Quince Street Underground Utility Reconstruction ProjectTHE CITY OF Dubuque --.. Dui E A~~~ i Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Quince Street Underground Utility Reconstruction Project (Reconstruction of Sanitary Sewer, Storm Sewer, and Watermain) (CIP 7101903, 7201008, 7401405 & 3002079) DATE: September 8, 2008 Sealed bids were received on September 4, 2008, for the Quince Street Underground Utility Reconstruction Project. City Engineer Gus Psihoyos is recommending award to the low bidder, Top Grade Excavating, Inc., in the amount of $107,453.25. I concur with the recommendation and respectfully request Mayor and City Council approval. V Mic ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque D'UB E ~ - Masterpiece on tl~e Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: September 5, 2008 SUBJECT: Quince Street Underground Utility Reconstruction Project (Reconstruction of Sanitary Sewer, Storm Sewer, and Watermain) (CIP 7101903, 7201008, 7401405 & 3002079) INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the Quince Street Underground Utility Reconstruction Project. DISCUSSION The Quince Street Underground Utility Reconstruction Project will provide for the reconstruction of all public underground utilities and replacement of the existing asphalt street pavement. The project will incorporate the following upgrades to the existing sanitary sewer system: the complete reconstruction of approximately 220 lineal feet of 8-inch mainline sewer; the reconstruction of 1 deteriorated brick manhole; and the replacement of 6 private sanitary sewer laterals. The cost for the individual sanitary sewer lateral replacements will be assessed to each respective private property owner. The project will also include the reconstruction of approximately 360 lineal feet of watermain and the replacement of 1 lead residential water service. The cost of the individual lead residential water service replacement will be assessed to the respective private property owner. The project also provides for the construction of approximately 365 lineal feet of new storm sewer which will manage and improve storm water conveyance in the area. BID RESULTS Sealed bids were received on September 4, 2008. Top Grade Excavating, Inc. of Epworth, Iowa, submitted the low base bid in the amount of $107,453.25. This amount is 1.1 % over the engineer's estimate of $106,256.80. A summary of the bid proposals received is as follows: Contractor Name Bid Amount Top Grade Excavating, Inc. $107,453.25 Drew Cook & Sons Excavating, Inc. $114,282.00 Horsfield Construction, Inc. $116,690.00 Connolly Construction, Inc. $123,692.75 RECOMMENDATION I recommend that the contract for the Quince Street Underground Utility Reconstruction Project be awarded to Top Grade Excavating, Inc. in the amount of $107,453.25. BUDGET IMPACT The estimate of probable cost for the Quince Street Underground Utility Reconstruction Project is as follows: Construction Contract Contingency (10%) Construction Engineering & Inspection (15%) Total Project Cost