Downtown Streetlight_Signal Pole Painting ProjectTHE CTTY OF Dubuque --. DUB E All-Ana3dcal~ty Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Downtown Streetlight & Traffic Signalization Pole Painting Project CIP 2501917: Painting Program for City-Owned Streetlights and Traffic Signals CIP 1021608: Downtown Streetlight Replacement Schedule DATE: July 1, 2008 City Engineer Gus Psihoyos is recommending the acceptance of the Downtown Streetlight and Traffic Signalization Pole Painting Project as completed by Alan Jackson Tuckpointing, Inc. in the amount of $66,541.90, which is a 42.88% increase from the original contract. The specifications called for the contractor to remove rust and to add one coat of primer and one coat of finishing paint. The actual condition of the poles was deteriorated to such point that one coat of primer and finishing paint were not adequate. Therefore, the contractor worked with the City to apply two coats of primer to cover the poles. Also, the project scope was expanded to include additional poles. I concur with the recommendation and respectfully request Mayor and City Council approval. ~ ~~ ~ ~~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi Dubuque A9-America City ,~~.~ 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer , SUBJECT: Downtown Streetlight & Traffic Signalization Pole Painting Project CIP 2501917: Painting Program for City-Owned Streetlights and Traffic Signals CIP 1021608: Downtown Streetlight Replacement Schedule DATE: INTRODUCTION June 27, 2008 The enclosed resolution provides for the acceptance of the construction contract for the Downtown Streetlight & Traffic Signalization Pole Painting Project. BACKGROUND The Downtown Streetlight and Traffic Signalization Pole Painting Project consisted of painting approximately 180 streetlilghts and traffic signal poles in the downtown area of Bluff Street to White Street, from 1S Street to 17th Street. DISCUSSION The Downtown Streetlight and Traffic Signalization Pole Painting Project was completed by Alan Jackson Tuckpointing, Inc. of Bellevue, Iowa, in the final contract amount of $66,541.90, which is a 42.88% increase from the original contract in the amount of $46,571.00. The specifications called for the contractor to remove rust and to add one coat of primer and one coat of finishing paint. The actual condition of the poles was deteriorated to such point that one coat of primer and finishing paint were not adequate. Therefore, the contractor worked with the City to apply two coats of primer to cover the poles. Also the project scope was expanded to include additional poles. RECOMMENDATION I recommend that the City Council accept the improvements and to authorize the payment of the contract amount of $66,541.90 to Alan Jackson Tuckpointing, Inc. for the Downtown Streetlight and Traffic Signalization Pole Painting Project. BUDGET IMPACT The estimate of final costs for the Downtown Streetlight and Traffic Signalization Pole Painting Project is summarized as follows: Bid Award Construction Contract $ 46,571.00 Contingency 5,823.60 Construction Engineering & Inspection 9,608.94 Total Project Cost: $62,003.54 The project funding summary is as follows: CIP No. Fund Description 2501917 Painting Program for City-Owned Streetlights and Traffic Signals 1021608 Downtown Streetlight Replacement Schedule Total Project Funding ACTION TO BE TAKEN Final $66,541.90 0 9,862.79 576.404.69 Fund Amount $31,250.00 45,154.69 X76,404.69 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $66,541.90 to Alan Jackson Tuckpointing, Inc. for the Downtown Streetlight and Traffic Signalization Pole Painting Project. Prepared by David Ness, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Schiesl, Assistant City Engineer RESOLUTION NO. 211-08 ACCEPTING THE DOWNTOWN STREETLIGHT & TRAFFIC SIGNALIZATION POLE PAINTING PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Downtown Streetlight & Traffic Signalization Pole Painting Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Painting Program for City-Owned Streetlights and Traffic Signals and Downtown Streetlight Replacement Schedule Capital Improvement Project appropriations for the contract amount of $66,541.90 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 7th day of July, 2008. Roy D. Buol, Mayor Attest: panne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE DOWNTOWN STREETLIGHT & TRAFFIC SIGNALIZATION POLE PAINTING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Downtown Streetlight & Traffic Signalization Pole Painting Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $76,404.69. Dated this 2nd day of July, 2008. Cit Engineer Filed in the office of the City Clerk on the 2nd day of July, 2008. Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Partial Payment Form PARTIAL PAYMENT NO: Final DATE: June 27, 2008 PROJECT NAME: DOWNTOWN STREETLIGHT AND TRAFFIC SIGNALJZATION POLE PAINTING PROJECT CONTRACTOR: ALAN JACKSON TUCKPOINTING, INC CONTRACT AMOUNT: 548,677.00 BID ITEM DESCRIPTION UNIT vP~N. ~ UN TTCOST OTOADATE EARNED TO Complete ~OTHb'BLUF ~h;~:~?~ii~'ai't~~~.»~d~a9~'~-~; .,- TTa ;; ~ 'rT:~~.li'La~ ~?'i:!~:'.~[t~~r~i..: ..,.. 4~.;~.~. 4 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 2 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100% 1,3 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% 6,7,8 LARGE OVERHEAD MAST w/ 2 POLES EACH 1 $1,757.00 1 $1,757.00 10D'Yo 5 PEDESTRIAN HEAD w/BRACKETS EACH 3 $29.00 3 $87.00 100% TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100% TOTAL COST PER INTERSECTION $2,764.00 9TH<a BLUF a a 13 30' LIGHT POLE EACH 1 $121.00 1 $121.00 100% 11 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 12,14 20' MASTARM POLE EACH 2 $439.00 2 $878.00 100% 10 30' COMBINATION POLE EACH 1 $606.00 1 $608.00 100% 9 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100% PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 100 TRAFFIC SIGNAL HEAD w/BRACKETS EACH 8 $37.00 8 $296.00 100 TOTAL COST PER INTERSECTION $2,268.00 8TH"d:BI.UF~ C!;`~~`,ct+.t G4i 3'a~µiifi~~J.^.:" . ,;;~i`:' `.K,~. '%,' `~~f~l.~e~~~fiFY~`~~h,Y',7G4 15,19 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100°!0 18 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 16,17,18 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 8 $232.00 100 % TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100 TOTAL COST PER INTERSECTION $955.00 6TH >i'BLUFF,+~Si~., P~_<,~-_ >r :.fi:~f..«h . 5,. ' , _ ti _. ~' ~ ~?~6.'f~.~i~1.i\~it: s3:. ..'~=!.~i-, - `~;:a, 24 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 2D-25 PEDESTAL SIGNAL EACH 6 $63.00 6 $378.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100 TRAFFIC SIGNAL HEAD wl BRACKETS EACH 6 $37.00 6 $222.00 100% TOTAL COST PER INTERSECTION 5902.00 2NUd.'BCUF `~!~ ~~~~:~'•. r".., ,y r~~.~'-t.~i:: ~i, . :~} S' ,.L ~ic;~'.~'~.~r'y`,'..'„~:: ~`,~t'.2~. .,~~{~-~~ :t'i't ,.e-. 26 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100Mo 26 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100% 27 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 10D% PEDESTRIAN HEAD w/ BRACKETS EACH 2 $29.00 2 $58.00 100% TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 4 $37.00 4 $148.00 100% TOTAL COST PER INTERSECTION $778.00 K\PROJECTS\Dovmtoxn SipnW B L'pM Pananp 20071Bid Dawmeirtc\COntroetor PaymeMSlPenid 1 to Alan Jackcortdc Pepe 7 of 7 Photo ITEM ITEM REF #'s LOCATION UNIT Q1Y• UNIT COST QTr• TOTAL COST '4TH'3~L`000S ~ ~' ~.N" e'=~'R~ ~i iS7 ""~rs+~`s~'Y'b. :+ ~" ~~t ~ ~ ' ~ t 28,31,32 . i 30' LIGHT POLE . EACH 3 $121.00 3 $363.00 100% 28,29 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 4 $37.00 4 $148.00 100 TOTAL COST PER INTERSECTION 5932.00 bT F18L`000S '~~!'~7~h`?:~~r'~a''~',1Y~a:aT„'^g~.`fi+:T . ~~ ':">` _ ` 33,36,37 30' LIGHT POLE EACH a $121.00 3 $363.00 100% 35 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 34,35 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100% PEDESTRIAN HEAD wl BRACKETS EACH 8 $29.00 8 - $232.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100% TOTAL COST PER INTERSECTION $976.00 7TH 3 lOCZ1ST$*~i~ .~ .~ ~`~+~,.~m~~it`t'f9,~~*w ~` 'a if' :~ -':'~~ ~'~{~~a17~t` „ut~,.=. ~ , ~. ~~t i.~~C. 'i~:t "M~ f~~sv::~~,.a3% ~l-M~L`: .W_ W. . 38,39 30' LIGHT POLE EACH ~ 5121.00 2 $24[.00 100% TOTAL COST PER INTERSECTION $zaz.oo BTH~3L000ST~.~ . ~. .~ .w _~ ~~... e:a4il4.~~` _~ r' w .~:~.x ~'4v~i fy,i`.~n:T 1`> "..:~ ~_ _. ~ ,-- E... ~ ~1i'.~i.°-i 40,42 30' LIGHT POLE EACH 2 $121.u0 2 $141.00 100% 41 CONTROL CABINETS EACH 1 $70.00 1 $70.00 10D% 43 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100% PEDESTRIAN HEAD w/ BRACKETS EACH 2 $29.00 2 $58.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 2 $37.00 2 $74.00 100% TOTAL COST PER INTERSECTION $507.00 9TH6`LOCUST ~'3>:~ s.;f#s~°.`',~(tiS~tz '~`'n'~.u~-t ~m°nrffi''.~~`~ ~~~` 44,45,47 30 LIGHT POLE EACH 3 $121.00 3 $363.00 100% 48 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 46,48 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100% PEDESTRIAN HEADw/BRACKETS EACH 6 $29.00 6 $174.00 100% TRAFFIC SIGNAL HEAD w! BRACKETS EACH 3 $37.00 3 $111.00 100 TOTAL COST PER INTERSECTION 5844.00 ; 1OTH3LOO0ST~~4~`; ,,.~ t ~a.` "'` _.,ta ~i23.kr. ~ ., ,'_ca~~Es~:'. ~. `~ 1?f~ , :*~~,_~ ., r`~ ,a~"~ej`,.~~,~~,~.;,'~,~'G~~L;`'`,i~. 