Downtown Streetlight_Signal Pole Painting ProjectTHE CTTY OF Dubuque
--.
DUB E All-Ana3dcal~ty
Masterpiece on the Mississippi
2007
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Downtown Streetlight & Traffic Signalization Pole Painting Project
CIP 2501917: Painting Program for City-Owned Streetlights and Traffic
Signals
CIP 1021608: Downtown Streetlight Replacement Schedule
DATE: July 1, 2008
City Engineer Gus Psihoyos is recommending the acceptance of the Downtown
Streetlight and Traffic Signalization Pole Painting Project as completed by Alan Jackson
Tuckpointing, Inc. in the amount of $66,541.90, which is a 42.88% increase from the
original contract.
The specifications called for the contractor to remove rust and to add one coat of primer
and one coat of finishing paint. The actual condition of the poles was deteriorated to
such point that one coat of primer and finishing paint were not adequate. Therefore, the
contractor worked with the City to apply two coats of primer to cover the poles. Also,
the project scope was expanded to include additional poles.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
~ ~~ ~ ~~
Michael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
THE CITY OF
DUB E
Masterpiece on the Mississippi
Dubuque
A9-America City
,~~.~
2007
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer ,
SUBJECT: Downtown Streetlight & Traffic Signalization Pole Painting Project
CIP 2501917: Painting Program for City-Owned Streetlights and Traffic
Signals
CIP 1021608: Downtown Streetlight Replacement Schedule
DATE:
INTRODUCTION
June 27, 2008
The enclosed resolution provides for the acceptance of the construction contract for the
Downtown Streetlight & Traffic Signalization Pole Painting Project.
BACKGROUND
The Downtown Streetlight and Traffic Signalization Pole Painting Project consisted of
painting approximately 180 streetlilghts and traffic signal poles in the downtown area of
Bluff Street to White Street, from 1S Street to 17th Street.
DISCUSSION
The Downtown Streetlight and Traffic Signalization Pole Painting Project was completed
by Alan Jackson Tuckpointing, Inc. of Bellevue, Iowa, in the final contract amount of
$66,541.90, which is a 42.88% increase from the original contract in the amount of
$46,571.00.
The specifications called for the contractor to remove rust and to add one coat of primer
and one coat of finishing paint. The actual condition of the poles was deteriorated to
such point that one coat of primer and finishing paint were not adequate. Therefore, the
contractor worked with the City to apply two coats of primer to cover the poles. Also the
project scope was expanded to include additional poles.
RECOMMENDATION
I recommend that the City Council accept the improvements and to authorize the
payment of the contract amount of $66,541.90 to Alan Jackson Tuckpointing, Inc. for
the Downtown Streetlight and Traffic Signalization Pole Painting Project.
BUDGET IMPACT
The estimate of final costs for the Downtown Streetlight and Traffic Signalization Pole
Painting Project is summarized as follows:
Bid Award
Construction Contract $ 46,571.00
Contingency 5,823.60
Construction Engineering & Inspection 9,608.94
Total Project Cost: $62,003.54
The project funding summary is as follows:
CIP No. Fund Description
2501917 Painting Program for City-Owned Streetlights and Traffic
Signals
1021608 Downtown Streetlight Replacement Schedule
Total Project Funding
ACTION TO BE TAKEN
Final
$66,541.90
0
9,862.79
576.404.69
Fund Amount
$31,250.00
45,154.69
X76,404.69
The City Council is requested to adopt the attached resolution to accept the
improvements and to authorize the payment of the contract amount of $66,541.90 to
Alan Jackson Tuckpointing, Inc. for the Downtown Streetlight and Traffic Signalization
Pole Painting Project.
Prepared by David Ness, Civil Engineer
cc: Jenny Larson, Budget Director
Don Vogt, Public Works Director
John Klostermann, Street & Sewer Maintenance Supervisor
Bob Schiesl, Assistant City Engineer
RESOLUTION NO. 211-08
ACCEPTING THE DOWNTOWN STREETLIGHT & TRAFFIC SIGNALIZATION
POLE PAINTING PROJECT AND AUTHORIZING THE PAYMENT OF THE
CONTRACT AMOUNT TO THE CONTRACTOR
Whereas, the Public Improvement Contract for the Downtown Streetlight & Traffic
Signalization Pole Painting Project (the Project) has been completed and the City
Engineer has examined the work and filed a certificate stating that the Project has been
completed according to the terms of the Public Improvement Contract and that the City
Engineer recommends that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Painting Program for City-Owned Streetlights and Traffic Signals and Downtown
Streetlight Replacement Schedule Capital Improvement Project appropriations for the
contract amount of $66,541.90 less any retained percentage provided for therein as
provided in Iowa Code chapter 573, and to pay such retainage only in accordance with
the provisions of Iowa Code chapter 573.
Passed, approved and adopted this 7th day of July, 2008.
Roy D. Buol, Mayor
Attest:
panne F. Schneider, CMC, City Clerk
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE
DOWNTOWN STREETLIGHT & TRAFFIC SIGNALIZATION POLE PAINTING
PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Downtown Streetlight & Traffic Signalization Pole Painting Project,
that the Project has been performed in compliance with the terms of the Public
Improvement Contract, and that the total cost of the completed work is $76,404.69.
Dated this 2nd day of July, 2008.
Cit Engineer
Filed in the office of the City Clerk on the 2nd day of July, 2008.
Jeanne F. Schneider, CMC, City Clerk
City of Dubuque -Engineering Division
Partial Payment Form
PARTIAL PAYMENT NO: Final DATE: June 27, 2008
PROJECT NAME: DOWNTOWN STREETLIGHT AND TRAFFIC SIGNALJZATION
POLE PAINTING PROJECT
CONTRACTOR: ALAN JACKSON TUCKPOINTING, INC CONTRACT AMOUNT: 548,677.00
BID ITEM DESCRIPTION UNIT vP~N. ~ UN TTCOST OTOADATE EARNED TO Complete
~OTHb'BLUF ~h;~:~?~ii~'ai't~~~.»~d~a9~'~-~; .,- TTa ;; ~ 'rT:~~.li'La~ ~?'i:!~:'.~[t~~r~i..: ..,.. 4~.;~.~.
