DICW North Siegert Farm Demolition_Grading2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Dubuque Industrial Center West -North Siegert Farm CIP 3601943 DATE: July 16, 2008 City Engineer Gus Psihoyos is recommending authorization of the bidding for the Dubuque Industrial Center West -North Siegert Farm Project and that a public hearing be set for August 4, 2008. I concur with the recommendation and respectfully request Mayor and City Council approval. ' ~~' , Mich el C. Van Milligen MCVM/ems Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque ~~'' DT T~ ~ Ab-Ame~CaCitY v Masterpiece on the Mississi~~7pi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Dubuque Industrial Center West -North Siegert Farm CIP 3601943 DATE: July 15, 2008 INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the Dubuque Industrial Center West -North Siegert Farm Project. BACKGROUND The North Siegert Farm expansion of the Dubuque Industrial Center West has been necessitated by recent development agreements and land sales in the developed portions of this area. The first phase (the southerly area) consists of approximately 54 acres and will be graded in the fall, 2008. The second phase (the northerly area) is approximately 74 acres along Middle Road and will be graded in the spring, 2009. All final requirements of the project for both Phase 1 and Phase 2 will be fully completed in the summer, 2009. In January, 2008, the City Council approved the selection of IIW Engineers & Surveyors, PC to provide design, engineering and construction services for this project. DISCUSSION The Dubuque Industrial Center West - North Siegert Farm Project includes the demolition and grading of approximately 1,369,950 cubic yards of excavation on the 128-acre North Siegert Farm. The project includes: - Temporary and permanent erosion control measures: Sediment basins, detention basins, vegetated swales, seeding, inlet and outlet projection, and energy dissipaters. - Grading: Clearing and grubbing topsoil removal, stockpile and spreading, removal of unsuitable material, sub-drains, excavation and embankment fill. - Demolition: Removal of existing structures, well abandonment, and septic system removal. - Storm Sewer: 1,407 lineal feet of storm sewer with 8 manholes. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Advertisement for Bids Notice of Public Hearing on Plans& Specifications Public Hearing Receipt of Bids Award Construction Contract Project Completion Date RECOMMENDATION July 21, 2008 July 25, 2008 July 25, 2008 August 4, 2008 August 6, 2008 August 18, 2008 August 1, 2009 I recommend that the City Council establish a date for the public hearing and authorize the City Clerk to advertise for proposals. BUDGET IMPACT The estimate of probable cost for the Dubuque Industrial Center West -North Siegert Farm Project is as follows: Estimate Construction Contract $4,540,739.00 Contingency (15%) 681,111.00 Construction Engineering & Inspection 150,000.00 Total Project Cost 5.371.850.00 The project funding summary is as follows: Fund Description Fund Amount DICW Land Sales $2,235,276.00 TIF Receipts 278,058.00 GO Bonds (TIF Abated) 2,858,516.00 Total Project Funding 5.371.850.00 ACTION TO BE TAKEN The City Council is requested to establish the date of the public hearing and to authorize the City Clerk to advertise for proposals through adoption of the enclosed resolutions for the Dubuque Industrial Center West -North Siegert Farm Project. Prepared by Steve Sampson Brown, Project Manager cc: Jenny Larson, Budget Director David Heiar, Economic Development Director RESOLUTION NO. 245-08 DUBUQUE INDUSTRIAL CENTER WEST NORTH SIEGERT FARM PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Dubuque Industrial Center West -North Siegert Farm Project, in the estimated amount $5,371,850.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 4th day of August, 2008, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause. the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Dubuque Industrial Center West -North Siegert Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 6th day of August, 2008. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at the public hearing at 6:30 p.m. on the 18th day of August, 2008, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this 21st day of July, 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE DUBUQUE INDUSTRIAL CENTER WEST -NORTH SIEGERT FARM PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Dubuque Industrial Center West -North Siegert Farm Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 4th day of August, 2008, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: The project includes demolition and grading of approximately 1,369,950 cubic yards of excavation on the 128-acre North Siegert farm. Temporary and permanent erosion control measures, such as sediment basins, detention basins, vegetated swales, seeding, inlet and outlet projection, and energy dissipaters, are required. Grading includes clearing and grubbing topsoil removal, stockpile and spreading, removal of unsuitable material, sub-drains, excavation and embankment fill. Demolition includes removal of existing structures, well abandonment, and septic system removal. Storm sewer includes 1,407 lineal feet of storm sewer with 8 manholes. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the day of , 2008. Jeanne F. Schneider, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT DUBUQUE INDUSTRIAL CENTER WEST NORTH SIEGERT FARM PROJECT Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on the 6th day of August, 2008, in the Office of the City Clerk, City Hall -First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Placed Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on August 6, 2008, at City Hall -Conference Room B, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on August 18, 2008. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by August 1, 2009. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state- chartered or federally chartered bank, or a certified share draft drawn on a state- chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the plans and specifications may be obtained at IIW Engineers & Surveyors, PC, 4155 Pennsylvania Avenue, Dubuque, IA 52002. Contact Michele Knief-Nemmers. Telephone 563-556-2464; facsimile: 563-556-7811. Plans and specifications may be obtained for a payment of $25.00 per set, which is nonrefundable. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. The Dubuque Industrial Center West -North Siegert Farm Project includes the demolition and grading of approximately 1,369,950 cubic yards of excavation on the 128-acre North Siegert Farm. The project includes: - Temporary and permanent erosion control measures: Sediment basins, detention basins, vegetated swales, seeding, inlet and outlet projection, and energy dissipaters. - Grading: Clearing and grubbing topsoil removal, stockpile and spreading, removal of unsuitable material, sub-drains, excavation and embankment fill. - Demolition: Removal of removal of existing structures, well abandonment, and septic system removal. - Storm Sewer: 1,407 lineal feet of storm sewer with 8 manholes. Published in the Telegraph Herald, July 25, 2008.