51 CONTROL CABINETS EACH 1 $70.OU 1 $70.OG 100% 49-52 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100% 56 LARGE OVERHEAD MASTwl2 POLES EACH 1 $1,757.00 1 $1,757.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100 % TRAFFIC SIGNAL HEAD w/BRACKETS EACH 4 $37.00 4 $148.00 100 TOTAL COST PER INTERSECTION 52,522.00 `12TH 3 LOCUST~~ _~_ ra+R:u ~ .: ~ f ... ~h,,, t .:"'~._ . e... ~' + ~„ a ;7~1.i1~ a~~ ~ ir:dtd '~:~~. e~., _.., 55 CONTROL CABINETS EACH i 570.OG 1 b. G.GO 10UY'o 53-55 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEAD w! BRACKETS EACH 4 $29.00 4 $116.00 100 TRAFFIC SIGNAL HEAD w/BRACKETS EACH 3 $37.00 3 $111.00 100% TOTAL COST PER INTERSECTION 5486.00 K:WROJECTS1DovrtROwn Sipnd & Light Painpnp ]ODTBid DowmenffitContractor Paymenffi~Partid 1 to Alen Jackaon.zls Pape 2 a/ 7 Photo ITEM ITEM REF #'s LOCATION UNIT °Tr• UNIT COST QTY• TOTAL COS7 1:1:- .. 12TH''3 NIAINj' Y ~ ~X:iL{-',- iiF~' l: 1l ' ~, ' '1`~L..`".:I~~~~r ~~+.~i:; ;''y y~ q~~ - ~~u~t ~t..,fi'~'.~~ _:~a:~~.~~~~..f,~. ~n..: :~: . .. ,dML~t.'r::.., 57,58 , _ .. . 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100°ro 60 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 59,60 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 6 $29.00 6 $174.00 100°h TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100 % TOTAL COST PER INTERSECTION 5834.00 '11TH`3 MAIN ~: ~r_ >~04~.';5~'~~ 61,62 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100% TOTAL COST PER INTERSECTION $242.00 .10TH-R MAIN `' fie. ~ t ., ,L. ~;}' i" r' ':;.,;~L '~` =,~,`4~ `~.,T. r~ fle~:~~ike'~ ":;:.,~'It.~*~-S! 63,64 30' LIGHT POLE EACH $121.00 2 $242.00 100 67 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 657 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEADw/BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100 TOTAL COST PER INTERSECTION $955.00 ._ .,,_... ,. ..~'4aP(S4F: ~.^F `Ge 'ra~.~ .,.r}~2'tl~e~w ~. ~ - i r, ,"~`.',' :'lla1.}4~ii~>,. 9TH"R NIAIN~ ? .. 1 ti 11F ts~ ~' t•~i?s'''S'f.°'`,~1A:~'.17! 'S~ 68-71 30' LIGHT POLE EACH >, .-.~ 4 ~ $121.00 4 $4x4.00 100% TOTAL COST PER INTERSECTION $484.00 STH6'M%11N;j~~;~`.7>r'. r :!'~', v ; k: r°:.\. ~ ~Y~~i~~'4pt7 ' e "~iy_ii~:i~ iFU •:Y ~ G ,; ~$'~!f~~.~!:~~v1S~r'^~' ct.~r:_`')~~ 72 30' LIGHT rULE EACH L $121.00 2 $242.00 100°~ TOTAL COST PER INTERSECTION 5242.00 `4TH3MAIN~',..n,~r:..r'r-r'Q./..X ~. ., :.''+?_ >tA~.?f,::,li :H. ;1, .:.:-.~ :r,1.1.,t,.$~r ?'.~~.. ..~ :. ~~'C's.-...,' ~~..at~''~,,. 76 30' LIGHT POLE 1 00 5121. 00 100 TOTAL COST PER irdreRSEC7iora $121.00 3FtD 3`-MAIN J.,~t,~C +~:' d, ~f ~ ~6. ~ ~ : "+~`'if i~ti.; Y` a ~ i` c:'a'ih ;' ~iY.% ,r _,f'a: ?rs:.li .:4~ ~ ~,i!'~~ ~~ -_ : c(i~ ::;:et 73 30' LIGHT PULE EACH 1 5121.00 1 $121.00 100°~ TOTAL COST PER INTERSECTION 5121.00 2ND 3 M/dIN'°riiarc~i.°~' 'r c'~ ~'S'~;..~..~ ~'O``i~ ~'. ~~'v ~. -~' tS~.: " 74,75 30' LIGHT POLE EACH 2 $121.00 2 5242.00 100% TOTAL COST PER INTERSECTION 5242.00 >7ST~3MAIN~,E~4~"9. ~.'~.'~[i.~.~:':~.1,1°'~','.~:1~y,7~:t'-i i_.',''•alri:u:~~.s~n;~La.~,''ii..~5~-?+~'.~;;e~~',::%t:'1:.:'.r'.:J:~~i'~~ata"~ 76,77 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100 TOTAL COST PER INTERSECTION 5242.00 4TH "d.101N.4~~x~ "~xy:.;, ti- .,;~` t ..;{~."~+il~.~:.. -.~c . r b~°J~~''...t.:~`'r~ii. iF~t.; ~ia~:S"s~`>If~`~:ti~! - .:'~L:>i~3 79-81 30' LIGHT FOLE EACH 's ~ $121.00 3 $363.00 100% TOTAL COST PER INTERSECTION 5363.00 K\PROJECTS\Oowntovm Sipnel 8 LipM Peintrnp 2007\BiE Documenh\Centredor Peymer~\PVEW 1 to Alen Jxkson.tlc Pepe 7 of 7 Photo ITEM ITEM REF #'s LOCATION UNIT °TY. UNIT COST t?rY. TOTAL COST 6TH 3""IOWA r~ Tc: .r:~t „ ,a+c. t., .~{~ •. A. ' . aa+F ,. ,.a,~~i~'L~... H M r ~ ~. ra.ti"A ` r./ v?~YJ- 'i` t K.-'.'-"'~°s '.~1~t, 3~~ ? tk+l 85$7 30' LIGHT POLE EAGH 3 $121.00 3 $363.00 100% 82,84 30' COMBINATION POLE EACH 2 $608.00 2 $1,216.00 100°~ 83 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100% PEDESTRIAN HEAD w/ BRACKETS EACH 4 $29.00 4 $116.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100% TOTAL COST PER INTERSECTION 51,943.00 ,. 6THR'IOW ` ,~'~_1: n:,?kYS~'?+, k~,,-:T~„;k,.i ~.;?. ;;:,M'JS'~-~Iti:lLff,/-?~+, y'f;~'3'~ '',:.,fit;"tom ~~x~?. ~.~t~' 88-92 30' LIGHT POLE EACH 5 $121.00 5 $605.00 100% TOTAL COST PER INTERSECTION $606.00 7TH810W ~'lr::'c'~if?, R~'~h~~£k'!'9~s~i}'~k~',~t .'"V~~r' ~ _~K•~+3 K 94,100,101 30' LIGHT POLE EACH 3 $121.00 3 $363.00 100% 97 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100 % 93,95,96,98,99 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 ~ 100% PEDESTRIAN HEAD wf BRACKETS EACH 10 $29.00 10 $290.00 100% TRAFFIC SIGNAL HEAD wJ BRACKETS EACH 9 $37.00 9 $333.00 100% TOTAL COST PER INTERSECTION $1,908.00 r ' ... 