Loading...
Consent Decree Semi Annual Report March 31, 2017 Copyrighted April 17, 2017 City of Dubuque Consent Items # 5. ITEM TITLE: Consent Decree Semi Annual Report March 31, 2017 SUMMARY: City Manager transmitting the March 31 , 2017 Semi Annual Consent Decree Report that has been submitted to the United State Environmental Protection Agency as required by the Consent Decree. SUGGESTED DISPOSITION: Suggested Disposition: Receive and File ATTACHMENTS: Description Type US EPA Consent Decree Semi Annual Report-MVM City Manager Memo Memo Staff Memo Staff Memo Final Report and Appendix33117 Supporting Documentation THE CITY OF Dubuque DUB E i" Masterpiece on the Mississippi 2007.2012.2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: March 31 Semi Annual Report US EPA Consent Decree Required Submittal DATE: April 11, 2017 City Engineer Gus Psihoyos is transmitting the March 31, 2017 Semi Annual Consent Decree Report that has been submitted to the United State Environmental Protection Agency as required by the Consent Decree. I �) k�4 d1L-A^1 Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer TE-iE CITY OF . � Dubuque DUB E �All3Amedc 1i" Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manage. 1 FROM: Gus Psihoyos, City Engineer SUBJECT: March 31 Semi Annual Report US EPA Consent Decree Required Submittal DATE: April 10, 2017 Introduction The purpose of this memorandum is to present the March 31, 2017 Consent Decree Semi Annual Report to the City Council. Background The City of Dubuque, Iowa is under a Consent Decree according to Case 2:11-cv- 01001-EJM, United States of America and the State of Iowa v. the City of Dubuque, IA (N.D. Iowa), Civil Action Number 2008V00041, DOJ Case Number 90-5-1-1-09339 effective June 27, 2011. Per the Consent Decree, the City is required to submit a Semi Annual Report on March 31 st on September 30th after the effective date of the Consent Decree. Discussion The purpose of the Semi Annual report is to provide information related to the City's efforts to comply with the Consent Decree. The report specifically includes documentation on all Sanitary Sewer Overflows, a summary and status of projects including the Water Resource Recovery Center upgrades, a listing of any NPDES violations, and efforts and actions taken to reduce sources of infiltration and inflow. Action to be taken No action requested. The Semi Annual Consent Decree report is provided for the information recorded therein. cc: Barry Lindahl, City Attorney Deron Muehring, Civil Engineer Consent Decree Semiannual Report March 31, 2017 Consent Decree No. 2:11-cv-01011-EJM Prepared for: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY, UNITED STATES DEPARTMENT OF JUSTICE AND IOWA DEPARTMENT OF NATURAL RESOURCES Prepared by: March 30, 2017 CITY OF DUBUQUE, IA 50 W 13�1' Street Dubuque, IA 52001 Table of Contents 1.0 CERTIFICATION...........................................................................................................1-4 2.0 INTRODUCTION...........................................................................................................2-5 2.1 Background..........................................................................................................2-5 2.2 Purpose................................................................................................................. 2-5 2.3 Report Summary.................................................................................................. 2-5 3.0 SANITARY SEWER OVERFLOWS............................................................................3-7 3.1 Sanitary Sewer Overflow Record........................................................................ 3-7 3.1.1 Dry Weather Overflows.............................................................................. 3-7 3.1.1.1 Dog Track Lift Station Overflow...............................................3-7 3.1.1.2 Welu Drive Overflow .........................................................3-8 3.1.2 Wet Weather Overflows ............................................................................. 3-8 3.2 SSO's Effect on Public Health and Water Quality..............................................3-8 3.3 Measures Enacted to Minimize Duration and Impact..........................................3-9 3.4 Measures Enacted to Stop the Overflow Event...................................................3-9 3.5 Measures Enacted to Prevent Another Recurrance.............................................. 3-9 3.6 Capturing Key Way Overflows ........................................................................... 3-9 3.7 Warning Sign Postings......................................................................................... 3-9 4.0 WATER& RESOURCE RECOVERY CENTER CONSTRUCTION UPGRADE4-11 4.1 Project Planning................................................................................................. 4-11 4.2 Current Project Status ........................................................................................ 4-12 4.3 Biosolid Accumulation Prevention at the W&RRC .......................................... 4-12 5.0 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES).5-13 5.1 Summary of all NPDES Permit Requirement Information................................ 5-13 5.2 NPDES Violations at the WRRC During The Reporting Period....................... 5-13 6.0 INFLOW & INFILTRATION REDUCTION PROGRAM......................................6-14 6.1 Background........................................................................................................ 6-14 6.2 Flow Metering.................................................................................................... 6-14 6.2.1 Sewershed 5 Flow Metering..................................................................... 6-15 6.2.2 Sewershed 7 Flow Metering..................................................................... 6-16 6.2.3 Sewershed 10 Flow Metering................................................................... 6-16 6.2.4 Sewershed 11 Flow Metering................................................................... 6-18 6.2.5 Sewershed 12 Flow Metering.................................................................. 6-18 6.3 Source Investigations......................................................................................... 6-19 6.3.1 Private Property Inspections..................................................................... 6-19 6.3.2 Dye Testing ......................................................................................... 6-20 i 6.3.3 Smoke Testing..................................................................................... 6-20 6.3.4 Manholes ............................................................................................. 6-20 6.3.5 Sanitary Sewer..................................................................................... 6-21 6.4 Corrective Action Plan....................................................................................... 6-21 7.0 CORRECTIVE ACTION PLAN IMPLEMENTATION SCHEDULE...................7-22 7.1 Sewershed 11 corrective action plan schedule................................................... 7-22 7.1.1 Private Property Corrections ............................................................... 7-22 7.1.2 Private Property Corrections Identified during 2011 Smoke Testing. 7-25 7.1.3 Public Sanitary and Storm Sewer Corrections Identified by 2011 Smoke Testing................................................................................................. 7-27 7.2 Sewershed 12 corrective action plan schedule................................................... 7-34 7.2.1 Private Property Inspections Corrections............................................ 7-34 7.2.2 Sanitary Sewer Smoke Testing: Private Property Defects Corrections — Laterals................................................................................................ 7-37 7.2.3 Sanitary Sewer Smoke Testing: Private Property Defects Corrections — Various................................................................................................ 