2007 CIPP Lining ProjectDubuque THE CITY OF Masterpiece on the Mississippi. 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2007 Sewer Cured-In-Place Pipe Lining Project (CIP 7101637: Sanitary Sewer Lining Program) (CIP 7101901: Washington Street Sanitary between 10th and 11th Streets) (CIP 7201910: Pierce Street Storm Sewer Lining) (CIP 7201066: General Storm Sewer Repair DATE: March 11, 2008 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2007 Sewer Cured-In-Place Pipe Lining Project, as completed by Visu-Sewer Clean & Seal, in the amount of $199,588.36. I concur with the recommendation and respectfully request Mayor and City Council approval. Mich el C. Van Mi ligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer + Dubuque THE CITY Qi ,, ~~ ~~ JB E ~.>I~;~~~y . IVlasterpiece on the Mississippi ~ ~ b 2007 TO: Michael C. Van Milligen, City Man r FROM: Gus Psihoyos, City Engineer ~ j SUBJECT: 2007 Sewer Cured-In-Place Pipe Lining Project (CIP 7101637: Sanitary Sewer Lining Program) (CIP 7101901: Washington Street Sanitary between 10th and 11 Streets) (CIP 7201910: Pierce Street Storm Sewer Lining) (CIP 7201066: General Storm Sewer Repairs) DATE: INTRODUCTION March 4, 2008 The enclosed resolution provides for the acceptance of the construction contract for the 2007 Sewer Cured-In-Place Pipe Lining Project. BACKGROUND The sewers lined as part of the 2007 Sewer Cured-In-Place Pipe Lining Project are as follows: Location Sewer Diameter (Inches Length Feet) Judson Drive between Vail Trail and Powers Ct. 8-inch 332 Carter Road in the vicinity of St. Anne Drive 8-inch 241 St. Anne Drive in the vicinity of Tyler Road 8-inch 303 Marion Street between Meadow Ln. and Cherokee Dr. 8-inch 600 King Street between Greeley St. and Broadway St. 8-inch 370 Main from Knob Hill Dr. towards Duggan Dr. 8-inch 157 TOTAL 8-INCH 2,003 Collector from University Ave. to Isborn Ave. 18-inch 800 TOTAL 18-INCH 800 Washington Street from 10th to 11th Street 24-inch 288 Pierce Street (Storm) between Angella and W. Locust 24-inch 280 TOTAL 24-INCH 568 DISCUSSION The 2007 Sewer Cured-In-Place Pipe Lining Project was completed by Visu-Sewer Clean & Seal of Pewaukee, Wisconsin, in the final contract amount of $199,588.36, which is a 12.21% increase from the original contract in the amount of $177,865.00. One reason for the increase is that the work was expanded to line an additional 258 feet of 8-inch diameter sewer, 81 feet of 18-inch diameter sewer, and 50 feet of 24-inch diameter sewer. The second reason is that the lining of two storm sewers, one on Keymont and another on Adeline, was added to the project. In order to line the sewers, an additional $16,307.53 was expended to make spot repairs and raise manholes as required prior to the lining operation. RECOMMENDATION I recommend that the City Council accept the improvements and to authorize the payment of the contract amount of $199,588.36 to Visu-Sewer Clean & Seal for the 2007 Sewer Cured-In-Place Pipe Lining Project. BUDGET IMPACT The estimate of final costs for the 2007 Sewer Cured-In-Place Pipe Lining Project is summarized as follows: Bid Award Final Construction $177,865.00 $199,588.36 Contingency $ 