4 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
2 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100%
1,3 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
6,7,8 LARGE OVERHEAD MAST w/ 2 POLES EACH 1 $1,757.00 1 $1,757.00 10D'Yo
5 PEDESTRIAN HEAD w/BRACKETS EACH 3 $29.00 3 $87.00 100%
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100%
TOTAL COST PER INTERSECTION
$2,764.00
9TH<a BLUF a a
13 30' LIGHT POLE EACH 1 $121.00 1 $121.00 100%
11 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
12,14 20' MASTARM POLE EACH 2 $439.00 2 $878.00 100%
10 30' COMBINATION POLE EACH 1 $606.00 1 $608.00 100%
9 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100%
PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 100
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 8 $37.00 8 $296.00 100
TOTAL COST PER INTERSECTION $2,268.00
8TH"d:BI.UF~ C!;`~~`,ct+.t G4i 3'a~µiifi~~J.^.:" . ,;;~i`:' `.K,~. '%,' `~~f~l.~e~~~fiFY~`~~h,Y',7G4
15,19 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100°!0
18 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
16,17,18 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 8 $232.00 100 %
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100
TOTAL COST PER INTERSECTION
$955.00
6TH >i'BLUFF,+~Si~., P~_<,~-_ >r :.fi:~f..«h . 5,.
' , _ ti _. ~' ~ ~?~6.'f~.~i~1.i\~it: s3:. ..'~=!.~i-, - `~;:a,
24 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
2D-25 PEDESTAL SIGNAL EACH 6 $63.00 6 $378.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100
TRAFFIC SIGNAL HEAD wl BRACKETS EACH 6 $37.00 6 $222.00 100%
TOTAL COST PER INTERSECTION
5902.00
2NUd.'BCUF `~!~ ~~~~:~'•. r".., ,y r~~.~'-t.~i:: ~i, . :~} S' ,.L ~ic;~'.~'~.~r'y`,'..'„~:: ~`,~t'.2~. .,~~{~-~~ :t'i't ,.e-.
26 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100Mo
26 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100%
27 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 10D%
PEDESTRIAN HEAD w/ BRACKETS EACH 2 $29.00 2 $58.00 100%
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 4 $37.00 4 $148.00 100%
TOTAL COST PER INTERSECTION $778.00
K\PROJECTS\Dovmtoxn SipnW B L'pM Pananp 20071Bid Dawmeirtc\COntroetor PaymeMSlPenid 1 to Alan Jackcortdc
Pepe 7 of 7
Photo ITEM ITEM
REF #'s LOCATION UNIT Q1Y• UNIT COST QTr• TOTAL COST
'4TH'3~L`000S ~ ~'
~.N" e'=~'R~ ~i iS7 ""~rs+~`s~'Y'b.
:+ ~" ~~t ~ ~ ' ~ t
28,31,32 .
i
30' LIGHT POLE .
EACH 3 $121.00 3 $363.00 100%
28,29 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 4 $37.00 4 $148.00 100
TOTAL COST PER INTERSECTION 5932.00
bT F18L`000S '~~!'~7~h`?:~~r'~a''~',1Y~a:aT„'^g~.`fi+:T . ~~ ':">` _ `
33,36,37 30' LIGHT POLE EACH a $121.00 3 $363.00 100%
35 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
34,35 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100%
PEDESTRIAN HEAD wl BRACKETS EACH 8 $29.00 8 - $232.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100%
TOTAL COST PER INTERSECTION
$976.00
7TH 3 lOCZ1ST$*~i~ .~ .~ ~`~+~,.~m~~it`t'f9,~~*w ~` 'a if' :~ -':'~~ ~'~{~~a17~t` „ut~,.=. ~ , ~. ~~t i.~~C. 'i~:t "M~ f~~sv::~~,.a3% ~l-M~L`:
.W_ W. .
38,39 30' LIGHT POLE EACH ~ 5121.00 2 $24[.00 100%
TOTAL COST PER INTERSECTION
$zaz.oo
BTH~3L000ST~.~ . ~. .~ .w _~ ~~... e:a4il4.~~` _~ r' w .~:~.x ~'4v~i fy,i`.~n:T 1`> "..:~ ~_ _. ~ ,-- E... ~ ~1i'.~i.°-i
40,42 30' LIGHT POLE EACH 2 $121.u0 2 $141.00 100%
41 CONTROL CABINETS EACH 1 $70.00 1 $70.00 10D%
43 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100%
PEDESTRIAN HEAD w/ BRACKETS EACH 2 $29.00 2 $58.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 2 $37.00 2 $74.00 100%
TOTAL COST PER INTERSECTION $507.00
9TH6`LOCUST ~'3>:~ s.;f#s~°.`',~(tiS~tz '~`'n'~.u~-t ~m°nrffi''.~~`~ ~~~`
44,45,47 30 LIGHT POLE EACH 3 $121.00 3 $363.00 100%
48 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
46,48 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100%
PEDESTRIAN HEADw/BRACKETS EACH 6 $29.00 6 $174.00 100%
TRAFFIC SIGNAL HEAD w! BRACKETS EACH 3 $37.00 3 $111.00 100
TOTAL COST PER INTERSECTION 5844.00
; 1OTH3LOO0ST~~4~`; ,,.~ t ~a.` "'` _.,ta ~i23.kr.
~
., ,'_ca~~Es~:'.
~.
`~ 1?f~ , :*~~,_~ ., r`~ ,a~"~ej`,.~~,~~,~.;,'~,~'G~~L;`'`,i~.
51 CONTROL CABINETS EACH 1 $70.OU 1 $70.OG 100%
49-52 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100%
56 LARGE OVERHEAD MASTwl2 POLES EACH 1 $1,757.00 1 $1,757.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100 %
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 4 $37.00 4 $148.00 100
TOTAL COST PER INTERSECTION 52,522.00
`12TH 3 LOCUST~~ _~_ ra+R:u ~ .: ~ f ... ~h,,, t .:"'~._ . e... ~' + ~„ a ;7~1.i1~ a~~
~
ir:dtd '~:~~.
e~.,
_..,
55 CONTROL CABINETS EACH i 570.OG 1 b. G.GO 10UY'o
53-55 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEAD w! BRACKETS EACH 4 $29.00 4 $116.00 100
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 3 $37.00 3 $111.00 100%
TOTAL COST PER INTERSECTION 5486.00
K:WROJECTS1DovrtROwn Sipnd & Light Painpnp ]ODTBid DowmenffitContractor Paymenffi~Partid 1 to Alen Jackaon.zls
Pape 2 a/ 7
Photo ITEM ITEM
REF #'s LOCATION UNIT °Tr• UNIT COST QTY• TOTAL COS7
1:1:- ..
12TH''3 NIAINj' Y ~
~X:iL{-',-
iiF~'
l:
1l ' ~, '
'1`~L..`".:I~~~~r ~~+.~i:; ;''y y~
q~~ -
~~u~t ~t..,fi'~'.~~
_:~a:~~.~~~~..f,~.
