Miss River Dis. Utility RelocatMEMORANDUM April 29, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Mississippi River Discovery Center Utility Relocation Project Public Works Director Mike Koch is recommending acceptance of the Mississippi River Discovery Center Utility Relocation Project, as completed by McDermott Excavating, in the final contract amount of $327,031.28, which is an 11.6% decrease from the original contract. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM TO: FROM: SUBJECT: April 29, 2002 Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director Mississippi River Discovery Center Utility Relocation Project INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Mississippi River Discovery Center Utility Relocation Project. DISCUSSION As part of the Port of Dubuque development and the America's River Project, it was necessary for the City to relocate underground utilities. Previously, the City's sanitary sewer and water main, in addition to several public utilities including Alliant-lnterstate, MediaCom and Qwest were located within the proposed development footprint of the Mississippi River Discovery Center Museum and Aquadum site. All affected utilities were relocated prior to construction of the River Discovery Center. Phase I has been completed and included the relocation of both City and public utilities within the proposed footprint of the Mississippi River Discovery Center Museum and Aquarium site, and constructing a new utility infrastructure corridor. Phase II is currently under construction and includes the relocation and construction of both City and public utilities, north along Bell Street to service the Hotel-Waterpark and Conference Education Center. The Mississippi River Discovery Center Utility Relocation Project has been completed by McDermott Excavating of Dubuque, Iowa, in the final contract amount of $327,031.28, which is a 11.6% decrease from the original contract in the amount of $369,864.65. RECOMMENDATION I recommend that the City Council accept the improvement and recommend that the final contract amount be established at $327,031.28. BUDGET IMPACT The construction cost for the Mississippi River Discovery Center Utility Relocation Project is as follows: Construction Contract Cost Contingency (15%) Engineering (10%) Estimate Bid Final $417,600.00 $369,864.65 $327,031.28 62,600:00 62,600.00 0 48,000.00 48,000.00 33,557.79 Total Construction Cost $528,200.00 $480,464.65 $360,589.07 The project will be funded from the Fiscal Year 2001 carryover, which included $324,165 for this phase of the Port of Dubuque development utility relocation in addition to $126,880 for parking lot removal and improvements. The remaining budget balance will be applied to the budget for the Phase II utility relocation and extension project. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final contract amount. Prepared by Robert D. Schiesl, P.E., Civil Engineer cc: Gus Psihoyos, Assistant City Engineer ' Pauline Joyce, Administrative Services Manager Bob Green, Water Plant Manager Mike Brekke, Water Distribution Supervisor RESOLUTION NO. 228-02 ACCEPTING IMPROVEMENT Whereas, the contract for the Mississippi River Discovery Center Utility Relocation Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Fiscal Year 2001 Water Construction, Sewer Construction, Cable Television, and General Funds in amount equal to the amount of his contract, less any retained pementage provided for therein. Passed, approved and adopted this 6th __ day of May, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 229-02 FINAL ESTIMATE Whereas, the contract for the Mississippi River Discovery Center Utility Relocation Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE iT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $360,589.07 and the said amount shall be paid from the Fiscal Year 2001 Water Construction, Sewer Construction, Cable Television, and General Funds of the City of Dubuque, Iowa. Passed, approved and adopted this 6th day of May, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk City of Dubuque - Engineering Division Final Payment Form PAYMENT NO: Council Final PROJECT NAME: Mississippi River Discovery Center Utility Relocation Project DATE: 24-Apr-02 CONTRACT AMOUNT: $369,864.65 CONTP.