16,346.00 $ 0.00 Miscellaneous Construction by others $ 0.00 $ 16,307.53 Engineering $ 26,971.96 $ 9,359.99 Total Project Cost $221,182.96 $225,255.88 The project will be funded by: CIP No. Fund Description Fund Amount 7101637 Sanitary Sewer Lining Project $ 99,193.38 7101901 Washington Street Sanitary between 10tH and 11th Streets $ 65,500.00 7201910 Pierce Street Storm Sewer Lining $ 57,000.00 7201066 General Storm Sewer Repairs $ 3,562.50 Total Project Funding $225,255.88 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $199,588.36 to Visu-Sewer Clean & Seal for the 2007 Sewer Cured-In-Place Pipe Lining Project. Prepared by Deron Muehring, Civil Engineer cc: Jenny Larson, Budget Director RESOLUTION NO. 91-08 ACCEPTING THE 2007 SEWER CURED-IN-PLACE PIPE LINING PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2007 Sewer Cured-In-Place Pipe Lining Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Sanitary Sewer Lining Project (CIP#7101637), Washington Street Sanitary between 10th and 11th Streets (CIP#7101901), Pierce Street Storm Sewer Lining (CIP#7201910), and General Storm Sewer Repairs (CIP#7201066) appropriation for the contract amount of $199,588.36 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 17th day of March, 2008 Roy D. Buol, Mayor Attest: eanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2007 SEWER CURED-IN-PLACE PIPE LINING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2007 Sewer Cured-In-Place Pipe Lining Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $225,255.88. Dated this 12th day of March, 2008. City Engineer Filed in the office of the City Clerk on the 18th day of March, 2008. Jeanne F. Schneider, CMC, City Clerk THE CIT\' OF DuB ///~ E ~ `r*~t, / City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM Project Name 2007 SEINER CIPP LINING PROJECT CIP # : 7101637, 7101901, and 7201910 CIP Number: CONSTRUCTION COST ESTIMATE prOJect COntraCt AmOUnt: $163,464.00 Pro'ect Com letion Date: 3o-Nov-o7 ontractor Name: disu-sewer Ciean 8 seai Contractor Address: w23o Naass Betker Drive City, State, Zlp: Pewaukee, WI 53072 Contractor Tele hone: eoo-e76-aa76 PROJECT COST SUMMAR7 Total Contract Work Performed to Date: $ 174,540.50 Total Change Order Work Performed to Date: $ 25,047.86 Total Contract and Change Order Work Performed to Date: $ 199,588.36 Miscellaneous Costs $ 16,307.53 En ineerin $ 9,359.99 TOTAL FINAL PROJECT COSTS: 5 225,255.88 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED Michael Van Milligan, City Manager Dubuque,lowa '/~ / / j; Gus Psihoyos, City Engineer Dubuque Iowa ' WSU•SE.WE.RCI.EAtJ~F SEgL,Z~yC" The Undersigned,PH1~..~.lA S. ROI'YIKIGWH~,contractorfortheabove improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for sa/i~d~i ~m/py/gvement. APPROVED!-~1~1lJs~O/,~ . / i d/~YY~1'I.iL~ BY: BY: TITLE: ~.I! "tl C;. at.{. ~y~'~ATE: - ~ ~ l L..~ r~~ THE CITI' OF DUB E i ~ / City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563)589-4270 ..