7-38 7.2.4 Sanitary Sewer Smoke Testing: Public Property Corrections............. 7-39 7.2.5 Sewershed 12 Sanitary Sewer Smoke Testing: Storm Catch Basins .. 7-39 7.2.6 Sewershed 12 Manhole Corrections........Error! Bookmark not derived. 7.2.7 Sewershed 12 Brick Manhole Corrections.......................................... 7-41 7.2.8 Sewershed 12 Sanitary Sewer Rehabilitation/Corrections.................. 7-42 7.3 Sewershed 7 corrective action plan schedule..................................................... 7-43 7.3.1 Sewershed 7 Failed and Corrected Private Property Inspections........ 7-44 7.3.2 Sewershed 7 Sanitary Sewer Smoke Testing- Private Property Defect Corrections.......................................................................................... 7-45 7.3.3 Sanitary Sewer Smoke Testing: Public Property— Sanitary Sewer Corrections.......................................................................................... 7-47 7.3.4 Sewershed 7 Sanitary Sewer Smoke Testing: Public Property—Storm Sewer Corrections............................................................................... 7-50 7.3.5 Sewershed 7 Manhole Corrections...................................................... 7-53 7.3.6 Sewershed 7 Brick Manhole Corrections............................................ 7-55 7.3.7 Sewershed 7 Sanitary Sewer Corrections............................................ 7-55 7.4 Sewershed 5 corrective action plan schedule..................................................... 7-56 7.4.1 Sewershed 5 Failed and Corrected Private Property Inspections........ 7-56 7.4.2 Sewershed 5 San. Sewer Smoke Testing—Private Property Defect Corrections.......................................................................................... 7-58 7.4.3 Sewershed 5 Manhole Corrections...................................................... 7-59 7.4.4 Sewershed 5 Carter Road Detention Basin - Manhole Corrections .... 7-64 7.4.5 Sewershed 5 Sanitary Sewer Corrections............................................ 7-65 7.5 Sewershed 10 corrective action plan schedule................................................... 7-68 7.5.1 Sewershed 10 Failed and Corrected Private Property Inspections...... 7-68 7.5.2 Sewershed 10 San. Sewer Smoke Testing—Private Property Defects 7-74 7.5.3 Sewershed 10 Sanitary Sewer Manhole Corrections........................... 7-76 7.5.4 Sewershed 10 Sanitary Sewer Rehabilitation...................................... 7-80 7.5.5 Sewershed 10 Sanitary Sewer Replacement........................................ 7-82 ii 8.0 CMOM UPDATE..........................................................................................................8-84 8.1 The CMOM Program......................................................................................... 8-84 8.2 CMOM Implementation..................................................................................... 8-84 8.2.1 Fats, Oils, and Grease ............................................................................... 8-84 9.0 ASSESSMENTS AND ENGINEERING ANALYSES...............................................9-85 TABLES Table 2-1 Organization of information required by the Consent Decree 2-6 Table 3-1 Sanitary sewer overflows during the reporting period__________________________________________ 3-8 Table 3-2 Warning sign posting locations_____________________________________________________________________________ 3-10 Table 4-1 Significant deadlines for the Water & Resource Recovery Center 4-11 Table 5-1 Monthly operating reports submitted during the reporting period------------------------ Table 6-1 Sewershed 5 Flow Data from Significant, Similar Storm Events ________________________ 6-15 Table 6-2 Sewershed 10-A Flow Meter Data Summary------------------------------------------------------- Table 6-3 Sewershed 10-B Flow Meter Data Summary........................................................6-17 Table 6-4 Sewershed 11 Flow Meter Data Summary------------------------------------------------------------- 6-18 Table 6-5 Sewershed 12 Flow Meter Data Summary for October 26, 2016 Rain___ ________6-19 Table 6-6 Private Property Inspection Progress---------------------------------------------------------------------6-19 FIGURES Figure 6-1 Map of priority sewersheds for I&I investigation 6-20 APPENDICES APPENDIX A— FLOW METER LOCATION MAP APPENDIX B — SEWERSHED 5: LOCATION MAP AND FLOW METER DATA APPENDIX C — SEWERSHED 7: LOCATION MAP AND FLOW DATA APPENDIX D— SEWERSHEDS 10 & 6C: LOCATION MAP AND FLOW DATA APPENDIX E — SEWERSHED 11: LOCATION MAP AND FLOW DATA APPENDIX F — SEWERSHED 12: LOCATION MAP AND FLOW DATA iii 1.0 Certification I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my directions and my inquiry of the person or person who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for kn 'olations. Gus N.Psihoyos City Engineer 14 2.0 Introduction 2.1 BACKGROUND The City of Dubuque, Iowa is under a Consent Decree according to Case 2:11-cv-01001-EJM, United States of America and the State of Iowa v. the City of Dubuque, IA (N.D. Iowa), Civil Action Number 2008V00041, DOJ Case Number 90-5-1-1-09339. The Consent Decree became effective on June 27, 2011 and requires the City to submit semiannual reports to the Department of Justice (DOJ), Environmental Protection Agency (EPA) and Iowa Department of Natural Resources (DNR). 2.2 PURPOSE The purpose of this report is to satisfy Section VIII, Paragraph 25 of the Consent Decree. Paragraph 25 requires the City to submit semiannual reports on March 31 and September 30 after the Effective Date (June 27, 2011). The report includes summary information regarding events and activities performed in the prior six months. Therefore, the "reporting period" shall refer to the time between October 1, 2016 and March 31, 2017, minus the document transportation dates to ensure deliver of the report by the deadline. 2.3 REPORT SUMMARY Paragraph 25 of the Consent Decree requires the semiannual reports to include specific information as well as a summary of the status and progress of all projects and programs required by Sections V and VI of the Consent Decree. Table 2-1 lists how the required information is organized in this report. 2-5 Table 2-1. Or anizatiion of information required by the Consent Decree. Consent Decree Summary of Requirement Report Section Paragraph 25(a)i Sanitary Sewer Overflow (SSO) locations 3.1 25(a)ii SSO duration of flows Table 3-1 25(a)iii SSO estimated flow volume Table 3-1 25(a)iv Waterbody downstream of SSO Table 3-1 25(a)v I Suspected cause of SSO Table 3-1 25(a)vi SSO effect on public health and water quality 3.2 25(a)vii Measures to minimize SSO 3.3 25(a)viii Measures to stop SSO 3.4 Measures to prevent recurrence of SSO and 25(a)ix 3.5 milestones 25 b i Construction upgrades 4.0 25(b)ii NPDES permit summary 5.1 25(b)iii NPDES permit violations during reporting period 5.2 8 Assessments and engineering analyses 9.0 9 Disposal of biosolids at WPCP 4.3 10(a) Capture of overflow from Key Way Drive manhole 3.6 10(b) Posting of warning signs at SSO locations 3.7 11 Construction upgrade to WPCP 4.0 12(a) North Fork Catfish Creek interceptor placed into Reported in 9/30/11 service Semiannual Report 12(b) I&I flow metering 6.2 12(c) Flow meters installed in first sewershed during 2010 Reported in 9/30/11 Semiannual Report 12(d) I&I source identification 6.3 12(e) I&I corrective action plan 6.4 12 Implement I&I corrective actions 7.0 13(a) Collection System Management, Operation, and 8.0 Maintenance plan CMOM 13(b) Implement CMOM 8.2 14 Certify legal authority Completed upon signing of Consent Decree To be completed by June 15 Certify that Section V of Consent Decree has been 30, 2016. Project completed and placed into service Extension Requested April 2016. 