8TH b 101NA>~y~"I1. ~ 4~::.ti .tyyy':•,,~a! ~~ ., ..-~~'6 Y r~r1e?I3~ ~i~ ?y ~•i"~t~ 102-105 30' LIGHT POLE EACH 4 $121 uv 4 $484.00 100% TOTAL COST PER INTERSECTION $484.00 T~,i :~, ~';'.F:~ 8TH 310~IVA•`~'~.y .:..,,;y„~ .`to't +~_. '~, ;. , . .'.a.±~?~h~~ ',~'Y~!~:~~ ~<~ _, N~. _`~`n,~"' y:.,,ir:'n~',~ ...: k~,~ .T' ~iJ-dtti-r:.;,,("p 106,108,111,112 _ 30' LIGHT POLE EACH 4 $121.00 4 3a84.00 100% 108 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100 117 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100% 107,109 30' COMBINATION POLE EACH 2 $608.00 2 $1,216.00 100% 108,110 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100% PEDESTRIAN HEAD w! BRACKETS EACH 10 $29.00 10 $290.00 100 % TRAFFIC SIGNAL HEADw/BRACKETS EACH 6 $37.00 6 $222.00 100% TOTAL COST PER INTERSECTION $2,847.00 70TIib IOWA .'.~ N .:,~:1_i~'~~2~.i~.' - "'"~ : t~ ~.:~.y.'>,~+'t `'~F~w'~~S[:[K1.~` r:t~~9.~~~ , yk"ti': '.~.'t4.f1«~.5~~,;_ 120 30' LIGHT POLE EACH I $121.00 1 $121.00 100% 116 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 114 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100% 121 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100 % 113.115,118,119 PEDESTAL SIGNAL EACH 4 $63.00 4 $252.00 100% PEDESTRIAN HEAD wf BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100 TOTAL COST PER INTERSECTION $1,944.00 11THSIOVUAy~~'~i37~itf" .. ~sa~~ - ~'; ..~Z ~:.-._,.:, .: ~''° :~:~: ..: s _,' '.. ~.•,.3~~u ... 122,123 30' LIGHT POLE rAi.H 2 8121 Ov c 3242.00 100 % TOTAL COST PER INTERSECTION 5242.00 K:\PROJECTSIDaenlown Sipnel6 LiOM Pairtlin0200718Itl Documents\COntrector PeymeMC\Partial 1 to Alen Jeckcontlc PeOe 4 of 7 Photo ITEM ITEM REF #'s LOCATION UNIT Qrr. UNIT COST aTY. TOTAL COST ;12TF3'3"IOWA ~1;, :.~ .~ r~~'~t"~_, ~. ~ :.`k~` . . ~ 126,128 30'LIGHTPOLE EACH 2 $121.00 2 $242.00 100% 124,125,127 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 6 $29.00 6 $174.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100 TOTAL COST PER INTERSECTION $790.00 13THb'10 A ~ ~~4'ii'i '1,t;;:t? ~3.a>:~w~~i'~+-5~~~2'.t't.i - 129,130 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100% TOTAL COST PER INTERSECTION 524200 `1 TTH &~CENTRA-'L~il~ x:.. ti:6?1 ,j.t:t,lstx~~i#r~lser°~?:°}.is~ C-'-'~'~,. ;$:~~ , # ~";; Y' ,r'','~~.M,'; .~.,..:i' ~n?E' 132 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100 134 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100 133 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100% 132,135 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100 TOTAL COST PER INTERSECTION 51,760.00 1 16TH 3 C:ENTRAI. iX'o~' t ~t:', r : ~;.~_>~ ;m.y •';y n~~~ -, 'x~S+~ : - ~^~i~~.>~:-i'k:1 ~ _ .;' ? s'~`,~~i ~ 136-138 30' LIGHT POLE EACH 3 $121.00 3 $363.00 100 TOTAL COST PER INTERSECTION $363.00 16TH 8°CENTRA ~"..t8.+~~ii4'~~~~ '~'~.'~"'iat°~'~~ r ~.~ r+~s~ 141,143 30'LIGHTPOLE EACH 2 $121.00 2 $242.00 100% 140 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100°h 139,140,142 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100% PEDESTRIAN HEADwlBRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100 % TOTAL COST PER INTERSECTION $1,081.00 .14TH 3'CEtJTRAL ~:'\d4 ~%~`~r~~t'~t".~ ~'~ i , : ~€~~'~'~5.~"Y,.7p~yy ~ f •."liSi~C"~ tix~', d ~t'd, :~:~'' , ~~.aatt,p~ a~~~yyt~~~~CC.~y,~q 1 ~~~:'f 7?: a4:.''b'AiIiFRYT•~A ~ 145 30' LIGHT POLE EACH 1 $121.OU 1 $121.00 100 150 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100% 152 20' MASTARM w! 2 POLES EACH 1 $762.00 1 5762.D0 100 151 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100 144 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100 PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100 TRAFFIC SIGNAL HEAD w/BRACKETS EACH 7 $37.00 7 $259.00 100% TOTAL COST PER INTERSECTION $2,484.00 111TH 3 CENTRA`t ,~.f _.. `1 ,~ .t r,-. r, .a .~, ~ ~~ r 3 r X~,'.: 5: e J. yt ; ~-r:~C j-~ 146 30' LIGHT POLE EACH 1 $121.00 1 5121.D0 100 io TOTAL COST PER INTERSECTION 5121.00 _~ i~. ;~ e, , tiff a r.`#~:'+?~~Fa .. . ,, ~: , <,titv'-~u"_ar. ~:*s:~.,1, ~, ,~~4 ''~if~`~.x~.a±~'t~lc8?' r,.:~,','!~! 110TH ~~~CENTRAL: __ 147,148 30' LIGHT POLE EACH 2 5121.00 1 $242.00 100 TOTAL COST PER INTERSECTION 5242.00 K:\PROJECTS\DOwn[evm Signal 8 LipM PanSnp 20071Bitl DxumeMC\COrxrxtw PaymeMClParSal 7 to Alan Jacks°n.xls Pepe 5 of 7 Photo REF #'s LOCATION UNIT 149 .9TH 3 CENTRAL ,.., ,.. 30' LIGHT POLE - EACH 149 CONTROL CABINETS EACH 158 20'MASTARM POLE EACH 154 20' MASTARM w!2 POLES EACH 153 30' COMBINATION POLE EACH PEDESTRIAN HEAD w/BRACKETS EACH TRAFFIC SIGNAL HEAD w/BRACKETS EACH TOTAL COST PER INTERSECTION 8'1'Hali"CENTRAL"pe'' ,..' _ ~;. . 