Loading...
Conference Center (Grand River Center) FY 2018 Budget Presentation Copyright 2014 City of Dubuque Public Hearings # 3. ITEM TITLE: Grand River Center(Conference Center) Fiscal Year 2018 Budget Presentation SUMMARY: SUGGESTED DISPOSITION: ATTACHMENTS: Description Type Recommended FY18 Conference Center CIP Supporting Documentation Recommended FY18 Conference Center OP Supporting Documentation DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C TOTAL Leisure Services/ General Government Grand River Center- Energy Efficiency DEPARTMENT: 33 PROJECT Conference Center I Improvements FD/CIP NO: 350-2590 COST 1$ 70,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 10,000 Design& Engineering $ 1,000 $ 1,000 $ 1,000 $ 1,000 $ 1,000 $ 20,000 $ 10,000 Construction $ 9,000 $ 9,000 $ 9,000 $ 9,000 $ 9,000 $ 80,000 $ - $ 20,000 TOTAL $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 100,000 B. PROJECT FINANCING $ 20,000 Sales Tax Fund (20%) $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 100,000 $ - $ 20,000 TOTAL $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 100,000 C. IMPACT-OPERATIONS Operating Cost (Savings) $ (500) $ (1,000) $ (1,500) $ (2,000) $ (2,500) $ (7,500) PROJECT DESCRIPTION This project provides for energy saving improvements recommended by Alliant Energy Audit. JUSTIFICATION Implementation costs would be determined by the retro commissioning study to be completed in Fiscal Year 2016. Alliant Audit estimates savings of$69,925 in energy costs each year. The City pays one half of the utilities thus the result would be positive savings to the City. Projects will include installing low wattage T8 lamps, replacing Halogen lamps with LED lamps, replacing MR16 Halogen lamps with LED lamps, installing LED fixtures in walk-in coolers and freezers, installing Equipment manufacturing Corporation (ECM) evaporator for motors in walk-in coolers and freezers, installing kitchen exhaust hood fan controls, and installing Variable-Frequency Drive (VFD) controls on the hot water and condenser water pumps. The payback of these improvements is between 1.8 - 6.4 years. Another project would be to replace T12 with T8 fixtures, install exterior LED parking lot fixtures and install LED parking garage fixtures. The payback is estimated between 8 - 8 1/2 years. Replacing fixtures will be completed in the spine and pre-function first, parking garage second, exhibit hall and then the parking lot Rebates will be applied for the improvements that are eligible. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten:To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principles of Regional Economy and Smart Energy Use. 113 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Paint Interior Rooms DEPARTMENT: 33 TOTAL Conference Center and Areas PROJECT FD/CIP NO: 350-2391 COST $ 74,500 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 44,500 Construction $ 15,000 $ 15,000 $ — $ 44,500 TOTAL $ 15,000 $ 15,000 $ — $ — $ — $ B. PROJECT FINANCING $ 44,500 Sales Tax Fund (20%) $ 15,000 $ 15,000 $ — $ 44,500 TOTAL $ 15,000 $ 15,000 $ — $ — $ — $ — PROJECT DESCRIPTION This project provides for painting various parts of the Grand River Center interior rooms and areas. JUSTIFICATION The Fiscal Year 2018 project includes the back of house and other smaller rooms which are original paint and painting the meeting room prior to carpeting the same room in the same year. Fiscal Year 2019 would be used to paint the Exhibit Hall. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 114 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Portable Bar DEPARTMENT: 33 TOTAL Conference Center Replacement PROJECT FD/CIP NO: 350-2650 COST 1$ 30,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 15,000 Equipment $ 15,000 $ — $ 15,000 TOTAL $ 15,000 $ — $ — $ — $ — $ B. PROJECT FINANCING $ 15,000 Sales Tax Fund (20%) $ 15,000 $ — $ 15,000 TOTAL $ 15,000 $ — $ — $ — $ — $ — PROJECT DESCRIPTION This project provides for replacing the six portable bars used at events and activities. JUSTIFICATION There were six portable bars purchased at the opening in 2003. Three would be replaced in Fiscal Year 2017 and the remaining three in Fiscal Year 2018. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 115 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- North Parking Lot DEPARTMENT: 55 TOTAL Conference Center Pavement Repairs PROJECT FD/CIP NO: 350-1516 COST $ 55,000 • 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS Design& Engineering $ 10,000 Construction $ 45,000 $ — $ — TOTAL $ 55,000 $ — $ — $ — $ — $ B. PROJECT FINANCING $ — Sales Tax Fund (30%) $ 55,000 $ — $ — TOTAL $ 55,000 $ — $ — $ — $ — $ — PROJECT DESCRIPTION This project will allow for the repair and replacement of deteriorating concrete pavement panels at the north parking lot of the Grand River Center. This project will also repair some areas where pavement settlement has occurred which is causing storm water drainage and ponding water issues. JUSTIFICATION By completing the repair and replacement of deteriorating concrete pavement panels and addressing the storm water drainage issues, this prolong the service life of the parking lot pavement and eliminate the nuisance areas of ponding water where guests and citizens walk in the parking lot. RELATIONSHIP TO OTHER PROJECTS RELATIONSHIP TO SUSTAINABILITY PRINCIPLES 116 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Exterior Decorative DEPARTMENT: 55 TOTAL Conference Center Concrete PROJECT FD/CIP NO: 300-2710 COST 1$ 100,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS Design& Engineering $ 15,000 Construction $ 85,000 $ — $ — TOTAL $ 100,000 $ — $ — $ — $ — $ B. PROJECT FINANCING $ — Sales Tax Fund (30%) $ 100,000 $ — $ — TOTAL $ 100,000 $ — $ — $ — $ — $ — PROJECT DESCRIPTION This project provides for removal and replacing damaged sections of decorative concrete walkways around the exterior Grand River Center. JUSTIFICATION The current walkways are made of decorative concrete (buff broomed, red brick stamped, gray broomed, red broomed, buff stamped with fossil and buff stamped) the concrete is then sealed. The concrete is having corner chip breaks on the existing color change concrete shapes. Cracking is also beginning to occur. This project includes repairs to the area around the front entrance driveway loop from 5th St to Bell Street, the concrete banding around the fountain area, the decorative concrete pedestrian walk way from the front Northwest parking lot to the front building entrance, the North staircase from the Northeast Parking to the Riverwalk, the South staircase from 5th Street Cul de Sac to the Riverwalk and the back complete back patio between the building and the Riverwalk. The project would remove replace and restore concrete sections in all these areas. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 117 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Replace Carpet DEPARTMENT: 33 TOTAL Conference Center PROJECT FD/CIP NO: 102-2113 COST 350-2113 $ 500,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 17,000 Design& Engineering $ 5,000 $ 7,000 $ 233,000 Construction $ 95,000 $ 143,000 $ — $ 250,000 TOTAL $ — $ 100,000 $ 150,000 $ — $ — $ B. PROJECT FINANCING Greater Downtown TIF $ 96,000 $ 150,000 $ 80,000 Sales Tax Fund (20%) $ 170,000 DRA Distribution $ 4,000 $ — $ 250,000 TOTAL $ — $ 100,000 $ 150,000 $ — $ — $ — PROJECT DESCRIPTION This project provides for replacing the carpet in various rooms and areas throughout the Grand River Center. JUSTIFICATION Higher use areas of the convention center are on an eight-year replacement cycle. The River Room is popular for gatherings and weddings. The carpeting will establish a new, fresh look to the room. Fiscal Year 2019 the six meeting rooms will need replacement carpet. In the next year the exhibit hall, exhibit hall pre- function, green room and sky bridge carpets will need replacement. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 118 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Replace Electric DEPARTMENT: 33 PR Conference Center Floor Boxes PROJECTAL FD/CIP NO: 102-2651 COST �$ 66,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 33,000 Construction $ — $ 33,000 $ — $ 33,000 TOTAL $ — $ 33,000 $ — $ — $ — $ B. PROJECT FINANCING $ 33,000 DRA Distribution $ — $ 33,000 $ — $ 33,000 TOTAL $ — $ 33,000 $ — $ — $ — $ — PROJECT DESCRIPTION This project provides for replacing the electric floor boxes in the meeting rooms. JUSTIFICATION The current floor boxes installed at original construction are not flush with the floor. This causes a trip hazard. Replacing them at the time of new carpet installation will allow for ease of installation of these floor boxes. The Fiscal Year 2019 request would be for the meeting rooms. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 119 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Maintenance DEPARTMENT: 33 TOTAL Conference Center Equipment Replacement PROJECT FD/CIP NO: 102-2520 COST 1$ 81,805 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 6,305 $ 26,000 Equipment $ 32,000 $ 17,500 $ 6,305 $ 26,000 TOTAL $ — $ 32,000 $ — $ — $ 17,500 $ B. PROJECT FINANCING $ 6,305 $ 26,000 DRA Distribution $ 32,000 $ 17,500 $ 6,305 $ 26,000 TOTAL $ — $ 32,000 $ — $ — $ 17,500 $ — PROJECT DESCRIPTION This project provides for purchasing and/or replacing Grand River Center maintenance equipment. JUSTIFICATION The current maintenance truck and snow plow were purchased in 2003. By Fiscal Year 2019 it will be 16 years old and in need of replacement. The purchase would be a 4-wheel drive, 3/4 ton truck and blade. The FY 22 equipment would be to replace the window washing system originally purchased in 2013 ($7500) and vacuums purchased in 2013 ($10,000). RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 120 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Upgrade AV DEPARTMENT: 33 TOTAL Conference Center Equipment PROJECT FD/CIP NO: 102-2389 COST $ 106,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 6,000 Equipment $ 90,000 $ 10,000 $ — $ 6,000 TOTAL $ — $ 90,000 $ — $ 10,000 $ — $ B. PROJECT FINANCING $ 6,000 DRA Distribution $ 90,000 $ 10,000 $ — $ 6,000 TOTAL $ — $ 90,000 $ — $ 10,000 $ — $ — PROJECT DESCRIPTION This project provides for replacing and upgrading audio visual equipment at the Grand River Center. JUSTIFICATION As technology changes the audio visual equipment needs of Conference Center users change. Fiscal Year 2017 provides for replacing six TVs in the spine area. These TV's were purchased in 2009. Screens, blue-rays, televisions, projectors, sound systems and more need replaced and upgraded in Fiscal Year 2019. The last upgrade was completed in Fiscal Year 2013. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten:To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 121 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Replace Fabric Wall DEPARTMENT: 33 PR Conference Center Covering PROJECTAL FD/CIP NO: 102-2112 COST 350-2112 $ 135,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 100,000 Construction $ 35,000 $ — $ 100,000 TOTAL $ — $ 35,000 $ — $ — $ — $ B. PROJECT FINANCING $ 100,000 Sales Tax Fund (20%) $ 35,000 $ — $ 100,000 TOTAL $ — $ 35,000 $ — $ — $ — $ — PROJECT DESCRIPTION This project provides for replacing the vinyl-like wall covering. JUSTIFICATION The wall covering in the ballroom was replaced in 2010. In Fiscal Year 2018 the wall covering will be in need of replacement due to wear and staining from heavy use of the room. This is an eight-year replacement schedule. In Fiscal Year 2019 the meeting rooms will be in need of replacement due to wear and staining from heavy use of the room. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten:To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 122 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Reupholster DEPARTMENT: 33 PR Conference Center Furniture PROJECTAL FD/CIP NO: 350- COST $ 27,500 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS Other $ 27,500 $ — $ — TOTAL $ — $ 27,500 $ — $ — $ — $ B. PROJECT FINANCING Sales Tax Fund (20%) $ 27,500 $ — $ — TOTAL $ — $ 27,500 $ — $ — $ — $ — PROJECT DESCRIPTION This project provides for reupholstering common space furniture. JUSTIFICATION There are benches, chairs and other seating that have been reupholstered once since the opening of the Grand River Center in 2003. By fiscal Year 2019 all common space furniture located in the prefunction, spine and skywalk will be in need of reupholstery. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 123 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center Replace Bathroom DEPARTMENT: 33 TOTAL Conference Center Sink Light Fixtures PROJECT FD/CIP NO: 102- COST $ 22,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS Consultant Services $ 2,000 Equipment $ 20,000 $ — $ — TOTAL $ — $ 22,000 $ — $ — $ — $ B. PROJECT FINANCING DRA Distribution $ 22,000 $ — $ — TOTAL $ — $ 22,000 $ — $ — $ — $ — PROJECT DESCRIPTION This project provides for replacing the light fixtures above the sinks in the public restrooms at the Grand River Center. JUSTIFICATION The replacement of the light fixtures is necessary to begin as they are no longer manufactured thus parts are not available. They are the two fixtures on either side of the mirror at each sink. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 124 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center-Technology DEPARTMENT: 33 PR Conference Center Upgrades PROJECT AL FD/CIP NO: COST 1$ 59,300 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS Other $ 59,000 $ — $ — TOTAL $ — $ 59,000 $ — $ — $ — $ B. PROJECT FINANCING Sales Tax Fund (20%) $ 59,000 $ — $ — TOTAL $ — $ 59,000 $ — $ — $ — $ — PROJECT DESCRIPTION This project provides for upgrading technology within the Grand River Center to accommodate conferences that require greater connectivity, conferencing and wireless capabilities. JUSTIFICATION The Grand River Center hosts numerous conferences, summits and seminars throughout the year. Each one has technology needs to connect to the outside world. Upgrades to current systems must continuously be made to accommodate the requests of the renter. These include state and national associations as well as local major employers. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 125 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Landscape DEPARTMENT: 33 PR Conference Center Renovation PROJECTAL FD/CIP NO: 350-2591 COST 1$ 30,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 15,000 Construction $ 15,000 $ — $ 15,000 TOTAL $ — $ — $ 15,000 $ — $ — $ B. PROJECT FINANCING $ 15,000 Sales Tax Fund (20%) $ 15,000 $ — $ 15,000 TOTAL $ — $ — $ 15,000 $ — $ — $ — PROJECT DESCRIPTION This project provides for various landscape renovations. JUSTIFICATION The landscape around the Grand River Center has matured and various areas will need renovations. The islands in the parking lots, common space areas and all have plant material that will need to be replaced. The funds will be used for landscape renovations. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties and Recreation Goal Seven: To enhance the visual attractiveness of the community and park system, objective 7.2) Consider providing flowers and other landscaping accents to enhance the beauty of all park areas and City-owned property, including use of indigenous plants, where possible. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principles of Regional Economy and Native Plants and Animals. 