16 Demonstrate all SSO and by-passes have been To be completed by June eliminated 30, 2017 17 If SSO or by-pass occurs, submit Remedial Plan and Only applicable after Schedule June 30, 2017 18 If SSO or by-pass occurs due to O&M, submit Only applicable after Remedial Plan and Schedule June 30, 2017 2-6 3.0 Sanitary Sewer Overflows 3.1 SANITARY SEWER OVERFLOW RECORD The City of Dubuque experienced two (2) dry weather sanitary sewer overflows during the six- month reporting period. No known wet weather overflows were observed. Table 3-1 lists the locations and details of the overflows. The times reported as Start Times document when the call came into the Public Works department. The precise start time of the overflow may not be reported as it is dependent upon a member of the public or City staff observing and reporting the occurrence. The end time is documented as the time when the Public Works department was able to return the flow back to the sewer flow line and contain any spill that may have occurred. 3.1.1 Dry Weather Overflows Dry weather overflows were observed at two locations during the reporting period. Power loss and the failure of the battery backup system at the Dog Track Lift Station resulted in a small discharge of untreated wastewater from a manhole into an unnamed ditch. A second incident occurred as a result of a sanitary sewer pipe plugged with a buildup of non-flushables and grease resulting in a discharge of untreated wastewater from a manhole located in an off-road location near 3654 Welu Drive. 3.1.1.1 Dog Track Lift Station Overflow The failure of the Dog Track Lift Station was discovered by the City of Dubuque WRRC maintenance electrician around 10:00 a.m. on the 14"' of November. The DNR was notified of the failure, and likelihood of a bypass, at approximately 2:00 p.m. that same afternoon. Once the failure was noticed, the City inspected the area for a possible overflow. Evidence of an overflow was found at a manhole just east of Greyhound Park Drive (the manhole is the first upstream of the lift station). The discharge appears to have flowed to a drainage ditch, which then flows through a culvert under Greyhound Park Drive, and then enters the Lake Peosta Channel of the Mississippi River just north of the 16th street bridge. The only evidence of the discharge was from the manhole to the water in the drainage ditch. The water in the drainage ditch appeared very clear, and did not seem to be heavily impacted. The discharge was attributed to a failed UPS (uninterruptable power supply), which caused a loss of control power at the station. It appears the station may have failed around 7:20 a.m. on Friday, November 11th,just after the station was checked by the maintenance crew. The UPS was replaced, and function of the station was restored at around 11 :30 a.m. on the 14th. With an estimated daily flow of 20,000 gallons into the station and similar capacity within the wet well, the estimate is that a few hundred gallons of untreated wastewater entered an unnamed drainage ditch which ditch empties into the Mississippi River. The amount could have been more but the manhole from which the discharge occurred has a cover that is gasketed and bolted down, which would heavily restrict flow out of the manhole cover. The area around the manhole was limed and a warning sign was posted as required. 3-7 3.1.1.2 Welu Drive Overflow The overflow near Welu Drive occurred on March 9, 2017. The bypass was reported to the Public Works Department at 1 :30 p.m. and reported to the DNR at approximately 3:30 p.m. the same day. Sewer maintenance crews found an overflowing manhole located in an off-road location near 3654 Welu Drive. Crews were able to remove the blockage from the manhole by 3:00 pm. The line was subsequently cleaned and inspected with CCTV equipment. No pipe defects were found. The area around the manhole was cleaned, and a warning sign posted . The sign will stay up for the required six months unless provided additional direction from the DNR. A media release was issued notifying the public of the SSO location. It is estimated that 1,000 gallons of untreated wastewater spilled on to the ground around the manhole. 3.1.2 Wet Weather Overflows No known wet weather overflows were observed. Table 3-1. Sanitary sewer overflows during the reporting period SSO# 1 2 Sewershed No. S 2 Local Address Greyhound Park Off road near Drive near E. W 3654 Welu Drive Street Lift Station Start Date 11/11/16 03/09/16 Estimated Estimated Start Time 7:20 a.m. 1:30 a.m. End Date 11/14/16 03/09/16 End Time 11:30 a.m. 2:30 p.m. Est.Overflow Est 200 gallons Est. 1,000 gallons Volume,Gal. Downstream Mississippi River Middle Fork Waterbody Catfish Creek Suspected Failed UPS at E. Buildup of non- Cause 16"Street(Dog flushables and Track)Lift Station grease in the line. 3.2 SSO'S EFFECT ON PUBLIC HEALTH AND WATER QUALITY There is always concern regarding public health, welfare and the environment with any overflow event. City staff conducts visual inspections of the overflow area to document the condition of the site and to perform clean-up activities as necessary. Both of the SSO's were reported to the Iowa DNR Manchester Office within 24 hours of discovery. In both cases, a sign was posted in accordance with the Consent Decree at a location near the intersection where the overflow occurred. 3-8 3.3 MEASURES ENACTED TO MINIMIZE DURATION AND IMPACT The City minimized the duration and impact of the SSOs by quickly responding to, and taking steps necessary to halt, the SSOs after they were discovered by City staff. The City maintains pumps and hose to return wastewater flows back to the sanitary sewer system and minimize the duration of the overflow. 3.4 MEASURES ENACTED TO STOP THE OVERFLOW EVENT The SSO related to the lift station failure was discovered by City staff seeking out a possible overflow once the control system failure was discovered at the lift station. The faulty uninterrupted power supply (UPS) that caused a loss of control power was replaced within 90 minutes of discovery. The fact that the manhole from which the SSO discharge occurred has a cover that is gasketed and bolted down, the release of wastewater was severely restricted. Public Works crews were able to clear the blockage that caused the second overflow within two hours of discovery. This involved cleaning and inspecting the line with CCTV equipment. No pipe defects were found. 3.5 MEASURES ENACTED TO PREVENT ANOTHER RECURRANCE The City inspects the Dog Track Lift Station on a daily basis. The Dog Track Lift Station has also been added to the City SCADA system so that timely notifications are sent out due to unusual flow conditions. With the replacement of the UPS battery and the automatic notifications produced by the SCADA system, no future overflows due to a faulty UPS should occur. The second overflow near Welu Drive was caused by an accumulation of non-flushables and grease in the line. The City's approved Sanitary Sewer System Capacity, Management, Operation and Maintenance Program (CMOM) identified a predictive/preventive maintenance schedule for known problem areas that are identified, prioritized, and placed on a programmed maintenance schedule by the Public Works Department. The adopted schedule called for cleaning the "Penn PI/ Welu Dr cul-de-sac" sewer line on a semi-annual (spring/fall)basis. Per the CMOM,the schedule will be updated and adjusted when appropriate. As such,the Public Works Department has adjusted the maintenance schedule for the "Penn PI/ Welu Dr cul-de- sac" sewer line to be cleaned on a quarterly basis. 3.6 CAPTURING KEY WAY OVERFLOWS Paragraph 10 of the Consent Decree requires the City to capture all overflows from the manhole located on Key Way Drive between 3500 Keymer Drive and 3507 Keystone Drive. No sanitary sewer overflows occurred at this location during the reporting period. 3.7 WARNING SIGN POSTINGS Paragraph 10 of the Consent Decree requires that the City post a warning sign at all SSO sites for at least 6 months after completion of the site cleanup, unless IDNR decides that the sign may be posted for a shorter period of time or not at all. 3-9 Table 3-2.Warning sign posting locations. SSO Location Description Greyhound Park Drive near E. Sign is located. 