155,156 30' LIGHT POLE E:,GI1 TOTAL COST PER INTERSECTION 157,160-162,165 7TH dx CEHTRAL 30' LIGHT POLE EAGI I 163 CONTROL CABINETS EACH 163-166 PEDESTAL SIGNAL EACH PEDESTRIAN HEAD w! BRACKETS EACH TRAFFIC SIGNAL HEAD w! BRACKETS EACH TOTAL COST PER INTERSECTION 8TH 6 CENTRAL'- _ 167-168 30' LIGHT POLE ~ EAL:H TOTAL COST PER INTERSECTION 6TH'3 CENTRAL , , ?,„ . 170,173,175 30' LIGHT POLE E..~;H 171 CONTROL CABINETS EACH 171-174 PEDESTAL SIGNAL. EACH PEDESTRIAN HEAD w/BRACKETS EACH TRAFFIC SIGNAL HEAD w/BRACKETS EACH TOTAL COST PER INTERSECTION 178 9H`6`WHITE ,y; ',' CONTROL CABINETS 176 20' MASTARM w/ 2 POLES 177,179 30' COMBINATION POLE 178 PEDESTAL SIGNAL PEDESTRIAN HEAD w/BRACKETS TRAFFIC SIGNAL HEAD w/ BRACKETS TOTAL COST PER INTERSECTION 14TH 6 WHRE ` 183,184 20' MASTAFcM r:JLE 185 20' MASTARM w! 2 POLES 180 PEDESTAL SIGNAL PEDESTRIAN HEAD wl BRACKETS TRAFFIC SIGNAL HEAD w/BRACKETS TOTAL COST PER INTERSECTION ITEM ITEM QTY• UNIT COST ~ TOTAL COST 1 $121.Gu ~~ 1,;.._ 51[1.004 ~ lOGo~~ 1 a7o.oo 1 $70.00 100% 1 $439.00 1 $439.00 100 % 1 $7s2.oo 1 $762.00 100% 1 $608.00 1 $608.00 100% 8 $29.00 8 $232.00 100% 5 $37.00 5 $185.00 100% 52,417.00 ~ 57[7.00 ~.. 2 ' .. $242.00 tuii-~o 5242.00 5 $121.00 5 ~ $uuGAU tOGSa 1 a7o.oo 1 s7o.oo 100% 5 $63.00 5 $315.OD 100% 8 $29.00 B $232.00 100% 6 $37.00 6 $222.00 100% x1,444.00 2 ~ $121.00 2 ~ ~ $242.00 luu ro x242.00 3 ~ 5121 ~00 ~ 3 $so3.00 10vio 1 $70.00 1 $70.00 100% 4 $63.00 4 $252.00 100% 8 $29.00 8 $232.00 100% 5 $37.00 5 $185.00 100% s1,loz.oo ., ~. t. - EAC.I I 1 570.00 1 $70.D0 100°!0 EACH 1 $762.00 1 $762.00 100% EACH 2 $608.00 2 $1,216.00 100% EACH 1 $63.00 1 $63.00 100 % EACH 8 $29.00 8 $232.00 100% EACH 4 $37.00 4 $148.00 100% 52,491.00 . ... ~ Ef.CH - ,. $439.OG ~.. -. aoi8.00 . ~_ 100% EACH 1 $762.OD 1 $762.00 100% EACH 1 $63.00 1 $63.00 100% EACH 8 $29.00 8 $232.00 100% EACH 8 $37.00 8 $296.00 100% 52,211.00 N:\PROJECTS1DOwntown Sipnal8 Lipht PelnGnp 20071Bid Datumenle\Cantractw Peymenis\Prtial 1 tt Alan Jeckcon.xk Pape 6 of 7 Photo REF p's LOCATION 181 i6TH'3 WNIYE , , CONTROL CABINETS 182 20' MASTARM POLE 181 30' COMBINATION POLE PEDESTRIAN HEAD w/BRACKETS TRAFFIC SIGNAL HEAD w! BRACKETS TOTAL COST PER INTERSECTION ITEM ITEM UNIT ~ UNIT COST °TM• TOTAL COST tncH , s7o.liD i a7o.o~ i~~;e EACH 1 $439.00 1 $439.00 100 EACH 1 $608.00 1 $608.00 100 EACH 2 $29.00 2 $58.00 100% EACH 4 $37.00 4 $148.00 100% $1,325.00 Grand Total 546.571.00 '. .: .. .,.;;CHANGEORI~fi{!a)r.~~-WP,.~S{T.€MS...-_ :,,. ,.... .~, -... ... aG . _;,;'.~ ~ -_ 'i" - Et Additional 2 Coats of Paint for finish EACH 1 519,970.90 ~ $19,970.9u E2 EACH 1 $0.00 E3 EACH 1 $0.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $18 870.80 TOTAL AMOUNT EARNED TO DATE: $66 bd1.90 PAYMENTS PREVIOUSLY APPROVED: 1. $44,242.45 7. 2. $18,970.00 B. 3. 9. 4. 10. 5. 11. 6. 12. TOTAL PAYMENTS FORWARDED: $66 b47.90 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: 19,970.90 TOTAL AMOUNT EARNED TO DATE: 66,541.90 TOTAL DUE CONTRACTOR: 66,b47.90 ENGINEERING DESIGN /PROJECT ADMINISTRATION: 8,862.78 TOTAL IMPROVEMENT COST: 76 d04.69 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in tleleil the correct amount of ell work required to wmplete the above improvement. APPROVED: Michael Van Milligan, CKy Manager City of Dubuque, Iowa APPROVED: Gus Psihoyos, City Engineer City o1 Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The untlersignetl, Alan Jackson Tuckpointing, Inc contractor for the above improvement, tloes hereby accept the above "Total Due Contractor', as full settlement for all claims for said improvement. CONTRACTOR: Alen Jackson Tuckpointing, Inc BY: TITLE: DATE: K:IPROJECTS\DOartrtown Signal & LipM Painary 20071Bid DocumentslCwNaclor PaymentslPartial 1 to Alan Jxkson.tle Pepe 7 0l I City of Dubuque -Engineering Division Partial Payment Form PARTIAL PAYMENT NO: Final DATE: June 23, 2008 PROJECT NAME: DOWNTOWN STREETLIGHT AND TRAFFIC SIGNALIZATION POLE PAINTING PROJECT CONTRACTOR: ALAN JACKSON TUCKPOINTING, INC CONTRACT AMOUNT: S46,S71.00 BID ITEM DESCRIPTION UNIT „,P~N , CONTRACT OUANTITV AMOUNT We UNIT COST TO DATE EARNED TO Cpm to 4 LOTH R BLUFF _ CONTROL CA .. -., - ..