~n..: :~: . .. ,dML~t.'r::..,
57,58 ,
_
..
.
30' LIGHT POLE EACH 2 $121.00 2 $242.00 100°ro
60 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
59,60 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 6 $29.00 6 $174.00 100°h
TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100 %
TOTAL COST PER INTERSECTION 5834.00
'11TH`3 MAIN ~: ~r_ >~04~.';5~'~~
61,62 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100%
TOTAL COST PER INTERSECTION $242.00
.10TH-R MAIN `' fie. ~ t ., ,L. ~;}' i" r' ':;.,;~L '~` =,~,`4~ `~.,T. r~ fle~:~~ike'~ ":;:.,~'It.~*~-S!
63,64 30' LIGHT POLE EACH $121.00 2 $242.00 100
67 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
657 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEADw/BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100
TOTAL COST PER INTERSECTION $955.00
._ .,,_... ,. ..~'4aP(S4F: ~.^F `Ge 'ra~.~ .,.r}~2'tl~e~w ~. ~ - i r, ,"~`.',' :'lla1.}4~ii~>,.
9TH"R NIAIN~ ? .. 1 ti 11F ts~ ~' t•~i?s'''S'f.°'`,~1A:~'.17! 'S~
68-71 30' LIGHT POLE EACH >, .-.~ 4 ~ $121.00 4 $4x4.00 100%
TOTAL COST PER INTERSECTION $484.00
STH6'M%11N;j~~;~`.7>r'. r :!'~', v ; k: r°:.\. ~ ~Y~~i~~'4pt7 ' e "~iy_ii~:i~ iFU •:Y ~ G ,; ~$'~!f~~.~!:~~v1S~r'^~' ct.~r:_`')~~
72 30' LIGHT rULE EACH L $121.00 2 $242.00 100°~
TOTAL COST PER INTERSECTION 5242.00
`4TH3MAIN~',..n,~r:..r'r-r'Q./..X
~.
.,
:.''+?_ >tA~.?f,::,li :H. ;1, .:.:-.~
:r,1.1.,t,.$~r ?'.~~.. ..~ :.
~~'C's.-...,' ~~..at~''~,,.
76 30' LIGHT POLE 1 00 5121.
00 100
TOTAL COST PER irdreRSEC7iora $121.00
3FtD 3`-MAIN J.,~t,~C +~:' d, ~f ~ ~6. ~ ~ : "+~`'if i~ti.; Y` a ~ i` c:'a'ih ;' ~iY.% ,r _,f'a: ?rs:.li .:4~ ~ ~,i!'~~ ~~ -_ : c(i~ ::;:et
73 30' LIGHT PULE EACH 1 5121.00 1 $121.00 100°~
TOTAL COST PER INTERSECTION 5121.00
2ND 3 M/dIN'°riiarc~i.°~' 'r c'~ ~'S'~;..~..~ ~'O``i~ ~'. ~~'v ~. -~' tS~.: "
74,75 30' LIGHT POLE EACH 2 $121.00 2 5242.00 100%
TOTAL COST PER INTERSECTION 5242.00
>7ST~3MAIN~,E~4~"9. ~.'~.'~[i.~.~:':~.1,1°'~','.~:1~y,7~:t'-i i_.',''•alri:u:~~.s~n;~La.~,''ii..~5~-?+~'.~;;e~~',::%t:'1:.:'.r'.:J:~~i'~~ata"~
76,77 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100
TOTAL COST PER INTERSECTION 5242.00
4TH "d.101N.4~~x~ "~xy:.;, ti- .,;~` t ..;{~."~+il~.~:.. -.~c . r b~°J~~''...t.:~`'r~ii. iF~t.; ~ia~:S"s~`>If~`~:ti~! - .:'~L:>i~3
79-81 30' LIGHT FOLE EACH 's ~ $121.00 3 $363.00 100%
TOTAL COST PER INTERSECTION 5363.00
K\PROJECTS\Oowntovm Sipnel 8 LipM Peintrnp 2007\BiE Documenh\Centredor Peymer~\PVEW 1 to Alen Jxkson.tlc
Pepe 7 of 7
Photo ITEM ITEM
REF #'s LOCATION UNIT °TY. UNIT COST t?rY. TOTAL COST
6TH 3""IOWA r~ Tc: .r:~t „ ,a+c. t., .~{~ •. A. ' .
aa+F ,. ,.a,~~i~'L~... H M r ~
~. ra.ti"A ` r./
v?~YJ- 'i` t K.-'.'-"'~°s
'.~1~t, 3~~ ? tk+l
85$7 30' LIGHT POLE EAGH 3 $121.00 3 $363.00 100%
82,84 30' COMBINATION POLE EACH 2 $608.00 2 $1,216.00 100°~
83 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100%
PEDESTRIAN HEAD w/ BRACKETS EACH 4 $29.00 4 $116.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100%
TOTAL COST PER INTERSECTION 51,943.00
,.
6THR'IOW ` ,~'~_1: n:,?kYS~'?+,
k~,,-:T~„;k,.i
~.;?. ;;:,M'JS'~-~Iti:lLff,/-?~+,
y'f;~'3'~ '',:.,fit;"tom ~~x~?.
~.~t~'
88-92 30' LIGHT POLE EACH 5 $121.00 5 $605.00 100%
TOTAL COST PER INTERSECTION $606.00
7TH810W ~'lr::'c'~if?, R~'~h~~£k'!'9~s~i}'~k~',~t .'"V~~r' ~ _~K•~+3 K
94,100,101 30' LIGHT POLE EACH 3 $121.00 3 $363.00 100%
97 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100 %
93,95,96,98,99 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 ~ 100%
PEDESTRIAN HEAD wf BRACKETS EACH 10 $29.00 10 $290.00 100%
TRAFFIC SIGNAL HEAD wJ BRACKETS EACH 9 $37.00 9 $333.00 100%
TOTAL COST PER INTERSECTION $1,908.00
r ' ...