16th Street Lift Station Two signs were placed: one just north of the easterly end of Off road near 3654 Welu Drive Welu Drive cul de sac and a second near the private drive of Penn Place Apartments. 3-10 4.0 Water & Resource Recovery Center Construction Upgrade Much of the information stated herein is a restatement from previous Semi Annual reports, and remains in the report for reference along with maintained compliance with the Consent Decree's reporting requirements. New information is presented in Section 4.2. 4.1 PROJECT PLANNING During its Fiscal Year 2006 goal setting process, the City Council listed the Water Pollution Control Plant (WPCP) as one of its high priorities. City staff subsequently applied for a State Revolving Fund (SRF) planning and design loan during the summer of 2006, and plant upgrades were placed on the DNR Intended Use Plan schedule. Following public hearings and bidding requirements, the Facility Plan was developed and approved by DNR. The facility's name was also changed to the Water & Resource Recovery Center (W&RRC). In October 2008, the team of Strand Associates and IIW Engineers was approved by the City Council to proceed with the design of the W&RRC upgrades. The NPDES permit was issued by DNR staff on April 1, 2010, and the plant construction permit was signed by DNR staff on April 5, 2010. Following public bidding requirements, the City Council approved a contract, and the notice to proceed was issued August 19, 2010. Table 4-1 lists the revised significant deadlines for the project, which take into account project delays resulting from force majeure. Table 4-1. Significant deadlines for the Water&Resource Recovery Center Deadline Project Completion Date Digester Startup January 7, 2013 Sludge Processing Startup February 6, 2013 Excess Flow Equalization April 18, 2013 Aeration Tank Completion June 21, 2013 Final Clarifiers August 8, 2013 Substantial Completion August 29, 2013 Upgrades completed and placed in service per Section August 29, 2013 11 of the Consent Decree 4-11 4.2 CURRENT PROJECT STATUS The City of Dubuque's lead engineer, Strand Associates, certified the project as substantially complete. A copy of the Substantial Completion letter was submitted with the March 31, 2014 Semi Annual Report. The W&RRC is fully operational and with all upgrades completed since August 2013, well within the compliance date set by the Consent Decree. As stated in their letter of March 23, 2017, the DNR inspected the W&RRC on 4/2/15 as a requirement of the SRF program and prerequisite to finalizing the loan(s). It was the determination of the DNR that the "project is considered complete for the purposes of finalizing the loan(s)." In March of 2017, the City Council formally accepted the improvements to the W&RRC and established the final contract in the amount of$54,942,567.00, officially closing the contract. 4.3 BIOSOLID ACCUMULATION PREVENTION AT THE W&RRC In February 2013, the City installed the new solids handling equipment (two centrifuges), and entered into a contract with Nutri-Jet Systems of Hudson, Iowa to manage the bio-solids, thereby preventing accumulation of bio-solids at the W&RRC. 4-12 5.0 National Pollutant Discharge Elimination System (NPDES) 5.1 SUMMARY OF ALL NPDES PERMIT REQUIREMENT INFORMATION NPDES Monthly Operating Reports (MOR)for the City of Dubuque W&RRC were submitted to IDNR on the dates listed in Table 5-1: Table 5-1.Monthly operating reports submitted during the reporting period. Report Date Submitted September 2016 10/15/2016 October 2016 11/15/2016 November 2016 12/16/2016 December 2016 1/15/2017 January 2017 2/14/2017 February 2017 3/15/2017 5.2 NPDES VIOLATIONS AT THE WRRC DURING THE REPORTING PERIOD There were no NPDES permit violations at the WRRC during the reporting period. 5-13 6.0 Inflow & Infiltration Reduction Program 6.1 BACKGROUND Prior to the Consent Decree date of lodging, the City had initiated a study to identify I/I within the sewer system utilizing flow meters strategically placed throughout the City. Depending on location, the meters measured the flow from each Sewershed for over a month with some up to an eleven month period. Five of the twelve Sewersheds monitored were identified as receiving elevated flows during and directly after a precipitation event. Under the Consent Decree,the City agreed to investigate these five Sewersheds, illustrated in Figure 6-1, before January 1, 2016. The City completed its preliminary investigation of the five sewersheds prior to January 1, 2016. As a result, the City has identified the capital improvements necessary to eliminate significant sources of inflow and infiltration of storm and ground water into the collection system. These improvements are identified in the Consent Decree Corrective Action Plan. The City recognizes that its work toward the goal of eliminating sanitary sewer overflows will continue beyond the sources identified during the investigations prior to January 1, 2016, therefore the City has invested and continues to invest in long term permanent flow metering of its collection system. The investment in long term flow metering will not only show the reduction of inflow and infiltration as a result of capital improvements made to the collection system, but also highlight areas where additional work may be necessary. Section 6.2 describes the ongoing flow metering results and effort. 6.2 FLOW METERING Even though the required investigation into the causes of I&I and their contribution to SSOs as outlined in the Consent Decree has been completed, the City continues to voluntarily monitor sanitary sewer flows at key locations throughout the City. This continued collection of flow metering data will inform the effectiveness of improvements and to observe changes from earlier flow metering data. During the reporting period, flow data was collected in Consent Decree Sewersheds 5, 7, 10, 11, and 12, as well as, Sewersheds 1, 2, 3, and 6. Sewersheds 1, 2, and 3 drain into an interceptor sewer along Catfish Creek, which was subject to overflows in July 2014 and also in June and July of 2016. Appendix A includes a map showing City-wide flow metering at thirty-three locations, including those in the Consent Decree focus areas. The City's new permanent flow metering stations are also highlighted on the map. In previous semi-annual reports, the notable rain events were selected based on the peak rain depth and total rain measured during the event. The intensity was not reported. Following March 2016 Semi Annual review comments, the rain event will include the intensity, while still including the total rain event in inches. During the reporting period the region experienced several notable rain events, rain intensities defined as greater than 0.5 inch per hour in May, June and July 2016. The following sections document the response of the system in each of the Consent Decree sewersheds to these events. 