~- BINETS ~ . ~ :... ~~ EACH 1 , ,.. ~ $70.00 1 ~ SiU.OU .. _ _~ tuu~ro 2 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100% 1,3 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% 6,7,8 LARGE OVERHEAD MAST w/2 POLES EACH 1 $1,757.00 1 $1,757.00 100% 5 PEDESTRIAN HEAD wJ BRACKETS EACH 3 $29.00 3 $87.00 100 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100 TOTAL COST PER INTERSECTION 52,764.00 ~ ~ 13 30' LIGHT POLE EACH 1 $111 AU 1 $121.00 100% 11 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 12,14 20' MASTARM POLE EACH 2 $439.00 2 $878.00 100% 10 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100% 9 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100 TRAFFIC SIGNAL HEAD w/BRACKETS EACH 8 $37.00 8 $296.00 100 TOTAL COST PER INTERSECTION 52,268.00 15,19 30' LIGH7 POLE EACH 2 $121.00 - i~d~.w 1uv-io 18 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 16,17,18 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100% TOTAL COST PER INTERSECTION 5856.00 6TH & BLUFF , ; ,i; "~ r< 24 CONTROLCAbINEIb EACH 1 Siu.uu 1 $70.00 100% 20-25 PEDESTAL SIGNAL EACH 6 $63.00 6 $378.00 100% PEDESTRIAN HEADw/BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100% TOTAL COST PER INTERSECTION $902.00 26 2ND S BLUFF > ; CONTROL CABINETS EACh 1 5lu.uu 1 $70.OU 100% 26 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100 27 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100% PEDESTRIAN HEADw/BRACKETS EACH 2 $29.00 2 $58.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 4 $37.00 4 $148.00 100% TOTAL COST PER INTERSECTION $778.00 K:IPROJECTS\Dovmtown Signal 8 LpM Pambrp 200TBitl DowmenfelContrx[or Payments\Partral 7 to Alan Jxkson.tlc Pape 7 of 7 Photo ITEM ITEM REF #'s LOCATION UNIT °rY• UNIT COST °TY• TOTAL COST 4TH~L000$T ~ ~ t••. •- _.•;,F' pc ~:,,h- ., ~ ~ ~ r ,SF r ~ - w 31 32 28 ~- ~ ~ ~ ~ 30' LIGHT PULL EnwrH o b121.0u 3 a.w3.G~ 100/ , , 28 29 PEDESTAL SIGNAL EACH 3 563.00 3 $189.00 100% , PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w! BRACKETS EACH 4 $37.00 4 $148.00 100 TOTAL COST PER INTERSECTION 5932.00 6TH S LOCUST ` ' ' .. . 36 37 33 .. . - : 30' LIGHT POLE En~H 3 b1[1.UU J S:iG3.00 100% , , 35 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 34 35 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100% , PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 B $232.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100% TOTAL COST PER INTERSECTION 5976.00 /~ 38,39 7THbL000ST 30' LIGHT POLE - EAI.H [ x111. Gv Sz4z.u0 ivu io ,, TOTAL COST PER INTERSECTION 5242.00 i BTH b LOCUST ~ .. 40 42 30'LIGHTPJ~6 Era.H 2 $1~1.Gv 2 $242.00 1uu-~o , 41 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 43 PEDESTAL SIGNAL EACH 1 563.00 1 $63.00 100% PEDESTRIAN HEAD wl BRACKETS EACH 2 529.00 2 $58.00 100 % TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 2 $37.00 2 $74.00 100 TOTAL COST PER INTERSECTION 5507.00 45,47 44 30' LIGHT POLE EACH 3 $121.00 3 Sdo~.00 i W % , 48 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 48 46 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100% , PEDESTRIAN HEAD w/BRACKETS EACH 6 $29.00 6 $174.00 100 TRAFFIC SIGNAL HEAD w! BRACKETS EACH 3 $37.00 3 $111.00 100% TOTAL COST PER INTERSECTION 5844.00 . ~ 51 ^IOTH 3 LOCUST i CONTROL CABINETS EACH 1 $7~.GU -_ _ 1 ~ ~ ' $70.00 , 100% 49-52 PEDESTAL SIGNAL EACH 5 563.00 5 $315.00 100% 56 LARGE OVERHEAD MAST w! 2 POLES EACH 1 $1,757.00 1 $1,757.00 100 PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 4 $37.00 4 $148.00 100% TOTAL COST PER INTERSECTION - 52,522.00 55 12TH b LOCUST CONTROLCA6INETS EAGM 1 ,,-.. f $70.00 1 $/u.uu R -- , 100% 53-55 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 4 $29.00 4 $116.00 100 TRAFFIC SIGNAL HEAD w/BRACKETS EACH 3 $37.00 3 $111.00 100% TOTAL COST PER INTERSECTION 5488.00 K:\PROJECTS\Downtown Signal 8 Light Painting 2007\Bid Documents\COntractor PaymantaWartial 1 to Alan Jxkson.ak Pepe 2 017 Photo ITEM ITEM REF q's LOCATION UNIT f~TY. UNIT COST QTY• TOTAL COST ~ ~.:. - k1 58 57 2TH b MAIN.. 30'LIGHTPGLE cAGH 2 a12LJv < $Y41.J11 100io , 60 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 59 60 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100% , PEDESTRIAN HEADw/BRACKETS EACH 6 $29.00 6 $174.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100% TOTAL COST PER INTERSECTION 5834.00 61,62 11TH d. MAIN. , . 30' LIGHT PG~E EN~H 2 ._ i 'iN a1<1.Jv ~ .. 2 ,. '. - 524[.vu ;. , _ - 1JOSe TOTAL COST PER INTERSECTION 5242.00 64 63 30' LIGHT POLE ,~ EACH 2 ~ $121.00 ~ 2 52d2.0v 100'vo , 67 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 65-67 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 B $232.00 100% TRAFFIC SIGNAL HEAD w! BRACKETS EACH 6 $37.00 6 $222.00 100% TOTAL COST PER INTERSECTION 5956.00 POLE Cn.:H a -- I ~ ~ ~ `.- - - ~ - -- `a ~.T.00 100% TOTAL COST PER INTERSECTION f 4 e a. o0 .N 72 30' LIGHT Fvi_E 1.C;0 ~ $242AJ 11,u°!o TOTAL COST PER INTERSECTION 5242.00 78 '4TH.~MAIN,a; 30' LIGHT POLE da EAi.H 1 ,.. :,: ' $121.00 1 ~ , $121.00 100°ro TOTAL COST PER INTERSECTION 5121.00 73 3RD 3 MAIN t: 30'LIGHTPOLE ~~~~ ~ ~ .