8TH b 101NA>~y~"I1. ~ 4~::.ti .tyyy':•,,~a! ~~ ., ..-~~'6 Y r~r1e?I3~ ~i~ ?y ~•i"~t~
102-105 30' LIGHT POLE EACH 4 $121 uv 4 $484.00 100%
TOTAL COST PER INTERSECTION $484.00
T~,i :~, ~';'.F:~
8TH 310~IVA•`~'~.y .:..,,;y„~ .`to't +~_. '~, ;. , . .'.a.±~?~h~~ ',~'Y~!~:~~ ~<~ _, N~. _`~`n,~"' y:.,,ir:'n~',~ ...: k~,~ .T' ~iJ-dtti-r:.;,,("p
106,108,111,112 _
30' LIGHT POLE EACH 4 $121.00 4 3a84.00 100%
108 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100
117 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100%
107,109 30' COMBINATION POLE EACH 2 $608.00 2 $1,216.00 100%
108,110 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100%
PEDESTRIAN HEAD w! BRACKETS EACH 10 $29.00 10 $290.00 100 %
TRAFFIC SIGNAL HEADw/BRACKETS EACH 6 $37.00 6 $222.00 100%
TOTAL COST PER INTERSECTION $2,847.00
70TIib IOWA .'.~ N .:,~:1_i~'~~2~.i~.' - "'"~ : t~ ~.:~.y.'>,~+'t `'~F~w'~~S[:[K1.~` r:t~~9.~~~ , yk"ti': '.~.'t4.f1«~.5~~,;_
120 30' LIGHT POLE EACH I $121.00 1 $121.00 100%
116 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
114 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100%
121 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100 %
113.115,118,119 PEDESTAL SIGNAL EACH 4 $63.00 4 $252.00 100%
PEDESTRIAN HEAD wf BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100
TOTAL COST PER INTERSECTION $1,944.00
11THSIOVUAy~~'~i37~itf" .. ~sa~~ - ~'; ..~Z ~:.-._,.:, .: ~''° :~:~: ..: s _,' '.. ~.•,.3~~u ...
122,123 30' LIGHT POLE rAi.H 2 8121 Ov c 3242.00 100 %
TOTAL COST PER INTERSECTION 5242.00
K:\PROJECTSIDaenlown Sipnel6 LiOM Pairtlin0200718Itl Documents\COntrector PeymeMC\Partial 1 to Alen Jeckcontlc
PeOe 4 of 7
Photo ITEM ITEM
REF #'s LOCATION UNIT Qrr. UNIT COST aTY. TOTAL COST
;12TF3'3"IOWA ~1;, :.~ .~ r~~'~t"~_, ~.
~ :.`k~` . .
~
126,128 30'LIGHTPOLE EACH 2 $121.00 2 $242.00 100%
124,125,127 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 6 $29.00 6 $174.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100
TOTAL COST PER INTERSECTION $790.00
13THb'10 A ~ ~~4'ii'i '1,t;;:t? ~3.a>:~w~~i'~+-5~~~2'.t't.i -
129,130 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100%
TOTAL COST PER INTERSECTION 524200
`1 TTH &~CENTRA-'L~il~
x:.. ti:6?1 ,j.t:t,lstx~~i#r~lser°~?:°}.is~ C-'-'~'~,.
;$:~~ , #
~";; Y' ,r'','~~.M,';
.~.,..:i' ~n?E'
132 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100
134 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100
133 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100%
132,135 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100
TOTAL COST PER INTERSECTION
51,760.00
1 16TH 3 C:ENTRAI. iX'o~' t ~t:', r : ~;.~_>~ ;m.y •';y n~~~ -, 'x~S+~ : - ~^~i~~.>~:-i'k:1 ~ _ .;' ? s'~`,~~i ~
136-138 30' LIGHT POLE EACH 3 $121.00 3 $363.00 100
TOTAL COST PER INTERSECTION $363.00
16TH 8°CENTRA ~"..t8.+~~ii4'~~~~ '~'~.'~"'iat°~'~~ r ~.~ r+~s~
141,143 30'LIGHTPOLE EACH 2 $121.00 2 $242.00 100%
140 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100°h
139,140,142 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100%
PEDESTRIAN HEADwlBRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100 %
TOTAL COST PER INTERSECTION $1,081.00
.14TH 3'CEtJTRAL ~:'\d4 ~%~`~r~~t'~t".~ ~'~ i , : ~€~~'~'~5.~"Y,.7p~yy ~ f
•."liSi~C"~
tix~', d ~t'd, :~:~''
, ~~.aatt,p~ a~~~yyt~~~~CC.~y,~q
1 ~~~:'f 7?: a4:.''b'AiIiFRYT•~A
~
145 30' LIGHT POLE EACH 1 $121.OU 1 $121.00 100
150 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100%
152 20' MASTARM w! 2 POLES EACH 1 $762.00 1 5762.D0 100
151 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100
144 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 7 $37.00 7 $259.00 100%
TOTAL COST PER INTERSECTION
$2,484.00
111TH 3 CENTRA`t ,~.f _.. `1 ,~ .t r,-. r, .a .~, ~ ~~ r 3 r X~,'.: 5: e J. yt ; ~-r:~C j-~
146 30' LIGHT POLE EACH 1 $121.00 1 5121.D0 100 io
TOTAL COST PER INTERSECTION
5121.00
_~ i~. ;~ e, , tiff a r.`#~:'+?~~Fa .. . ,, ~: , <,titv'-~u"_ar. ~:*s:~.,1, ~, ,~~4 ''~if~`~.x~.a±~'t~lc8?' r,.:~,','!~!
110TH ~~~CENTRAL: __
147,148 30' LIGHT POLE EACH 2 5121.00 1 $242.00 100
TOTAL COST PER INTERSECTION 5242.00
K:\PROJECTS\DOwn[evm Signal 8 LipM PanSnp 20071Bitl DxumeMC\COrxrxtw PaymeMClParSal 7 to Alan Jacks°n.xls
Pepe 5 of 7
Photo
REF #'s LOCATION UNIT
149 .9TH 3 CENTRAL ,.., ,..
30' LIGHT POLE -
EACH
149 CONTROL CABINETS EACH
158 20'MASTARM POLE EACH
154 20' MASTARM w!2 POLES EACH
153 30' COMBINATION POLE EACH
PEDESTRIAN HEAD w/BRACKETS EACH
TRAFFIC SIGNAL HEAD w/BRACKETS EACH
TOTAL COST PER INTERSECTION
8'1'Hali"CENTRAL"pe'' ,..' _ ~;. .
155,156 30' LIGHT POLE E:,GI1
TOTAL COST PER INTERSECTION
157,160-162,165 7TH dx CEHTRAL
30' LIGHT POLE
EAGI I
163 CONTROL CABINETS EACH
163-166 PEDESTAL SIGNAL EACH
PEDESTRIAN HEAD w! BRACKETS EACH
TRAFFIC SIGNAL HEAD w! BRACKETS EACH
TOTAL COST PER INTERSECTION
8TH 6 CENTRAL'- _
167-168 30' LIGHT POLE ~ EAL:H
TOTAL COST PER INTERSECTION
6TH'3 CENTRAL , , ?,„ .
