Water Department Fiscal Year 2018 Budget Presentation Copyright 2014
City of Dubuque Public Hearings # 1.
ITEM TITLE: Water Department Fiscal Year 2018 Budget Presentation
SUMMARY:
SUGGESTED DISPOSITION:
ATTACHMENTS:
Description Type
Recommended FY18 Water CIP Supporting Documentation
Recommended FY18 Water OP Supporting Documentation
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Water Storage Tank Coating Program DEPARTMENT: 42 TOTAL
PROJECT
FD/CIP NO: 740-2656 COST
$ 333,500
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 88,500 Consultant Services $ 45,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
$ — $ 88,500 TOTAL $ 45,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
B. PROJECT FINANCING
$ 88,500 Water Construction Fund $ 45,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
88
$ — $ ,500 TOTAL $ 45,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
PROJECT DESCRIPTION
This project provides the funding to clean, spot prime and paint the interior and exterior of the Water Storage Tanks. Painting of water tanks is a cyclical program,
coatings can last 20-25 years. A study was conducted in 2010 by KLM Engineering. the results from this study supports the need to proceed with this program as
identified. Tanks to be addressed are: Pennsylvania (2018 - 2019), Park Hill (2020 - 2021), College (2022 -2023) and Eagle Point (2024- 2025).
JUSTIFICATION
Painting of the tanks is required to maintain the tank structure as well as add to the aesthetics of the tank.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply, 1.2) Support cost-effective delivery of water and 1.3) Support a safe water supply that meets all
local, state, and federal water quality standards and Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties,
objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and properties.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Clean Water, Smart Resource Use and Community Health &Safety.
136
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Water Main Relocation for Sanitary Sewer DEPARTMENT: 42 TOTAL
Manhole Replacement/Rehabilitation PROJECT
Project FD/CIP NO: 740-2596 COST
$ 175,512
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 418 $ 70,094 Construction $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 25,000 $ 25,000
$ 418 $ 70,094 TOTAL $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 25,000 $ 25,000
B. PROJECT FINANCING
$ 418 $ 70,094 Water Construction Fund $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 25,000 $ 25,000
$ 418 $ 70,094 TOTAL $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 25,000 $ 25,000
PROJECT DESCRIPTION
This project provides for the scheduled replacement/rehabilitation of old sanitary sewer manholes to relocate water mains. This fund covers the cost of material
and labor for the relocation of water mains currently located with in sewer manholes.
JUSTIFICATION
Under the City's current Engineering program of sanitary sewer inspection and maintenance, manholes that are in need of repair or replacement are noted. This
project provides the funding for such repair/replacement of water mains as these manholes are located.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply and 1.2) Support cost-effective delivery of water.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Regional Economy, Smart Resource Use, Clean Water and Community Health &Safety.
137
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Creek Crossing Restoration DEPARTMENT: 42 TOTAL
PROJECT
FD/CIP NO: 740-2595 COST
$ 319,656
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 978 $ 22,764 Design & Engineering $ 11,000 $ 11,000 $ 11,000 $ 11,000 $ 11,000
$ 70,914 Construction $ 34,000 $ 34,000 $ 34,000 $ 34,000 $ 34,000
$ 978 $ 93,678 TOTAL $ 45,000 $ 45,000 $ 45,000 $ 45,000 $ 45,000 $
B. PROJECT FINANCING
$ 978 $ 93,678 Water Construction Fund $ 45,000 $ 45,000 $ 45,000 $ 45,000 $ 45,000
$ 978 $ 93,678 TOTAL $ 45,000 $ 45,000 $ 45,000 $ 45,000 $ 45,000 $ -
PROJECT DESCRIPTION
This project provides the funding for the repairs of various water main crossings of drainage ways in the city's water distribution system.
JUSTIFICATION
During the past several years with normal and heavy rains, the systems water way crossing covers have deteriorated. This project is a proactive maintenance
approach to restore these crossings back to functional levels for future protection.
Cost Estimate Project Name Cost Estimate Project Name Cost Estimate Project Name
$ 2,330 Pennsylvania Ave $ 13,200 Northwest Arterial (East) $ 5,300 Samantha Dr. to Holiday Dr.
$ 4,500 Seipple Rd. $ 15,900 Fremont Ave. $ 6,500 Carter Rd. 950' south of 32nd St.
$ 33,120 Cousins Rd. $ 19,000 Old Mill Rd. $ 26,900 Carter Rd. at 32nd
$ 9,500 Radford Rd. $ 9,680 Southern Ave. $ 1,875 32nd at Ski Slope
$ 22,324 Northwest Arterial (West) $ 2,290 Rockdale at Brian $ 1,875 Louella Lane
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply and 1.2) Support cost-effective delivery of water.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Regional Economy, Smart Resource Use, Clean Water and Community Health &Safety.
138
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Water Main Upgrades during Street DEPARTMENT: 42 TOTAL
General Repairs PROJECT
FD/CIP NO: 740-2657 COST
$ 175,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 2,500 Design & Engineering $ 2,500 $ 3,500 $ 3,500 $ 4,000 $ 4,000 $ 5,000
$ 17,500 Construction $ 22,500 $ 26,500 $ 26,500 $ 31,000 $ 31,000 $ 35,000
$ - $ 20,000 TOTAL $ 25,000 $ 30,000 $ 30,000 $ 35,000 $ 35,000 $ 40,000
B. PROJECT FINANCING
$ 20,000 Water Construction Fund $ 25,000 $ 30,000 $ 30,000 $ 35,000 $ 35,000 $ 40,000
$ - $ 20,000 TOTAL $ 25,000 $ 30,000 $ 30,000 $ 35,000 $ 35,000 $ 40,000
PROJECT DESCRIPTION
This project provides funding to support City Engineering's program of design and construction for general street construction related improvements.
JUSTIFICATION
In prior years, the City had an annual capital improvement budget that would collectively fund all construction related improvements and the 5-Year Annual Street
Construction Program. This policy has been changed and now the Annual Street Construction Program is budgeted as individual CIP's. As a result, an annual
program is needed to provide a funding mechanism to allow for the design and construction for general street construction repairs and related improvements as
miscellaneous projects develop that may include water main related goods to be upgraded or adjusted. The Engineering Department routinely work on
miscellaneous repair projects that occur, require a quick response and that are both unexpected and not budgeted. This annual program will provide a funding
source to cover design and construction costs for those unanticipated small repair projects.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.1) Support the ongoing street reconstruction, rehabilitation, and maintenance overlay programs, ensuring the timely
maintenance, repair and reconstruction of the city's streets and bridges and Transportation Goal One: To provide, maintain and improve safe and efficient
movement on the City's street system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and
reconstruction of the City street system and 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting,
street layout, speed limits, street signage, street pavement striping, and traffic signals.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility
139
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Maintenance of Public Water Mains during DEPARTMENT: 42 TOTAL
Stone Retaining Wall Repair PROJECT
FD/CIP NO: 740-2655 COST
$ 120,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 2,000 Design & Engineering $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000
$ 18,000 Construction $ 18,000 $ 18,000 $ 18,000 $ 18,000 $ 18,000 $ 18,000
$ - $ 20,000 TOTAL $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
B. PROJECT FINANCING
$ 20,000 Water Construction Fund $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
$ - $ 20,000 TOTAL $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
PROJECT DESCRIPTION
This annual funding provides for maintenance and repair of existing water utilities behind retaining walls that are owned by or are the responsibility of the City of
Dubuque in various locations throughout the City. Many times the public utilities behind these retaining walls need to be replaced or supported during the retaining
wall repair. This annual program will allow for maintenance, repair and reconstruction of city owned retaining walls as needed. Based on the recommendation of
the City's Legal Department, there are a significant number of private property owner retaining walls which are adjacent to City right-of-way in which a mutual
benefit could be establish through litigation, as a result, the annual funding for retaining wall maintenance, repair and reconstruction of water utilities has been
increased to address this potential liable cost to the City.
JUSTIFICATION
This annual program would provide for proactive maintenance, reconstruction and emergency repairs to city owned retaining walls that included public water main
(s).
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities and Transportation Goal One: To provide, maintain and improve safe and efficient movement on the
City's street system, objective 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the
City street system.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Community Design and Clean Water.
140
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Fire Hydrant Assembly Relocation/ DEPARTMENT: 42 TOTAL
Replacement for the Sidewalk Program PROJECT
FD/CIP NO: 740-2654 COST
$ 96,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 12,000 Construction $ 12,000 $ 12,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
$ — $ 12,000 TOTAL $ 12,000 $ 12,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
B. PROJECT FINANCING
$ 12,000 Water Construction Fund $ 12,000 $ 12,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
$ — $ 12,000 TOTAL $ 12,000 $ 12,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
PROJECT DESCRIPTION
This project provides for two (2) fire hydrant assemblies to be relocated/replaced per year in support of City Engineering's replacement of curbs and catch basins
related to the sidewalk inspection and replacement program
JUSTIFICATION
Replacement of sidewalks, particularly those abutting the curb line or an intersection, frequently requires replacement of curbs and catch basins. It is anticipated
in future years this program will increase with the installation of curb ramps with detectable warnings required by the Americans with Disabilities Act (ADA).
Without funding for replacement of the curbs and catch basins, the program is restricted or delayed until funding can be secured. With funding earmarked for curb
and catch basin replacement, the program can move forward on an established schedule. With an increase in curb and catch basin inspections at time of sidewalk
inspections, additional curb and catch basins are identified for replacement, especially if the street is to be overlaid in the near future. The anticipated cost for curb
and catch basin repairs has been increasing over the past few years and is anticipated to continue when the ramps needing walls, foundations, railings, and
special designs are addressed.
RELATIONSHIP TO OTHER PROJECTS
This project is tied to the City's annual sidewalk inspection program. Curb replacements are also funded in the operating and capital budgets of the Operations
and Maintenance Department. This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective,
safe and functional surface transportation system, objective 4.1) Support the ongoing street reconstruction, rehabilitation, and maintenance overlay programs,
ensuring the timely maintenance, repair and reconstruction of the city's streets and bridges and Goal Five: To provide for, maintain and improve safe, accessible
public sidewalks and steps throughout the community, where possible, objective 5.1) Support maintaining and improving the condition of public sidewalks, steps,
walks, and handrails.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Clean Water.
141
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Water Main Replacements - Streets DEPARTMENT: 42 TOTAL
PROJECT
FD/CIP NO: 740-1405 COST
$ 5,022,677
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 9,248 $ 63,900 Design & Engineering $ 20,000 $ 386,300
$ 2,079 $ 497,500 Construction $ 180,000 $ 3,863,650
$ 11,327 $ 561,400 TOTAL $ — $ — $ 200,000 $ — $ — $ 4,249,950
B. PROJECT FINANCING
$ 11,327 $ 561,400 Water Construction Fund $ 200,000 $ 4,249,950
$ 11,327 $ 561,400 TOTAL $ — $ — $ 200,000 $ — $ — $ 4,249,950
PROJECT DESCRIPTION
This project provides for an ongoing annual water main replacement associated with the city street improvement program.
JUSTIFICATION
We have evaluated the integrity of water mains for the street improvement programs. Many sections of water mains, valves and hydrants have lost their integrity
due to corrosion and weathering process. We will replace and repair these sections as part of the Street Improvement Program. This will ensure that the water
system functions properly under the new concrete pavement and streets rescheduled to have an asphalt overlay. Funding for future water main replacement
projects will be evaluated annually and in conjunction with street improvement projects city-wide. When the Street Improvement Program enters into the Keyway
area behind ARC (formally Econofoods), we will need to replace many of the water mains due to the hot soil conditions in this area.
142
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C TOTAL
Water Department Business Type Water Main Replacements- Streets DEPARTMENT: 42 PROJECT
FD/CIP NO: 740-1405 COST
$ 5,022,677
BEYOND
2017-18 2018-19 2019-20 2020-21 2021-22 2022
Custer to Auburn (Sanitary Pro ect $ 165,000
8th Street Central -Washington)
Cummins Street Loras College Wall $ 72 000
14th Street(Maple- Sycamore) $ 75,000
5th Street(White- Blu $ 265 000
11th Street Resurf White-Alley) $ 50,000
Central Ave Resurf 9th -21 st $ 200,000
Cedar Cross Road Reconstruction $ 285,000
16th Street(Bridge- Sycamore) $ 125,000
Chavenelle Rehab NWA- Radford $ 100,000
Bennet Algona to N Grandview $ 170,000
Bies (Pennsylvania- Century) $ 150,000
Sylvan (Pennsylvania-Century) $ 195,000
14th Street(White- Elm $ 98,000
7th St at Hill St Intersection $ 65,000
Asbury /Clarke Dr to JFK $ 675,000
Asbury/St. Ambrose to Clarke Dr $ 200 000
Asbury/University Intersection $ 40,000
Asbury/University to St. Ambrose $ 150,000
Century Drive $ 110,000
Century, Bies to End $ 180,000
E 7th St Central to Peavee $ 305 650
E 7th St Peavee to RR Bride $ 170,000
Hill St Mix Master $ 88,000
W 17th Cox to Clark 130,000
$ — $ — $ 200,0001$ — $ — $ 3,863,650
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply and 1.2) Support cost-effective delivery of water.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Regional Economy, Smart Resource Use, Clean Water and Community Health & Safety.
143
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Southwest Arterial Water Main Extension DEPARTMENT: 42 TOTAL
PROJECT
FD/CIP NO: 740-2594 COST
360-2594 $ 6,805,880
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 431,561 $ 354,947 Design & Engineering $ 120,000 $ 110,000 $ 1,100,580
$ 50,000 Land and R.O.W. $ 250,000
$ 27,357 $ 4,182,015 Construction $ 650,000 $ 630,000 $ 9,674,420
$ 458,918 $ 4,586,962 TOTAL $ 250,000 $ — $ 770,000 $ 740,000 $ — $10,775,000
B. PROJECT FINANCING
$ 458,918 $ 3,833,962 Water Construction Fund $ 250,000 $ 770,000 $ 740,000 $10,775,000
$ 753,000 Housing TIF
$ 458,918 1 7 4,586,962 TOTAL r-250,000 $ — $ 770,000 $ 740,000 $ — $10,775,000
PROJECT DESCRIPTION
This project provides for the funding to provide water service to the Southwest Arterial corridor.
JUSTIFICATION
Water service is necessary to promote growth along the Southwest Arterial corridor.
144
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Southwest Arterial Water Main DEPARTMENT: 42 TOTAL
Extension PROJECT
FD/CIP NO: 740-2594 COST
360-2594 $ 6,805,880
BEYOND
2017-18 2018-19 2019-20 2020-21 2021-22 2022
South West Arterial Utility Easement $ 250,000
From N.Cascade Road to English Mill pump station $ 1,305,000
South West Arterial 12"water main (4th pressure zone)from $ 978,750
South West Arterial 16"water main (4th pressure zone)from $ 740,000
Lake Eleanor Road Water Main Loop Connection $ 115,000
Military Road 16"water main (from Key West Drive to S.W.Arterial) $ 345,000
HWY 151/61 off ramp to Olde Davenport Road 12"water main $ 295,000
South West Arterial 16"water main (from N.Cascade Road to HWY
151/61) $ 3,375,000
Key West Water Tower- 1.5 million gallons(3rd pressure zone) $ 4,300,000
Hwy 20 to Southwest Arterial Roundabout $ 770,000
English Mill Pump Station $ 1,200,000
English Mill Road 16"WP from S.W.Arterial to Crescent Ridge $ 1,900,000
$ 250,000 $ — $ 770,000 $ 740,000 $ — $ 13,813,750
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply and 1.2) Support cost-effective delivery of water.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Regional Economy, Smart Resource Use, Clean Water and Community Health &Safety.
145
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Vacuum Filter Plant Process Upgrade DEPARTMENT: 42 TOTAL
PROJECT
FD/CIP NO: 740-2030 COST
$ 230,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 30,000
Construction $ — $ 200,000
$ — $ — TOTAL $ 30,000 $ — $ 200,000 $ — $ — $
B. PROJECT FINANCING
Water Construction Fund $ 30,000 $ 200,000
$ — $ — TOTAL $ 30,000 $ — $ 200,000 $ — $ — $ —
PROJECT DESCRIPTION
This project provides funding for the upgrade of the Vacuum Filter Plant Process.
JUSTIFICATION
The Vacuum Filter Plant is in need of process upgrades. An engineering study should be done to determine scope cost of this project.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.2) Support cost-effective delivery of water, 1.3) Support a safe water supply that meets all local, state, and federal water quality
standards and 1.4) Support ongoing improvements to the water plant and facilities and Environmental Quality Goal Two: To promote conservation practices that
result in responsible use of non-renewable natural resources, objectives 2.2) Promote awareness and use of alternate, renewable resources, 2.3) Encourage
green building principles and 2.4) Promote programs to improve energy efficiency, Goal Four: To protect and preserve existing water supplies and air quality and
ensure that future water and air quality is safeguarded, objective 4.6) Promote ground water protection and adequate water quality and quantity of our streams and
rivers by expanded infiltration, and Goal Five: To assure appropriate control, collection, disposal, and per capita reduction of stormwater, wastewater, solid wastes,
and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best management practices in the collection and
disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Clean Water and Community Health &Safety.
146
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Bridge Repairs/Maintenance of the Water DEPARTMENT: 42 TOTAL
Main Supply Line to City Island PROJECT
FD/CIP NO: 740-2713 COST
$ 30,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 10,000
Construction $ 20,000
$ — $ — TOTAL $ 30,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
Water Construction Fund $ 30,000
$ — $ — TOTAL $ 30,000 $ — $ — $ — $ — $ —
PROJECT DESCRIPTION
The City currently has 18 bridge structures under it's jurisdiction. This annual program provides for the biannual bridge inspection (a new Federal requirement),
bridge program management and periodic preventative maintenance and repairs to the various bridges throughout the City. The Bridge Repair and Maintenance
program includes painting, repair of spalled areas in the concrete deck, piers, wingwalls and barrier rail. Program funding is also used for the sealing of hairline
cracks to prevent deterioration of reinforcing steel, maintain and repair expansion joints, and the repairs to armoring stone at abutments, inlet and outlet structures
to prevent scour and undermining. During the inspection/repair work of the 16th Street bridge to City Island, we plan to have the 12"water main inspected and
maintenance work performed. This water main is currently supported from under the bridge deck with protected insulation and is the only water main that supplies
domestic and fire protection water to the Island.
JUSTIFICATION
The City's bridges are inspected every two years. The last inspection, dated August 2013, indicated that several of the City's bridges require minor repairs. As a
result of the new federal bridge inspection standards, the annual Bridge Repair and Maintenance program funding has been increased to allow for the preventative
maintenance and repairs to the various bridge structures throughout the City, as needed.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objectives 4.1) Support the ongoing street reconstruction, rehabilitation, and maintenance overlay programs, ensuring the timely
maintenance, repair and reconstruction of the city's streets and bridges and 4.5) Support extending the life and improve the quality of the city street system
through preventative maintenance programs and Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objective 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility
147
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Bulk CO2 Tank Replacement DEPARTMENT: 42 TOTAL
PROJECT
FD/CIP NO: 740-2714 COST
$ 75,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Equipment $ 75,000
$ — $ — TOTAL $ 75,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
Water Construction Fund $ 75,000
$ — $ — TOTAL $ 75,000 $
PROJECT DESCRIPTION
This project provides the funding to replace the bulk carbon dioxide tank and associated equipment
JUSTIFICATION
The carbon dioxide bulk tank and associated equipment is aged and is in need of replacement. The current tank is the original which dates back to the 1950s.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply, 1.2) Support cost-effective delivery of water and 1.3) Support a safe water supply that meets all
local, state, and federal water quality standards.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water and Community Health &Safety.
148
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type South end water main loop DEPARTMENT: 42 TOTAL
Rockdale Road - Manson Road PROJECT
FD/CIP NO: 740-2349 COST
$ 155,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 15,500
Construction $ 139,500
$ — $ — TOTAL $ 155,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
Water Construction Fund $ 155,000
$ — $ — TOTAL $ 155,000 $ — $ — $ — $ — $ —
PROJECT DESCRIPTION
Project consist of providing approx. 875 feet of 8" PVC water main from existing 8" water main located near Manson Road to the rear of the proposed South
Pointe subdivision. This water main will be installed with-in a public utility easement adjacent to proposed public sanitary sewer.
JUSTIFICATION
This project will create a second water main loop to the south end of town (Keywest area -Airport [6th] pressure zone) along with the development of the South
Pointe subdivision on Rockdale Road. Creating a water main loop from Mason Road to Rockdale Road through the South Pointe Subdivision.
RELATIONSHIP TO OTHER PROJECTS
This project supports the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply and 1.2) Support cost-effective delivery of water.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Regional Economy, Smart Resource Use, Principles of Clean Water and Community Health and Safety.
149
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type West Side Water System Connection to DEPARTMENT: 42 TOTAL
New Water Tower PROJECT
FD/CIP NO: 740-2703 COST
$ 4,396,500
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Construction $ 4,045,000
Design & Engineering $ 351,500
$ — $ — TOTAL $ 4,396,500 $ — $ — $ — $ — $
B. PROJECT FINANCING
State Revolving Fund Loan $ 4,396,500
$ — $ — TOTAL $ 4,396,500 $ — $ — $ — $ — $ —
PROJECT DESCRIPTION
Project consists of one pump station located at the corner of Stone Valley Drive and English Mill Road. Pump station will have the capabilities of converting 4th
pressure zone water into the new 7th pressure zone (West Side Water System) and future 3rd pressure zone to 4th pressure zone system. Approx. 5,600 feet of
12"water main along English Mill Road, Approx. 5,500 feet of 12"water main along North Cascade Road connecting too the West Side Water System and 5,600
feet of 12"water main along Highway 20 from North Cascade Road to near the existing ground storage reservoir.
Pump Station $ 1,050,000
English Mill Road water main $ 705,000
North Cascade Road water main $ 615,000
Water meter conversion $ 202,000
Fire hydrant installation $ 100,000
Well abandonment (1-deep) $ 30,000
SCADA system $ 35,000
Tower Gridbee Mixer $ 10,000
Building modification $ 8,000
Rock excavation $ 35,000
Engineering $ 241,600
Contingency $ 60,000
English Mill Road connection $ 40,000
Highway 20 water main $ 750,000
Water meter conversion $ 170,000
Fire hydrant installation $ 30,000
Well abandonment (2) $ 30,000
Ground storage tank demo $ 35,000
150
Utility easement(s) $ 20,000
Rock excavation $ 55,000
Engineering $ 109,900
Contingency $ 65,000
Sub-total $ 4,396,500
JUSTIFICATION
This project will support the agreement to supply water to the West Side Water System through a proposed pump station and distribution water mains. Expanding
the City water customer base in addition to providing a third water source from the 3rd pressure zone to the 4th pressure zone. Provides much benefit to the
southern end (West Industrial Park) of the 4th pressure zone as this pump station is adjacent too the West Industrial Park with the JFK Water Tower being over six
miles away.
RELATIONSHIP TO OTHER PROJECTS
This project supports the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply and 1.2) Support cost-effective delivery of water.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Regional Economy, Smart resource Use, Clean Water and Community Health and Safety.
151
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Water Main Replacements - Sewer DEPARTMENT: 42 TOTAL
Consent Decree PROJECT
FD/CIP NO: 740-2658 COST
$ 362,150
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 31,350 Design & Engineering $ 5,800 $ 76,200
$ 209,000 Construction $ 116,000 $ 825,000
$ — $ 240,350 TOTAL $ 121,800 $ — $ — $ — $ — $ 901,200
B. PROJECT FINANCING
$ 240,350 Water Construction Fund $ 121,800 $ 901,200
$ — $ 240,350 TOTAL $ 121,800 $ — $ — $ — $ — $ 901,200
PROJECT DESCRIPTION
This project provides for an ongoing annual water main replacement associated with the City sanitary sewer improvement and consent decree program
JUSTIFICATION
We have evaluated the integrity of water mains for the sanitary sewer and consent decree programs. Many sections of water mains, valves and hydrants have lost
their integrity due to corrosion and weathering process. We will replace and repair these sections as part of the sanitary sewer and consent decree Program. This
will ensure that the water system functions properly under the new concrete pavement and streets rescheduled to have an asphalt project overlay (not City public
works overlay program).
2017-18 2018-19 2019-20 2020-21 BEYOND 2021 BEYOND 2022
Heeb Street(Sanitary Pro ect $ 102,000
Loras Blvd. (Walnut to Prairie St. $ 45,000
Monroe Street S.S. Extension $ 65,000
Brunswick Street S.S. pro ect $ 65 000
Fairway Drive S.S. pro ect Bunkerhill $ 150,000
Southgate S.S. pro ect easement $ 78,000
King Street S.S. pro ect $ 105,000
Washington St. S.S. 24th to 25th pro ect $ 12,000
Hempstead St. S.S. pro ect $ 120,000
Grove Terrace S.S. pro ect $ 95 000
Marquette Place $ 104,000
Kauffmann Ave Elm to Kane St
Custer&Auburn 165,000
Total $ 116 000 $ — $ — $ — $ — $ 825,000
152
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply and 1.2) Support cost-effective delivery of water.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Community Design, Regional Economy, Smart Resource Use, Clean Water and Community Health & Safety
153
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type City Water Department Public Lead Line DEPARTMENT: 42 TOTAL
water main replacement PROJECT
FD/CIP NO: 740- COST
$ 234,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 4,600 $ 10,200 $ 6,500 $ 7,300
Construction $ 41,400 $ 39,800 $ 58,500 $ 65,700
$ — $ — TOTAL $ — $ 46,000 $ 50,000 $ 65,000 $ 73,000 $
B. PROJECT FINANCING
Water Construction Fund $ 46,000 $ 50,000 $ 65,000 $ 73,000
$ — $ — TOTAL $ — $ 46,000 $ 50,000 $ 65,000 $ 73,000 $ —
PROJECT DESCRIPTION
This project provides funding for the removal and replacement of the Water Departments existing public lead water mains. Scheduled in phases, Union Street FY
17-18, Austin Street FY 18-19, May Place FY 19-20 and Washington Street FY 20-21.
JUSTIFICATION
This project will eliminate the Water Department's public lead line water mains that were installed in the early 1920's. A phased proactive approach to upgrade the
water distribution system.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply, 1.2) Support cost-effective delivery of water, 1.3) Support a safe water supply that meets all local,
state and federal water quality standards, 1.4) Support ongoing improvements to the water distribution system.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water and Community Health and Safety.
154
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Tamarack Park Drive/Wood Gate Drive DEPARTMENT: 42 TOTAL
Frontage Road Water Main Extension PROJECT
FD/CIP NO: 740- COST
$ 550,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 79,000
Construction $ 321,000 $ 150,000 $ 515,000
$ — $ — TOTAL $ — $ — $ 400,000 $ 150,000 $ — $ 515,000
B. PROJECT FINANCING
Water Construction Fund $ 400,000 $ 150,000 $ 515,000
$ — $ — TOTAL $ — $ — $ 400,000 $ 150,000 $ — $ 515,000
PROJECT DESCRIPTION
Phase one (FY 17-18) includes the installation of a 16" diameter water main from near Elmwood Drive and Highway 151/61 intersection to north property line
(Tamarack Park Drive) for future connection with the South West Arterial water main and continuing south to the intersection of Tamarack Park Drive and Highway
151/61. Phase two (FY18-19) includes continuing the 12"diameter water main installation from the end of Phase one (Tamarack Park Drive and Highway 151/61)
to Wood Gate Drive.Installation of a 12"water main from Highway intersection to the south property line for future loop to support future growth and Airport
pressure zone.
JUSTIFICATION
This project will support the pre-annexation agreement of Tamarack Park development. Per agreement, water main is planned to be installed with in a two year
period of request or maximum of seven years from approved agreement and future development growth along the west side of Highway 151/61.
RELATIONSHIP TO OTHER PROJECTS
This water main project will support the South West Arterial water main in helping to create a water main loop distribution system from North Cascade Road to the
Key West Area with future support of a second feed to the Airport pressure zone.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Community Design, Regional Economy, Smart Resource use and Community Health &Safety.
155
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type 20"Transmission Main, 12" and 8"Water DEPARTMENT: 42 TOTAL
Main Relocation/Replacement/Extension PROJECT
FD/CIP NO: 740-2261 COST
$ 400,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 100,000
Construction $ 300,000
$ — $ — TOTAL $ — $ 400,000 $ — $ — $ — $
B. PROJECT FINANCING
Water Construction Fund $ 400,000
$ — $ — TOTAL $ — $ 400,000 $ — $ — $ — $ —
PROJECT DESCRIPTION
This project provides for the installation of a 20" main transmission line from 8th to 9th and 10th to 12th Streets. Improvements have been completed from 9th to
10th street, leaving 8th to 9th street and 10th to 12th to be completed. Valves and fire hydrants along with lead water service lines will be updated. Central Avenue
street improvements from 9th to 21 st are currently scheduled in FY 2018-29.
JUSTIFICATION
The existing city 20" main transmission line was installed in the 1880's and is currently located in the alley between Central Ave. and Iowa St. This main is the
single large transmission line providing service to the south and west ends of our city. With upcoming street repairs planned by the Department of Transportation
(DOT) for Central Ave., the best location and optimum flow design capacity will be on Central Ave. from 12th St. to 8th St.
RELATIONSHIP TO OTHER PROJECTS
This project supports the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply and 1.2) Support cost-effective delivery of water.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Clean Water and Community Health &Safety.
156
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type Raw Water Transmission Lines DEPARTMENT: 42 TOTAL
PROJECT
FD/CIP NO: 740-2528 COST
$ 75,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Construction $ 75,000
$ — $ — TOTAL $ — $ — $ 75,000 $ — $ — $
B. PROJECT FINANCING
Water Construction Fund $ 75,000
$ — $ — TOTAL $ — $ — $ 75,000 $ — $ — $ —
PROJECT DESCRIPTION
Raw water transmission lines accumulate iron and sediment and over time will become restricted and not allow water to flow freely. The raw water transmission
lines need to be cleaned or pigged to remove mineral accumulation and remove sediment. This project provides for an engineering study and services required to
clean the transmission lines from the shallow wellfield to the treatment plant.
JUSTIFICATION
A proactive raw water transmission line maintenance program will optimize well efficiency and improve water quality, lower daily, peak and lifetime power use.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal One: To provide, maintain and improve a cost-effective, functional and self-supporting water
utility system, objectives 1.1) Support an adequate water supply, 1.2) Support cost-effective delivery of water, 1.3) Support a safe water supply that meets all local,
state, and federal water quality standards, 1.4) Support ongoing improvements to the water plant and facilities and 1.5) Support ongoing improvements to the
water distribution system.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Smart Energy Use, Smart Resource Use, Clean Water and Community Health &Safety
157
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Water Department Business Type English Ridge Water Main DEPARTMENT: 42 TOTAL
PROJECT
FD/CIP NO: 360- COST
$ 330,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 82,500
Construction $ 247,500
$ — $ — TOTAL $ — $ — $ — $ — $ 330,000 $
B. PROJECT FINANCING
English Ridge Housing TIF $ 330,000
$ — $ — TOTAL $ — $ — $ — $ — $ 330,000 $ —
PROJECT DESCRIPTION
Project provides 12"diameter water main on the proposed frontage road from South West Arterial (round-about) to Stone Valley Drive..
JUSTIFICATION
English Mill Road TIFF project supports the creation of a water distribution looped system of domestic and fire protection water between the 3rd and 4th pressure
zones in support of the English Ridge Subdivision and South West Arterial development.
RELATIONSHIP TO OTHER PROJECTS
English Mill Road TIFF project will be phased with the construction of South West Arterial project.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Community Design, Regional Economy, Smart Resource Use, Clean Water and Community Health &Safety
158
Water Department
-1-
This page intentionally left blank.
_2_
WATER DEPARTMENT
FY 2016 FY 2017 FY 2018 % Change From
Budget Highlights Actual Budget Requested FY 2017 Budget
Expenses
Employee Expense 2,295,218 2,409,275 2,302,821 (4.4)%
Supplies and Services 2,217,827 2,467,222 2,466,500 — %
Machinery and Equipment 258,988 1,155,395 875,824 (24.2)%
Administrative Overhead Recharges 101 — 264,667 — %
Finance Utility Billing 156,437 174,607 170,662 (2.3)%
Payment in Lieu of Taxes 142,884 142,884 142,884 — %
Payment to Construction Fund 354,466 1,012,000 1,157,000 14.3 %
Debt Service 1,565,437 1,647,089 1,653,146 0.4 %
Total Expenses 6,991,358 9,008,472 9,033,504 0.3 %
Resources
Operating Revenue 8,906,782 9,009,007 9,296,823 3.2 %
Total Resources 8,906,782 9,009,007 9,296,823 3.2 %
Net Operating Surplus (Deficit) 1,915,424 535 263,319 262,784
Personnel -Authorized FTE 25.57 25.57 25.57
Water User Fee Rate Increase 10% 3% 3%
Revenue 1% Rate Increase Generates $ 76,776
Improvement Package Summary
1 of 4
This improvement package would provide funding for a full-time Water Distribution Field Inspector (GE-2913)
to increase the efficiency and quantity of the operation, documentation of water distribution piping system
from the field and projects being completed within the City. This position would be responsible for assisting
the Water Distribution Engineering Assistant, GIS Specialist and other staff with the documentation of the
City's operation, maintenance and construction of the water treatment plant, pump stations, tanks, towers,
wells and the water distribution network. This person would field inspect all water field activities both public
and private in accordance with Federal, State and local codes and ordinances. Produce as-built drawings of
new or replaced water assets in addition to the collection of GPS coordinates for input into the City's
Geographic Information System. As the city continues to grow and the water system becomes of age
creates a demand on staff time to focus on its growth and maintenance. This position will support the
proactive sustainable approach of being as effective and efficient with the operation in providing
uninterrupted service to the citizens, contractors, developers and engineering firms that are served. Non-
Recurring includes a smart phone ($375) and computer ($2,100).
Related Cost: $ 71,081 Water User Fees Recurring Recommend - No
Related Cost: $ 2,475 Water User Fees Non-Recurring
Total Cost: $ 73,556
Water Rate Impact: 0.96%
Activity: Water Distribution
-3-
2 of 4
This improvement package would provide funding for one additional mobile GIS laptop for the recently
purchased Water Meter Truck. Currently Water Distribution has five mobile GIS laptops permanently
mounted in the five Distribution work vehicles and NO mobile GIS laptops in both of our Water Meter
vehicles. This improvement package is a request for one additional mobile GIS laptop for the recently
purchased Water Meter Truck. This will provide the Meter staff with the same level of City computer data
and access as our Distribution staff. This will provide efficiency for staff to retrieve and enter data in the
City's geographic Information System (GIS), view water distribution maps, meter records and enter various
information into operations database, including Work Orders, Daily Activities and other activities. This is a
proactive sustainable approach of being as effective and efficient with the operation in providing
uninterrupted service to the citizens, contractors, developers and engineering firms that are served.
Related Cost: $ 5,500 Water User Fees Non-Recurring Recommend -Yes
Water Rate Impact: 0.07%
Activity: Water Meters
3 of 4
This improvement package would provide funding for the purchase of two tablets which will help Distribution
and Meter staff collect and enter data in to the City's Geographical Information System (GIS) directly from
the field. The tablets will assist in capturing GPS points of new and existing water fixtures, view water
distribution maps and enter various information into operations database, including Work Orders, Daily
Activities and other activities while in the field. In addition, the tablets allow office staff a access to the City
network while in the field. This is a proactive sustainable approach of being as effective and efficient with
the operation in providing uninterrupted service to the citizens, contractors, developers and engineering
firms that are served.
Related Cost: $ 2,080 Water User Fees Non-Recurring Recommend -Yes
Related Cost: $ 960 Water User Fees Recurring
Total Cost: $ 3,040
Water Rate Impact: 0.04%
Activity: Water Distribution
4 of 4
This improvement package would provide funding for the purchase of one new GPS unit with an external
antenna. This GPS unit will work wirelessly with the tablets for real time placement of water features in the
field while infrastructure is being installed. City Engineering has had much success with this exact same unit
over the last couple of years. This is a proactive sustainable approach of being as effective and efficient with
the operation in providing uninterrupted service to the citizens, contractors, developers and engineering
firms that are served.
Related Cost: $ 2,644 Water User Fees Non-Recurring Recommend -Yes
Water Rate Impact: 0.03%
Activity: Water Distribution
-4-
Significant Line Items
Employee Expense
1. FY 2018 employee expense reflects a 2.0% wage package increase.
2. The Iowa Public Employee Retirement System (I PERS) City contribution is unchanged at 8.93% and
the employee contribution is unchanged at 6.18% in FY 2018.
3. The City portion of health insurance expense is unchanged from $1,325 in FY 2017 to $1,325 in FY
2018 per month per contract.
4. Overtime unchanged from $90,040 in FY 2017 to $90,040 in FY 2018. FY 2016 Actual was $63,023.
5. Sick Leave Payout is increased from $7,039 in FY 2017 to $16,474 in FY 2018.
6. The Water Plant Manager position is frozen until June 30, 2018 with cost savings of$125,359 in FY
2018.
Supplies & Services
7. Property Insurance decreased from $87,871 in FY FY 2017 to $73,764 in FY 2018.A new insurance
contract was negotiated which decreased -16%.
8. Electricity Utility Expense increased from $563,243 in FY 2017 to $603,738 in FY 2018 based on FY
2016 Actual $580,517 and the addition of the Airport pump stations.
9. Sales Tax expense increased from$445,000 in FY 2017 to $476,890 in FY 2018 based on
unchanged water rates in FY 2018. This expense is directly offset by Sales Tax Revenue.
10. Machinery and Equipment Maintenance decreased from $132,368 in FY 2017 to $128,233 in FY
2018 based on FY 2017 less -3%.
11. Costs for Fluoride, Phosphate, Chlorine, Lime, and Polymer expense (water processing materials)
are projected to increased from $389,428 in FY 2017 to $396,900 in FY 2018 based on FY 2016
Actual $379,783 plus 5%.
12. Hauling Services increased from $139,699 in FY 2017 to $148,250 in FY 2018 based on FY 2016
Actual of$141,199 plus 5%. It is anticipated that the hauling contract for lime sludge will change.
13. Property Maintenance increased from $57,951 in FY 2017 to $73,088 in FY 2018. FY 2016 Actual
was $43,615. This line item has been increased to reflect the additional pump station buildings
constructed and other property that will require property maintenance.
14. Pipe Special Fittings increased from $50,000 in FY 2017 to $70,000 in FY 2018. In previous fiscal
years, the majority of pipe special fittings were coded to the water main replacement line item;
however in FY 2018 these expenses are now being recorded to the proper line item.
15. Valves is decreased from $66,000 in FY 2017 to $10,000 in FY 2018. FY 2016 Actual was $967.
16. Engineering Division Services decreased from $61,000 in FY 2017 to $0 in FY 2018 due to all
engineering charges being directly charged to Water capital projects.
-5-
17. Environment Testing/Monitoring increased from $30,811 in FY 2017 to $45,000 in FY 2018. FY 2016
Actual was $33,685. It is expected that there will be increased samples due to boil advisories and
chlorine monitoring
Machinery & Equipment
18. Equipment replacement items at the maintenance level include ($875,824):
Meters
Software $ 1,500
Large Water Meters $ 15,000
Plant Operation & Maintenance
3/4 Ton Extended Cab 4x4 Truck $ 42,000
Laboratory Equipment $ 3,500
Shop Equipment $ 1,000
Pumps $ 1,000
Smart Phone (3) $ 1,125
Water Distribution System
Hydrants $ 70,000
Emergency Radios $ 46,175
Shop Equipment $ 1,200
Barricades $ 1,000
Test Equipment $ 1,000
Smart Phone $ 800
One Ton Dump Truck $ 70,000
Software $ 500
Annual Maintenance Projects
Automatic Meter Reading System Maintenance $ 15,000
Pump Replace Vacuum Filter $ 20,000
Filter Maintenance Program $ 25,000
Generator Maintenance Program $ 18,000
Large Valve Replacement (2) $ 25,000
Internal Lines Loan $ 45,000
Water Main Replacements (Repair of 70 mains) $ 321,500
Large Water Meters $ 68,500
Water Valve Box Maintenance (Public Works) $ 20,000
Water Meter Testing $ 25,000
Well Maintenance Program $ 26,800
Recommended Improvement Packages $ 10,224
Total $ 875,824
-6-
Debt Service
19. Debt service reflects repayment to ($1,653,146):
Final Call
Amount Debt Series Source Purpose Payment Date
$ 62,558 SRF 2007A Water Fees Clear Wells 2028
$ 118,528 Revenue 2008D Water Fees Water Improvements 2023 2016
$ 218,280 SRF Series 2009 Water Fees Meter Change-Out 2031
$ 379,700 Revenue 2010D Water Fees Water Improvements 2030 2017
$ 111,119 G.O. 2011A Water Fees Water Improvements 2031 2018
$ 42,794 G.O. 2012E Water Fees Water Improvements 2032 2018
$ 127,250 G.O. 2012D Water Fees Water Improvements 2033 2019
$ 295,131 G.O. 20148 Water Fees Water Improvements 2032 2021
$ 45,888 G.O. 2016C Water Fees Water Improvements 2033 2024
$ 251,898 Planned SRF Water Fees CIWA Purchase/Imp 2036
$1,653,146 Total Water Debt Service
Revenue
20. Water User Fees increased from $8,023,216 in FY 2017 to $8,149,680 in FY 2018. Increase is
based on FY 2016 Actual of$7,677,554 plus the FY 2017 rate increase of 3% and the FY 2018
projected rate increase of 3%.
21. Flat Rates decreased from $23,581 in FY 2017 to $20,000 in FY 2018 based on FY 2016 Actual of
$20,685.
22. Fire Protection Rates increased from $134,101 in FY 2017 to $150,000 in FY 2018 based on FY
2016 Actual of$155,143.
23. Taps increased from $30,344 in FY 2017 to $33,000 in FY 2018. FY 2016 Actual was $42,056.
24. Tap Service increased from $17,221 in FY 2017 to $22,500 in FY 2018 based on FY 2016 Actual of
$36,260.
25. Connection Charge Front Footage is increased from $35,570 in FY 2017 to $49,435 in FY 2018. FY
2016 Actual was $75,905.
26. Backflow Prevention Administrative Fees increased from$61,026 in FY 2017 to $66,038 in FY 2018
based on FY 2016 Actual of$66,038. This is the $25 annual fee charged to all customers with a
backflow device.
27. Penalties increased from $80,109 in FY 2017 to $81,092 in FY 2018 based on FY 2016 Actual of
$81,581.
28. Tower Monthly Rental decreased from $91,621 in FY 2017 to $80,183 in FY 2018 based on FY 2016
Actual of$80,183.
29. Sales Tax Collected increased from $445,000 in FY 2017 to $476,890 in FY 2018 based on the rate
increase for water fees. This line item off-sets the sales tax expense.
-7-
This page intentionally left blank.
_g_
WATER DEPARTMENT
The Water Department ensures our community has high quality, safe, reliable and affordable
drinking water.
Water
Department
Plant Water
Administration Operations and Distribution Water Meters
Maintenance
SUCCESS IS ABOUT PLANNING, PARTNERSHIPS AND PEOPLE
LEADING TO OUTCOMES
PLANNING
The Water Department is engaged in
PEOPLE conscientious, strategic planning which
allows for maintaining compliance with the
Employees of the Water state and federal regulatory agencies in
Department are provided training order to provide the highest quality, safe
to ensure the maintenance of the and cost effective drinking water possible.
appropriate licenses required by
the Iowa Department of Natural
Resources. Other job-related
educational training is provided
to broaden employee skills and
increase productivity.
PARTNERSHIPS
The Water Department is involved in Community
Activities/Partnerships/ Outreach programs such as Water
Conservation Educational Program and the Smarter City Initiative.
The Water Department provides tours of its Eagle Point Treatment
Plant to local schools and organizations.
-9-
WATER DEPARTMENT
Resources and Property Tax Support
$8,906,782 $9,009,007 $9,296,823
$9,000,000
$8,000,000
$7,000,000
$6,000,000
$5,000,000
$4,000,000
$3,000,000
$2,000,000
$1,000,000
$0
Operating Revenue
FY 2016 FY 2017 111 FY 2018
The Water Department is supported by 25.57 full-time equivalent employees, which accounts for 25.49% of
the department expense as seen below. Overall, the department's expenses are expected to increase by
0.28% in FY 2018 compared to FY 2017.
Expenditures by Category by Fiscal Year
$3,000,000
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$0 m cn m D c n o
3C: -0 Q _ F o m
o _0 c 3 O N 0-
o C/)
CD F 3 O 00 2 m
r EDO �.
Q S 3 (D
(p N N C
(3p Q
N �.
(D
Cn
FY 2016 FY 2017 FY 2018
-10-
WATER DEPARTMENT
Administration
Overview
The Dubuque Water Department is dedicated to producing and delivering drinking water that is in
compliance with all state and federal drinking water standards. We continually strive to adopt new
and better methods of delivering the best quality drinking water to the citizens of Dubuque in the
most cost-effective manner.
Water Department Administration is responsible for the preparation of operating and capital
budgets, analysis of rate structure, interacting with the state and federal regulatory agencies,
evaluation and coordination of treatment facility operations and the water distribution system
functions.
Water Administration Funding Summary
FY 2016 Actual FY 2017 Budget FY 2018 Requested
Expenditures $2,282,583 $2,426,667 $2,417,082
Resources $— $— $—
Water Administration Position Summary
FY 2018
Water Department Manager 1.00
Secretary 0.50
GIS Specialist 1.00
Total FT Equivalent Employees 2.50
Highlights of Fiscal Year 2016
j.
Airport Water Main Extension- 19,981 feet(3.8 miles)of varying sizes of water main pipe
including fire hydrants, valves, two pump stations and a 500,000 gallon reservoir
-11-
WATER DEPARTMENT
Future Initiatives
• Maintain appropriate staffing levels to ensure proper functioning of utility
• Provide industry related training to maintain licensing and expand the skill set of Water
Department employees
• Utility extensions to support areas of future growth
verrormance Measures
Code Compliance -Activity Statement
Provide management, administrative and public information services to internal and external customers while
ensuring the efficient daily operation of the Dubuque Fire Department.
""Goal: Financially Responsible & High Performance Organization 11t
Outcome #1: Maintain a financially viable water utility
Financial viability allows the Water Department to achieve its operating objectives and allows the
department to fulfill its mission over the long term.
Outcome #2: Strategic planning of Water Department activities
Strategic planning enables the Water Department to focus the energy, resources, and time of
everyone in the organization in the same direction to become more efficient and cost-effective
Plant Operations and Maintenance
Overview
Plant Operations and Maintenance ensures that water used for domestic, commercial and
industrial purposes is safe for drinking and is supplied at sufficient volumes to meet the needs of
our community as well as provide for fire protection. Responsible for the management of
equipment and chemicals used to treat and disinfect groundwater for human consumption and to
maintain compliance with all Federal, State and Local water quality standards.
Over two hundred tests a day are performed by water treatment plant operators. In addition to
these tests, the Dubuque Water & Resource Recovery Laboratory performs over 60 bacteriological
analysis of our drinking water on a monthly basis. Other compliance related testing is performed by
the University of Iowa Hygienic Laboratory and Keystone Laboratories. All of these analytical
measures ensure that the water reaching your home is safe to drink.
-12-
WATER DEPARTMENT
Plant Operations and Maintenance Funding Summary
FV 2016 FV 2017
Actual Budget FV 2018 Requested
Expenditures $2,457,487 $2,525,856 $2,525,835
Resources $489 $200 $250
Plant Operations and Maintenance Position Summary
FV 2018
Water Plant Manager 1.00
Electronic Technician 1.00
Equipment Mechanic 1.00
Plant Operator 11 5.00
Plant Operator III &IV 3.00
Total FT Equivalent Employees 11.00
Future Initiatives
• Maintain the operations and maintenance of the Eagle Point Water Plant and all associated
storage, pumping and well facilities in the most environmentally conscious manner
• Ensure continued compliance with all regulatory agencies
Performance Measures
Plant Operations and Maintenance -Activity Statement
Protect, preserve and promote the public health and welfare of the residents of the city of Dubuque by
effectively and efficiently managing, maintaining and operating the Eagle Point Water Treatment Plant.
(P�Goal: Environmental Integrity 1
Outcome#1: Ensure proper treatment of drinking water that meets or exceeds drinking
water regulations
Drinking water is one of our most vital resources and is essential to human health. The Eagle Point
Water Treatment Plant delivers an average of 7 million gallons of clean water each day to our
homes, schools and businesses which is then used for cooking, drinking, cleaning, bathing,
watering our lawns and so forth.
-13-
WATER DEPARTMENT
I�Ellll. FINISHED WATER TAP REPORT COMPLIANCE IN MALE
K e ANAlY1E MCL/AL Mf16 TYPE VALUE MIN MOAIE xaunon ICAI SOURCE
. Erosion of natural
Barium Z Z SGL 0.0201 NIA N/A 09/04/2012 NO deposits
Erosion of natural
r r r vadeposits:Added to
Fluoride a d MCL 0.69 036 1.62 2014 NO
water duringtrcatmerrc
process
_ Runofffrom fertilizer
use;leaching from
Nitrate 10 10 SGL 0.6 0.5 0.6 2014 NO septic tanks,sewage;
erosion of natural
deposits
Erosion of natural
- I Sodium N/A N/A SGL 14 N/A N/A 09/04/2012 NO deposits;Added to
W water duringtrcatment
II process
DISTRIBUTION O•
ANALYZE Mo./AL MELG/MRIX COMPLUNQ SAMPLE DATE xoumx TYPICAL SOURCE
G TYPE VALUE MIN MAX
Total Chlorine(ppm) 4A 4.0 RAA 1.0 038 116 2014 NO Water additive used:o
.. control microbes
Presence in Presence in
>5%of >5%of Naturally present in the
Total Coliform Bacteria monthly monthly TCR 1.0 NO 1 10/31/2o1a No environment
samples samples
Total Haloacetic Acids By-products of drinking
60 N/A LRAA 11.00 NO 22.00 2(114 NO water disinfection
(Ppb)
Total Trihalomethanes 80 N/A LRAA 42.00 21.00 54.00 2014 NO By-productsofdrinking
(ppb) water chlorination
ANALYTE COMPLIANCE TYPICAL SOURCE
,Yre4f42N_ dd
TYPE I WA
Corrosion of household
COPppr plumbing systems;
1.3 1.3 90th 0.0100 NO 0.0100 30 0 2014 NO Erosion of natural
(PPM) deposits;Leaching from
wood preservatives
/ f / Corrosion of household
Lead(ppb) 15 0 90th 4.00 NO 13 30 0 2014 NO plumbing systems;
Erosion of natural
deposits
The 2015 Water Quality Report can be downloaded at
http://cityofdubupue.orp/DocumentCenter/View/24076
Outcome #2: Produce high quality water at the required pressures and volumes
Maintaining the proper pressures and volumes ensures adequate fire suppression abilities and
consumer demand
?�ajfer ?MfIr
1. ANIF C3aAri
3.000 941
2,902
2.900 2,859 2.863
2,8115 2,797
2,800
2,700 2,638 2,641
2,600 2,538 2,539
2,500
MOO
2,300
FIro6 rV'07 ErOg 1`11`09 rIr10 rV'll 1`11'12 rV73 Er14 FV'15
-14-
WATER DEPARTMENT
DID
•
Dubuque's ,
water comes from
wells. There are five
locatedshallow wells
at - A.Y McDonald
Park and four .--.
wells located around
Treatment PLant on
Hawthorne Street. Distribution
Overview
The function of the Water Distribution Division is to safely transport potable water from the source
to point of use. Distribution is also responsible for the machinery, equipment, materials and
personnel required to repair main breaks; install water mains, control valves and fire hydrants and
assist other sections of the Water Department. It is our goal to operate and maintain a water
distribution system consistent with established procedures recognized by the American Water
Works Association for efficient management practices and to meet Federal, State and local rules
and regulations
Water Distribution Funding Summary
FY 2016 Actual FY 2017 Budget FY 2018 Requested
Expenditures $1,568,310 $2,586,311 $2,895,453
Resources $8,786,038 $8,914,756 $9,137,641
Water Distribution Position Summary
FY 2018
Equipment Operator II 2.00
Water Distribution Maintenance Worker 4.00
Water Distribution Foreman 1.00
Water Distribution Supervisor 1.00
Water Engineering Assistant 1.00
Custodian 1 0.07
Total FT Equivalent Employees 9.07
Highlights of the Year
• Street Reconstruction/Engineering Projects
• Purchase of the Central Iowa Water Association
-15-
WATER DEPARTMENT
Future Initiatives
• The Water Distribution Division is prepared to replace; as needed, the aged, existing water
main, fire hydrants, control valves and lead service lines on construction projects in
partnership with the Engineering and Public Works Departments.
Performance Measures
Water Distribution -ActivityStatement
Operate and maintain a water distribution system consistent with established procedures recognized by the
American Water Works Association for efficient management practices.
JGoal: Planned and Managed Growth J
Outcome #1: Ensure the integrity of the distribution system piping system
Maintains the safety of our drinking water through flushing, replacing aged piping, valves and fire
hydrants
M1
R,
i.�
" r
B-Branch project- Rhomberg Ave., 20"& 8"
water main replacement. 2,965 feet(0.56
miles) of varying sizes of water main pipe
Outcome #2: Addressing customer and system issues in a timely manner
Minimizes the time customers are without water
-16-
WATER DEPARTMENT
DIDYOU
1,.
composedThe
system is Um
of 321 miles of water
so - �2 �o
81
mains . .
diameter 69
. . 60
8,017 control
40
valves-, and 2,330 fire
hydrants 20
o -
Fro6 Fro7 Fros Frog Fr10 Fru Fru Frl3 Fr14 Fr LS
xelyoe-e ralhr
350
301 301
288
300 270
250
206
zoo 287 M 179
us 1�
1W
so -
T �
FY06 FY'07 FT08 FY'09 FY'10 FY'll FY'12 FY'13 FY'14 FY']5
Service taps are new connections to the public water mains
Water Meters
Overview
The Water Meter Division provides dependable meter repair consisting of testing, dismantling,
cleaning, repairing, and reassembling meters as required. The Meter Division performs installation
services, addresses pressure complaints, investigates illegal use of water, installs outside
registers, and performs special reading of meters upon request and performs backflow
administration to comply with state and federal mandates while ensuring accurate charges to the
customer.
-17-
WATER DEPARTMENT
Water Meters Funding Summary
FV 2018
FV 2016 Actual FV 2017 Budget Requestetl
Expenditures 1 $301,469 $368,936 $332,035
Resources 1 $116,569 $94,051 $158,932
Water Meters Position Summary
FV 2018
Water Meter Repair Worker l 3.00
Total Full-Time Equivalent Employee's 3.00
Future Initiatives
• Continue to educate the public of the importance of adhering to all State and Federal
mandates concerning Backflow Control Devices, which protect public water supplies from
potential contamination
• Continue to provide excellent customer service
Performance Measures
Water Meters -Activity Statement
Provide dependable meter repair, installation services and backflow administration to comply with state and
federal mandates to ensure accurate charges to customers. /
(p4Goal: Environmental Integrity�1A
Outcome#1: Provide accurate meter readings
Ensures that customers pay for the appropriate amount of water used by tracking private water
service line leaks (internal and external). Repair reimbursement and service line assistance.
Outcome#2: Backflow protection
Minimizes the possibility of contamination of the distribution system by preventing back siphonage.
A backflow prevention device prevents contamination of the water system from industrial and
commercial water services by using equipment that stops the backward flow of water through a
pipe or cross connection between potable water and contaminants.
-18-
WATER
DEPARTMENT
� J
DID YOU KNOW? 4l 4 L�i=` . '
Since the adoption by "�- ` '
Council of the Backflow _ �" -
Prevention Program, we -
have established over � �— ; I' C
1,851 accounts having ��" � �� ('
Backflow Protection
and we also monitor -'i
over 2,624 Control � - - -
Devices. TheseTypical Meter/Fire Sprinkler Room
accounts are a
Meter
combination of various
Industrial and
Commercial facilities.
Annually we receive �r
$25.00 per device as
the administration fee. It ,,,"
is expected an
additional 75 accounts �
will be established ' !�
before the end of the
fiscal year
WATER DEPARTMENT
Outcome #3: Responding to customer inquiries in a timely manner
Maintains consumer confidence in the water utility
Ser�rceC��
869
s00 713 681 714
600
q33 420
400
200
LO
MO6 M07 MOs M09 M10 M11 M12 M13 M14 Mss
-20-
Recommended Operating Revenue Budget - Department Total
42 -WATER
FY15 Actual FY16 Actual FY17 Adopted FY IS Recomm'd
Fund Account Account Title Revenue Revenue Budget Budget
640 43110 INVESTMENT EARNINGS 21,947 27,640 0 27,461
43-USE OF MONEY AND PROPERTY 21,947 27,640 0 27,461
640 51105 METER RATES 6,873,347 7,677,554 8,023,216 8,149,680
640 51106 UB REFUND CLEARING ACCT (6,992) (6) 0 0
640 51110 FLATRATES 14,209 20,685 23,581 20,000
640 51111 FLAT RATE KEY WEST 0 29,871 0 0
640 51115 FIRE PROTECTION RATES 137,758 155,143 134,101 150,000
640 51125 TAPS-3/4&1 INCH 31,536 42,056 30,344 33,000
640 51130 CONNECT CHG LARGE SERVICE 14,860 36,260 17,221 22,500
640 51135 CONNECT CHG FRONT FOOTAGE 9,385 75,905 35,570 49,435
640 51140 METER SALES-REMOTES 0 456 0 456
640 51145 SALE OF METERS 28,930 32,987 18,530 75,350
640 51146 SALE OF UFR DEVICES 7,295 5,973 3,338 5,973
640 51165 MAINTENANCE CHARGES 8,196 7,327 9,732 7,327
640 51170 REPAIR OF METERS 11,453 10,493 10,371 10,493
640 51175 SHUT OFF PENALTIES 15,329 22,923 13,586 22,923
640 51176 METER TAMPERING FEE 3,222 1,789 2,684 1,789
640 51177 CALL OUT CHARGE 2,494 1,618 2,300 1,618
640 51180 CROSS CON.CNTL ADMIN FEE 63,407 66,038 61,026 66,038
640 51215 PENALTIES 89,212 81,581 80,109 81,092
640 51310 MONTHLY RENTAL 82,184 80,183 91,621 80,183
640 51720 UB-WTR RPR TEMP HOLDING 0 1,285 0 0
51-CHARGES FOR SERVICES 7,385,825 8,350,121 8,557,330 8,777,857
640 53201 REFUNDS 20 119 0 0
640 53610 INSURANCE CLAIMS 1,715 0 0 0
640 53615 DAMAGE CLAIMS 7,100 14,241 5,087 14,241
640 53620 REIMBURSEMENTS-GENERAL 8,593 2,467 690 124
640 53630 SALES TAX COLLECTION 405,147 450,414 445,000 476,890
53-MISCELLANEOUS 422,575 467,241 450,777 491,255
640 54109 SALVAGE SALES 1,051 250 900 250
54-OTHER FINANCING SOURCES 1,051 250 900 250
640 59100 FR GENERAL 0 60,944 0 0
640 59500 TRF TO PEONY TRUST 0 584 0 0
59-TRANSFER IN AND INTERNAL 0 584 0 0
42-WATER TOTAL 7,831,398 8,845,836 9,009,007 9,296,823
-21-
Recommended Operating Expenditure Budget - Department Total
42 -WATER
FY15 Actual FY16 Actual FY17 Adopted FY IS Recomm'd
Fund Account Account Title Expense Expense Budget Budget
640 61010 FULL-TIME EMPLOYEES 1,408,801 1,459,520 1,511,988 1,411,566
640 61020 PART-TIME EMPLOYEES 4,460 4,707 21,741 22,091
640 61050 OVERTIME PAY 71,486 63,023 90,040 90,040
640 61071 HOLIDAYPAY-OVERTIME15,331 17,562 14,000 17,000
640 61072 TANK CLIMBING PAY 0 90 1,200 1,200
640 61091 SICK LEAVE PAYOFF 4,606 7,044 7,039 16,474
640 61310 IPERS 133,957 137,960 146,364 137,690
640 61320 SOCIAL SECURITY 109,966 113,605 125,923 119,219
640 61410 HEALTHINSURANCE 371,280 403,427 397,500 381,600
640 61415 WORKMENS'COMPENSATION 82,099 80,174 82,465 94,589
640 61416 LIFE INSURANCE 1,102 1,106 3,023 2,656
640 61417 UNEMPLOYMENT INSURANCE 6,585 0 0 0
640 61620 UNIFORM ALLOWANCE 1,737 762 0 0
640 61640 SAFETYEQUIPMENT 3,449 2,814 6,000 6,000
640 61650 MEAL ALLOWANCE 646 584 500 500
640 61660 EMPLOYEE PHYSICALS 1,512 2,841 1,492 2,196
61-WAGES AND BENEFITS 2,217,017 2,295,219 2,409,275 2,302,821
640 62010 OFFICE SUPPLIES 4,411 3,426 4,464 3,850
640 62011 UNIFORM PURCHASES 13,725 14,093 14,000 14,550
640 62030 POSTAGE AND SHIPPING 5,207 1,354 2,262 2,445
640 62033 HAND TOOLS/EQUIPMENT 6,162 5,020 6,285 5,120
640 62034 REPAIR PARTS/SUPPLIES 8,050 10,690 8,210 13,595
640 62036 CONSTRUCTION SUPPLIES 2,985 1,528 3,467 2,900
640 62061 DP EQUIP.MAINT CONTRACTS 15,975 16,955 17,453 17,608
640 62062 JANITORIAL SUPPLIES 4,569 4,746 4,708 4,650
640 62063 SAFETY RELATED SUPPLIES 2,551 2,858 2,763 2,930
640 62064 ELECTRICAL SUPPLIES 13,198 9,254 13,711 9,650
640 62065 LAB SUPPLIES 12,822 12,202 13,078 12,260
640 62066 PLUMBING MATERIALS 3,933 12,128 4,408 12,370
640 62090 PRINTING&BINDING 1,640 1,371 1,157 1,400
640 62110 COPYING/REPRODUCTION 1,044 2,080 1,043 2,069
640 62130 LEGAL NOTICES&ADS 3,021 472 1,040 4,540
640 62170 SUBSCRIPTIONS-BOOKS-MAPS 1,020 716 1,359 1,380
640 62190 DUES&MEMBERSHIPS 4,007 3,543 4,487 4,485
640 62204 REFUNDS 0 9,623 0 9,815
640 62206 PROPERTY INSURANCE 84,149 84,655 87,871 73,764
640 62207 BOILERINSURANCE 1,400 6,730 6,730 0
640 62208 GENERAL LIABILITY INSURAN 21,679 20,926 21,334 21,942
640 62210 SALES TAX 408,269 445,192 445,000 476,890
640 62216 REFUND LEAK ALLLOWANCE 0 3,017 0 3,077
640 62310 TRAVEL-CONFERENCES 4,110 2,532 4,196 6,800
640 62320 TRAVEL-CITY BUSINESS 577 0 200 200
640 62340 MILEAGE/LOCAL TRANSP 3,401 4,169 4,368 4,512
640 62360 EDUCATION&TRAINING 7,302 4,955 6,742 17,350
640 62411 UTILITYEXP-ELECTRICITY521,521 580,517 563,243 603,738
640 62412 UTILITYEXP-GAS40,633 28,210 38,406 31,031
640 62414 UTILITY EXP-FUELOIL 482 3,375 5,500 3,442
640 62415 UTILITY EXPENSE STORMWATR 45 169 1,400 173
-22-
Recommended Operating Expenditure Budget - Department Total
42 -WATER
FY15 Actual FY16 Actual FY17 Adopted FY IS Recomm'd
Fund Account Account Title Expense Expense Budget Budget
640 62416 UTILITY EXP-WATER 9 0 0 0
640 62421 TELEPHONE 11,974 7,783 7,850 12,710
640 62423 TELECOMMUNICATION CG 7,742 7,939 7,896 8,098
640 62424 RADIO/PAGERFEE 0 0 2,500 2,500
640 62431 PROPERTY MAINTENANCE 31,119 43,615 57,951 73,088
640 62433 CUSTODIAL SERVICES 0 0 700 700
640 62435 ELEVATOR MAINTENANCE 0 175 2,200 2,000
640 62436 RENTAL OF SPACE 1,680 1,764 1,714 1,799
640 62437 BARRICADERENTAL 2,978 5,364 3,038 5,471
640 62511 FUEL,MOTOR VEHICLE 29,144 20,007 26,229 20,007
640 62521 MOTOR VEHICLE MAINT. 36,271 20,701 37,963 21,783
640 62528 MOTOR VEH.MAINT.OUTSOUR 11,465 5,601 11,616 5,713
640 62611 MACH/EQUIP MAINTENANCE 129,772 89,832 132,368 128,233
640 62613 METER MAINTENANCE 1,601 1,930 1,600 14,000
640 62614 EQUIP MAINT CONTRACT 210 0 0 0
640 62615 MACH/EQUIP MAINT.OUTSOUR 1,798 266 0 500
640 62630 FLUORIDE 14,270 0 14,555 14,700
640 62631 LIME 258,686 282,155 263,859 266,500
640 62632 PHOSPHATE 63,294 59,191 64,560 67,000
640 62633 CHLORINE 37,066 31,655 37,807 40,000
640 62638 POLYMER 8,477 6,783 8,647 8,700
640 62639 LIQUID CO2/02 15,228 13,353 18,000 18,000
640 62663 SOFTWARE LICENSE EXP 135 992 16,000 15,586
640 62664 LICENSE/PERMIT FEES 6,837 7,027 7,000 7,167
640 62667 INTERNET SERVICES 0 1,506 1,351 2,466
640 62669 PROGRAMMING 24,344 7,037 5,117 25,000
640 62671 MISC.OPERATING SUPPLIES 0 15 0 0
640 62675 VALVES 33,866 967 66,000 10,000
640 62676 PIPE-SPECIAL FITTINGS 67,672 56,886 50,000 70,000
640 62692 LANDFILL FEES 199 15 202 200
640 62696 OUTSIDE COLLECTOR EXPENSE 7,687 8,024 404 8,319
640 62710 CONTRACTOR SERVICES 606 0 500 500
640 62713 LEGAL SERVICES 60,944 32,451 60,000 0
640 62716 CONSULTANT SERVICES 100,000 13,860 2,000 14,137
640 62726 AUDIT SERVICES 3,500 2,500 3,700 3,700
640 62731 MISCELLANEOUS SERVICES 0 4,150 20,000 20,000
640 62746 ONE CALL OPERATION 4,514 5,568 5,000 5,679
640 62765 GRANTS 0 5,409 8,500 8,500
640 62767 ENVIRON.TESTING/MON. 30,207 33,685 30,811 45,000
640 62780 HAULING SERVICES 133,046 141,199 139,699 148,250
640 62811 ENG.DIVISION SERVICES 0 0 61,000 0
640 62820 STREET DIVISION SERVICES 0 1,920 0 1,958
62-SUPPLIES AND SERVICES 2,334,229 2,217,831 2,467,222 2,466,500
640 71120 PERIPHERALS,COMPUTER 0 200 0 7,580
640 71123 SOFTWARE 2,316 883 2,000 2,000
640 71312 VAN/PICKUP/WAGREPL 0 0 70,000 42,000
640 71314 TRUCK-REPLACEMENT 0 0 70,000 70,000
640 71315 TRUCK-ADDITIONAL 9 0 0 0
-23-
Recommended Operating Expenditure Budget - Department Total
42 -WATER
FY15 Actual FY16 Actual FY17 Adopted FY IS Recomm'd
Fund Account Account Title Expense Expense Budget Budget
640 71318 HEAVYEQUIP-REPLACEMENT0 0 95,000 0
640 71328 TRAILERS 0 0 8,000 0
640 71410 SHOP EQUIPMENT 224 266 1,300 2,200
640 71413 LABORATORY EQUIPMENT 0 481 3,500 3,500
640 71414 AIR HAMMER/DRILL 227 0 0 0
640 71419 TAPPING MACHINE 1,950 17,770 0 0
640 71510 HYDRANTS 59,206 14,785 70,000 70,000
640 71511 PUMPS 30 3,487 21,000 21,000
640 71516 LARGE WATER METERS 2,901 81,356 83,522 83,500
640 71550 MISCELLANEOUS EQUIPMENT 82 0 0 0
640 71619 OTHER MAINT.EQUIPMENT 260 1,399 22,300 0
640 72410 PAGER/RADIO EQUIPMENT 0 0 0 46,175
640 72415 ELECTRONIC DATA COLLECTOR 0 0 0 2,644
640 72418 TELEPHONE RELATED 847 36 1,200 1,925
640 72515 TEST EQUIPMENT,OTHER 2,777 318 1,000 1,000
71-EQUIPMENT 70,829 120,981 448,822 353,524
640 72115 BARRICADES/WARN SIGNALS 4,840 89 500 1,000
72-EQUIPMENT 4,840 89 500 1,000
640 73211 CONST.CONTR-NOTBLDG 765 137,919 688,583 503,300
640 73410 EQUIP ACQUISITION 0 0 17,490 18,000
73-CIP EXPENDITURES 765 137,919 706,073 521,300
640 74111 PRINCIPAL PAYMENT 812,975 833,193 879,595 709,290
640 74112 INTERESTPAYMENT 597,107 732,244 767,494 943,856
74-DEBT SERVICE 1,410,082 1,565,437 1,647,089 1,653,146
640 91100 TO GENERAL 862,719 142,985 142,884 407,551
640 91740 TO WATER CONSTRUCTION 595,000 354,466 1,012,000 1,157,000
91-TRANSFER TO 1,457,719 497,451 1,154,884 1,564,551
42-WATER TOTAL 7,495,481 6,834,927 8,833,865 8,862,842
-24-
Recommended Expenditure Budget Report by Activity & Funding Source
42 -WATER
UNDIST - 10640
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
SUPPLIES AND SERVICES 20,129 0 20,531
TRANSFER TO 497,451 1,154,884 1,564,551
OWUNDISTRIBUTED 517,580 1,154,884 y 1,585,082
WATER ADMINSTRATION -42100
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
DEBT SERVICE 1,565,437 1,647,089 1,653,146
SUPPLIES AND SERVICES 493,809 526,609 501,994
WAGES AND BENEFITS 223,336 252,969 261,942
MERADMINSTRATION Z 2,28 ,
METERS
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
EQUIPMENT 22,194 86,500 22,000
SUPPLIES AND SERVICES 28,208 22,293 50,716
WAGES AND BENEFITS 251,067 260,143 259,319
w
METERS 301,469 368,936
PLANT OPER. &MAINT -42400
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
EQUIPMENT 2,463 6,300 48,625
SUPPLIES AND SERVICES 1,440,929 1,490,900 1,557,801
WAGES AND BENEFITS 1,014,095 1,028,656 919,409
T
ErPLANT OPER.&MAINT 2,457,487 2,525,856 2,525,835
WATER DISTR. SYSTEM -42700
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
CIP EXPENDITURES 0 0 0
EQUIPMENT 33,422 268,000 195,399
SUPPLIES AND SERVICES 210,588 295,920 252,821
WAGES AND BENEFITS 806,720 867,507 862,151
NEEPW WATER
DISTR.SYSTEM MW30 1,4315427
STORAGE TANK INSPECTIMON-42705
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
SUPPLIES AND SERVICES 13,860 2,000 14,137
-25-
Recommended Expenditure Budget Report by Activity & Funding Source
42 -WATER
STORAGE TANK INSPECT/MON 13,860 21
000 14,137
AUTO MTR RD SYS MNT PROG-42710
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
CIP EXPENDITURES 6,670 15,000 15,000
NTPROG 6,670 15,000
PUMP REPLC VACUUM FILTER-42713
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
EQUIPMENT 3,038 20,000 20,000
F!!PMREPLC VACUUM FILTER 3,038 20,000
FILTER MAINT PROGRAM -42715
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
CIP EXPENDITURES 21,752 25,000 25,000
WFILTER MAINT PROGRAM
FIRE HYD NTING -42720
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 4,136 5,000 5,000
LIRE HYDRANT PAINTING
GENERATOR MAIN PROGRAM -42725
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
CIP EXPENDITURES 0 17,490 18,000
MNERATOR MAIN PROGRAM 0 17,49
GIS MAINT/UPDATES -42730
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 747 15,000 15,000
ErGISMAINT/UPDATES 747
SERVICE LINE ASSIST -42735
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 11 15,000 15,000
-26-
Recommended Expenditure Budget Report by Activity & Funding Source
42 -WATER
ERVICE LINE ASSIST 11 15,000
VALVE EXERCISE PROGRAM - 42740
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
SUPPLIES AND SERVICES 0 25,000 25,000
MMM
ERCISEPR M VALVER CEMENT 42745 25,000
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
CIP EXPENDITURES 2,150 0 25,000
EPLACEMENT 2,150
INTERNAL LINES LOAN -42750
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
CIP EXPENDITURES 5,000 45,000 45,000
SUPPLIES AND SERVICES 0 5,000 0
INTERNAL LINES LOAN 5,000 50,000 45,000
WATER MAIN REPLACEMENTS - 42755 J
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
CIP EXPENDITURES 81,287 536,781 321,500
SUPPLIES AND SERVICES 0 56,000 0
EWAINREPLAC.EjMENTS 81,287 592,781 321,500
WATER METER EXCHANGE -4
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
EQUIPMENT 59,952 68,522 68,500
WATER MET ER EXCHANGE 59,952 68,522
WATER LEAK REPAIR GRANT - 42765
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
SUPPLIES AND SERVICES 5,409 8,500 7,000
E
WATER LEAK REPAIR GRANT 5,409 8,500
COUNTY WATER ASSISTANCE -42766
FUNDING SOURCE:WATER UTILITY OPERATION
-27-
Recommended Expenditure Budget Report by Activity & Funding Source
42 -WATER
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
SUPPLIES AND SERVICES 0 0 1,500
1
COUNTY WATER ASSISTANCE 0 0 1,500
R VALVE BOX MAINT - 42770
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
CIP EXPENDITURES 20,200 15,000 20,000
OrAMTERWLVE BOX MAINT 20,200 15,000
WATER METER TESTING -42790
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
CIP EXPENDITURES 0 25,000 25,000
"WATER TESTING 0 25,000
WELL MAINT PROGRAM -42795
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY16 Actual Expense FY17 Adopted Budget FY1S Recomm'd Budget
CIP EXPENDITURES 861 26,802 26,800
-L MAINT PROGRAM ,800
WATER TOTAL ,842.00
-28-
CITY OF DUBUQUE , IOWA
DEPARTMENT DETAIL-PERSONNEL COMPLEMENT
42 WATER DEPARTMENT
FY 2016 FY 2017 FY 2018
FD JC WP-GR JOB CLASS FTE BUDGET FTE BUDGET FTE BUDGET
61010 Full Time Employee Expense
640 3275 GE-40 WATER DEPARTMENT MANAGER 1.00 $ 103,453 1.00 $ 106,708 1.00 $ 84,185
640 2775 GE-37 WATER PLANT MGR. 1.00 $ 86,436 1.00 $ 88,299 1.00 $ -
640 3200 GE-37 WATER DISTRIBUTION SUPERVISOR 1.00 $ 69,063 1.00 $ 85,338 1.00 $ 86,711
640 2950 GE-33 WATER ENGINEERING ASSISTANT 1.00 $ 70,444 1.00 $ 63,371 1.00 $ 67,933
640 2650 GE-31 FOREMAN -WATER DISTR. 1.00 $ 65,144 1.00 $ 66,540 1.00 $ 52,000
640 2610 GE-30 GIS SPECIALIST 1.00 $ 59,339 1.00 $ 60,630 1.00 $ 61,606
640 2400 OE-16 ELECTRONIC TECHNICIAN 1.00 $ 59,412 1.00 $ 60,669 1.00 $ 62,244
640 2800 OE-14 EQUIPMENT MECHANIC 1.00 $ 56,997 1.00 $ 58,206 1.00 $ 59,143
640 2550 OE-13 WATER PLANT OPR CERT GR III/IV 3.00 $ 168,263 3.00 $ 171,813 3.00 $ 166,238
640 2475 OE-12 WATER PLANT OPERATOR CRT GR II 5.00 $ 262,629 5.00 $ 271,998 5.00 $ 277,038
640 2305 OE-10 EQUIPMENT OPERATOR II 2.00 $ 107,032 2.00 $ 109,279 2.00 $ 106,554
640 1775 OE-09 WATER METER REPAIRWORKER 1 3.00 $ 154,871 3.00 $ 158,303 3.00 $ 156,289
640 1476 OE-09 WATER DISTR MAINTENANCE WORKER 4.00 $ 205,555 4.00 $ 210,834 4.00 $ 211,555
TOTAL FULL TIME EMPLOYEES 25.00 $ 1,468,638 25.00 $1,511,988 25.00 $1,391,496
61020 Part-Time Employee Expense
640 225 GE-25 SECRETARY 0.50 $ - 0.50 $ 18,552 0.50 $ 18,850
640 2050 OE-06 CUSTODIAN 1 0.07 $ 3,066 0.07 $ 3,189 0.07 $ 3,241
TOTAL PART TIME EMPLOYEES 0.57 $ 3,066 0.57 $ 21,741 0.57 $ 22,091
TOTAL WATER DEPARTMENT 25.57 $ 1,471,704 25.57 $1,533,729 25.57 $1,413,587
-29-
CITY OF DUBUQUE,IOWA
ACTIVITY PERSONNEL COMPLEMENT SUMMARY
FY 2016 FY 2017 FY 2018
ACCT FD JC WP-GR POSITION CLASS FTE BUDGET FTE BUDGET FTE BUDGET
Water Administration-FT
64042100 61010 640 2610 GE-30 GIS SPECIALIST 1.00 $ 59,339 1.00 $ 60,630 1.00 $ 61,606
64042100 61010 640 3275 GE-40 WATER DEPARTMENT MANAGER 1.00 $ 103,453 1.00 $ 106,708 1.00 $ 84,185
Total 2.00 $ 162,792 2.00 $ 167,338 2.00 $ 145,791
Water Administration-PT
64042100 61020 640 225 GE-25 SECRETARY 0.50 $ - 0.50 $ 18,552 0.50 $ 18,850
Total 0.50 $ - 0.50 $ 18,552 0.50 $ 18,850
Water Meters-FT
64042300 61010 640 1775 OE-09 WATER METER REPAIRWORKER I 3.00 $ 154,871 3.00 $ 158,303 3.00 $ 156,289
Total 3.00 $ 154,871 3.00 $ 158,303 3.00 $ 156,289
Water Plant Operation-FT
64042400 61010 640 2475 OE-12 WATER PLANT OPER.CRT GR II 5.00 $ 262,629 5.00 $ 271,998 5.00 $ 277,038
64042400 61010 640 2550 OE-13 WATER PLANT OPR CERT GR III/IV 3.00 $ 168,263 3.00 $ 171,813 3.00 $ 166,238
64042400 61010 640 2775 GE-37 WATER PLANT MGR. 1.00 $ 86,436 1.00 $ 88,299 1.00 $ -
64042400 61010 640 2800 OE-16 ELECTRONIC TECHNICIAN 1.00 $ 59,412 1.00 $ 60,669 1.00 $ 62,244
64042400 61010 640 3015 OE-14 EQUIPMENT MECHANIC 1.00 $ 56,997 1.00 $ 58,206 1.00 $ 59,143
Total 11.00 $ 633,737 11.00 $ 650,985 11.00 $ 564,663
Water Distribution-FT
64042700 61010 640 1476 OE-09 WATER DIST MAINTENANCEWOR 4.00 $ 205,555 4.00 $ 210,834 4.00 $ 211,555
64042700 61010 640 2305 OE-10 EQUIPMENT OPERATOR II 2.00 $ 107,032 2.00 $ 109,279 2.00 $ 106,554
64042700 61010 640 2650 GE-31 FOREMAN-WATER DISTR. 1.00 $ 65,144 1.00 $ 66,540 1.00 $ 52,000
64042700 61010 640 2950 GE-33 WATER ENGINEERING ASSISTANT 1.00 $ 70,444 1.00 $ 63,371 1.00 $ 67,933
64042700 61010 640 3200 GE-37 WATER DISTRIBUTION SUPV 1.00 $ 69,063 1.00 $ 85,338 1.00 $ 86,711
Total 9.00 $ 517,238 9.00 $ 535,362 9.00 $ 524,753
Water Distribution-PT
64042700 61020 640 2050 GD-03 CUSTODIAN 1 0.07 $ 3,066 0.07 $ 3,189 0.07 $ 3,241
Total 0.07 $ 3,066 0.07 $ 3,189 0.07 $ 3,241
TOTAL WATER DEPARTMENT 25.57 $ 1,471,704 25.57 $1,533,729 25.57 $ 1,413,587
-30-
Capital Improvement Projects by Department/Division
WATER
FY 15 Actual FY 16 Actual FY 17 Adopted FY 18 Recomm'd
CIP Number Capital Improvement Project Title Expense Expense Budget Budget
3602594 SW ARTERIAL MAIN EXT 0 0 500,000 0
7401389 GIS MAINTENANCE/UPGRADE 2,741 0 0 0
7401390 SERVICE LINE ASSISTANCE 20,394 0 0 0
7401400 WATER METER EXCHANGE 62,605 0 0 0
7401405 WATER MAIN REPLACEMENTS 626,118 4,192 489,900 0
7401409 FIRE HYDRANT REPLACMENTS 68,150 0 0 0
7401410 VALVE REPLACEMENT 13,825 0 0 0
7401411 MAIN EXT ANNEXATION REL. 101,628 206,286 0 0
7401672 ROOSEVELT RD MAIN EXT. 86,566 2,950 150,000 0
7401826 PAINT PUMP ROOM PIPES 0 0 0 0
7402030 VACUUM FILTER BACK-UP 0 0 0 30,000
7402200 WATER SVC REPAIR GRANT 7,888 0 0 0
7402201 FIRE HYDRANT PAINTING 74,343 0 0 0
7402203 WATER VALVE BOX MAINT 14,824 0 0 0
7402261 RAMP UTILITY RELOCATION 2,944 0 0 0
7402314 AUTO MTR RD SYST MET PRG 10,037 0 0 0
7402349 MANSON ROAD WATER MAIN 0 0 0 155,000
7402395 WATER EXT-AIRPORT 334,263 5,491,202 0 0
7402396 NORTH SOFTENING BASIN REN 185,803 8,948 0 0
7402400 BRK BLD-REPAIR-EPP PS 984 0 0 0
7402472 WATER COMP LEAK SURVEY 26,050 0 0 0
7402504 ENGLISH MILL WATER MAIN E 169,482 924 0 0
7402524 ONLINE PROCESS ANALYZER 453 0 15,000 0
7402526 SRF GREEN ALLEY 6,832 0 0 0
7402527 GENERATOR 6,898 0 0 0
7402528 RAW H2O TRANSMISSION LINE 0 0 0 0
7402594 SW ARTERIAL MAIN EXT 0 439,315 2,942,000 250,000
7402595 CREEK CROSSING RESTORE 0 0 46,730 45,000
7402596 MAIN RELOC SEWER MANHOLE 0 0 50,000 20,000
7402653 LIME SLAKER REPLACE STUDY 0 0 10,000 0
7402654 FIRE HYDRNT ASSMBLY SW PG 0 0 12,000 12,000
7402655 MAINTWTRMN-RETAINWAL 0 0 20,000 20,000
7402656 WATER STORAGE TANK COATIN 0 0 88,500 45,000
7402657 WTR MN UPGRADES-STREET 0 0 20,000 25,000
7402658 WTR MN REPLACE-SWR CONS 0 0 240,350 121,800
7402703 WEST RURAL WATER PURCHASE 0 0 0 4,396,500
7402713 RPIUMAINT WATER LINE ISLA 0 0 0 30,000
7402714 BULK CO2 TANK REPLACEMENT 0 0 0 75,000
-31-
PROGRAM/
DEPT PROJECT DESCRIPTION FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 TOTAL PAGE
WATER DEPARTMENT
Business Type
Water Storage Tank Coating
Program $ 45,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 245,000 136
Manhole Replacement Rehab $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 25,000 $ 105,000 137
Creek Crossing Restoration $ 45,000 $ 45,000 $ 45,000 $ 45,000 $ 45,000 $ 225,000 138
Water Main Upgrades during
Street General Repairs $ 25,000 $ 30,000 $ 30,000 $ 35,000 $ 35,000 $ 155,000 139
Maintenance of Public Water
Mains during Stone Retaining Wall
Repair $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 100,000 140
Fire Hydrant Assembly Relocation/
Replacement for the Sidewalk
Program $ 12,000 $ 12,000 $ 20,000 $ 20,000 $ 20,000 $ 84,000 141
Water Main Replacements-
Streets $ - $ - $ 200,000 $ - $ - $ 200,000 142
Southwest Arterial Water Main
Extension $ 250,000 $ - $ 770,000 $ 740,000 $ - $1,760,000 144
Vacuum Filter Plant Process
Upgrade $ 30,000 $ - $ 200,000 $ - $ - $ 230,000 146
Bridge Repairs/Maintenance of the
Water Main Supply Line to City
Island $ 30,000 $ - $ - $ - $ - $ 30,000 147
Bulk CO2 Tank Replacement $ 75,000 $ - $ - $ - $ - $ 75,000 148
South End Water Main Loop $ 155,000 $ - $ - $ - $ - $ 155,000 149
West Side Water System $4,396,500 $ - $ - $ - $ - $4,396,500 150
Water Main Replacements-Sewer
Consent Decree $ 121,800 $ - $ - $ - $ - $ 121,800 152
Public Lead Line Water
Replacement $ - $ 46,000 $ 50,000 $ 65,000 $ 73,000 $ 234,000 154
Tamarak Park Frontage Road
Water Main
$ - $ - $ 400,000 $ 150,000 $ - $ 550,000 155
20"Transmission Main, 12"and 8"
Water Main Relocation/
Replacement/Extension $ - $400,000 $ - $ - $ - $ 400,000 156
Raw Water Transmission Lines $ - $ - $ 75,000 $ - $ - $ 75,000 157
English Ridge Water Main $ - $ - $ - $ - $330,000 $ 330,000 158
Total -Water Department $5,225,300 $623,000 $1,880,000 $1,145,000 $598,000 $9,471,300
-32-
City of Dubuque
Water Department
BUDGET PRESENTATION
FISCAL YEAR 2018
Water Department
The City of Dubuque’s Water Department is
dedicated to producing and delivering clean and
safe drinking water that is in compliance with all state
and federal drinking water standards.
We continually strive to adopt new and better
methods of delivering the best quality drinking water
to the citizens of Dubuque in the most cost-effective
manner.
FY17/FY18 Water Department Organization
25.5 FTE
(1) Water
Department
Manager
(1) Water
Plant
Manager
(1) Equipment
Mechanic
(8) Plant
Operators
(1) Electronic
Technician
(0.5)
Secretary
(1) Water
Distribution
Supervisor
(1) Water
Engineering
Assistant
(1) Water
Distribution
Foreman
(3) Meter
Repairworker I
(1) Distribution
Equipment
Operator
(1) Equipment
Operator II
(4) Distribution
Maintenance
Workers
(1) GIS
Specialist
•Human Resources
•Training
•Safety
•Regulatory Compliance
•Budget and Financial
Management
•Capital Improvements
•Data Management (GIS)
Training
Provided specialized
training to eligible Grade 3
and 4 Water Operators
Provided Backflow
Prevention Training to
Distribution staff members
Backflow Prevention Training
Regulatory Compliance & Capital Improvements
Completion of the booster pump
Stations Nos.1 & 2 and 500,000 gallon
ground storage reservoir to the
Airport property
Initiated engineering contract for
design of English Mill Pump Station
and Water Main Extension to Vernon
and Barrington Lakes Water Systems Airport site Booster No.2 and
0.5 MG Storage Tank
Phased Improvements: Economic growth and
Development
Acquisition of the Vernon Water Tower and Vernon and Barrington Lakes
Water Systems resulted in the City’s ability to phase in necessary
improvements at a later date to serve the area on and around the SW
Arterial Project.
The SW Arterial Project included capital improvements such the English Mill
Pump station and water main extension that will now be covered in the West
Side Water System improvements.
The Vernon Water Tower enables the City to provide pressure and supply to
Dubuque’s Industrial Center West promoting a phased approach and response
to improvements.
•Regulatory Compliance
•Water Production & Treatment
•Wells & Well Field Maintenance
•Pumping to the Distribution
System
•Water Storage Facilities
•SCADA Communications
2,863 2,805 2,787 2,638 2,538 2,641 2,539 2,580
1,893 1,888 1,975 2,061 2,098 2,011 2,025 2,079
-
500
1,000
1,500
2,000
2,500
3,000
3,500
FY'09 FY'10 FY'11 FY'12 FY'13 FY'14 FY'15 FY'16
Water Produced, Treated, and Metered
(Million Gallons)
Treated Metered
33.88%32.69%
29.14%
21.87%
17.34%
23.85%
20.24%19.42%
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
FY'09 FY'10 FY'11 FY'12 FY'13 FY'14 FY'15 FY'16
Water Loss, Percentage
Operation of the Vernon and Barrington
Water Systems
Installation of SCADA Communications to
the Airport and Vernon and Barrington
Water Systems
Well No. 8 Emergency Maintenance and
Repairs
Well No. 8 Pump and Motor
Revised Permit: Lead and Copper Rule
Water Quality Report
Well No. 6 Maintenance and Repairs
W. 3 rd Street Pump Station Generator Final Design and Bid
Analyze and provide a solution for Roosevelt Road area water pressure issues
W. 3rd Street Pump Station
•Operation and Maintenance
•Emergency Response
•Inspection
•General Construction
•Service Line Main Taps
•Water Main Installation
•Meter Management
•Backflow Prevention
•Development Review
Mueller TM Fire Hydrant
Emergency Response & General
Construction
45* main breaks
113* New Service Tap installations
*current through February 2017
11St and Main St. Main Break
*FY 2017 to date:
45 Water Main Breaks
Main Breaks can result
from conditions such as
freezing and thawing
conditions of the ground,
water hammer, or aging.
70 69
137
81
58 45
0
20
40
60
80
100
120
140
160
FY'12 FY'13 FY'14 FY'15 FY'16 FY'17*
Water Main Break
Response
301
206
109
179
278
113
0
50
100
150
200
250
300
350
FY'12 FY'13 FY'14 FY'15 FY'16 FY'17*
New Service Taps
*FY 2017 to date:
113 Service Taps
New Connections
result from community
growth such as new
housing, businesses,
and industry.
Inspection Services
Inspection and Assistance with Bee
Branch 20 inch water main
replacement
Airport Utility Extension Project
Key West/Lake Eleanor Water
Main Project (Twin Ridge)
Century Circle Water Main
Project
Bee Branch 20 inch water main
Back flow Prevention Program
In 2017: 2,800 installed devices; in
2005 only 260 devices
Administrative fee $25 per device
(City devices not billed)
Addition of 50 new devices in
FY2017
Backflow Prevention Training
Residential, Business, and
Commercial Meter
Program Management
*FY2017 to date:
333 service calls
433
714
591
420
673
333
0
100
200
300
400
500
600
700
800
FY'12 FY'13 FY'14 FY'15 FY'16 FY'17*
Meter Service Calls
FY 2018 RATES,REVENUE, EXPENSES,
CAPITAL IMPROVEMENTS AND
IMPROVEMENT PACKETS
WATER DEPARTMENT ADMINISTRATION, PLANT OPERATIONS, AND
DISTRIBUTION
$33.55
$30.25 $30.24 $28.82 $28.43 $28.22 $27.27
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
$35.00
$40.00
West Des
Moines
Des
Moines
Iowa City Council
Bluffs
Dubuque Ames Cedar
Rapids
FY18 Water Rate Comparison*
Average Household Use: 6,000 gallons
*Largest Iowa Cities with Lime Softening
Rate Summary
Proposed 3% increase in Water Rates
FY18 rate will be $.004738 per gallon up from FY17 rate of $0.0046 per
gallon
Using the Average Household water use:
FY2017 cost for 6,000 gallons -$27.60
FY2018 cost for 6,000 gallons -$28.43
Comparing Iowa’s Largest Cities with Lime Softened Water:
Average cost for 6,000 gallons, not including Dubuque -$29.73
Dubuque’s cost is 4.3% less than the Average Top 6 Largest Cities' rate
with lime softening
Overall the City of Dubuque has the 3rd Lowest Proposed Water Rate
FY'14
Actual
FY'15
Actual
FY'16
Actual
FY'17
Budget
FY'18
Requested
Revenue $7,727,159 $7,829,512 $8,906,782 $9,009,007 $9,296,823
Expenses $7,921,010 $7,568,224 $6,991,358 $9,008,472 $9,033,504
$- $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 $8,000,000 $9,000,000 $10,000,000
Water Department
Revenue & Expense Summary
Revenue Expenses
Lead and Copper Rule Permit Compliance
Operator Certification Training
Well Maintenance Program –Well No. 10
West 3 rd Generator Completion
Provide City water to the Vernon Water Tower and the Vernon and Barrington Lakes water systems
Water Quality Testing
Capital Improvements
Water Storage Tank Coating
Program
Vacuum Filter Plant Process
Upgrade
Bulk CO2 Tank Replacement
Sludge Plant Vacuum Filter
Project Description Funding Source
Budget Cost
Estimate
Water Storage Tank Coating
Program
Water Construction
Fund $45,000.00
Bulk CO2 Tank Replacement
Water Construction
Fund $75,000.00
Vacuum Filter Plant Process
Upgrade
Water Construction
Fund $30,000.00
Estimated Total $150,000.00
Water Main Creek
Crossing Restoration
Old Mill Rd Before
Old Mill Rd After
Provide Clean, Safe and Reliable City Water and
Fire Protection
Installation of over 320 water meters and MIUs in
Vernon and Barrington Lakes in preparation for
connection to the City’s water supply.
Installation of approximately 7,000 lineal feet of 12
inch water main along John F Kennedy Road to
serve two new subdivisions.
Provide Clean, Safe and Reliable City Water and
Fire Protection
Installation and Completion of the English Mill
Pump Station and WestsideWater Main Extension
to the Vernon Water Tower, serving the Vernon
and Barrington Lake Water Systems.
Project Description Funding Source
Budget Cost
Estimate
Water Main Relocation -Sanitary Sewer Water Construction Fund $20,000.00
Creek Crossing Restoration Water Construction Fund $45,000.00
Water Main Upgrades -Street General Repairs Water Construction Fund $25,000.00
Maintenance of Water Main During Retaining Wall
Repair Water Construction Fund $20,000.00
Fire Hyd Relocation -Sidewalk Program Water Construction Fund $12,000.00
SW Arterial Water Main Extension Water Construction Fund $250,000.00
Southend Water Main Loop -Rockdale Rd to Manson
Rd Water Construction Fund $155,000.00
Water Main assoc. with Bridge Repairs Water Construction Fund $30,000.00
Westside Water Connection to Vernon Water Tower State Revolving Loan Fund $4,396,500.00
Estimated Total $4,953,500.00
Improvement
Packet
Description Supporting Information Est. Cost
One Mobile GIS
Laptop.
Improved efficiency. Ability for distribution staff in the field
to access the same level of GIS information for water
mains, hydrants, valves, and meter records available in
the department offices. These units are fixed in the work
vehicles to prevent theft.
$ 5,500.00
Two electronic
tablets
Used for capturing GIS information in the field during
inspection for live data entry into the mapping system.$ 3,040.00
One GPS unit
Used for field data collection of water main
appurtenances such as valves, bend, and hydrants for
accurate GIS location data entry. Reduces the need for
further surveying.
$ 2,644.00
Estimated Total $ 11,184.00
Thank you & Questions