~ . „,., ~ ~ EAGH 1 $121.J0 __ 1 __ , _ $12100 ;' :.. ; 100% TOTAL COST PER INTERSECTION S 121.00 ~'~ 74,75 30' LIGHT PULE EACH 2 $121.Ju 2 $~a<.vJ 100% TOTAL COST PER INTERSECTION 5242.00 - 76,77 1§Tb~MAIN .. , : 30' LIGHT POLE EACH. . 'L atit.00 < a2 41.00 :. 1vJ•ra TOTAL COST PER INTERSECTION 5242.00 47H ~y IOWA,: ~ .y ~ ~ . .',". v!'r ;r _ i ' , ' 79-81 30' LIGHT POLE ENVh 3 .o111Ap 3 $369.~J tuJio TOTAL COST PER INTERSECTION 5363.00 K'.WROJECTS\DOx*rtown Sipnal8 Light Pair,lin9 200TBid DocpmenblCor,bador Peymards\Perbal 1 to Nan Jackson.ds Pape 3 0/7 Photo ITEM ITEM REF #'s LOCATION UNIT QTY. UNIT COST QTY. TOTAL COST ~ 857 6THd~lONfA: ~ 30' LIGHT PiiLE tACH 3 al[1.ud 3 $363.00 ~ " , 100ro 84 82 30' COMBINATION POLE EACH 2 $608.00 2 $1,216.00 100% , 83 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 4 $29.00 4 $116.00 100% TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 5 $37.00 5 8185.00 100% TOTAL COST PER INTERSECTION 51,943.00 88-92 BTH6tOWA ~ 30'LIGHIPGLE 6>~:H 5 ,. b121.0u ," ,:. 5 ao06.uu tw-io TOTAL COST PER INTERSECTION 5606.00 100 101 94 30' LIGHT PULE EnCH 3 $121.00 s $3fi3.v0 100% , , 97 30' COMBINATION POLE EACH 1 $608.00 1 $608.D0 100 99 95 96 98 93 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100% , , , , PEDESTRIAN HEADw/BRACKETS EACH 10 $29.00 10 $290.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 9 $37.00 9 $333.00 100% TOTAL COST PER INTERSECTION 51,809.00 ~ ~ ~ 102-105 30' LIGHT POLE E- -H 4 $121.00 4 $484.00 luuie TOTAL COST PER INTERSECTION 5484.00 108,111,112 106 8TH R IbWA 30' LIGHT ruL~ ,,,, ,, - tACn •- 4 $ 111. w d $atsa.uu ; li><i-ro , 108 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 117 20' MASTARM POLE EACH 1 $438.00 1 $439.00 100 109 107 30'COMBINATIONPOLE EACH 2 $608.00 2 $1,216.00 100% , 108 110 PEDESTAL SIGNAL EACH 2 $63.00 2 $126.00 100% , PEDESTRIAN HEADw/BRACKETS EACH 10 $29.00 10 $290.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100 TOTAL COST PER INTERSECTION $2,847.00 ~« 120 1Q]'H b IOWA • ~~ 30' LIGHT P~L~ EAGH 1 a121.vu ~ 1_.__... _ $121.00 10u ro 116 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 114 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100% 121 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100% 113.115,118,119 PEDESTAL SIGNAL EACH 4 $63.00 4 $252.00 100% PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 1D0% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100 TOTAL COST PER INTERSECTION $1,944.00 11TH S IOW A ~ i- ~ ~~~ 122,123 30' LIG HT POLE EACH 2 alti.uv - c $242.00 100 r TOTAL COST PER INTERSECTION 5242.00 K:IPROJECTSIDOVmtavm SipnW 8 LIpM Painting 200718k1 DowmantslContractar PaymenlstPanial 1 to Alan Jackson.tls Page d of 7 Photo ITEM ITEM REF #'s LOCATION UNIT °TV• UNIT COST °TV• TOTAL COST , _ - 112TH 610WA" ~, °..r>>; ~~ _ :- ~.- -- - ~ - .•~ ~ . , . .'~:' ~ `. ~ -- G _ . 126 128 _ 3D' LIGHT POLE EA%H c $1c1.iiU c $242.UU 100ro , 125,127 124 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 1D0% , PEDESTRIAN HEAD w/BRACKETS EACH 6 $29.00 6 5174.00 100 % TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 5185.00 100% TOTAL COST PER INTERSECTION 5790.00 129,130 13TH b IOWA.. 30' LIGHT P~~E 'EACH 2 ;;~,- $121.00 ~~ . _ 2 $142.UU ~ _. luu ra TOTAL COST PER INTERSECTION 5242.00 17TH 6 CENTRAL ~ „ , <,: - a~;, hwy... 132 CONTROLCABINE(5 1 EA~:H t S.O.BO t y70.v0 100°!0 134 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100% 133 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100% 132,135 PEDESTAL SIGNAL EACH 3 $63.00 3 $189.00 100% PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 B 5232.00 100 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100 TOTAL COST PER INTERSECTION 51,760.00 136-138 16TH di'CENTRAL` 30' LIGHT POLE - ~ ~ ~ ~ EACH ~ - 3 $121,00 ~~~ - S - ~- ~ 5363.00 ~ ~~ 1u0 i TOTAL COST PER W T E R S E C T I O N 5361.00 :- • .., ~I ,. 16TF~ 8'CENTRAL ` . , , ., _ ., 141,143 , , . 30'LIGHTPOLE EACH 2 bitt.Oli 2 $242.UU 1Uui 140 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 139,140,142 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100% PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 8 5232.00 100 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $37.00 6 $222.00 100 TOTAL COST PER INTERSECTION . 51,081.00 .. ._ ~ 145 14TH03 CGHT OLI=.,..~ -. EACH ~ t 1.Ou $12 ` .:. " ' 1 . ~ - ~ ~ ~ $121.uv ~.:..i .