170,173,175 30' LIGHT POLE
E..~;H
171 CONTROL CABINETS EACH
171-174 PEDESTAL SIGNAL. EACH
PEDESTRIAN HEAD w/BRACKETS EACH
TRAFFIC SIGNAL HEAD w/BRACKETS EACH
TOTAL COST PER INTERSECTION
178 9H`6`WHITE ,y; ','
CONTROL CABINETS
176 20' MASTARM w/ 2 POLES
177,179 30' COMBINATION POLE
178 PEDESTAL SIGNAL
PEDESTRIAN HEAD w/BRACKETS
TRAFFIC SIGNAL HEAD w/ BRACKETS
TOTAL COST PER INTERSECTION
14TH 6 WHRE `
183,184 20' MASTAFcM r:JLE
185 20' MASTARM w! 2 POLES
180 PEDESTAL SIGNAL
PEDESTRIAN HEAD wl BRACKETS
TRAFFIC SIGNAL HEAD w/BRACKETS
TOTAL COST PER INTERSECTION
ITEM ITEM
QTY• UNIT COST ~ TOTAL COST
1 $121.Gu ~~ 1,;.._ 51[1.004 ~ lOGo~~
1 a7o.oo 1 $70.00 100%
1 $439.00 1 $439.00 100 %
1 $7s2.oo 1 $762.00 100%
1 $608.00 1 $608.00 100%
8 $29.00 8 $232.00 100%
5 $37.00 5 $185.00 100%
52,417.00
~
57[7.00 ~..
2 ' ..
$242.00
tuii-~o
5242.00
5 $121.00 5 ~ $uuGAU tOGSa
1 a7o.oo 1 s7o.oo 100%
5 $63.00 5 $315.OD 100%
8 $29.00 B $232.00 100%
6 $37.00 6 $222.00 100%
x1,444.00
2 ~ $121.00 2 ~ ~ $242.00 luu ro
x242.00
3 ~ 5121 ~00 ~ 3 $so3.00 10vio
1 $70.00 1 $70.00 100%
4 $63.00 4 $252.00 100%
8 $29.00 8 $232.00 100%
5 $37.00 5 $185.00 100%
s1,loz.oo
., ~. t. -
EAC.I I 1 570.00 1 $70.D0 100°!0
EACH 1 $762.00 1 $762.00 100%
EACH 2 $608.00 2 $1,216.00 100%
EACH 1 $63.00 1 $63.00 100 %
EACH 8 $29.00 8 $232.00 100%
EACH 4 $37.00 4 $148.00 100%
52,491.00
. ... ~ Ef.CH - ,. $439.OG ~.. -. aoi8.00 . ~_ 100%
EACH 1 $762.OD 1 $762.00 100%
EACH 1 $63.00 1 $63.00 100%
EACH 8 $29.00 8 $232.00 100%
EACH 8 $37.00 8 $296.00 100%
52,211.00
N:\PROJECTS1DOwntown Sipnal8 Lipht PelnGnp 20071Bid Datumenle\Cantractw Peymenis\Prtial 1 tt Alan Jeckcon.xk
Pape 6 of 7
Photo
REF p's LOCATION
181 i6TH'3 WNIYE , ,
CONTROL CABINETS
182 20' MASTARM POLE
181 30' COMBINATION POLE
PEDESTRIAN HEAD w/BRACKETS
TRAFFIC SIGNAL HEAD w! BRACKETS
TOTAL COST PER INTERSECTION
ITEM ITEM
UNIT ~ UNIT COST °TM• TOTAL COST
tncH , s7o.liD i a7o.o~ i~~;e
EACH 1 $439.00 1 $439.00 100
EACH 1 $608.00 1 $608.00 100
EACH 2 $29.00 2 $58.00 100%
EACH 4 $37.00 4 $148.00 100%
$1,325.00
Grand Total 546.571.00
'. .: .. .,.;;CHANGEORI~fi{!a)r.~~-WP,.~S{T.€MS...-_ :,,. ,.... .~, -... ... aG . _;,;'.~ ~ -_ 'i" -
Et Additional 2 Coats of Paint for finish EACH 1 519,970.90 ~ $19,970.9u
E2 EACH 1 $0.00
E3 EACH 1 $0.00
TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $18 870.80
TOTAL AMOUNT EARNED TO DATE: $66 bd1.90
PAYMENTS PREVIOUSLY APPROVED:
1. $44,242.45 7.
2. $18,970.00 B.
3. 9.
4. 10.
5. 11.
6. 12.
TOTAL PAYMENTS FORWARDED: $66 b47.90
TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: 19,970.90
TOTAL AMOUNT EARNED TO DATE: 66,541.90
TOTAL DUE CONTRACTOR: 66,b47.90
ENGINEERING DESIGN /PROJECT ADMINISTRATION: 8,862.78
TOTAL IMPROVEMENT COST: 76 d04.69
CERTIFICATE OF THE CITY MANAGER:
I hereby certify that the above statement shows in tleleil the correct amount of ell work required to wmplete the above improvement.
APPROVED:
Michael Van Milligan, CKy Manager
City of Dubuque, Iowa
APPROVED:
Gus Psihoyos, City Engineer
City o1 Dubuque, Iowa
CERTIFICATE OF THE CONTRACTOR:
The untlersignetl, Alan Jackson Tuckpointing, Inc contractor for the above improvement, tloes hereby accept the
above "Total Due Contractor', as full settlement for all claims for said improvement.
CONTRACTOR: Alen Jackson Tuckpointing, Inc
BY:
TITLE:
DATE:
K:IPROJECTS\DOartrtown Signal & LipM Painary 20071Bid DocumentslCwNaclor PaymentslPartial 1 to Alan Jxkson.tle
Pepe 7 0l I
City of Dubuque -Engineering Division
Partial Payment Form
PARTIAL PAYMENT NO: Final DATE: June 23, 2008
PROJECT NAME: DOWNTOWN STREETLIGHT AND TRAFFIC SIGNALIZATION
POLE PAINTING PROJECT
CONTRACTOR: ALAN JACKSON TUCKPOINTING, INC CONTRACT AMOUNT: S46,S71.00
BID ITEM DESCRIPTION UNIT „,P~N , CONTRACT OUANTITV AMOUNT We
UNIT COST TO DATE EARNED TO Cpm to
4 LOTH R BLUFF _
CONTROL CA .. -., - ..~-
BINETS ~ .