6-14 6.2.1 Sewershed 5 Flow Metering The City reports Sewershed 5 flow data via a permanent flow monitor located at the intersection of West 32nd Street and Central Avenue, using the City's extensive fiber optic network onto the City's SCADA system. The City is capable of real time monitoring of sanitary sewer flows during rain events. The permanent flow metering station came online November 13, 2015. The site was selected due to its ease of access, proximity to a fiber optic network via the traffic control system, electricity, and the ability to review flow data from the Sewershed in isolation from other sewersheds. The City continues to use Teledyne/ISCO flow meters and installed the latest generation of flow meter, the Signature meter. The meter body is installed in a nearby traffic cabinet and it relays real-time flow data and alarms via the City's fiber optic network. Flows from Sewershed 5 are monitored in unison with flows from Sewersheds 6 and 7 as they are also measured as they pass through Sewershed 10. Section 7 of this report includes the corrective actions established for Sewershed 5 as the City works toward reducing sources of I&I. During the required monitoring period prescribed under the Consent Decree, flow metering and site inspections identified significant inflow in an area adjacent to the Carter Road detention basin. The Carter Road detention basin, a storm water flood mitigation facility, is located upstream of the intersection of Carter Road and West 32nd Street. When the basin fills with storm water, sanitary sewer manholes are often submerged. The City identified several corrective actions to be taken, including sanitary sewer cured-in-place-pipe lining and manhole rehabilitation in and around the detention basin; this work has been completed. The supporting graphical flow data may be found in Appendix B along with a location map. No new sources of inflow and infiltration were identified during the current reporting period. There was one significant rain event during the reporting period; 1.16 inches of rain was recorded on October 26. Unfortunately, a meter sensor failure prevented a full picture of the resulting I/I within the sewershed. But even so, the sensor was brought back online in time to capture meaningful data. The maximum depth of water in the sewer pipe reached only 3.81 inches. When compared to recorded depths from similar rains in previous years, the UI source identification and removal efforts [manhole improvements/replacements and sanitary sewer lining] in 2015 and 2016 appear to have made a difference. The City will continue to track and monitor the system following improvements and significant rain events. Table 6-1 Comparison of Flow Meter Data Collected in Sewershed 5 from Significant,Similar Storm Events Event Date Ave. Dry Weather Total Rain Peak,Wet Weather Max flow depth(in) Flow Rate, MGD Event,Inches Flow Rate, MGD 24"dia. pipe October 4, 2013 0.283 0.74 0.69 October 13, 2014 0.525 1.83 0.94 7.17 September 29, 2015 0.279 1.03 0.71 4.86 October 26, 2016 0.381 1.16 Sensor Failure 3.81 6-15 6.2.1 Sewershed 7 Flow Metering The flows through Sewershed 7 are metered at two permanent flow metering sites, site 7A and site 713, with two mobile flow meters located upstream of Sewershed 7B. Sewershed 7 is divided into in two separate basins, 7A and 7B as there is a common high point manhole where the basins connect but flow in opposite directions. The flow metering reports therefore reflect the two distinct areas, and are summarized in the following tables. Data collected from the meters during significant rain events will be retained and compared to future rain events to observe emerging patterns. Appendix C contains a map of Sewershed 7 and the flow data collected during the reporting period. The data is from the meters located at White Street next to Fulton (7A Master Meter), 2404 White (713 Master Meter), 2225 Central (713 sub-meter), and 400 Kaufmann (2225 Central sub-meter). During the October 26, 2016 rain event, the peak flow rate measured at 7A jumped to 0.09 mgd, more than double the peak dry weather flow rate of 0.04 mgd. Similarly, peak flow rate at 7B jumped to 0.23 mgd, three times the peak dry weather rate of 0.08 mgd. In both cases, the apparent immediate response indicates the presence of direct connections that allow surface water to enter into the system. The City will continue to investigate the area for sources of inflow and infiltration and may deploy flow meters upstream of site 7A flow meter to assist with the investigation. All available graphical data for the October rain are in Appendix C. The area upstream of 7B has been improved, with sanitary sewer manhole replacements, sanitary sewer main rehabilitation and replacement, and repairs made to sanitary sewer laterals. The flows appear to be less than what is typically measured, however it is clear additional improvements are necessary to reduce inflow. The graphics show trending where the systems recovers quickly to normal levels, therefore the focus will remain on improvements to address inflow. Improvements are scheduled for the area upstream of site 7B through 2026. 6.2.3 Sewershed 10 Flow Metering The Sewershed 10 drainage area changed since filing of the Consent Decree in 2009 and completion of the required monitoring period in 2014. Construction of the Upper Bee Branch Creek Restoration Project, one phase of the $219 million Bee Branch Watershed Flood Mitigation Project, started in early 2015. The project involves the removal of a buried storm sewer and daylighting the creek. The work required the relocation/reconstruction of public utilities, including sanitary sewer that both serve and/or pass through the project footprint. As a result, all of the flow originating in Sewershed 10 no longer passes through the meter at Rhomburg and Kniest (10-A) as it did prior to 2015. Instead, a second meter, known as site 10- B, was added in a 36-inch diameter sewer located adjacent to 2256 Prince Street installed as part of the Upper Bee Branch Creek Restoration Project. Two location maps are in Appendix D, one shows the Sewershed 10 monitoring area pre-2015, the second shows the revised Sewershed 10 monitoring locations beginning in December of 2015, with two metering sites 10-A and 10-B. The maps also show where adjacent sewersheds pass into Sewershed 10. The Sewershed 10-A 6-16 flow meter is located downstream of adjacent the Sewershed 7(`A' and `B'), and the Sewershed 10-B flow meter is located downstream of Sewersheds 5 and 6 sub-area C. A summary of the flow data at sites 10-A and 10-B are shown in Tables 6-2 and 6-3 respectively. Table 6-4 includes Sewershed 7-A and 7-13 meter data as wastewater from Sewershed 7 flows into Sewershed 10 and ultimately through flow meter 10-A. The peak flow essentially increased by 300% through each metered area as a result of the 1-inch rain in October. This is similar to, but slightly less than the increase reflected in flow data collected at 10-A following an October 13, 2014 1.8-inch rain. In that case, the flow increased by 331% due to I/I. Table 6-2 Sewershed 10-A Flow Meter Data Summary Average Daily Dry October 26,2016 Sewershed Meter Reference No. Weather Flow, Peak Flow,MGD MGD (Rain Intensity, 0.40 in/hr) 7A Master Meter(sub to 10-A) 0.024 0.09 7B Master Meter(sub to 10-A) 0.073 0.23 10-A Master Meter Rhomburg and Kneist 0.320 1.10 Table 6-3 shows a comparison of flow data collected in October of 2013 to flow data collected in October 2016. It includes flow data from Sewersheds 5 and 6, sub-basin C as they contribute flow to Sewershed 10. A significant direct inflow source was detected in September of 2015 upstream of meter 6C. The source was removed and is evidenced by the reduced I/I peaking factor. Table 6-3 Sewershed 10-B Flow Meter Data Summary Sewershed Meter 5 Master Meter 6C Meter 10-B Meter Reference No. (sub to 6C) (sub to 10-B) Prince Street October 13, 2014: 1.83 inches of Rain Peak Flow, MGD 0.94 2.27 (Average DWF, MGD) (0.525) (0.770) N/A /1 Peaking Factor 1.8 2.9 October 26, 2016: 1.16 Inches of Rain Peak Flow, MGD 0.525 1.85 2.17 (Average DWF, MGD) (0.381) (0.927) (0.846) /1 Peaking Factor 1.4 2.0 2.6 The City will continue to work with private property owners to make improvements to several buildings upstream of meter 6C. Specifically, one property owner has identified several improvements that are necessary to their facilities. They will be examining their internal roof drainage system to verify where it is connected and have indicated that they will continue to keep the City informed as they make improvements. In addition, the City continues to work on focusing efforts to reducing I&I in Sewershed 5 as described in Section 6.2.1 and in Sewershed 10. The City will be following the Corrective Actions as outlined in the December 2015 plan. 6-17 6.2.4 Sewershed 11 Flow Metering The City continues to collect flow data at three locations within Sewershed 11 located in and around the Rosedale and Locust area where rain related sanitary sewer overflows have been historically