___......... PROJECT CLOSE OUT FORM ~P~OjeCt Name ~~~~ ~ 2007 SEWER CIPP LINING PROJECT~~~~~ CIP # : 7101637, 7101901, and 7201910 CIP Number: CONSTRUCTION COST ESTIMATE PrOjeCt Contract AmOUnt: $163,464.00 Pro'ect Com letion Date: 3o-Nov-07 ontractor Name: _Visu sewer Clean a seal Contractor Address: W230 N4855 8etker Drive City, State, Zip: Pewaukee, WI 53072 Contractor Tele hone: eoo-676-6476 PROJECT COST SUMMARY Total Contract Work Performed to Date: $ 174,540.50 Total Change Order Work Performed to Date: $ 25,047.86 Total Contract and Change Order Work Performed to Date: $ 199,588.36 Miscellaneous Costs $ 16,307.53 En ineerin $ 9,359.99 TOTAL FINAL PROJECT COSTS: $ 225,255.88 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa ~.: ~'' ~t.~~-;~;~ ','~'. LCD'-t'7~1i--..__ Gus Psihoyos, City Engineer Dubuque, Iowa BY: ~t5u• SE.WE.R a~aaa ~ SEa~,=lac. The Undersigned, PHtu.tp S. RDmaGNp ~ ,contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said impr~ement. APPROVED: n ~ Y~C BY: -~ TITLE: (`~~r s~~: ~.h.~.~..7 DATE: '~ ~ / " t_.~ THE CITI' OF DuB /~ E i ~ / ITEM 9 1 2 3 4 City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563)589-4270 CONTRACT ITEM DESCRIPTION Clean 8-Inch Diameter Sewer Line 8-Inch Diameter Sewer Clean 18-Inch Diameter Sewer Line 18-Inch Diameter Sewer Clean 24-Inch Diameter Sewer Line 24-Inch Diameter Sewer Reinstate Laterals Spray Seal Manhole Traffic Control ......_...._.... PROJECT CLOSE OUT FORM --_ Project Namei _ __ 2007 SEWER CIPP LINING PROJECT CIP # : 7101637, 7101901, and 7201910 CIP Number: CONSTRUCTION COST ESTIMATE :Project Contract Amount: $163,464.00 Project Com letion Date: 30-Nov-07 ontractor Name. disu sewer Clean s Seal Contractor Address: W23o N4855 t3etker Drive City, State, Zip: Pewaukee, WI 53072 Contractor Tele hone: soo-67s-6476 CHANGE ORQERS Date Description ~ Delete Item No. 8 and ADD Chemical Grout Manhole $ Chemical Grout of Keymont & Adeline Storm Sewers $ Line 18-Inch Diameter Sewer w/Drop $ Clean an additional 258 LF of 8-Inch Diameter Sewer $ Line an additional 258 LF of 8-Inch Diameter Sewer $ CONTRACT ITEM TITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 2003 LF $ 2.00 2003 $ 4,006.00 100.00% 2003 LF $ 27.50 2003 $ 55,062.50 100.00 800 LF $ 4.00 881 $ 3,524.00 110.13% 800 LF $ 56.00 768 $ 43,008.00 96.00% 568 LF $ 10.00 618 $ 6,180.00 108.80% 568 LF $ 100.00 618 $ 61,800.00 108.80% 56 EA $ 10.00 44 $ 440.00 75.86 28.3 LF $ 255.00 0 $ - 0.00 1 LS $ 500.00 1 $ 500.00 100.00% Cha a Order Amount Sub Total $ 174,540.50 Pro ect Total 3,962.00 3,562.50 9,912.36 516.00 7,095.00 $ $ $ $ $ 3,962.00 3,562.50 9,912.36 516.00 7,095.00 100.00 100.00% 100.00%I 100.00 100.00% Sub Total $25.047.86 Payment Totals $ 199,588.36 PROJECT COST SUMMARY Total Contract Work Performed to Date: $ 174,540.50 Total Change Order Work Performed to Date: $ 25,047.66 Total Contract and Change Order Work Performed to Date: $ 199,588.36 Miscellaneous Costs $ 16,307.53 En ineerin _ $ 9,359.99 TOTAL FINAL PROJECT COSTS: $ 225,255.88 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa ~~ r _~~ ../ - L.,- Gus Psihoyos, City Engineer TheUndersi ned, PNt~~tP S• RCty1M~Gh1p,~tSll-SEWER Cl.£A-•1~ SEtat.,.LtJC. 9 , conbactor for the above improvement, does hereby accept the above'Total Due Contractor", as full settlement for all claims for said impro~epient. BY Dubuque,lowa BY: TITLE: ~ ~"n-j ~: n-cy"lt~~Z DATE: 7 ... '~ . - C. `'~