquisition (SCADA) system technology in sanitary sewer manholes. We are requesting several sanitary sewer manholes (flow metering stations) be replaced to provide the best conditions for permanent flow monitoring. DISCUSSION The Consent Decree identifies five sewersheds, that are required to be individually flow metered for specific periods over a five year schedule. While flow metering for short periods of time may result in locating inflow under one or two rain events, it will not capture how the sanitary sewer system will perform under different or changing rain patterns more commonly seen. Long term or permanent flow monitoring is a method used to continually meter the sanitary sewer system, so staff can observe changes in flow; document and measure how rain events impact the system; and provide valuable feedback on how capital improvements have or have not reduced inflow. The proposed permanent flow metering stations are designed to not only monitor and record flows, but also report them in real-time triggering an alarm if there are any changes in the system where a flow meter is in place. In the event of increased flows or water level changes, or a fouled meter sensor, the flow metering stations will report via the SCADA system to Public Works, the W&RRC, and the Engineering department for immediate response to reduce the possibility of sanitary sewer overflows. FAPROJECTS\Storm and Sanitary\Sanitary\SCADA Manholes\Council\INITIATE\Initiate Memo-2015 SCADA Manhole Installation Project.doc This project involves the replacement of four(4) sanitary sewer manholes and their conversion to permanent flow metering stations in Sewersheds 7 (a & b), 11, and 12, please see the following location map. Inflow £a h flltratiolt Prograi3t� svufryy sewe stwds To Be dwpfcfeB �'J„ y e 4 Yk/4L KENNEDY RD 'y Q naf I DERBY GRANGE aAasr"� 32ND ST v 4 x 611151 KAUFMANN AVE rsherr 4�PP S TST 1149 HILLCRESTRD sus,itvtrck li`i � cA .Ff(tD D y PENN YLVANIIAAVE a ' CCHAVO Lt O N A y2y ,5�•` "vim scar ''a.K { Dt/SUWeC7['/iFl+hs X DG, The flow metering station for Sewershed 5 is installed and will be operational by November 11, 2015; and the metering station for Sewershed 10 will be delayed until the completion of Phase 2 of the Bee Branch project. Portions of some water mains may need to be relocated as part of this project due to the replacement of the manholes. RECOMMENDATION I recommend that the City Council approve construction plans and specifications for the SCADA(flow metering stations) Manhole Installation Project 2015. BUDGET IMPACT The estimate of probable cost for the 2015 SCADA(flow metering stations) Manhole Installation Project: Estimate Construction Contract $ 105,000.00 Contingency $ 10,500.00 Construction Engineering & Inspection $ 15,750.00 Total Project Cost $ 131,2 00 The project funding summary is as follows: 2 Available CIP No. Fund Description Funding 7101335 Sanitary Sewer Manhole Replacement $ 267,000.00 REQUESTED ACTION The City Council is requested to approve the plans, specifications, form of contract and the estimated cost for the 2015 SCADA (flow metering stations) Manhole Installation Project through adoption of the enclosed resolutions. cc: Jenny Larson, Budget Director Gus Psihoyos, City Engineer Ken TeKippe, Finance Director Todd Irwin, Engineering Technician 3 RESOLUTION NO. 395-15 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2015 SCADA (FLOW METERING STATIONS) MANHOLE INSTALLATION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the 2015 SCADA(flow metering stations) Manhole Installation Project, in the estimated amount $105,000.00, are hereby approved. Passed, adopted and approved this 16th day of November, 201 Attest: Kevin S. Firnsta I, CMC, City Clerk /Roy D. Buol, Mayor RESOLUTION NO. -15 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2015 SCADA (FLOW METERING STATIONS) MANHOLE INSTALLATION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the 2015 SCADA(flow metering stations) Manhole Installation Project, in the estimated amount $105,000.00, are hereby approved. Passed, adopted and approved this day of , 2015. Roy D. Buol, Mayor Attest: Kevin S. Firnstahl, CMC, City Clerk CITY OF DUBUQUE, OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2015 SCADA (FLOW ME- TERING: • STATIONS), MANHOLE' "INSTAL- LATION PROJECT - NOTICE AS HEREBY GIVEN: The City Coun- cil of the City of Dubuque, Iowa will hold a public hearing •II on the proposed plans, specifications, form of contract and estimated cost for the 2015 SCADA (flow metering stations) Manhole Installation Project, in accordance with the provisions of Chapter 26, Code of Iowa,' at 6:30 p.m., on the 16th day of November 2015, in the Historic Federal Building Council Cham- bers (second floor), 350 W. 6th Street, Dubuque, Iowa. Said proposed plans, speci- fications, form of contract and estimated cost are now on file in l the office of the City ' Clerk, City Hall, 50 W. ! 