documented. Appendix E contains flow data collected at the three Sewershed 11 meter locations. The data is from the meters located at 1098 W. Locust, Rosedale and W. Locust, and 606 W. Locust Street. Recognizing that it only two events are compared [they are the only two October events with flow data collected as a result of a significant rain event], the data in Table 6-4 shows flow data collected during the October 2017 rain and the October 2013 rain. The table reveals a few things. The reduced I/I peaking factor from 2013 to 2016 seems to provide evidence of progress made reducing the UI coming from the Rosedale area and W. Locust Street area west of Rosedale. The fact that the peaking factor at 606 W. Locust Street is about 120% more than the two upstream meters seems to indicate that a look into I/I coming from the Cox Street area is warranted. The City continues to work with private property owners to make improvements as flows continue to demonstrate direct inflow. Table 6-4 Sewershed 11 Flow Meter Data Summary Sewershed Meter 1098 W. Locust Rosedale &W. 606 W. Locust Reference No. Locust (Master) October 13, 2014: 1.83 inches of Rain Peak Flow, MGD 0.22 1.28 NA (Average DWF, MGD) (0.029) (0.261) /1 Peaking Factor 7.6 4.9 October 26, 2016: 1.16 Inches of Rain Peak Flow, MGD 0.16 1.02 1.03 (Average DWF, MGD) (0.059) (0.396) (0.331) /1 Peaking Factor 2.7 2.6 3.11 6.2.5 Sewershed 12 Flow Metering Sewershed 12 has a permanent flow meter installed at 1" Street and Locust Street; this will monitor all flows passing through the Sewershed. In addition, the City continues to meter flow upstream of the master meter at four sites. A meter location map and available flow data may be found in Appendix F. The purpose is to evaluate improvements that were made in Sewershed 12, which included sanitary sewer CIPP lining, manhole replacement, and sanitary sewer repairs and establish the benchmark for further work which is scheduled for the area. Flow data collected for the October rain is summarized in Table 6-5. Flow characteristics of the sanitary sewer system in Sewershed 12 are not conducive to flow metering due to excessive pipe slopes. The City is exploring alternative locations and/or configurations to improve flow data collection. 6-18 Table 6-5 Sewershed 12 Flow Meter Data Summary for October 26,2016 Rain(1.16 Inches) Bluff Sewershed Meter325 W.1st St. Reference No. 554 W.8th 8th& Hill 420 Emmett (Master) Peak Flow, MGD 0.22 0.84 0.19 1.13 (Average DWF, MGD) (0.067) Sensor Failure (0.409) (0.039) (0.525) /1 Peaking Factor 3.3 2.1 4.9 2.2 6.3 SOURCE INVESTIGATIONS 6.3.1 Private Property Inspections Private property inspection progress is reported in Table 6-6. Private property inspections identify roof drain discharge locations, the presence of stairwell or driveway drains, and the presence of a sump pit/pump on site. A site passes inspection only if there are no connections of clear water to the sanitary system. A failed inspection indicates a connection of clear water directly into the sanitary system. This may include roof drains connected to the sanitary sewer, a stairwell or driveway drain connected to the building floor drain, or a sump pump plumbed directly to the sanitary lateral or floor drain within the building. Table 6-6 Property inspection progress Sewershed Percent of Completed Property Consent Decree Deadline to Complete Inspections* Property Inspections 11 100.00 9/30/11 12 99.86 6/30/12 7 99.34 6/30/13 5 99.68 6/30/14 10 98.65 6/30/15 *The Consent Decree does not state that all properties must be inspected. Each improper connection observed during a private property inspection results in a failure notice. The property owner then has 30 days to correct the improper connection, at which point a re-inspection of the property is conducted to verify that the improper connection has been eliminated. If the improper connection has not been corrected, the City may pursue legal action against the property owner to complete the necessary work. 6-19 Inflow &Infiltration Progranift A x DuncQVE Sanitary S,.,,W,T,B,[nspeetdAa f� „ � a.�s, KEN DV RD O DERBY GRANGE A a o sFx°xv _ arxiscxrs 52 s o U'p3 givas' (l \R W 32ND 5Ts'Z� 5ewershed 10 �� esu P 0 x M,ro �///' o . .GPS o NpNE si °E0.iw.os '9L���asrd m7 61115 0 4S KAUFMANN AVE oe ��� mwEus i +aM sa b Z �sTST Im Ws 0 D o m > RiucREsr RD n .a��r 3 =Amar+s°° -Ws rsh 11 tP , DLFF RD 'D z °T m o PENNSVLVANIAAVE o n 120o �CHAVEN LE ftO Q p DO�9� pp?si cwvcsr � £ w i °b°°- L-, N '� DODGES-r <w N W+E cq c '-� DAGISt';- �rPoDo 4 ice �rQ. !y W"n a N Figure 6-1. Map of Priority Smersheds identified in the Consent Decree for I&I investigation. 6.3.2 Dye Testing Dye testing is performed in conjunction with private property inspections if the discharge location of a downspout, exterior stairwell drain, or driveway drain is unknown. The City will use dye to identify the discharge location(s). If the dye is found in the sanitary sewer, the property owner receives notice consistent with the private property inspection process described in Section 6.3.1. During the reporting period, no new areas were dye tested by the City. The City will perforin its own testing, as necessary following private property improvements to confirm improvements have had the desired effect in eliminating direct sources of storm water inflow. 6.3.3 Smoke Testing During the reporting period, no new areas were smoke tested. Additional smoke testing is currently being scheduled for Sewersheds 5 and 10 and will be conducted following private property improvements to confirm the improvement has the desired effect or prompt further corrective action. 6.3.4 Manholes During the reporting period, 53 manholes were inspected within Sewershed 10. A manhole replacement project is under development to replace fifteen (15) of the manholes and eliminate another three (3). 6-20 6.3.5 Sanitary Sewer The City uses televising footage recorded within a maximum period of five years to determine improvements. The recorded footage allows the City to view any cracks, leaky joints, illegal lateral connections, and damaged or broken pipes. The severity of the structural degradation of each pipe section is rated based on a severity scale following the NASSCO (National Association of Sewer Service Companies) rating schedule. The rating system is used to assist the city in prioritizing which pipe sections are in need of immediate improvement. This work combined with the flow monitoring data provides the City with direction on how and where to make valued capital improvements. During the reporting period, corrective action was completed on 263 lineal feet of sanitary sewer in Sewershed 10. 6.4 CORRECTIVE ACTION PLAN It is the City's intent to complete the necessary work identified in the approved Corrective Action Plans in a timely manner. If response to emergency events and unexpected issues arise which indicate delay in implementation, the City will submit a formal request to amend the schedule to the U.S. EPA and the Iowa DNR. The City requested modification to its Corrective Action Plans in May 2016 and continues to implement improvements in each of the Sewersheds. Per the Consent Decree the City provides the Corrective Action Plan Implementation Schedule in Section 7.0 of this report. 6-21 7.0 Corrective Action Plan Implementation Schedule In April of 2016, the City of Dubuque submitted a Status Update Report requesting modification to completion dates originally set forth in the Corrective Action Plans for each Sewershed identified in the Consent Decree. During the course of planning, design, and construction it became necessary to adjust project completion dates, as clarified in the Status Update Report. For all Public Property projects to be completed by the City, the reporting tables show the dates reflected in the City's April 2016 Corrective Action Plan Status Update Report. 