Estimate $106,256.80 10,625.68 17.532.37 $134,414.85 Bid Award $107,453.25 10,625.68 17, 532.37 $135,611.30 The estimated project category costs are as follows: Cost Summary /Description Street Restoration Improvements Water Main Improvements Sanitary Sewer Improvements Storm Sewer Improvements Total Project Cost Amount $ 34, 360.89 22,142.18 44,821.20 34.287.03 $135,611.30 The project funding summary is as follows: CIP No. Fund Description 3002079 Quince Street Resurfacing 7401405 Water Main Replacement Program Special Assessment -Water Services, Residential Property 7101903 Quince Street Sanitary Sewer Reconstruction Special Assessment -Sanitary Lateral, Residential Property 7201008 Storm Sewer Improvement/Extension Total Project Funding Fund Amount $34,360.89 20,715.80 $1,426.38 39,000.00 5,821.20 34,287.03 $135,611.30 The Quince Street Underground Utility Reconstruction Project will be funded through the annual capital improvement project appropriation of City funds as noted above in the amount of $128,363.72. The project, as outlined, will require Special Assessments in the amount of $7,247.58 and expenditure from the FY2009 Annual Street Construction Program (Funded through Local Option Sales Tax) in the amount of $34,360.89. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the Quince Street Underground Utility Reconstruction Project to Top Grade Excavating, Inc. in the amount of $107,453.25. Prepared by Jon Dienst, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer Greg Doeden, Civil Engineer Deron Muehring, Civil Engineer RESOLUTION NO. 308-08 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE QUINCE STREET UNDERGROUND UTILITY RECONSTRUCTION PROJECT Whereas, sealed proposals have been submitted by contractors for the Quince Street Underground Utility Reconstruction Project (the Project) pursuant to Resolution No. ____ and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 22nd day of August, 2008. Whereas, said sealed proposals were opened and read on the 4th day of September, 2008, and it has been determined that Top Grande Excavating, Inc. of Epworth, Iowa, with a bid in the amount of $107,452.25, it the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Top Grade Excavating, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 15th day of September, 2008. Kevin J. Lynch, Mayor Pro-Tem Attest: Jeanne F. Schneider, CMC, City Clerk CITY OF DUBUQUE • ENGINEERING DIVISION -BID TABULATION SHEET BID TABULATION FOR: QUINCE STREET UNDERGROUND BID DATE: 9/4/2008 BIDDER: BIDDER: UTILITY RECONSTRUCTION PROJECT Toa Grade Excavating. Inc. Drew Cook 8 Sons Excavating BID ITEM DESCRIPTION UNIT QUANTNTY UN T COST ESCOST E UNIT COST COST UNI BCOST COST BASE BID: DEMOLITION & REMOVAL..: ~ ~ I I 1 Remove Curb & Gutter LF 295 $2.05 $604.75 $ 2.50 $ 737.50 $ 6.00 ~ $ ~~ 1 770 00 2 Abandon Existing Pipe & Manhole CY 0.5 $103.00 $51.50 $ 1,500.00 $ 750.00 $ 590.00 $ , . 