Loading...
Locust Street Connector_Central Avenue CameraTHE CTTY OF D"ubuq'ue AN-AmerlcaCAll DUB E Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project Iowa DOT Project No. STP-A-946-0(1)--86-31 DATE: July 1, 2008 Bids were received for the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project. City Engineer Gus Psihoyos is recommending award to the low bidder, Price Industrial Electric in the amount of $408,622. I concur with the recommendation and respectfully request Mayor and City Council approval. ~~ l~ ~-- . ~_ Michael C. Van Mill gen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer ..-- THE CITY OF Du s ~ E Masterpiece an the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer y~~~- DATE: June 24, 2008 Dubuque ~~~~~®~ zoos SUBJECT: Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project Iowa DOT Project No. STP-A-946-0(1)--86-31 INTRODUCTION The enclosed resolution authorizes the award of the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project, Iowa DOT Project No. STP-A-946-0(1)--86-31. BACKGROUND On December 3, 2007, the City Council approved (Res. 570-07) an agreement with the Iowa Department of Transportation (Iowa DOT) and the City of Dubuque (City) for the funding of the Primary Highway Improvements Project No. 2008-16-019, Final Traffic Control System Improvements (Iowa DOT Project No. STP-A-946-0(1)--86-31). Under ICAAP funding, 80 percent (80%) or $330,090 of the total eligible project items are reimbursable. The traffic control system improvements will be made throughout the City including the integration of a computer-based transportation management system to monitor, control, change, and evaluate traffic conditions. Traffic signal improvements will also be made on Locust Street at the US 20 and US 151/61 intersections. The Primary Highway Improvements Project No. 2008-16-019, Final Traffic Control System Improvements provides for the following: - Locust Street at US 20 and US 151/61 Intersections: Traffic signal improvements at the intersections near the Locust Connector, which includes the three intersections on Locust Street at Charter, US 20, and the Locust Connector. It will also include connecting the two intersections on US 151/61 at the Locust Connector and Jones Street. This project includes installation of fiber and conduit along US 52 from City Hall to Locust Connector at US 151/61. Communication equipment will be installed at the primary intersections along US 52 and at the referenced 5 intersections. This project will provide remote monitoring capabilities and will extend the traffic signal interconnect back to City Hall. - Traffic Signal Control System: The integration of a computer-based transportation management system to monitor, control, change, and evaluate traffic conditions on US 20 and all future coordinated corridors within the entire City. Currently the City of Dubuque has a Public Interest Finding memo to the Iowa DOT requesting the purchase of ACTRA, a traffic control software produced by Siemens. The City of Dubuque will pursue the purchase of this software, if approved. Currently this software purchase is not part of this project that is going to the State for bidding. BID RESULTS The Iowa Department of Transportation (Iowa DOT) received the following bids for the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project, Iowa DOT Project No. STP-A-946-0(1)--86-31 on June 17, 2008: Contractor Name Total Bid Price Industrial Electric $408,622.00 Volkens Excavating, Inc. $483,837.50 RECOMMENDATION I recommend that the contract for the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project, Iowa DOT Project No. STP-A-946-0(1)--86-31 be awarded to Price Industrial Electric of Hiawatha, Iowa, in the amount of $408,622.00, which is 11.00% under the engineer's estimate. The Iowa DOT late start date is August 11, 2008, with completion in 50 working days or approximately November, 2008. BUDGET IMPACT The summary of the project costs is as follows: Construction Contract (No Software) Contingency Engineering/Contract Administration Engineering Design Project Cost -Phase II The funding summary for the project is as follows: CIP Funding Source Estimate $ 459,104 45,910 36,728 14,100 42 Award $408,622 45,910 36, 728 14,100 $~4 `~-f - Amount ICAAP Funds (so% Maximum of Total Eligible Items) $330,090 3001852 ICAAP -City Hall and Locust Street Improvements 32,039 3001266 Traffic Signal Interconnect 25,000 1011133 Traffic Signal Mastarm Retrofit 10,000 1021609 Fiber Optic Conduit -Private Subdivisions & Misc. 33,231 Projects 1021017 Fiber Optic Conduit -Paving Projects 75,000 Total Project Funding $~g~ ~ This agreement will become null and void if the project drops out of the current Transportation Improvement Program (TIP) of the Dubuque Metropolitan Area Transportation System (DMATS) or the approved current Iowa DOT Statewide Transportation Improvement Program (STIP) prior to authorization of federal funds. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project, Iowa DOT Project No. STP-A-946-0(1)--86-31 to Price Industrial Electric in the amount of $408,622.00. Prepared by David Ness, PE cc: Roger Walton, District Staff Engineer, Iowa DOT Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Chris Kohlmann, Information Services Manager RESOLUTION NO. 212-08 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE LOCUST STREET CONNECTOR AND CENTRAL AVENUE TRAFFIC CONTROL CAMERA AND FIBER OPTICS IMPROVEMENTS PROJECT (IOWA DOT PROJECT NO. STP-A-946-0(1)--86-31) Whereas, sealed proposals have been submitted by contractors for the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optics Improvements Project (Iowa DOT Project No. STP-A-946-0(1)--86-31) (the Project) pursuant to Resolution No.184-08 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 5th day of June, 2008. Whereas, said sealed proposals were opened and read by the Iowa Department of Transportation on the 17th day of June, 2008 and it has been determined that Price Industrial Electric of Hiawatha, Iowa, with a bid in the amount of $408,622.00, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY. COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Price Industrial Electric, subject to the concurrence by Iowa Department of Transportation (Iowa DOT), and the City Manager is hereby directed to executo a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this nth day of July , 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk IOWA DEPARTMENT OF TRANSPORTATION Run Date: 06/19/08 TABULATION OF CONSTRUCTION AND MATERIAL BIDS Page: 358 2 Bid:. Order: 358 Contract ID: 31-9460-001 Primary County: DUBUQUE Letting Date: 06/17/08 10:00 A.M. ------------------------------------------------------------------------------------------------------------------------------------ ' ( 1 ) PR175 ( 2 ) VO039 ( ) PRICE INDUSTRIAL ELECTRIC VOLKENS EXCAVATING, INC. LID7E NO / ITEM .CODE / ALT ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT SECTION 0001 TRAFFIC SIGNALIZATION ITEMS 0010 2511-6745900 146.000 SY 20.00000 2920.00 25.00000 3650.00 REMOVAL OF SIDEWALK 0020 2511-7526004 146.000 SY 55.00000 8030.00 75.00000 10950.00 SIDEWALK, P.C. CQNCRETE, 4 IN. 0030 2515-2475006 11.000 SY 25.00000 275.00 90.00000 990.00 DRIVEWAY, P.C. CONCRETE, 6 IN. 0040 2515-6745600 11.000 SY 75.00000 825.00 40.00000 440.00 REMOVAL OF PAVED DRIVEWAY 0050 2523-0000310 8.000 EACH 2400.00000 19200.00 3500.00000 28000.00 HANDHOLES AND JUNCTION BOXES 0060 2525-0000100 ~ LUMP 98300.00000 98300.00 65000.00000 65000.00 TRAFFIC SIGNALIZATION _ 0070 2528-8445I10 LUMP 3000.00000 3000.00 7500.00000 7500.00 TRAFFIC CONTROL 0080 2533=4980005 LUMP 5000.00000 5000.00 5000.00000 5000.00 MOBILIZATION 0090 2599-9999005 14.000 EACH 1200.00000 16800.00 1000.00000 14000.00 ('EACH' ITEM) CONNECT TO EXISTING HANDHOLE OR CONTROL ' 0100.2599-9999005 3.000 EACH 5200.00000 15600.00 6000.00000 18000.00 ('EACH' ITEM) FIBER'OPTIC'HUB CABINET ' INSTALL 0110 2599-9999005 6.000 EACH 3400.00000 27200.00 4500.00000 36000.00 (''EACH' ITEM)'FIBER VAULT, 48 IN. ' 0120 2599-9999009 ~~ 520.000 LF 10.50000 5460.00 5.00000 2600.00 ('LINEAR FEET' ITEM) CONDUIT, RIGID PVC 1 IN. CONDUITS " 0130 2599-9999009 700.000 LF 13.25000 9275.00 16.00000 11200.00 ('LINEAR FEET' ITEM) CONDUIT, RIGID PVC PUSHED, 2 IN. 0140 2599-9999009 6705.000 LF 26.00000 174330.00 35.00000 234675.00 ('LINEAR FEET' ITEM) CONDUIT, RIGID PVC PUSHED, 4 IN. WITH 4 0150 2599-9999009 10185.000 LF 2.20000 22407.00 4.50000 45832.50 ('LINEAR FEET' ITEM) FIBER CABLE; 24 SINGLE MODE AND 12 SECTION TOTALS $ 408,622.00 $ 483,837.50 $ CvivinACT TOTALS ------------------------------------ ------------------------------------ ------- ------- $ ---------------- ---------------- 408,622.00 --------------- --------------- $ --------------- --------------- 483,837.50 $ ------------------------------------------- ------------------------------------------- IOWA DEPARTMENT OF TRANSPORTATION VENDOR RANKING Bid Order: 358 Contract ID: 31-9460-001 Letting Date: 080617 10:00 A.M. Letting Status: AWARD RECOMMENDED to PRICE INDUSTRIAL ELECTRIC Contract Period: 50 WORK DAYS Late Start Date: 08/11/08 Project: STP-A-946-0(1)--86-31 ' Work Type: TRAFFIC SIGNALS County: DUBUQUE Prj Awd Amt: $408,622.00 Route: IOWA 946 Location: CENTRAL AVE./LOCUST ST./ U.S 20 1 U.S. 61 IN DUBUQUE Run Date: 06/19/08 Page: 358 1 Primary County: DUBUQUE No Established DBE Goal TOTAL $ OVER RANK VENDOR NO./NAME BID LOW BID 1 PR175 PRICE INDUSTRIAL ELECTRIC $ 408,622.00 100.00 ~ 2 V0039 VOLKENS EXCAVATING, INC. $ 483,837.50 118.40 $