~ :... ~~
EACH
1
, ,.. ~
$70.00
1
~
SiU.OU
.. _ _~
tuu~ro
2 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100%
1,3 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
6,7,8 LARGE OVERHEAD MAST w/2 POLES EACH 1 $1,757.00 1 $1,757.00 100%
5 PEDESTRIAN HEAD wJ BRACKETS EACH 3 $29.00 3 $87.00 100
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100
TOTAL COST PER INTERSECTION 52,764.00
~ ~
13 30' LIGHT POLE EACH 1 $111 AU 1 $121.00 100%
11 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
12,14 20' MASTARM POLE EACH 2 $439.00 2 $878.00 100%
10 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100%
9 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 8 $37.00 8 $296.00 100
TOTAL COST PER INTERSECTION 52,268.00
15,19 30' LIGH7 POLE EACH 2 $121.00 - i~d~.w 1uv-io
18 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
16,17,18 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100%
TOTAL COST PER INTERSECTION 5856.00
6TH & BLUFF , ; ,i; "~
r<
24 CONTROLCAbINEIb EACH 1 Siu.uu 1 $70.00 100%
20-25 PEDESTAL SIGNAL EACH 6 $63.00 6 $378.00 100%
PEDESTRIAN HEADw/BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100%
TOTAL COST PER INTERSECTION $902.00
26 2ND S BLUFF > ;
CONTROL CABINETS
EACh
1
5lu.uu
1
$70.OU
100%
26 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100
27 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100%
PEDESTRIAN HEADw/BRACKETS EACH 2 $29.00 2 $58.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 4 $37.00 4 $148.00 100%
TOTAL COST PER INTERSECTION $778.00
K:IPROJECTS\Dovmtown Signal 8 LpM Pambrp 200TBitl DowmenfelContrx[or Payments\Partral 7 to Alan Jxkson.tlc
Pape 7 of 7
Photo ITEM ITEM
REF #'s LOCATION UNIT °rY• UNIT COST °TY• TOTAL COST
4TH~L000$T
~
~ t••. •- _.•;,F' pc ~:,,h- .,
~ ~ ~ r ,SF r ~ - w
31
32
28 ~- ~ ~ ~ ~
30' LIGHT PULL EnwrH o b121.0u 3 a.w3.G~ 100/
,
,
28
29 PEDESTAL SIGNAL EACH 3 563.00 3 $189.00 100%
, PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w! BRACKETS EACH 4 $37.00 4 $148.00 100
TOTAL COST PER INTERSECTION 5932.00
6TH S LOCUST
`
' ' ..
.
36
37
33 ..
.
- :
30' LIGHT POLE En~H 3 b1[1.UU J S:iG3.00 100%
,
,
35 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
34
35 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100%
, PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 B $232.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100%
TOTAL COST PER INTERSECTION 5976.00
/~
38,39 7THbL000ST
30' LIGHT POLE - EAI.H [ x111.
Gv
Sz4z.u0
ivu io
,,
TOTAL COST PER INTERSECTION 5242.00
i BTH b LOCUST ~ ..
40
42 30'LIGHTPJ~6 Era.H 2 $1~1.Gv 2 $242.00 1uu-~o
,
41 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
43 PEDESTAL SIGNAL EACH 1 563.00 1 $63.00 100%
PEDESTRIAN HEAD wl BRACKETS EACH 2 529.00 2 $58.00 100 %
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 2 $37.00 2 $74.00 100
TOTAL COST PER INTERSECTION 5507.00
45,47
44 30' LIGHT POLE EACH 3 $121.00 3 Sdo~.00 i W %
,
48 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
48
46 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100%
, PEDESTRIAN HEAD w/BRACKETS EACH 6 $29.00 6 $174.00 100
TRAFFIC SIGNAL HEAD w! BRACKETS EACH 3 $37.00 3 $111.00 100%
TOTAL COST PER INTERSECTION 5844.00
.
~
51 ^IOTH 3 LOCUST i
CONTROL CABINETS
EACH
1
$7~.GU -_ _
1 ~
~
'
$70.00 ,
100%
49-52 PEDESTAL SIGNAL EACH 5 563.00 5 $315.00 100%
56 LARGE OVERHEAD MAST w! 2 POLES EACH 1 $1,757.00 1 $1,757.00 100
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 4 $37.00 4 $148.00 100%
TOTAL COST PER INTERSECTION
- 52,522.00
55 12TH b LOCUST
CONTROLCA6INETS
EAGM
1
,,-..
f
$70.00
1
$/u.uu R
-- ,
100%
53-55 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 4 $29.00 4 $116.00 100
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 3 $37.00 3 $111.00 100%
TOTAL COST PER INTERSECTION 5488.00
K:\PROJECTS\Downtown Signal 8 Light Painting 2007\Bid Documents\COntractor PaymantaWartial 1 to Alan Jxkson.ak
Pepe 2 017
Photo ITEM ITEM
REF q's LOCATION UNIT f~TY. UNIT COST QTY• TOTAL COST
~ ~.:. -
k1
58
57 2TH b MAIN..
30'LIGHTPGLE cAGH 2 a12LJv < $Y41.J11 100io
,
60 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
59
60 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100%
, PEDESTRIAN HEADw/BRACKETS EACH 6 $29.00 6 $174.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100%
TOTAL COST PER INTERSECTION 5834.00
61,62 11TH d. MAIN. , .
30' LIGHT PG~E
EN~H
2 ._ i 'iN
a1<1.Jv ~ ..
2 ,. '. -
524[.vu ;. , _ -
1JOSe
TOTAL COST PER INTERSECTION 5242.00
64
63 30' LIGHT POLE ,~ EACH 2 ~ $121.00 ~ 2 52d2.0v 100'vo
,
67 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
65-67 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 B $232.00 100%
TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100%
TOTAL COST PER INTERSECTION 5956.00
POLE Cn.:H a -- I ~ ~ ~ `.- - - ~ - -- `a ~.T.00 100%
TOTAL COST PER INTERSECTION f 4 e a. o0
.N
72 30' LIGHT Fvi_E 1.C;0 ~ $242AJ 11,u°!o
TOTAL COST PER INTERSECTION 5242.00
78 '4TH.~MAIN,a;
30' LIGHT POLE da
EAi.H
1 ,.. :,: '
$121.00
1 ~ ,
$121.00
100°ro
TOTAL COST PER INTERSECTION 5121.00
73 3RD 3 MAIN t:
30'LIGHTPOLE ~~~~ ~ ~ .~ . „,.,
~ ~ EAGH
1
$121.J0
__ 1 __ ,
_ $12100 ;' :.. ;
100%
TOTAL COST PER INTERSECTION S 121.00
~'~
74,75 30' LIGHT PULE EACH 2 $121.Ju 2 $~a<.vJ 100%
TOTAL COST PER INTERSECTION 5242.00
-
76,77 1§Tb~MAIN .. , :
30' LIGHT POLE EACH. . 'L atit.00 < a2
41.00 :.