295 00 3 Remove Existing Manhole Each 2 $257 50 $515 00 $ 275 00 $ 550 00 $ 400 00 . . . . . . $ 800.00 EXCAVATION 8 STONE 4 Excavation, Unclassfied CY 300 $6.75 $2,025.00 $ 12.25 $ 3,675.00 $ 6.50 $ 1 950.00 5 Excavation, Rock CY 40 $110.00 $4,400.00 $ 110.00 $ 4,400.00 $ 70.00 $ , 2 800.00 6 Backfill, Limestone Ton 1,300 $13.70 $17,810.00 $ 6.75 $ 8,775.00 $ 7.00 $ , 9 100 00 7 Backfill, Topsoil SY 100 $12.00 $1,200.00 $ 7.00 $ 700.00 $ 6.50 $ , . 650 00 8 Graded Stone Base " Ton 350 $11.85 $4,147.50 $ 12.50 $ 4,375.00 $ 14.00 $ . 4 900.00 9 3 Crushed Stone Base Ton 140 $12.00 $1 680 00 $ 12 50 $ 1 750 00 $ 14 00 , , . . , . . $ 1,960.00 PAVEMENT - - ~ 10 HMA 300k Binder Course 1/2" (PG 64-22) Ton 115 $65.00 $7,475.00 $ 74.80 $ 8,602.00 $ 69.00 $ 7 935.00 11 HMA 300k SuAace Course 1!2" (PG 70.26) Ton 115 $66.00 $7,590.00 $ 74.80 $ 8,602.00 $ 69.00 $ , 7 935.00 12 Fixture Adjustment EA 1 $175.00 $175.00 $ 200.00 $ 200.00 $ 400.00 $ , 400 00 13 PC Concrete Driveway 6", Remove & Construct SY 10 $41.00 $410.00 $ 40.00 $ 400.00 $ 38.00 $ . 380 00 14 PC Concrete Sidewalk, 4", Remove & ConsWct SF 60 $5.00 $3110.00 $ 10.00 $ 600.00 $ 5.00 $ . 300 00 15 PC Concrete Curb and Gutter, 2.5', Construct LF 295 $17.00 $5,015.00 $ 20.00 $ 5,900.00 $ 15.00 $ . 4,425.00 STORM SEWER ._ z 16 Stortn Sewer, 18" RCP, CL III LF 365 $28.00 $10,220.00 $ 32.50 $ 11,862.50 $ 40.00 $ 14 600 00 17 Storm Water Curb Opening Neenah R-3262-3 Each 1 $115.50 $115.50 I $ 120.00 $ 120.00 I $ 100.00 $ , . 100.00 l Bid Tabulation Sheet 1 of 4 CITY OF DUBUQUE -ENGINEERING DIVISION -BID TABULATION SHEET BID TABULATION FOR: QUINCE STREET UNDERGROUND BID DATE: 9/4!2008 UTILITY RECONSTRUCTION PROJECT BIDDER: Too Grade Excavating. Inc. BIDDER: Drew Cook & Sons Excavating BID ITEM DESCRIPTION UNIT QUANTITY UNITICOST ESCOSTTE UNIT COST COST I UNIT COST COST SANITARY SEWER 18 _8"PVC w./Bedding LF 220.0 $33.00 $7 260 00 19 48" Diameter Manhole Base Each 1 $765.00 , . $765.00 2D 48" Diameter Manhole Sidewall VF 6.1 $100.00 $610.00 21 Manhole Frame E Cover Each 1 $250.00 $250.00 22 4"PVC Lateral w./Beddi LF 120 $32.00 $3,840.00 23 8"x4"PVC Wye Each 6 $130.00 $780 00 24 Locate Existing Lateral/Exploration Each 6 $149.50 . $897.00 WATER MAIN 25 6" DIP, Class 52 w./Polywrap LF 860 $29.50 $10,620.00 26 6" Mega Lug MJ Each 8 $50.25 $402.00 27 6" Bend MJ x MJ Each 4 $154.00 $616.00 28 Tracer Wire Access Box Each 1 $68.00 $68.00 29 Copper Tracer Wire LF 370 $0.40 $148.00 30 3/4" Copper Service Line TYPE K LF 80 $30.00 $2 400.00 31 _Water Service Lines Stop Box Curb Stop Tap Installation 3/4" Each 1 $682.05 , $682.05 32 3/4"Copper Service Reconnect Each 5 $475.00 $2,375.00 MISCELLANEOUS 33 Sawcut, Concrete LF 30 $4.50 $135.00 34 Sawcut, Asphalt LF 50 $4.00 $200.00 35 Sod SY 100 $7.00 $700.00 36 Watering MGAL 5 $60.00 $300.00 37 Tree Preservation Measures LS 1 $500.00 $500.00 ~' 38 Dust Control Surface Treatment MGAL 5 $60.00 $300.00 39 Erosion Control Plan -Operating Procedures LS 1 $1,500.00 $1,500.00 40 Traffic Control & Safety Control LS 1 $2,000.00 $2,000.00 41 Existing Water Service Stop Box Clean Repair and Adjust Each 5 $200.00 $1 000 OD 42 Mobilization LS 1 $4,174.50 $4,174.50 Bid