` uv%a 150 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100 152 20' MASTARM w/ 2 POLES EACH 1 $762.00 1 $762.00 100% 151 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100% 144 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 7 $37.00 7 $259.00 100% TOTAL COST PER INTERSECTION 52,484.00 11TH 3 CENTgE1 ~ _, ~ t[t ~ ~ ~ d ',~'~, 146 30'LIGHTPOLE EA~H t 37~1.Ov 1 $121.00 iw%o TOTAL COST PER INTERSECTION 5721.00 il1TH 6~CENTRAL' ~ ~ r'~ ~ 147,148 _ 30' LIGHT POLE EACH 2 $121.00 2 $242.00 100% TOTAL COST PER INTERSECTION 5242.00 K'.NftOJECTS1Doamtown Sipnel 8 Light Painting 200TBid Docomenis\CoMraclor PaymemslPartial 1 to Nan Jxkson.tls Pepe 5 0/7 Photo ITEM ITEM REF #'s LOCATION UNIT OTY. UNIT COST en. TOTAL COST k "- 9TH 3lENTRALf 'i~:~~~`'~ +t< ..`~';.-gr..L^1:... i:q~.,~C ,.,: ~:ii`,.~~tJ,tF" -:'i~7'~'~':..~, .,.J'~`: 't..3~~t' . ;' ~4,';;kfru7i 149 , , , 30' LIGHT POLE EACH 1 5121.00 1 5121.00 100% 149 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 158 20' MASTARM POLE EACH 1 $439.00 1 $439.00 100% 154 20' MASTARM w! 2 POLES EACH 1 $762.00 1 $762.00 100% 153 30' COMBINATION POLE EACH 1 $608.00 1 $608.00 100 % PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEADw/BRACKETS EACH 5 $37.00 5 $185.00 100% TOTAL COST PER INTERSECTION $2,417.00 Pik`` BTHbIENTR'A `~~~~L~ :-~''El~~i ~'1`.'I!C`~, F~`~,~. ri?t,r'~'t!f~U' 155,156 30' LIGHT POLE - EACH 2 $121.00 2 $242.00 100% TOTAL COST PER INTERSECTION $242.00 TTf13CENTRAU~,. ~'~,`R'`' .f , ~:i~i.:'~. t. ~,,,~.+~..:~.~t `,~':44.:%Mr'r+~1r4": -..,fir? 157,160-162,165 30' LIGHT POLE EACH 5 $121.00 5 $605.00 100% 163 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 163-166 PEDESTAL SIGNAL EACH 5 $63.00 5 $315.00 100% PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 6 $37.00 6 $222.00 100% TOTAL COST PER INTERSECTION $1,444.00 6TH3CENTRAL~. '; ,; .+~~~„ 3!~:`.'~a.T.±. .i, ,.. # ''>:'d~a_. . . :.~ x~; y ~::k''~. l,_ .:eue..y 167-168 30'LIGHT POLE EACH 2 $121.00 2 $242.00 10D% TOTAL COST PER INTERSEC7lOl1 $242.00 6TH3CENTRAL'jjr:il`~',-,~ ~; ...1 ,..r't .... „~~`.~9tl~~h~i~ r.,• ' i. 3^„ , s ~ ,. ,y. } ~ t..q '~ :~., ;~ ` .':d:cL..:h 170,173,175 30' LIGHT POLE EACH 3 $121.00 3 5363.00 100% 171 CONTROL CABINETS EACH 1 $70.00 1 $70.00 1D0% 171-174 PEDESTAL SIGNAL. EACH 4 $63.00 4 $252.00 100% PEDESTRIAN HEAD w/ BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w/BRACKETS EACH 5 $37.00 5 $185.00 100% TOTAL COST PER INTERSECTION 51,102.00 9TH 3 WHITEi ' ~~ t` '?ii`^i;', m. ' • ?°;<. fs'~4~',n?~~ifb 178 CONTROL CABINETS EACH 1 $70.00 1 $70.00 100% 176 20' MASTARM w/ 2 POLES EACH 1 $762.00 1 $762.00 100% 177,179 30' COMBINATION POLE EACH 2 $608.00 2 $1,216.00 100% 178 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100% PEDESTRIAN HEAD w! BRACKETS EACH 8 $29.00 8 $232.00 100% TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 4 $37.00 4 $148.00 100% TOTAL COST PER INTERSECTION 52,491.00 `:~1'4TH S WHITE ~ . . 1 ~.~ .. t f•kSr6'.3--~: ~}~srFr e '' - ~ 1' ~ {t~'. '".,.-t~.i''~ .~ti:!~` ~~: i "~'f1~:~ i~: ~"'~.~i 183,184 . 20' MASTARM POLE EACH 2 $439.00 2 SBl6.U0 1QU`Yo 185 20' MASTARM w/ 2 POLES EACH 1 $762.00 1 $762.00 100% 180 PEDESTAL SIGNAL EACH 1 $63.00 1 $63.00 100% PEDESTRIAN HEAD w/BRACKETS EACH 8 $29.00 8 $232.00 100 TRAFFIC SIGNAL HEAD wl BRACKETS EACH 8 $37.00 8 $296.00 100% TOTAL COST PER INTERSECTION 52,231.00 K:tPROJECTS1Dawntown SipnW & L1flht PeinOnp 20071Bid DowmenhlCOrmector PaymentetPartlel 1 b Alen Jackaon.xk Pape B of 7 Photo REF #'S LOCATION 181 18TH i WtltTE CONTROL CABINETS 182 20' MASTARM POLE 181 30' COMBINATION POLE PEDESTRIAN HEAD w/BRACKETS TRAFFIC SIGNAL HEAD w/ BRACKETS TOTAL COST PER INTERSECTION ITEM ITEM UNIT gTY. UNIT COST QTY. TOTAL COST EACH 1 $70.00 1 $70.00 100% EACH 1 $439.00 1 $439.00 100% EACH 1 $608.00 1 $608.00 100 EACH 2 $29.00 2 $58.00 100 EACH 4 $37.00 4 $148.00 100% $1,323.00 Grand Total $46,671.00 CtIANGE ORDERS} -EXTRA WORK ETEMS Et Additional 2 Coats W Paint for finish EAGH 1 $19,970.90 $19,970.90 E2 EACH 1 $0.00 E3 EACH 1 $0.~ TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: f[9,970.90 TOTAL AMOUNT EARNED TO DATE: 566 541.90 PAYMENTS PREVIOUSLY APPROVED: 1. $44,242.45 2. $16,970.00 3. 4. 5. 8. TOTAL PAYMENTS FORWARDED: 7. 8. 9. 10. 11. 12. S86 b41.90 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: 19,970.90 TOTAL AMOUNT EARNED TO DATE: 66,641.90 TOTAL DUE CONTRACTOR: 66,641.90 ENGINEERING DESIGN I PROJECT ADMINISTRATION: 9,862.79 TOTAL IMPROVEMENT COST: 76 404.89 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correU amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa APPROVED: Gus Psihoyos, Cfty Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersignetl, Alan Jackson Tuckpointing, Inc contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all Uaims for said improvement. CONTRACTOR: Alan Jackson Tuck joimin ,Inc /) TITLE: ~~i ~i ~ //y (/ DATE: 7 ~ ~ ' ~~ b F:IPROJECTS\Downtown Signel8 LgM Pekitirq 2007\Bid Dowman6\Gontreobr PaymentaNartial 1 m Alan Jackaon.tls Page 7 of 7