126 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Kitchen Equipment DEPARTMENT: 33 TOTAL Conference Center Replacement/ Rebuild PROJECT FD/CIP NO: 102-2588 COST $ 94,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS $ 29,437 $ 14,563 Equipment $ 50,000 $ 29,437 $ 14,563 TOTAL $ — $ — $ — $ 50,000 $ — $ B. PROJECT FINANCING $ 29,437 $ 14,563 DRA Distribution $ 50,000 $ 29,437 $ 14,563 TOTAL $ — $ — $ — $ 50,000 $ — $ — PROJECT DESCRIPTION This project provides for replacing the equipment used in the kitchen. JUSTIFICATION By Fiscal Year 2017, all equipment will be fourteen years old and in need of replacement or rehab/rebuild. Fiscal Year 2018 would be to replace four hot boxes used to hold food after cooked before serving and two more ice cubers. In Fiscal Year 2020 we would replace seven more hot boxes, fryers and refurbishing roll in ovens and replace dish machine and convection oven. Fiscal Year 2021 would entail replacement of garbage disposals and compactor and ice machines will be rehabbed. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten:To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 127 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Market Study and DEPARTMENT: 33 PR Conference Center Facility Assessment PROJECTAL FD/CIP NO: 360- COST 1$ 65,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS Design& Engineering $ 65,000 $ — $ — TOTAL $ — $ — $ — $ — $ 65,000 $ B. PROJECT FINANCING Greater Downtown TIF $ 65,000 $ — $ — TOTAL $ — $ — $ — $ — $ 65,000 $ — PROJECT DESCRIPTION This project provides for a facility assessment and market study in preparation of the Center's first 20 years. JUSTIFICATION The Grand River Center opened in 2003. In 2023 the facility will be 20 years old. Twenty years is the replacement cycle for many major mechanical systems within a building. The assessment will review and make recommendations about system upgrades and replacements necessary. It would outline costs related to those. It would consider things such as rest room and back of house renovations necessary for service and operation of our top notch facility. This assessment considers the infrastructure of the building. Additionally the market study would consider competing facilities and market opportunities. This information would be used in the consideration of the 20 year service cycle as well as if renovations to the meeting/event areas are necessary. These would be renovations beyond the decor upgrades that have been ongoing and look at physical layouts and patterns. It would consider trends of the hospitality industry that can affect the market share the Center has. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principles of Regional Economy, Community Design and Green Buildings. 128 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center Replace Clouds DEPARTMENT: 33 PR Conference Center PROJECTAL FD/CIP NO: 350- COST 1$ 79,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS Equipment $ 79,000 $ — $ — TOTAL $ — $ — $ — $ — $ 79,000 $ B. PROJECT FINANCING Sales Tax Fund (20%) $ 79,000 $ — $ — TOTAL $ — $ — $ — $ — $ 79,000 $ — PROJECT DESCRIPTION This project provides for replacing the cloth "clouds"that hang over the pre-function area on the east side of the building and in the River Room. JUSTIFICATION The clouds were last replaced in 2013. By FY 22 they will be nine years old and will be discolored, cloth beginning to fail due to UV light and need to be updated. The style may be changed to something new and rehung. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goals 7.3 Encourage the development and maintenance of riverfront facilities and 10.1 Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 129 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Exhibit Hall Concrete DEPARTMENT: 33 TOTAL Conference Center Renovation PROJECT FD/CIP NO: 350- COST $ 24,000 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS Professional Services $ 24,000 $ — $ — TOTAL $ — $ — $ — $ — $ 24,000 $ B. PROJECT FINANCING Sales Tax Fund (20%) $ 24,000 $ — $ — TOTAL $ — $ — $ — $ — $ 24,000 $ — PROJECT DESCRIPTION This project provides for fixing all cracks and grinding concrete in exhibit hall then applying a reflector enhancer epoxy. JUSTIFICATION The concrete section of the Exhibit Hall floor is in need of renovation. It takes a lot of abuse as the staging area and entrance from machinery into the Exhibit Hall. The concrete floor has cracks to fix and would be resealed with a reflector enhancer epoxy. This area is also up next to the concession stand thus is used by the public and for events in the Hall. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten:To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Regional Economy. 130 DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C Leisure Services/ General Government Grand River Center- Replace Interior DEPARTMENT: 55 TOTAL Conference Center Digital Signs PROJECT FD/CIP NO: 350- COST $ 71,700 2016 2017 ACTUAL AMENDED BEYOND EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022 A. EXPENDITURE ITEMS Equipment $ 71,700 $ — $ — TOTAL $ — $ — $ — $ — $ 71,700 $ B. PROJECT FINANCING $ — Sales Tax Fund (20%) $ 71,700 $ — $ — TOTAL $ — $ — $ — $ — $ 71,700 $ — PROJECT DESCRIPTION This project provides for replacing twenty-five 12"and ten 15" room monitors. JUSTIFICATION The current monitors were purchased in 2015 and has a life of 7 years. The monitors welcome groups and show which group is in which room. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Goal Ten:To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principles of Regional Economy and Community Knowledge. 131 Conference Center 31- This page intentionally left blank. -32- GRAND RIVER CONFERENCE CENTER FY 2016 FY 2017 FY 2018 % Change From Budget Highlights Actual Budget Requested FY 2017 Budget Expenses Supplies and Services 274,098 383,301 357,129 -6.8% Machinery and Equipment 14,000 0.0% Total Expenses 274,098 383,301 371,129 -3.2% Debt on Projects paid with Sales Tax Fund (20%) 5,840 5,719 9,890 72.9% Property Tax Support 274,098 383,301 371,129 (12,172) Percent Increase (Decrease) -3.2% Improvement Package Summary 1 of 2 This improvement package would provide funding for 15 security cameras to be placed inside and outside the Grand River Center (GRC). Currently GRC has cameras on the loading dock and an internal system for the employee service area back of house. The safety and security of the many citizens and visitors to the Grand River Center is of utmost importance. No security monitoring system is in place for all the public areas as well as entrances and exits to the building. The City Council has a high priority goal of surveillance camera funding under their Social/Cultural Vibrancy five-year goal. There will be a recurring cost of approximately $4,100 a year for the maintenance contract on the cameras starting in FY 2018. The first year is included in the purchase price. Related Cost: $ 70,000 Tax Funds Non-Recurring Recommend - No Related Cost: $ 4,100 Tax Funds Recurring Total Cost: $ 74,100 Property Tax Impact: $ 0.0312 0.29% Activity: Conference Center 2 of 2 This decision package provides for the purchase of a rotary ironing press for GRC linens. The Center does not have an iron, thus linens laundered at GRC are used on tables unpressed with many wrinkles. Related Cost: $ 13,500 Tax Funds Non-Recurring Recommend - No Property Tax Impact: $ 0.0057 0.05% Activity: Conference Center Significant Line Items Supplies & Services 1. Platinum Hospitality privately manages the Grand River Center. The following expenses are the responsibility of the City based on the Facility Management Agreement: -33- 50% of energy costs (gas and electric) are estimated to be $178,839 in FY 2017 and are projected to be $158,157 in FY 2018. y Insurance costs (property and general liability) are estimated to be $31,314 in FY 2017 and are projected to be $26,446 in FY 2018. Data Processing Maintenance Contracts is estimated to be $10,500 in FY 2017 and are projected to be $10,710 in FY 2018 and represents