7.1 SEWERSHED 11 CORRECTIVE ACTION PLAN SCHEDULE The City continues to work with property owners to make corrections to their private properties. These corrections are made to private properties and therefore dependent upon funding by the property owner. The City's intent is to work with owners to achieve completion of the corrections without placing undue financial hardship on the private property owner. In 2014, the City documented twelve private property owners with sump pump, drive way drain, or downspout connections to the sanitary sewer system; during the reporting period, these have since been reduced to one. The remaining connection is a driveway drain. There are several options available to disconnect the drain from the property's sanitary sewer lateral however each comes at a substantial cost to the property owner, and in the event of failure or blockage of an improvement the owner is greatly concerned that they will experience property damage. Currently the drive way drain protects the property from flooding, as there are no storm sewers for storm water to enter in the immediate area. As such, the City is prepared to assist the property owner and install a possible gravity solution as a back-up or emergency overflow to the mechanical pump that would be required. The City anticipates resolving the issue by September 2017. 7.1.1 Private Property Corrections The total number of private property inspection corrections required as reported in the Sewershed 11 Corrective Action Plan dated December 2011 was 79. During follow up smoke and dye testing, several of those properties tested as not connected were amended to reflect a positive connection to the sanitary sewer system and became subject to corrective action, as such the number of properties was adjusted up from 79 to 82. As of this reporting period a total of 81 of the 82 are corrected. Item House Street Defect Corrective Action Corrected and Passed No. Number Re-inspection 1 1350 Nowata St Exterior drain to Constructed enclosure around stairway yes sanitary sewer 2 1775 Alta PI Exterior drain to Constructed enclosure around stairway yes sanitary sewer 7-22 3 2010 Alta Vista St Roof drain to sanitary Disconnected from sanitary sewer Yes sewer 4 875 W Locust St Sump pump discharges New sump pit installed to separate storm Yes to sanitary sewer and sanitary 5 2340 Green St Sump pump discharges New sump pit installed to separate storm Yes to sanitary sewer and sanitary 6 2360 Green St Sump pump discharges New sump pit installed to separate storm Yes to sanitary sewer and sanitary 7 1340 Auburn St Sump pit without pump Pump installed in sump pit and plumbed Yes properly 8 1365 Loras Blvd Sump pit without pump Pump installed in sump pit and plumbed Yes properly 9 1818 Asbury Rd Sump pit without pump Pump installed in sump pit and plumbed Yes properly 10 1511 Adair St Roof drain to sanitary Roof drain disconnected from sanitary Yes sewer sewer 11 1586 Wood St Roof drain to sanitary Roof drain disconnected from sanitary Yes sewer sewer 12 1870 St Ambrose St Roof drain to sanitary Roof drain disconnected from sanitary Yes sewer sewer 13 1340 Wood St Sump pump discharges Sump pit disconnected from sanitary sewer Yes to sanitary sewer 14 1451 Atlantic St Sump pump discharges Sump pit disconnected from sa n ita ry sewer Yes to sanitary sewer 15 1670 NGrandview Sump pump discharges Sump pit disconnected from sa n ita ry sewer Yes Ave to sanitary sewer 16 1845 Atlantic St Sump pump discharges Sump pit disconnected from sanitary sewer Yes to sanitary sewer 17 1885 Wood St Sump pump discharges Sump pit disconnected from sanitary sewer Yes to sanitary sewer 18 2386 University Ave Sump pump dischargesSump pit disconnected from sanitary sewer Yes to sanitary sewer 19 770 An ella St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 20 895 Kirkwood Ave Sump pump discharges through flexible hose Sump pump discharges through rigid pipe Yes 21 1050 Loras Blvd Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 22 1085 Wood St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 23 1111 Rosedale Ave Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 24 1205 N Booth St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 25 1212 Wood St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 26 1458 Mt Pleasant St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 27 1480 Glen Oak St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 28 1490 NGrandview Sump pump discharges Sump pump discharges through rigid pipe Yes Ave through flexible hose 29 1580 Ashton PI Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 30 1610 Ashton PI Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 31 1645 Atlantic St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 32 1665 Asbury Rd Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 33 1693 Loras Blvd Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 34 1695 Asbury Rd Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 7-23 35 1715 Asbury Rd Sump pump discharges through flexible hose p pump g g Sum um discharges throw hrig id pipe Ves 36 1726 AsburyRd Sump pump discharges Sum um dischargesthrough id a Yes through flexible hose p pump g g pipe 37 1730 Avoca St Sump pump discharges through flexible hose Sump pump discharges through rigid pipe Yes 38 1755 Wood St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 39 1800 Lawndale St Sump pump discharges through flexible hose Sump pump discharges through rigid pipe Yes 40 1810 Adair St Sump pump discharges through flexible hose Sump pump discharges through rigid pipe Yes 41 1845 AsburyRd Sump pump discharges Sum um dischargesthrough id a Yes through flexible hose p pump g g pipe 42 1850 AsburyRd Sump pump discharges Sum um dischargesthrough id a Yes through flexible hose p pump g g pipe 43 1855 Clarke Dr Sump pump discharges through flexible hose Sump pump discharges through rigid pipe Yes 44 1860 St Ambrose St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 45 1921 NGrandview Sump pump discharges Ave through flexible hose Sump pump discharges through rigid pipe Yes 46 1985 NGrandview Sump pump discharges Sump pump discharges through rigid pipe Yes Ave through flexible hose 47 2175 Rosedale Ave Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 48 2215 Green St Sump pump discharges Sump pump discharges through rigid pipe Yes through flexible hose 49 1049 W Locust St Exterior drain to Corrective action to be completed by sanitary sewer property owner Yes 50 1065 Auburn St Exterior drain to Corrective action to be completed by sanitary sewer property owner Yes 51 1222 Wood St Sump pump discharges Corrective action to be completed by through flexible hose property owner Yes 52 1275 Mt Pleasant St Sump pump discharges Corrective action to be completed by to sanitary sewer property owner Yes 53 1325 Loras Blvd Sump pump discharges Corrective action to be completed by Yes to sanitary sewer property owner 54 1339 Alta Vista St Roof drain to sanitary Corrective action to be completed by sewer property owner Yes 55 1380 Auburn St Exterior drain to Corrective action to be completed by sanitary sewer property owner Yes 56 1392 Atlantic St Roof drain to sanitary Corrective action to be completed by sewer property owner Yes 57 1435 Mt Pleasant St Sump pump discharges Corrective action to be completed by through flexible hose property owner Yes 58 1475 University Ave Exterior drain to Corrective action to be completed by sanitary sewer property owner Yes Exterior drain to Corrective action to be completed by 59 1485 University Ave sanitary sewer property owner Yes 60 1491 Mt Pleasant St Sump pump discharges Corrective action to be completed by to sanitary sewer property owner Yes 61 1528 Mt Pleasant St Roof drain to sanitary Corrective action to be completed by sewer;sump pump property owner Yes 62 1540 N Algona St Exterior drain to Corrective action to be completed by sanitary sewer property owner No 63 1640 Lawndale St Sump pump discharges Corrective action to be completed by to sanitary sewer property owner Yes 64 1660 Ashton PI Sump pit without pump Corrective action to be completed by property owner Yes 65 1671 Avoca St Roof drain to sanitary Corrective