Loading...
Quince Street Underground Utility Reconstruction ProjectTHE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Quince Street Underground Utility Reconstruction Project (Reconstruction of Sanitary Sewer, Storm Sewer, and Watermain) (CIP 7101903, 7201008, 7401405 & 3002079) DATE: August 26, 2008 City Engineer Gus Psihoyos is recommending approval of the plans, specifications, form of contract, estimated cost of $134,414.85, the Resolution of Necessity and the Preliminary Schedule of Assessments, for the Quince Street Underground Utility Reconstruction Project. concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: August 26, 2008 SUBJECT: Quince Street Underground Utility Reconstruction Project (Reconstruction of Sanitary Sewer, Storm Sewer, and Watermain) (CIP 7101903, 7201008, 7401405 & 3002079) INTRODUCTION The enclosed resolutions are in reference to the public hearing on the Quince Street Underground Utility Reconstruction Project. DISCUSSION The Quince Street Underground Utility Reconstruction Project will provide for the reconstruction of all public underground utilities and replacement of the existing asphalt street pavement. The project will incorporate the following upgrades to the existing sanitary sewer system: the complete reconstruction of approximately 220 lineal feet of 8-inch mainline sewer; the reconstruction of 1 deteriorated brick manhole; and the replacement of 6 private sanitary sewer laterals. The cost for the individual sanitary sewer lateral replacements will be assessed to each respective private property owner. The project will also include the reconstruction of approximately 360 lineal feet of watermain and the replacement of 1 lead residential water service. The cost of the individual lead residential water service replacement will be assessed to the respective private property owner. The project also provides for the construction of approximately 365 lineal feet of new storm sewer which will manage and improve storm water conveyance in the area. On August 19, a public information meeting was held at Bryant School. No impacted property owners attended the meeting. However, there was one resident in the area who participated. The project schedule, accessibility to residences during construction, preliminary assessments, and other construction-related items were discussed. RECOMMENDATION recommend that the City Council approve the plans, specifications, form of contract and the estimated cost and to adopt the Resolution of Necessity and the Preliminary Schedule of Assessments for the Quince Street Underground Utility Reconstruction Project. BUDGET IMPACT The estimate of probable cost for Quince Street Underground Utility Reconstruction Project is summarized as follows: Estimate Construction Contract $106,256.80 Contingency (10%) 10,625.68 Construction Engineering & Inspection (15%) 17,532.37 Total Project Cost $134,414.85 The estimated project category costs are as follows: Cost Summary /Description Amount Street Restoration Improvements $ 34,424.48 Water Main Improvements 21,898.48 Sanitary Sewer Improvements 44,821.20 Storm Sewer Improvements 33,270.69 Total Project Cost $134,414.85 The project funding summary is as follows: CIP No. Fund Description Fund Amount 3002079 Quince Street Resurfacing $ 34,424.48 7401405 Water Main Replacement Program 20,472.10 Special Assessment -Water Services, Residential Property 1,426.38 7101903 Quince Street Sanitary Sewer Reconstruction 39,000.00 Special Assessment -Sanitary Lateral, Residential Property 5,821.20 7201008 Storm Sewer Improvement/Extension 33,270.69 Total Project Funding $134,414.85 The Quince Street Underground Utility Reconstruction Project will be funded through the annual capital improvement project appropriation of City funds as noted above in the amount of $127,167.27. The project, as outlined, will require Special Assessments in the amount of $7,247.58 and expenditure from the FY2009 Annual Street Construction Program (Funded through Local Option Sales Tax) in the amount of $34,424.48. ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications the estimated cost and to adopt the Resolution of Necessity Schedule of Assessments for the Quince Street Underground Project. form of contract and and the Preliminary Utility Reconstruction Prepared by Greg Doeden, Civil Engineer Bob Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Jon Dienst, Civil Engineer Deron Muehring, Civil Engineer RESOLUTION NO. 302-08 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE QUINCE STREET UNDERGROUND UTILITY RECONSTRUCTION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Quince Street Underground Utility Reconstruction Project, in the estimated amount $134,414.85, and hereby approved. Passed, adopted and approved this 2nd day of September, 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 303-08 RESOLUTION WITH RESPECT TO THE ADOPTION OF THE RESOLUTION OF NECESSITY PROPOSED FOR THE QUINCE STREET UNDERGROUND UTILITY RECONSTRUCTION PROJECT Whereas, the City Council has proposed a Resolution of Necessity for the Quince Street Underground Utility Reconstruction Project has given notice of the public hearing thereon as required by law; and Whereas, the public hearing has been held, all persons offering objections have been heard and consideration given to all objections and is pending before this Council; and , Whereas, this is the time and place set as provided for the taking of action on the proposed Resolution of Necessity. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed Resolution of Necessity described above is hereby: -- Adopted, without amendment, and all objections filed or made having been duly considered are overruled. Adopted as amended by the Preliminary Schedule of Assessments attached hereto as Exhibit A, and made a part hereof by reference. All objections filed or made having been duly considered are overruled. Deferred for later consideration to a City Council meeting to be held on the day of , 2008, next at 6:30 p.m. in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, with jurisdiction retained for further consideration and action at the adjourned meeting. Abandoned. Passed, adopted and approved this 2nd day of September, 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 304-08 APPROVING SCHEDULE OF ASSESSMENTS AND ESTIMATE OF TOTAL COST FOR THE QUINCE STREET UNDERGROUND UTILITY RECONSTRUCTION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached plat, schedule of assessments, and estimate of total cost for the Quince Street Underground Utility Reconstruction Project are hereby approved. Passed, approved and adopted this 2nd day of September, 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY OF DUBUQUE, IOWA QUINCE STREET UNDERGROUND UTILITY RECONSTRUCTION PROJECT (RUSH TO CLEVELAND) PRE~Ip~^tN.AR ~ SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS DATE: AUGUST 11, 2008 The following schedule is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the amount proposed to be assessed against each lot and the valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the City Council of the City of Dubuque. WATER SERVICE SANITARY SEWER PUBLIC PARCEL VALUATION TOTAL NET PROPERTY OWNER NAME LOT DESCRIPTION PRIVATE LATERAL PRIVATE LATERAL IMPROVEMENTS NUMBER WITH IMPROVEMENT COST COST ASSESSMENT ASSESSMENT Schmidt, Melvin J I LOT 1-116 UNION ADD 110-25-453A10 ~ $79,870.20 I I $970.20 I $970.20 I $970.20 Lott, Julie A I LOT 2 OF 104 UNION ADD 110.25-45&0041 $85,770.20 I I $970.20 I $970.20 I $970.20 Hard, James K I LOT 2-1-N 150'-1-105 UNION ADD 110.25-054005 I $76,970.20 I I $970.20 I 5970.20 I $97D.20 Gvnnn, Richard S & Vogt, Francis J. I S 50' LOT 1-105 UNION ADD 110.25-4540061 $102,996.58 I $1,426.38 I 5970.20 I $2,396.58 I $2,396.58 Maiers, David L. & Diane L. I LOT 1 QUINCE STREET SUB 110.25 354015 I $129,070.20 I I $970.20 ( $970.20 I $970.20 Schwartz. Jeffrey L. & Krier, Tina M. I LOT 2.116 UNION ADD 110.25353011 I $116,970.20 I I $970.20 I $970.20 I $970.20 TOTALS 31,426.38 I 55,821.20 I 57,247.58 I $7,247.58 i i Page 1 of 1