1vJ•ra
TOTAL COST PER INTERSECTION 5242.00
47H ~y IOWA,: ~ .y ~ ~ . .',". v!'r ;r _ i ' , '
79-81 30' LIGHT POLE ENVh 3 .o111Ap 3 $369.~J tuJio
TOTAL COST PER INTERSECTION 5363.00
K'.WROJECTS\DOx*rtown Sipnal8 Light Pair,lin9 200TBid DocpmenblCor,bador Peymards\Perbal 1 to Nan Jackson.ds
Pape 3 0/7
Photo ITEM ITEM
REF #'s LOCATION UNIT QTY. UNIT COST QTY. TOTAL COST
~
857 6THd~lONfA: ~
30' LIGHT PiiLE
tACH
3
al[1.ud
3
$363.00 ~ "
,
100ro
84
82 30' COMBINATION POLE EACH 2 $608.00 2 $1,216.00 100%
,
83 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 4 $29.00 4 $116.00 100%
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 5 $37.00 5 8185.00 100%
TOTAL COST PER INTERSECTION 51,943.00
88-92 BTH6tOWA ~
30'LIGHIPGLE
6>~:H
5 ,.
b121.0u ," ,:.
5
ao06.uu
tw-io
TOTAL COST PER INTERSECTION 5606.00
100
101
94 30' LIGHT PULE EnCH 3 $121.00 s $3fi3.v0 100%
,
,
97 30' COMBINATION POLE EACH 1 $608.00 1 $608.D0 100
99
95
96
98
93 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100%
,
,
,
, PEDESTRIAN HEADw/BRACKETS EACH 10 $29.00 10 $290.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 9 $37.00 9 $333.00 100%
TOTAL COST PER INTERSECTION 51,809.00
~ ~ ~
102-105 30' LIGHT POLE E- -H 4 $121.00 4 $484.00 luuie
TOTAL COST PER INTERSECTION 5484.00
108,111,112
106 8TH R IbWA
30' LIGHT ruL~ ,,,, ,, - tACn
•- 4 $ 111.
w
d
$atsa.uu ;
li><i-ro
,
108 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
117 20' MASTARM POLE EACH 1 $438.00 1 $439.00 100
109
107 30'COMBINATIONPOLE EACH 2 $608.00 2 $1,216.00 100%
,
108
110 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100%
, PEDESTRIAN HEADw/BRACKETS EACH 10 $29.00 10 $290.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100
TOTAL COST PER INTERSECTION $2,847.00
~«
120 1Q]'H b IOWA
• ~~
30' LIGHT P~L~
EAGH
1
a121.vu
~ 1_.__... _
$121.00
10u ro
116 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
114 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100%
121 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100%
113.115,118,119 PEDESTAL SIGNAL EACH 4 $63.00 4 $252.00 100%
PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 1D0%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100
TOTAL COST PER INTERSECTION $1,944.00
11TH S IOW
A ~ i- ~ ~~~
122,123 30' LIG
HT POLE EACH 2 alti.uv
- c $242.00 100 r
TOTAL COST PER INTERSECTION 5242.00
K:IPROJECTSIDOVmtavm SipnW 8 LIpM Painting 200718k1 DowmantslContractar PaymenlstPanial 1 to Alan Jackson.tls
Page d of 7
Photo ITEM ITEM
REF #'s LOCATION UNIT °TV• UNIT COST °TV• TOTAL COST
, _ -
112TH 610WA" ~, °..r>>;
~~ _ :- ~.- -- - ~ - .•~ ~ . , . .'~:' ~ `.
~ -- G _ .
126
128 _
3D' LIGHT POLE EA%H c $1c1.iiU c $242.UU 100ro
,
125,127
124 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 1D0%
, PEDESTRIAN HEAD w/BRACKETS EACH 6 $29.00 6 5174.00 100 %
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 5185.00 100%
TOTAL COST PER INTERSECTION 5790.00
129,130 13TH b IOWA..
30' LIGHT P~~E
'EACH
2 ;;~,-
$121.00 ~~ . _
2
$142.UU ~ _.
luu ra
TOTAL COST PER INTERSECTION 5242.00
17TH 6 CENTRAL ~ „ , <,:
-
a~;,
hwy...
132 CONTROLCABINE(5 1 EA~:H t S.O.BO t y70.v0 100°!0
134 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100%
133 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100%
132,135 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100%
PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 B 5232.00 100
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100
TOTAL COST PER INTERSECTION 51,760.00
136-138 16TH di'CENTRAL`
30' LIGHT POLE - ~ ~ ~ ~
EACH ~
- 3
$121,00 ~~~
- S -
~- ~ 5363.00 ~ ~~
1u0 i
TOTAL COST PER W T E R S E C T I O N 5361.00
:- • .., ~I ,.
16TF~ 8'CENTRAL
` . , , ., _ .,
141,143 ,
, .
30'LIGHTPOLE EACH 2 bitt.Oli 2 $242.UU 1Uui
140 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
139,140,142 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100%
PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 8 5232.00 100
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100
TOTAL COST PER INTERSECTION
. 51,081.00
..