Sub-Total $106,256.80 Contingency $10,625.68 Cons[niction Engineering & Inspection $17,532.37 Total Construction Estimate: $134 414.85 BASE BID (%) OVER /UNDER (-): $ 39.50 ~ $ 8,690.00 $ 850.00 $ 850.00 $ 125.50 $ 765.55 $ 400.00 $ 400.00 $ 38.00 $ 4,560.00 $ 94.00 $ 564.00 $ 275.00 $ 1,650.00 $ 32.50 $ 11,700.00 $ 45.65 $ 365.20 $ 115.00 $ 460.00 $ 55.00 $ 55.00 $ 0.45 $ 166.50 $ 28.25 $ 2,260.00 $ 522.00 $ 522.00 $ 395.00 $ 1,975.00 $ 10.00 $ 300.00 $ 10.00 $ 500.00 $ 10.00 $ 1,000.00 $ 15.00 $ 75.00 $ 250.00 $ 250.00 $ 50.00 $ 250.00 $ 500.00 $ 500.00 $ 1,846.00 $ 1,846.00 $ 250.00 $ 1,250.00 $ _ 4,500.00 $ 4,500.00 Bid sub-7ota1 S107,453.25 1.1 $ 29.00 $ 6,380.00 $ 500.00 $ 500.00 $ 90.00 $ 549.00 $ 325.00 $ 325.00 $ 31.00 $ 3,720.00 $ 120.00 $ 720.00 $ 200.00 $ 1,200.00 $ 42.00 $ 15,120.00 $ 36.00 $ 288.00 $ 100.00 $ 400.00 $ 50.00 $ 50.00 $ 0.50 $ 185.00 $ 21.00 $ 1,680.00 $ 200.00 $ 200.00 $ 250.00 $ 1,250.00 $ 3.00 $ 90.00 $ 2.50 $ 125.00 $ 11.00 $ 1,100.00 $ 75.00 $ 375.00 $ 2,000.00 $ 2,000.00 $ 75.00 $ 375.00 $ 2,000.00 $ 2,000.00 $ 1,850.00 $ 1,850.00 $ 500.00 $ 2, 500.00 $ 11,000.00 $ 11,000.00 BidSUb-Trnai $114,2$2,U0 % Under/Over 7.6% Bid Tabulation Sheet 2 of 4 CITY OF DUBUQUE -ENGINEERING DIVISION -BID TABULATION SHEET BID TABULATION FOR: QUINCE STREET UNDERGROUND BID DATE: 9/4/2008 UTILITY RECONSTRUCTION PROJECT BIDDER: BIDDER: Horsfield Construction. Inc. Connolly Construction. Inc. BID ITEM DESCRIPTION UNIT QUANTITY UNITI COST E COSTTE UNIT COST COST UNIT OST COST BASE BID: DEMOLITION 3 REMOVAL I 1 Remove Curb & Gutter ~ 2 LF 295 ~ $2.05 $604.75 $ 1.00 $ 295.00 $ 5.95 $ 25 ~ 1 755 Abandon Existing Pipe & Manhole CY 0.5 $103.00 $51.50 $ 1,000.00 $ 500.00 $ 680 00 $ i , . 340 00 3 Remove Existing Manhole Each 2 $257 50 $515 00 $ 500 00 $ . . . . . 1,000.00 $ 315.00 $ 630.00 EXCAVATION 8 STONE 4 Excavalion, UnclassiFed CY 300 $6.75 $2,025.00 $ 15.00 $ 4,500.00 $ 9 75 $ 2 925 00 5 Excavation, Rock 6 CY 40 $110.00 $4,400.00 $ 100.00 $ 4,000.00 $ . 110.00 $ , . 4 400.00 Backfill, Limestone Ton 1,300 $13.70 $17,810.00 $ 7.00 $ 9,100.00 $ 7 95 $ , 10 335 00 7 Backfill, Topsoil SY 100 $12.00 $1,200.00 $ 10.00 $ 1,000.00 $ . 13 25 $ , . 1 325 00 8 Graded Slone Base " Ton 350 $11.85 $4,147.50 $ 14.00 $ 4 900.00 $ . 13.25 $ , . 4 637 50 9 3 Crushed Sfone Base Ton 140 $12 00 $1 680 00 $ 13 00 , . . , . . $ 1,820.00 $ 14.65 $ 2,051.00 PAVEMENT-; 10 HMA 300k Bmder Course 1/2" (PG 64-22) Ton 115 $65.00 $7,475.00 $ 80 00 $ 9 200 00 $ 74 90 $ 8 613 50 11 HMA 300k Surface Course 1/2" (PG 70.28) Ton 115 $66 00 $7 590 00 $ . 80 00 $ , . 9 200 00 . , . 12 Fixture Adjustment EA 1 . , . . , . $ 74.90 $ 8,613.50 13 PC Concrete Driveway 6" Remove & Construct SY 1 $175.00 $175.00 $ 300.00 $ 300.00 $ 535.00 $ 535.00 14 PC Concrete Sidewalk 4" Remove 8 Construct SF 0 $41.00 $410.00 $ 40.00 $ 400.00 $ 59.00 $ 590.00 , , 15 PC Concrete Curb and Gutter 2 5' Construct 60 $5.00 $300.00 $ 10.00 $ 600.00 $ 6.00 $ 360.00 , . , LF 295 $17.00 $5,015.00 $ 20.00 $ 5,900.00 $ 17.00 $ 5,015.00 STORM SENIER 16 Storm Sewer, 18" RCP, CL 111 LF 365 $28.00 $10,220.00 $ 40.00 $ 14,600.00 $ 38 65 $ 14 107 25 17 Storm Water Curb Openin Neenah R~3262.3 Each 1 $115.50 $115.50 $ 100.00 $ 100.00 $ . 