the associated costs computer network support and server maintenance. y During FY 2013 an agreement was renegotiated to require a payment of 25% instead of 50% of the actual Hotel/Motel Tax generated by the Grand Harbor Hotel. Payments and budget are as follows: FY 2015 - $87,342 FY 2016 - $88,101 FY 2017 - $88,216 (Budgeted) FY 2018 - $89,616 (Projected) 2. The City is responsible for repairs and maintenance in excess of$1,000 individually and $15,000 in aggregate in any fiscal year. As per the new Management Agreement the limit and aggregate will increase by the CPI as of July 1, 2015. The first years increase resulted in a change so that the City is now responsible for repairs and maintenance in excess of$1,014 individually and $15,239 in aggregate for the fiscal year. Historical actual maintenance costs have been as follows: FY 2015 - $36,368 FY 2016 - $86,869 FY 2017 - $70,000 (Budgeted) FY 2018 - $71,400 (Projected) Equipment 3. The following equipment will be replaced in FY 2018: HVAC Computer $ 2,175 Copier $ 11,000 Security Camera (2 - Back Dock) $ 3,000 Total Equipment Replacements $ 14,000 Debt Service 4. FY 2018 Debt Service is as follows: FY18 Payment Final Call Debt Debt Series Source Purpose Paymen Date Service Conference Center t $ 9,890 2012D G.O. Sales Tax 20% Improvements 2027 2019 $ 9,890 Total FY18 Conference Center Debt Service For Conference Center Performance Measures see Five Flags Civic Center Outline -34- Recommended Operating Revenue Budget - Department Total 33 -CONF CENTER OPERATION FY15 Actual FY16 Actual FY17 Adopted FY18 Recomm'd Fund Account Account Title Revenue Revenue Budget Budget 100 43235 PLATINUM HOLDINGS LEASE 69,089 69,842 72,332 72,219 43-USE OF MONEY AND PROPERTY 69,089 69,842 72,332 72,219 400 59350 FR SALES TAX CONSTRUCTION 5,940 5,840 5,719 9,890 59-TRANSFER IN AND INTERNAL 5,940 5,840 5,719 9,890 33-CONF CENTER OPERATION TOTAL 75,029 75,682 78,051 82,109 -35- Recommended Operating Expenditure Budget - Department Total 33 -CONF CENTER OPERATION FY15 Actual FY16 Actual FY17 Adopted FY 18 Recomm'd Fund Account Account Title Expense Expense Budget Budget 100 62061 DP EQUIP.MAINT CONTRACTS 0 0 10,500 10,710 100 62206 PROPERTY INSURANCE 29,078 29,252 30,363 25,488 100 62207 BOILER INSURANCE 4,210 4,432 4,432 0 100 62208 GENERAL LIABILITY INSURAN 1,072 957 951 958 100 62411 UTILITYEXP-ELECTRICITY122,857 124,251 132,685 129,221 100 62412 UTILITYEXP-GAS48,831 26,306 46,154 28,936 100 62431 PROPERTY MAINTENANCE 0 0 70,000 71,400 100 62664 LICENSE/PERMIT FEES 400 800 0 800 100 62761 PAY TO OTHER AGENCY 87,342 88,101 88,216 89,616 62-SUPPLIES AND SERVICES 293,790 274,099 383,301 357,129 100 71116 COPIER MACHINE 0 0 0 11,000 100 72417 CAMERA RELATED EQUIPMENT 0 0 0 3,000 71-EQUIPMENT 0 0 0 14,000 400 74111 PRINCIPAL PAYMENT 4,300 4,300 4,300 8,600 400 74112 INTEREST PAYMENT 1,640 1,540 1,419 1,290 74-DEBT SERVICE 5,940 5,840 5,719 9,890 33-CONF CENTER OPERATION TOTAL 299,730 I 279,939 389,020 I 381,019 -36- Recommended Expenditure Budget Report by Activity & Funding Source 33-CONF CENTER OPERATION 111 111 CONF CENTER OPERATIONS -33300 FUNDING SOURCE:GENERAL Account FY16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget EQUIPMENT 0 0 14,000 SUPPLIES AND SERVICES 274,098 383,301 357,129 ONF CENTER OPERATIONS 274,098 383,301 DEBT SERVICE FUNDING SOURCE:DEBT SERVICE Account FY16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget DEBT SERVICE 5,840 5,719 9,890 .111 DEBT SERVICE 5,840 5,719 9,890 CONF CENTER OPERATION TOTAL $279,938.43 $389,020.00 $381,019.00 -37- Capital Improvement Projects by Department/Division CONE CENTER OPERATION CIP FY 15 Actual FY 16 Actual FY 17 Adopted FY 18 Recomm'd Number Capital Improvement Project Title Expense Expense Budget Budget 1022113 GRC-REPLACE CARPET 0 0 200,000 0 1022389 GRC-UPGRDE AV EQUIP 0 0 6,000 0 1022521 HVAC HANDLING UNITS 12,946 0 0 0 1022522 BOOKDROP 16,078 0 0 0 1022523 LIBRARY