._ ~
145 14TH03 CGHT OLI=.,..~ -. EACH ~ t
1.Ou
$12 ` .:. " '
1 . ~ - ~ ~
~
$121.uv ~.:..i .`
uv%a
150 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100
152 20' MASTARM w/ 2 POLES EACH 1 $762.00 1 $762.00 100%
151 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100%
144 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 7 $37.00 7 $259.00 100%
TOTAL COST PER INTERSECTION 52,484.00
11TH 3 CENTgE1 ~ _, ~ t[t
~ ~ ~ d ',~'~,
146 30'LIGHTPOLE EA~H t 37~1.Ov 1 $121.00 iw%o
TOTAL COST PER INTERSECTION 5721.00
il1TH 6~CENTRAL' ~ ~ r'~
~
147,148 _
30' LIGHT POLE EACH 2 $121.00 2 $242.00 100%
TOTAL COST PER INTERSECTION 5242.00
K'.NftOJECTS1Doamtown Sipnel 8 Light Painting 200TBid Docomenis\CoMraclor PaymemslPartial 1 to Nan Jxkson.tls
Pepe 5 0/7
Photo ITEM ITEM
REF #'s LOCATION UNIT OTY. UNIT COST en. TOTAL COST
k "-
9TH 3lENTRALf
'i~:~~~`'~
+t< ..`~';.-gr..L^1:... i:q~.,~C ,.,: ~:ii`,.~~tJ,tF" -:'i~7'~'~':..~, .,.J'~`: 't..3~~t' . ;' ~4,';;kfru7i
149 ,
,
,
30' LIGHT POLE EACH 1 5121.00 1 5121.00 100%
149 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
158 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100%
154 20' MASTARM w! 2 POLES EACH 1 $762.00 1 $762.00 100%
153 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100 %
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEADw/BRACKETS EACH 5 $37.00 5 $185.00 100%
TOTAL COST PER INTERSECTION $2,417.00
Pik``
BTHbIENTR'A `~~~~L~ :-~''El~~i ~'1`.'I!C`~, F~`~,~. ri?t,r'~'t!f~U'
155,156 30' LIGHT POLE -
EACH 2 $121.00 2 $242.00 100%
TOTAL COST PER INTERSECTION $242.00
TTf13CENTRAU~,. ~'~,`R'`' .f , ~:i~i.:'~. t. ~,,,~.+~..:~.~t `,~':44.:%Mr'r+~1r4": -..,fir?
157,160-162,165 30' LIGHT POLE EACH 5 $121.00 5 $605.00 100%
163 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
163-166 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100%
PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100%
TOTAL COST PER INTERSECTION $1,444.00
6TH3CENTRAL~. '; ,; .+~~~„ 3!~:`.'~a.T.±. .i, ,.. # ''>:'d~a_. . . :.~ x~;
y ~::k''~. l,_ .:eue..y
167-168 30'LIGHT POLE EACH 2 $121.00 2 $242.00 10D%
TOTAL COST PER INTERSEC7lOl1 $242.00
6TH3CENTRAL'jjr:il`~',-,~ ~; ...1 ,..r't .... „~~`.~9tl~~h~i~ r.,• ' i. 3^„ ,
s ~ ,. ,y. } ~ t..q '~ :~., ;~ ` .':d:cL..:h
170,173,175 30' LIGHT POLE EACH 3 $121.00 3 5363.00 100%
171 CONTROL CABINETS EACH 1 $70.00 1 $70.00 1D0%
171-174 PEDESTAL SIGNAL. EACH 4 $63.00 4 $252.00 100%
PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100%
TOTAL COST PER INTERSECTION 51,102.00
9TH 3 WHITEi ' ~~ t` '?ii`^i;', m. ' • ?°;<. fs'~4~',n?~~ifb
178 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100%
176 20' MASTARM w/ 2 POLES EACH 1 $762.00 1 $762.00 100%
177,179 30' COMBINATION POLE EACH 2 $608.00 2 $1,216.00 100%
178 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100%
PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 8 $232.00 100%
TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 4 $37.00 4 $148.00 100%
TOTAL COST PER INTERSECTION 52,491.00
`:~1'4TH S WHITE ~
. . 1 ~.~ .. t f•kSr6'.3--~: ~}~srFr e '' - ~ 1' ~ {t~'. '".,.-t~.i''~ .~ti:!~` ~~: i "~'f1~:~ i~: ~"'~.~i
183,184 .
20' MASTARM POLE EACH 2 $439.00 2 SBl6.U0 1QU`Yo
185 20' MASTARM w/ 2 POLES EACH 1 $762.00 1 $762.00 100%
180 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100%
PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100
TRAFFIC SIGNAL HEAD wl BRACKETS EACH 8 $37.00 8 $296.00 100%
TOTAL COST PER INTERSECTION 52,231.00
K:tPROJECTS1Dawntown SipnW & L1flht PeinOnp 20071Bid DowmenhlCOrmector PaymentetPartlel 1 b Alen Jackaon.xk
Pape B of 7
Photo
REF #'S LOCATION
181 18TH i WtltTE
CONTROL CABINETS
182 20' MASTARM POLE
181 30' COMBINATION POLE
PEDESTRIAN HEAD w/BRACKETS
TRAFFIC SIGNAL HEAD w/ BRACKETS
TOTAL COST PER INTERSECTION
ITEM ITEM
UNIT gTY. UNIT COST QTY. TOTAL COST
EACH 1 $70.00 1 $70.00 100%
EACH 1 $439.00 1 $439.00 100%
EACH 1 $608.00 1 $608.00 100
EACH 2 $29.00 2 $58.00 100
EACH 4 $37.00 4 $148.00 100%
$1,323.00
Grand Total $46,671.00
CtIANGE ORDERS} -EXTRA WORK ETEMS
Et Additional 2 Coats W Paint for finish EAGH 1 $19,970.90 $19,970.90
E2 EACH 1 $0.00
E3 EACH 1 $0.~
TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: f[9,970.90
TOTAL AMOUNT EARNED TO DATE: 566 541.90
PAYMENTS PREVIOUSLY APPROVED:
1. $44,242.45
2. $16,970.00
3.
4.
5.
8.
TOTAL PAYMENTS FORWARDED:
7.
8.
9.
10.
11.
12.
S86 b41.90
TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: 19,970.90
TOTAL AMOUNT EARNED TO DATE: 66,641.90
TOTAL DUE CONTRACTOR: 66,641.90
ENGINEERING DESIGN I PROJECT ADMINISTRATION: 9,862.79
TOTAL IMPROVEMENT COST: 76 404.89
CERTIFICATE OF THE CITY MANAGER:
I hereby certify that the above statement shows in detail the correU amount of all work required to complete the above improvement.
APPROVED:
Michael Van Milligen, City Manager
City of Dubuque, Iowa
APPROVED:
Gus Psihoyos, Cfty Engineer
City of Dubuque, Iowa
CERTIFICATE OF THE CONTRACTOR:
The undersignetl, Alan Jackson Tuckpointing, Inc contractor for the above improvement, does hereby accept the
above "Total Due Contractor", as full settlement for all Uaims for said improvement.
CONTRACTOR: Alan Jackson Tuck joimin ,Inc /)
TITLE: ~~i ~i ~ //y (/
DATE: 7 ~ ~ ' ~~ b
F:IPROJECTS\Downtown Signel8 LgM Pekitirq 2007\Bid Dowman6\Gontreobr PaymentaNartial 1 m Alan Jackaon.tls
Page 7 of 7