295.00 $ , . 295.00 BiC Ta6ulatbn Sheet 3 or 4 CITY OF DUBUQUE -ENGINEERING DIVISION -BID TABULATION SHEET BID TABULATION FOR: QUINCE STREET UNDERGROUND BID DATE: 9/4!2008 UTILITY RECONSTRUCTION PROJECT BIDDER: BIDDER: HorsTield Construction. Inc. Connolly Construction. Inc. BID ITEM DESCRIPTION UNIT QUANTITY UNITICOST ESCOSTTE UNIBCOST COST UNIT COST COST SANITARY SEWER 18 8"PVC w./Bedding LF 220.0 $33.00 $7,260.00 t9 48" Diameter Manhole Base Each 1 $765.00 $765.00 20 48" Diameter Manhole Sidewall VF 6.1 $100.00 $610.00 21 Manhole Frame 8 Cover Each 1 $250.00 $250.00 22 4"PVC Lateral w.lBedding LF 120 $32.00 $3,840.00 23 8"x4" PVC Wye Each 6 $130.00 $780.00 24 Locate Existing Lateral/Exploration Each 6 $149.50 $897.00 WATER MAIN 25 6"DIP, Class 52 w./Polywrap LF 26 6"Mega Lug MJ Each 27 6" Bend MJ x MJ Each 28 Tracer Wire Access Box Each 29 Copper Tracer Wire LF 30 3/4" Copper Service Line TYPE K LF 31 Water Service Lines Stop Box Curb Stop Tap Installation 3/4" Each 32 3/4" Copper Service Reconnect Each 360 $29.50 $10,620.00 8 $50.25 $402.00 4 $154.00 $616.00 1 $68.00 $68.00 370 $0.40 $148.00 80 $30.00 $2,400.00 1 $682.05 $682.05 5 $475.00 $2,375.00 MISCELLANEOUS 33 Sawcut, Concrete LF 30 $4.50 $135.00 34 Sawwt, Asphalt LF 50 $4.00 $200.00 35 Sod SY 100 $7.00 $700.00 36 Watering MGAL 5 $60.00 $300.00 37 Tree Preservation Measures LS 1 $500.00 $500.00 38 Dust Control Surface Treatment MGAL 5 $60.00 $300.00 39 Erosion Control Plan -Operating Procedures LS 1 $1,500.00 $1,500.00 40 Traffic Control 8 Safety Control LS 1 $2,000.00 $2,000.00 41 Existing Water Service Stop Box Clean Repair and Adjust Each 5 $200.00 $1,000.00 42 Mobilization LS 1 $4,174.50 $4,174.50 Bid Sub-Total $106,256.80 Contingency $10,625.68 Construction Engineering 8 Inspection $17,532.37 Total Construction Estimate: $134,414.86 BASE BID (%) OVER /UNDER (-): $ 42.00 $ 9,240.00 $ 700.00 $ 700.00 $ 150.00 $ 915.00 $ 500.00 $ 500.00 $ 41.00 $ 4,920.00 $ 110.00 $ 660.00 $ 250.00 $ 1,500.00 $ 35.00 $ 12,600.00 $ 55.00 $ 440.00 $ 100.00 $ 400.00 $ 75.00 $ 75.00 $ 0.50 $ 185.00 $ 40.00 $ 3,200.00 $ 500.00 $ 500.00 $ 500.00 $ 2,500.00 $ 8.00 $ 240.00 $ 6.00 $ 300.00 $ 10.00 $ 1,000.00 $ 50.00 $ 250.00 $ 100.00 $ 100.00 $ 50.00 $ 250.00 $ 750.00 $ 750.00 $ 2,000.00 $ 2,000.00 $ zlo.oo $ 1,oso.oo $ 5,000.00 $ 5,000.00 $ 45.65 $ 10,043.00 $ 520.00 $ 520.00 $ 161.00 $ 982.10 $ 435.00 $ 435.00 $ 20.40 $ 2,448.00 $ 121.00 $ 726.00 $ 370.00 $ 2,220.00 $ 36.30 $ 13,068.00 $ 59.80 $ 478.40 $ 123.50 $ 494.00 $ 50.00 $ 50.00 $ 0.70 $ 259.00 $ 14.20 $ 1,136.00 $ 635.00 $ 635.00 $ a9s.oo $ z,a8a.oo $ 4.00 $ 120.00 $ 2.40 $ 120.00 $ 82.65 $ 8,265.00 $ 82.65 $ 413.25 $ 1,862.00 $ 1,862.00 $ 153.00 $ 765.00 $ 1,650.00 $ 1,650.00 $ 2,030.00 $ 2,030.00 $ als.oo $ 2,o7s.oo _$ 3,890.00 $ 3,890.00 8ia sub-Total $116,690.00 % Under/Over 9.82% eid seo-row 5123,692.75 16.41 % BiA Tabulation Sheet 4 ofd