13th Street. Written comments regarding the public hearing may be submitted to the City Clerk's Office on or before said time of public hearing. At said hearing any interested person may appear.) and file objections thereto. The scope of the Project is as follows: This project involves the replacement of four (4) sanitary sewer manholes and their conversion to perma- nent flow metering !, stations in Sewersheds 7 (a & b), 11, and 12. Portions ofsome water mains may need to be relocated as part of this project due to the { replacement of the manholes. Any visual or hearing- impaired persons need- ing special assistance or -persons with special accessibility needs should,contact the City Clerk's office at (563) 589-4120 or TDD at' (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 2nd day of November, 2015 Kevin S. Firnstahl, CMC, City Clerk NOTICE TO BIDDERS SECTION 00120 CITY OF DUBUQUE PUBLIC • IMPROVEMENT PROJECT 2015 SCADA (Flow Metering Stations) Manhole Installation Project 120.1 Time and Place for. • Filing Sealed Proposals Sealed Bids for the work comprising each improvement as stated below must be filed ! before 2:00 p,m. on November 19, 2015, in the Office of the City Clerk, City Hall First !, Floor, 50 West 13th ':Street,Dubugpe, Iowa. • I 120.2 Time. and Placed Sealed Pro- posals Will be Openedand .Con-, sidered Sealed proposals will "l, be opened and Bids tabulated at 2:00 p.m. on November 19, 2015, at City Hall -: Con- ference Room C, 50 West 13th Street, Dubu- que, :Iowa, for con- sideration by the City Council at its meeting on December 7, 2015. The City of Dubuque, Iowa, reserves the right to reject any and all Bids. 120.3 Time for Commencement and Completion of Work Work on the Project must be commenced within ten (10) cal- endar, days after the Notice to Proceed has been issued. All man- holes must be, installed by March 31, 2016 and I be fully completed by June 30, 2016. 120.4 Bid Security Each Bidder must accompany its Bid with a . Bid security as security that the successful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful per- formance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier's check or certified check drawn on a state -chartered or° federally chartered bank, or a certified sharddraft drawn on a state -chartered or fed- erally chartered credit union, or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental en- tity. The Bid Bond must contain no conditions except as provided in this section. 120.5 Contract;Docu ments_ ' Copies of the Contract Documents may be obtained at the Engi- neering Department, City Hall Second Floor, 50 West 13th' Street, Dubuque, Iowa 52001. The Contract Documents will also be available on the City's website atwww.cityof- dubuque.org/bids.aspx. No plan deposit is I required. 120.6 Preference for Iowa Products and Labor By virtue of statutory, authority, " preference will be given to pro- ducts and provisions grown and coal pro- duced within the State of loWa, and to Iowa domestic labor, to the extent lawfully, re- quired under ' Iowa statutes. 120.7'. Sales Tax The Bidder should not include State of Iowa sales tax in its Bid. A sales tax exemption certificate will be avail- able for all material purchased in Iowa for incorporation into the Project. 120.8 General Na- ture of Public' Im- provement Project 2015 SCADA (Flow Metering Stations) Manhole Installation Project, CIP # 7101335 This project will include the installation . of; ` four manholes, associated piping, conduit, precast hand holes and vaults, and fiber hub cabinets. Conduit is both trenched and direc- tionallydrilled. This project does require a permitted confined space entry at one of the four locations. The SCADA manhole located at Fulton Elementary School will need to be coordinated I with the Dubuque Community School Dis- trict and be completed during the holiday I break. The Davis -Bacon Federal I Prevailing Wage Act is not applicable for >-this project. Published in the Telegraph Herald on November 6, 2015. It 11/6 STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: November 6, 2015, and for which the charge is $75.19. Subscribed to before me, . , otary Public i and for Dubuque County, Iowa, this _ Jag day of , 20 ,/j . otary Public in and for Dubuque County, Iowa. NJ:altar FEB, 9, 2017 `eL IESTEr iy `;:Ion Number 1543 rv'=1 FEB. 1, 201