~CTOR: McDermott Excavating BID ITEM Mobilization & Miscellaneous 2 Sanitary Sewer Manhole Extended Base (48" ID) 3 Sanitm'y Sewer Manhole Sidewall (48 ") 4 Sanitary Sewer Manhole Ring/Cover 5 Tie to Existing Sewer 6 18" D.hP. Sanitary Sewer (Class 5I) 7 16" D.I.P. Sanitary Sewer (Class 5I) 8 12" D.hP. Sardtary Sewer (Class 5 i) 9 8" D.I.P. Sanitary Sewer (Class 51) 10 Saddle Tee 18" x 6" (includes tap) 11 6" D.I.P. Sewer Lataral (Class 51) 12 Pavement Removal 13 Curb/Gutler Removal 14 3" ACC Pavement Replacement 15 Curb/Guaer Replacement 16 8" Crashed Stone Base 17 parking Stall Slxiping i8 Cormect to Existing Watar Main 19 12" Water Main (DdiP. - Class 52) 20 12" Valve with Box 21 6" Valve with Box 22 6" Fire Hydrant 23 Fitlings (Compact Ductile Iron) 24 6" D.I:P. Water Service and Hydrant Lead 25 1" Connection at Tap, Curb Stop and Box 26 1" Type "K" Copper Water Service 27 Remove Existing Yard Hydrant 28 Remove Existing Fire Hydrant &Salvage for City 29 Sewer Bedding and Stabilization Stone 30 Fill Sand (for Utility Trenches) 31 Traffic Control 32 Ftaggers 33 Transformer Pad 34 3" Conduit (Seb. 40 PVC) 35 4" Conduit (Sch. 40 PVC) 36 5" Conduit (Sch. 40 PVC) 37 6" Conduit (Sch. 40 PVC) 38 Trenching/Install Conduit/BackfilI 39 Install 4'x4'x4' PCC Hand Hole 40 Concrete Encased Sweeps 4I 10" Vatve with Box 42 Remove and Reinstall Light Standards 43 Conslrucfion Staking 44 Abandon Existing Manholes 45 8" Watar Main (DIP -Class 52) 46 8" Valve w/Box UNIT UNIT COST QUANTI2W AMOUNT EARNED TO DATE TO DATE LS $8,162.00 1.00 $8,162.00 EA $467.50 6.00 $2,805.00 LF $83.50 56.06 $4,681.01 EA $415.00 6.00 $2,490.00 EA $250.00 3.00 $750.00 LF $44.05 723.83 $31,884.71 LF $39.98 238.25 $9,525.24 LF $29.83 54.75 $1,633.19 LF $23.03 161.00 $3,707.83 EA $340.00 2.00 $680.00 LF $21.24 172.50 $3,663.90 SY $1.45 7374.47 $10,692.98 TON $52.69 1216.91 $64,118.99 LF' $11.10 163.00 $1,809.30 TON $9.35 1802.87 $16,856.83 LS $492.00 1.00 $492.00 F:~ $417.00 8.00 $3,336.00 LF $27.91 1177.00 $32,850.07 EA $1,281.00 7.00 $8,967.00 EA $503.00 12.00 $6,036.00 EA $1,366.00 5.00 $6,830.00 LBS $2.80 4584.00 $12,835.20 LF $21.25 424.50 S9,020.63 FAx $445.00 5.00 $2,225.00 LF $7.50 152.00 $1,140.00 EA $93.00 3.00 $279.00 EA $200.00 3.00 $600.00 TON $11.90 495.17 $5,892.52 TON $7.50 LS $600.00 1.00 $600.00 LS $300.00 1.00 $300.00 EA $664.00 2.00 $1,328.00 LF $0.88 221.00 $t94.48 LF' $1.14 5484.50 $6,252.33 LF $1.73 2058.30 $3,560.86 LF $2.15 367.30 $789.70 LF $8.17 I996.00 $16,307.32 EA $150.00 2.00 $300.00 EA $92.35 43.00 $3,97I .05 EA $1,043.00 2.00 $2,086.00 EA $400.00 4.00 $1,600.00 LS $3,937.00 i.00 $3,937.00 EA $300.00 2.00 $600.00 LF $23.89 361.00 $8,624.29 EA $731.00 4.00 $2,924.00 ADD - EXTRA WORK ITEMS UNIT UNIT COST QUANTITY AMOLNT EARNED TO DATE TO DATE LF $25.89 8.58 $222.14 47 10" Water Main (DIP - Class 52) 48 Limest one Backfill, Wat ermain TON $7.50 70.74 $530.55 49 Pavement Removal, Boat House Slab & Sidewalk SY $1.45 198.44 $287.74 5O 52 53 54 55 56 57 58 59 6O 62 63 Excavate Water Lateral to Depot LS Remove & Dispose, Foudation Wails, RR Tracks &Misc Debri: LS Remove, Dispose & Backfill Underground Tank LS ACC Curb, 6" LF Crushed Stone Base, MRDC Stockpile TON Stone Bmse, Breaker Run TON Fill Sand, 6th St. Stockpile (for Utility Trenches) TON Sand Stockpile Relocate, 6th St. to Riverfront LS Telecommunications Vault, Adjustment LS ConduitTWiring for Parking Lot Lights LS Temporary Entrance to East Parking Lot LS Remove Chain Lknk Fence LS Construct Semi-Access East Entrance to MRDC LS Construct ACC Sidewalk East Enlrance to MRDC TON $132.00 1.00 $132.00 $2,209.i0 $2,209.10 $1,026.00 $1,026.00 $7.70 442.00 $3,403.40 $4.25 I095.00 $4,653.75 $II.90 44.01 $523~72 $3.00 60.00 $180.00 $391.00 $391.00 $702.00 $702.00 $722.00 1.00 $722.00 $328.00 1.00 $328.00 $80~00 1.00 $80.00 $I,766.00 1.00 $1,766.00 $63.50 22.59 $1,434.47 ' TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: $327,031.28 [ $327,031.28 CERTIFICATE OF THE CITY MakNAGER: detail the correct amount o work r ired t ~omplete the e improvement. I hereby certifi7 that the above statement shows in ~~~~ APPROVED: - ~ichaet Van Milligen, City Manager City of Dubuque, Iowa APPROVED: . -0 ~ Michael A. Koch, Public Works Director City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, ~k~ (- D E ~-m0T"~ ~"X C ~ X/ contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: BY: TITLE: DATE: