Hamilton St Storm Sewer AcceptMEMORANDUM April 29, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Hamilton Street Storm Sewer Project Acceptance Public Works Director Mike Koch is recommending acceptance of the Hamilton Street Storm Sewer Project, as completed by Drew Cook & Sons, in the final contract amount of $21,182,01. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Pbblic Works Director TO: CITY OF DUBUQUE, IOWA MEMORANDUM April 29, 2002 Michael C. Van Milligen, City Manager FROM: Michael A. Koch, Public Works Director SUBJECT: Hamilton Street Storm Sewer Project Acceptance INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Hamilton Street Storm Sewer Project. DISCUSSION The project involved the replacement of the existing, crumbling sewer with reinforced concrete pipe. The storm sewer replaced runs along Hamilton Street between Garfield and the I&M Railway railroad tracks. Drew Cook & Sons, Dubuque, Iowa, has completed the project in the final contract amount of $21,182.01. RECOMMENDATION I recommend that the City Council accept the improvements and the final contract be established at $21,182.01. BUDGET IMPACT A summary of the budget costs is as follows: Estimate Bid Final Construction Contract $24,755.85 $23,285.73 $21,182.01 Contingency 2,475.59 2,475.59 0 Engineering 4,084.72 4,084.72 4,084.72 Total Project Cost $31,316.16 $29,846.04 $25,266.73 The project has been funded by a Fiscal Year 2000 General Fund appropriation of $75,000. The balance of the $75,000 was used to fund the Jackson StOrm Sewer Project that came in over budget. The budget transaction was recorded in the last budget amendment. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvements and establishing the final construction cost. CC: Pauline Joyce, Administrative Services Manager Gus Psihoyos, Assistant City Engineer Deron Muehring, Civil Engineer RESOLUTION NO. 232-02 ACCEPTING IMPROVEMENT Whereas, the contract for the Hamilton Street Storm Sewer Project has been completed and the City Manager has examined the work and filed his cerUficate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Fiscal Year 2000 General Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 6th dayof May ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 233-02 FINAL ESTIMATE Whereas, the contract for the Hamilton Street Storm Sewer Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $25,266.73 and the said amount shall be paid from the Fiscal Year 2000 General Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 6th day of May, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk City of Dubuque ENGINEERING DIVISION FINAL ESTIMATE FOR: Hamilton Street Storm Sewer DATE: April 24, 2002 ITEM QTY. UNIT UNIT COST TOTAL COST Clearing & Grubbing 36" Class IV RCP 36" RCP 5' Dia. MH Base 5' Dia. MH Sidewall Manhole Cover & Frame Tap Existing Manhole C-Collar 36" RCP Intake 101-C Complete Bedding Stone, 1" Clean Limestone Backfill 3/4" Rolled Stone Base AC Street Patch w/Full Depth Saw Cut Traffic Control Extra Work Grading 1.00 Lump $300.00 $300.00 15.00 Lin. Ft. $(;9.00 $1,035.00 144.00 Lin. Ft. $59.75 $8,604.00 2.00 Each $235.00 $470.00 22.25 Lin. Ft. $139.00 $3,092.75 2.00 Each $260.00 $520.00 1.00 Each $350.00 $350.00 1.00 Each $200.00 $200.00 1.00 Each $1,950.00 $1,950.00 61.54 Ton $9.50 $584.63 178.45 Ton $5.25 $936.86 105.78 Ton $9.00 $952.02 10.99 Ton $75.00 $824.25 1.00 Lump $250.00 $250.00 1.00 Lump $1,112.50 $1,112.50 TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque,Iowa The undersigned, , contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. $21,182.01 $2,475.59 $23,657.60 Michael A. Koch Public Works Director