SANITARY LINE 9,891 0 0 0 1022588 GRC KITCHEN EQUIPMENT 0 29,437 0 0 1022589 GRC PAINT BRIDGE 0 0 0 0 1022651 GRC REPLC ELECTR FLR BOX 0 0 33,000 0 3002710 EXTERIOR DECORATIVE CONCR 0 0 0 100,000 3501516 GRC PARKING LOT REPAIRS 0 0 0 55,000 3501598 GRAND RIVER CTR MAINTENAN 36,368 65,321 0 0 3501990 GRAND RIVER CTR CHAIRS 0 0 52,700 0 3501993 GRAND RIVER CTR PAINT ENT 0 0 100,000 0 3502112 GRC-FABRIC WALL COVERING 0 0 0 0 3502113 GRC-REPLACE CARPET 0 0 0 0 3502391 GRC-PAINT OFFICE 0 0 15,000 15,000 3502519 GRC TECH REPLC SUPPORT 55,558 21,380 25,000 0 3502520 GRC MAIN EQUIP RPLC 0 6,305 26,000 0 3502590 GRC ENERGY EFFICIENCY IMP 0 0 20,000 10,000 3502591 GRC LANDSCAPE IMPROVEMENT 0 0 0 0 3502649 GRC REPLACE PATIO CAULK 0 0 20,000 0 3502650 GRC PORTABLE BAR REPLACEM 0 0 15,000 15,000 ONF CENTER OPERATION TOTAL 130,841 IIIII -38- PROGRAM/ DEPT PROJECT DESCRIPTION FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 TOTAL PAGE CONFERENCE CENTER General Government Energy Efficiency Improvements $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 50,000 113 Paint Interior Rooms and Areas $ 15,000 $ 15,000 $ - $ - $ - $ 30,000 114 Portable Bar Replacement $ 15,000 $ - $ - $ - $ - $ 15,000 115 North Parking Lot Pavement Repair $ 55,000 $ - $ - $ - $ - $ 55,000 116 Replace Decorative Concrete $100,000 $ - $ - $ - $ - $ 100,000 117 Replace Carpet $ - $100,000 $150,000 $ - $ - $ 250,000 118 Replace Electric Floor Boxes $ - $ 33,000 $ - $ - $ - $ 33,000 119 Maintenance Equipment Replacement $ - $ 32,000 $ - $ - $ 17,500 $ 49,500 120 Upgrade AV Equipment $ - $ 90,000 $ - $ 10,000 $ - $ 100,000 121 Replace Fabric Wall Covering $ - $ 35,000 $ - $ - $ - $ 35,000 122 Reupholster Furniture $ - $ 27,500 $ - $ - $ - $ 27,500 123 Replace Sink Light Fixture $ - $ 22,000 $ - $ - $ - $ 22,000 124 Technology Upgrades $ - $ 59,000 $ - $ - $ - $ 59,000 125 Landscape Renovation $ - $ - $ 15,000 $ - $ - $ 15,000 126 Kitchen Equipment Replacement/ Rebuild $ - $ - $ - $ 50,000 $ - $ 50,000 127 Market Study and Facility Assessment $ - $ - $ - $ - $ 65,000 $ 65,000 128 Replace Clouds $ - $ - $ - $ - $ 79,000 $ 79,000 129 Exhibit Hall Concrete Renovation $ - $ - $ - $ - $ 24,000 $ 24,000 130 Replace Digital Indoor Signs $ - $ - $ - $ - $ 71,700 $ 71,700 131 Total- Conference Center $195,000 $423,500 $175,000 $ 70,000 $267,200 -39- This page intentionally left blank. -40- GRAND RIVER CENTER FY 2018 INFRASTRUCTURE AND AMENITIES SUPPORTING ECONOMIC DEVELOPMENT, TOURISM AND GROWTH •$9.7 million economic impact •Approx $175 per out of town guest (2015 CVB calculations) •184,983 Guests (55,500 out of town) •155 corporate bookings, 214 local corporate bookings, 18 state associations, 5 national associations, 11 regional associations HOW IS GRAND RIVER CENTER MAINTAINED? Grand River Center building •Owned by the City of Dubuque •Capital improvements of the building and grounds responsibility of the City HOW IS GRAND RIVER CENTER MANAGED ? Day to Day Operations •Management Agreement with Platinum Hospitality •Oversight provided by Leisure Services WHO PAYS FOR WHAT? CITY General Building Repairs and Maintenance -$71,400 annually •City is responsible for items in excess of $1,014 individually and $15,239 in aggregate in any fiscal year 25% actual hotel/motel tax generated by Grand Harbor Resort Property, boiler, and general liability insurance 50% gas and electric Capital improvement projects WHO PAYS FOR WHAT? PLATINUM HOSPITALITY •All other general building repairs and maintenance •All remaining operating expenses INVESTMENT UPGRADES IN 2016 •New carpeting spine and pre-function as well as outside the meeting rooms, ballroom, and the river room •Painting areas of spine and pre-function FY 18 CAPITAL IMPROVEMENT PROJECTS Exterior Decorative Concrete Repairs $ 100,000 North Parking Lot Repairs $ 55,000 Paint Interior Rooms $ 15,000 Energy Efficiency Improvements $ 10,000 Portable Bar Replacement $ 15,000 QUESTIONS?