DICW North Siegert Farm_Demolition and GradingDubuque THE CITY OF ,. ~T TR ~ AlaAmericaCily ~J 1J Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Dubuque Industrial Center West -North Siegert Farm CIP 3601943 DATE: July 21, 2008 City Engineer Gus Psihoyos is recommending approval of the plans, specifications, form of contract and the estimated cost of $5,371,850 for the Dubuque Industrial Center West -North Siegert Farm Project. The project includes the grading of approximately 1,369,950 cubic yards of excavation on the 128 acre City-owned property. I concur with the recommendation and respectfully request Mayor and City Council approval. `'~ Micha I C. Van Milligen MCVM/Iw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Mana FROM: Gus Psihoyos, City Engineer SUBJECT: Dubuque Industrial Center West -North Siegert Farm CIP 3601943 DATE: July 21, 2008 INTRODUCTION ~ ~ ~ h .~r.® 2007 The enclosed resolution is in reference to the public hearing for the Dubuque Industrial Center West -North Siegert Farm Project. DISCUSSION The Dubuque Industrial Center West - North Siegert Farm Project includes the demolition and grading of approximately 1,369,950 cubic yards of excavation on the 128-acre North Siegert Farm. The project includes: - Temporary and permanent erosion control measures: Sediment basins, detention basins, vegetated swales, seeding, inlet and outlet projection, and energy dissipaters. - Grading: Clearing and grubbing topsoil removal, stockpile and spreading, removal of unsuitable material, sub-drains, excavation and embankment fill. - Demolition: Removal of existing structures, well abandonment, and septic system removal. - Storm Sewer: 1,407 lineal feet of storm sewer with 8 manholes. RECOMMENDATION recommend that the City Council approve the plans, specifications, form of contract and the estimated cost for the Dubuque Industrial Center West -North Siegert Farm Project. BUDGET IMPACT The estimate of probable cost for the Dubuque Industrial Center West -North Siegert Farm Project is as follows: 'i Estimate Construction Contract $4,540,739.00 Contingency (15%) 681,111.00 Construction Engineering & Inspection 150,000.00 Total Project Cost 5.371.850.00 The project funding summary is as follows: Fund Descriation Fund Amount DICW Land Sales $2,235,276.00 TIF Receipts 278,058.00 GO Bonds (TIF Abated) 2,858,516.00 Total Project Funding 5.371.850.00 ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and the estimated cost for the Dubuque Industrial Center West -North Siegert Farm Project. Prepared by Steve Sampson Brown, Project Manager cc: Jenny Larson, Budget Director David Heiar, Economic Development Director RESOLUTION NO. 261-08 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE DUBUQUE INDUSTRIAL CENTER WEST -NORTH SIEGERT FARM PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Dubuque Industrial Center West -North Siegert Farm Project, in the estimated amount $5,371,850.00, are hereby approved. Passed, adopted and approved this 4th day of August, 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk