NW Art JFK - 52 IDOT AgreementMEMORANDUM May 14, 2002 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen. City Manager SUBJECT: IDOT Pre-Construction Agreement - Northwest Arterial Extension. John F. Kennedy to US 52 The Iowa Department of Transportation (IDOT) has submitted a Pre-Construction Agreement for the City of Dubuque relating to the construction of Iowa 32 (Northwest Arterial) from John F. Kennedy Road to US 52. The agreement provides for the City's reconstruction of John F. Kennedy Road from Spring Valley Road to the northerly City limits to be incorporated into the IDOT construction project for the Northwest Arterial. A public hearing on these plans and specifications and the levy of special assessments has already been held and approved by the City Council. The additional work, although it will be incorporated into the IDOT contract, will be paid for at 100% City cost. The IDOT estimate for this work is $1,038,927. The City's public hearings were based on the City's estimated cost of $1,027,780, which is slightly different than IDOT's estimate. At the end of the project, the actual construction costs will be computed; and both the City's contribution to IDOT and the special assessments will be recalculated based upon actual construction costs. Public Works Director Mike Koch recommends approval of the of the Pre-Construction Agreement with IDOT relating to the construction of John F. Kennedy Road from Spring Valley Road to the northerly City limits, in conjunction with the Northwest Arterial from John F. Kennedy to US 52. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser. Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM May 14, 2002 TO: Michael C. Van Milligen, City Manager FROM: Michael A. Koch, Public Works Director SUBJECT: IDOT Pre-Construction Agreement- Northwest Arterial Extension, John F. Kennedy to US 52 INTRODUCTION Enclosed is a proposed agreement between the City of Dubuque and the Iowa Department of Transportation relating to the construction of Iowa 32 (Northwest Arterial) from John F. Kennedy Road to US 52. DISCUSSION The IDOT agreement provides for the City's reconstruction of John F. Kennedy Road from Spring Valley Road to the northerly City limits to be incorporated into the IDOT construction project for the Northwest Arterial. A public hearing on these plans and specifications and the levy of special assessments has already been held and approved by the City Council. The additional work, although it will be incorporated into the IDOT contract, will be paid for at 100 percent (100%) City cost. The IDOT estimate for this work is $1,038,927. The City's public hearings were based on the City's estimated cost of $1,027,780, which is slightly different than IDOT's estimate. At the end of the project, the actual construction costs will be computed; and both the City's contribution to IDOT and the special assessments will be recalculated based upon actual construction costs. RECOMMENDATION I recommend approval of the proposed agreement and further recommend that the Mayor be authorized and directed to sign the attached pre-construction agreement through the adoption of the enclosed resolution. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution relating to the construction of John F. Kennedy Road from Spring Valley Road to the northerly City limits, in conjunction with the Northwest Arterial from John F. Kennedy to US 52. MAK/vjd RESOLUTION NO.258-02 RESOLUTION APPROVING PRE-CONSTRUCTION AGREEMENT NO. 99-4-095C WITH THE IOWA DEPARTMENT OF TRANSPORTATION RELATING TO THE CONSTRUCTION OF IOWA 32 (NORTHWEST ARTERIAL) AND JOHN F. KENNEDY ROAD TO US 52 Whereas, the Iowa Department of Transportation is proposing to construct Iowa 32 from John F. Kennedy Road to US 52; and, Whereas, the Iowa Department of Transportation has prepared a pre- construction agreement outlining the terms and conditions under which the City's reconstruction project on John F. Kennedy Road from Spring Valley Road to the northerly City limits can be included in the State's construction project; and, Whereas, the City Council of the City of Dubuque approves the terms and conditions of said pre-construction agreement. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the Iowa Department of Transportation Agreement No. 99-4-095C consisting of an agreement providing for the City's reconstruction project on John F. Kennedy Road from Spring Valley Road to the northerly City limits be included in the Iowa Department of Transportation's contract for the construction of the Northwest Arterial from John F. Kennedy Road to US 52. Section 2. That the Mayor be authorized and directed to execute two copies of said pre-construction agreement. 2002. Karen M. Chesterman, Deputy City Clerk Passed, adopted and approved this 20th day of May, 2002. Terrance M. Duggan, .'Mayor Iowa Department of Transportation District 6 Office 430 Sixteenth Avenue SW P.O. Box 3150, Cedar Rapids, IA 52406-3150 319-364-0235 FAX: 319-364-9614 April 30, 2002 Ref: STP-32-t(2)--2C-31 Dubuque County City of Dubuque Addendum 99-4-095C Michael A. Kock P.E. Public Works Director/City Engineer 50 West 13th Street Dubuque, IA 52001~4845 SUBJECT: Extension of Iowa 32 (Northwest Arterial) Dear Mike: Attached are two (2) copies of an addendum to Agreement 99-4-095 between the City of Dubuque and the Iowa Department of Transportation for the above referenced project. The project involves the construction of an extension to Iowa 32 (Northwest Arterial). The addendum reflects the current concept of this project. Please secure the necessary approvals and signatures of the appropriate city officials and return both signed copies of the addendum to this office for further processing. An original of the fully executed addendmn will be forwarded to the city after final signature by our department. If you have any questions concerning this addendum, please contact me at the above listed phone number. Very truly yours, Richard E. Kautz, P.E. District Engineer REK/jh Attachment Staff Action No: ADDENDUM TO PRECONSTRUCTION AGREEMENT No: 99-4-095 County Dubuque City Dubuque Project No. STP-32-1 (2)- -2C-3 ! Iowa DOT Addendum No. 99-4-095C This Addendum, is entered into by and between the Iow~i Department of Transportation, hereinafter designated the "DOT", the City of Dubuque, hereafter designated the "CITY" in accordance with 761 Iowa Administrative Code Chapter 150 and Iowa Code sections 28E.12 and 306A.7; WITNESSETH; that WHEREAS, the DOT proposes to establish or improve an extension of the Northwest Arterial within Dubuque County, Iowa; and WHEREAS, the DOT and CITY are willing to jointly participate in said project, in the manner hereinafter provided; and WHEREAS, this Addendum reflects the current concept of this project which is subject to modification by the DOT; and NOW, THEREFORE, IT IS AGREED as follows: l. The DOT will design, let and inspect construction of the following described project in accordance with the project plans and DOT standard specifications: A new extension of Iowa 32, also known as the Northwest Arterial, will be constructed beguming at the junction of existing Iowa 32/J.F.Kermedy Road (J.F.K. Road) and extending northeasterly to the CITY's north corporation line. The new paved roadway will be a four-lane divided facility with a raised median. Each pair of lanes will be approximately 7.2 meters in width with a 1.8~meter wide paved inside shoulder and a 3.0-meter wide ~anular outside shoulder. 2 Special Provisions The CITY and DOT have previously entered into the following Agreements for the above referenced project: Agreement 98-1-178 for right of way acquisition was signed by the CITY and DOT on March 1 & 8, 1999 respectively. Agreement 99-4-095 for construction of the above referenced project was signed by He CITY and DOT on July 5 and 17, 2000 respectively. Addendum 99--4-095A for transfer 9f jurisdiction of Iowa 32 was signed by the CITY and DOT on July 20 and 26, 200t respectively. Addendum 99-4-095B for recreational trail construction was signed by the CITY and DOT on January 2 and 9, 2001 respectively. Additional miscellaneous improvements will be made to JFK Road within the CITY, at its west junction with the Northwest Arterial. This additional work will be accomplished at 100% CITY cost. The estimate for said work is approximately $1,038,927 (see the estimated quantities on Exhibit "A" attached). Miscellaneous Provisions Previously executed Agreements 98-1-178, 99-4-095 and Addendums 99-4-095A and 99- 4-095B (see section 2 herein) will remain in full force and effect except as revised herein. If any section, provision, or part of this Addendum shall be found to be .invalid or unconstitutional, such judgment shall not affect the validity of th? Addendum as a whole or any section, provision, or part thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the Addendum cannot be fulfilled. 6. It is the intent of all parties that no third party beneficiaries be created by this Addendum. Tiffs Addendum may be executed in two counterparts, each of which so executed will be deemed to be an original. Any subsequent change or modification to the terms of this Addendum will be in the form of a duly executed amendment to this document. 3 IN WITNESS WHEREOF, each o£the parties hereto has executed Addendum No. 99-4-095C as of the date shown opposite its signature below. CITY OF DUBUQUE, IOWA: By: Terrance M. Duggan, Mayor Date May 20 ,2002 Title: Karen M. Chesterman Deputy , certify that I am thc. Clerk of the CITY, and that Terrance M. Duggan, Mayor , who signed said Agreement for and on behalf of the CITY was duly authorized to execute the same on thel-20 day of l~ay ,200 2 Signed Karen M. Chesterman Deputy City Clerk of Dubuque, Iowa. IOWA DEPARTMENT OF TRANSPORTATION: By: Richard E. Kautz District Engineer District 6. Date ~ 200 4 EXHIBIT"A" CODE ITEM t 2101-100100 Clearing & Grubbing 2 2102-100100 Class t0 Excavation, Roadway and Borrow 3 2102-230100 Special Backfill Mater/al 4 2105-103000 Topsoil, Furnish and Spread 5 2110-100200 Granular Material 6 2111-100000 Granular Subbase 7 2121-200100 Granular Shoulder, Type B 8 2123- t 00100 Earth Shoulder Finishing 9 2 t 23-100200 Earth Shoulder, Construction 10 2301-132260 Standard or slip - Form Portland Cement Concrete Pavement, Class C, Class 2 Durability 260 mm 11 2303-042120 HMA (3M EASL) Intermediate, 12.5 mm 12 2353-043124 HMA (3M EASL) surf, 12.5 mm, Fric L-4 13 2303-246422 Asphalt Binder PG 64-22 14 2303-600000 Adjustment Of Fixture 15 2416-240525 Concrete Pipe Aprons 525 mm, Dia. 16 2416-240750 Concrete Pipe Aprons 750 mm Dia. 17 2416-320750 Pipe Aprons Guard (RF-26) 750 mrn 18 2502-300193 Su drain Outlet, R.F - 19C 19 2502-250100 Longitude Subdraln (Shoulder) t00 mm 20 2503-120525 Concrete 75D Storm Sewer pipe 525mm. Dia. 21 2503-120750 Concrete 75D Storm Sewer pipe 750 mm Dia. 22 2503-140375 Concrete 100D) Storm Sewer pipe 375 mm Dia. 23 2503-140450 Concrete 100D) Storm Sewer pipe 450 mm Dia. 24 2503-140525 Concrete 100D) Storm Sewer p~pe 525mm Dia. 25 2503-400500 Storm Sewer Utility Access RA-50 26 2507-001100 Revetment Class A 27 2510-001000 Removal of Pavement 28 2511-100000 Removal of Sidewalk 29 2511-200100 Portland Cement Concrete Sidewalk 100mm 30 2515-000100 Removal of Paved Driveway 31 2515-100150 Portland Cement Concrete Driveway 150 mm 32 2516-101000 Remove retaining Walls and Steps 33 2527-1010112 Painted Pavement Marking, Waterborne 34 2527-104010 Painted Symbols & Legend, Waterborne 35 2535-200440 Modular Block Retaining Wall 36 2598-190050 Relocate Water Service Stop Boxes 37 2599-999901 Watermain 304.8mrn DIP, Push on Joint w/Polywrap, Class 52 38 2599-999901 Watermaln 203.2mm, Push on Joint w/Polywrap, Class 52 UNIT QUANTITY Unit 98.9 M3 17686 MG 6670 M3 1178 MG 318 M2 3005 MG 68 M 1918 M 322.22 M2 11992 MG 374 MG 666 MG 34 Each 14 Each 1 Each t Each 1 Each 38 M 2375 M 7.6 M I4.3 M 677.3 M 271.5 M 75.5 Each 1 M2 60 M2 6334 M2 53 M2 2126 M2 1075 M2 641 M3 6 M 2839 Each 16 M2 30 Each 3 M 118 M' 4 39 2599-999901 Watermain t52.4mm DIP, Push on Joint w/Polywrap, Class 52 40 2599-999915 Fitting 304.8mm x 304.8mm x 304.8mm Anchor Tee 41 2599-999915 Storm Sewer, Intake 101-B 42 2599-999915 Water Valve Box Adjusrment, Repair and Clean 43 2599-999915 Water Valve Box, (Street) Replace Upper Sections and Lids 44 2599-999915 Hydrants MJ 45 2599-999915 Bend 152.4mm (90 Deg.) MJ 46 2599-999915 Fitting 304.8mm x 304.8mm x 203.2mm Anchor Tee 47 2599-999915 Mega Lug 304.8mm 48 2599-999915 Mega Lug 203.2mm 49 2599-999915 Pipe Aprons Guard (RF-26) 525mm 50 2599-999915 Valve, Gate 152.4mm RS "0" Ring MJ 51 2599-999915 Valve, Gate 203-.2rran RS "0" Ring MJ 52 2599-999915 Valve, Gate 304.8rfim RS "0" Ring MJ 53 2599-999915 54 2599-999915 55 2601-101200 56 2601-104200 57 2601-106000 58 2601-109010 59 2602-000020 Sleeve #441,203.2mm MJ Sleeve g441, 304.8mm MJ Seeding, Fertilizing (Urban) Mulching Sodding Watering Silt Fence M 20 Each t Each 30 Each 10 Each 10 Each 4 Each 1 Each 1 Each 7 Each 4 Each 1 Each 3 Each 1 Each 7 Each 1 Each 9 Ha 0.3 Ha 0.3 M2 6022 KL 2640 M 420 Estimated Total (100% CITY) $1,038,927