action to be completed by sewer property owner Yes 66 1675 Loras Blvd Sump pump discharges Corrective action to be completed by through flexible hose property owner Yes 7-24 67 1715 Atlantic St Exterior drain to Corrective action to be completed by sanitary sewer property owner yes 68 1795 Adair St Exterior drain to Corrective action to be completed by sanitary sewer property owner yes 69 1795 Auburn St Roof drain to sanitary Corrective action to be completed by sewer property owner yes 70 1815 Loras Blvd Sump pit without pump Corrective action to be completed by property owner yes 71 1885 St Ambrose St Sump pump discharges Corrective action to be completed by yes through flexible hose property owner 72 1911 St Ambrose St Sump pump discharges Corrective action to be completed by to sanitary sewer property owner yes 73 1983 St Ambrose St Sump pump discharges Corrective action to be completed by to sanitary sewer property owner yes 74 1985 Alta Vista St Roof drain to sanitary Corrective action to be completed by sewer property owner yes 75 2025 Delaware St Sump pump discharges Corrective action to be completed by through flexible hose property owner yes 76 2033 Clarke Or Sump pit without pump Corrective action to be completed by property owner yes 77 2215 University Ave Sump pump discharges Corrective action to be completed by through flexible hose property owner yes 78 2275 Green St Sump pump discharges Corrective action to be completed by through flexible hose property owner yes 79 2396 University Ave Sump pump discharges Corrective action to be completed by to sanitary sewer property owner yes L82 2337 Cherry Ave Sump pump discharges Corrective action to be completed by to sanitary sewer property owner yes 1511 N Algona St Sump pump discharges Corrective action to be completed by to sanitary sewer property owner yes 1550 N Algona St Driveway drains to Corrective action to be completed by sanitary sewer property owner yes 7.1.2 Private Property Corrections Identified during 2011 Smoke Testing A total of 13 of the 27 identified private connections have been corrected. Several of the corrective actions listed include televising the sanitary sewer lateral. Televising the lateral may be costly for private property owners and may not provide conclusive evidence of inflow or infiltration, similar to televising of public mains. Therefore, the City will assist the private property owners with financial assistance, as funds are available, to televise the lateral and perform either dye or flood testing during the televising operation to determine the condition of the resident's lateral. Item House No. Number Street Defect Corrective Action Completed 1 1744 NGrandview Smoke from Water Televise lateral;notify property owner of No Ave Access any necessary repair Smoke from Behind Televise lateral;notify property owner of 2 1669 Adair St No Curb any necessary repair 3 1450 Wood St Severed Sanitary property owner repair with watertight seal yes Cleanout 4 1951 Loras Blvd Smoke from ground Televise lateral;notify property owner of No neargas meter any necessary repair 5 1280 Glen Oak St Smoke from ground Televise lateral;notify property owner of No and wateraccess any necessary repair 7-25 Smoke from water Televise latera l;notify property owner of 6 800 W Locust St valve at corner of stairs No and sidewalk any necessary repair Smoke from buffer 7 1537 Irving St strip between sidewalk Televise lateral;notify property owner of No and back of curb any necessary repair Smoke from retaining 8 1890 Audubon St wall,steps and Televise lateral;notify property owner of No concrete in front of any necessary repair house Smoke from water Televise lateral;notify property owner of 9 990 Booth St No valve across street any necessary repair 10 1871 Glen Oak St Smoke from driveway Property ownerto disconnect driveway Yes drain Smoke from rocks near Televise lateral;notify property owner of 11 1575 Irving St No driveway any necessary repair 12 1671 Avoca St Smoke from rear Property owner disconnect downspout Yes downspout from sanitary sewer Smoke from shut-off Televise lateral;notify property owner of 13 1660 Ashton PI No valve any necessary repair 14 1657 Ashton PI Smoke from Televise lateral;notify property owner of No sidwalk/valve any necessary repair 15 1905 Loras Blvd Smoke from rear door Televise lateral;notify property owner of No any necessary repair 16 1065 Auburn St Smoke from crack near Property ownerto disconnect driveway Yes driveway drain 17 1339 St.Pleasant Smoke from valve Property owner to install water tight cap No 18 730 Kirkwood St Smoke from ground Televise lateral;notify property owner of No behind curb any necessary repair 19 1985 Clarke Or Smoke from hole in Property owner disconnect downspout Yes ground by down spout from sanitary sewer 20 1550 Clarke Or Smoke from hole in Property ownerto install watertight cap Yes ground 21 1570 Mt.Pleasant Smoke from uneven Televise lateral;notify property owner of No St curb any necessary repair 22 1556 Mt.Pleasant Smoke from driveway Property ownerto disconnect driveway Yes St drain drain 23 1350 Nowata St Smoke from stairway Action complete;awning installed to Yes drain prevent rain from entering drain Smoke by water shut- Televise lateral;notify property owner of 24 1200 Glen Oak St No off any necessary repair Smoke by water shut- Lateral wastelevised by licensed plumber; 25 615 Angella St Yes off no corrective action needed Smoke from 26 1065 Auburn St MH/cistern in front Property owner repair Yes yard Clarke Or(SHS Smoke from ground 27 1800 Property owner repair Yes softball field) near MH 7-26 7.1.3 Public Sanitary and Storm Sewer Corrections Identified by 2011 Smoke Testing The following tables reflect public sanitary sewer and storm sewer corrections identified in the Sewershed 11 Corrective Action Plan dated December 2011 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2016. 7.1.3.1 Sewershed 11 Manhole Correction Schedule The table below includes seven (7) manholes that remain following the 2016 construction season. These projects are directly tied to the replacement of sanitary sewers located in Wood Street and Auburn and Custer Street areas. The sanitary sewer mains are scheduled for full removal and replacement, and the associated manholes below, also need to be removed and replaced. Therefore, as requested in the April 2016 Status Update Report, these manholes will be replaced at the same time as the sanitary sewer reconstruction projects. Final Item No. GIS ID House Street Defect Corrective Action Completion Completion Number Date Date 1 SAN S 1893 Wood St Brick Improve or replace December 04710 manhole manhole 2020 2 SAN S 1321 N Grandview Brick Improve or replace Oct 2013 05394 Ave manhole manhole 3 SAN S 1800 Lawndale St Brick Improve or replace June 2016 June 2016 05580 manhole manhole 4 SANS 1939 Wood St Brick Improve or replace July 2011 05751 manhole manhole 5 SANS 1675 Glen Oak St Brick Improve or replace July 2012 05610 manhole manhole SAN 5 Decorah St& Brick Improve or replace 6 05385 NA Irving St manhole manhole July 2012 7 SANS 1911 NGrandview Brick Improve or replace July 2012 05344 Ave manhole manhole SAN 5 8 AUAI 1700 Glen Oak St Brick Improve or replace July 2012 07013 manhole manhole 9 SANS NA Atlantic St& Brick Improve or replace Jul 2012 05331 Delaware St manhole manhole y 10 SANS 1800 Glen Oak St Brick Improve or replace June 2016 June 2016 05585 manhole manhole 11 SANS 1445 Auburn St Brick Improve or replace July 2012 05391 manhole manhole SAN S Fillmore St& Brick Improve or replace 12 05383 NA Auburn St manhole manhole July 2012 13 SAN S 1845 Avoca St Brick Improve or replace June 2016 June 2016 05341 manhole manhole 14 SAN S 1045 Vernon St Brick Improve or replace June 2016 June 2016 05626 manhole manhole 15 SAN S 1210 Loras Blvd Brick Improve or replace June 2016 June 2016 05653 manhole manhole 16 SANS NA Decorah St& Brick Improve or replace July 2012 05367 Auburn St manhole manhole 17 SANS NA Delaware St Brick Improve or replace July 2012 05357 &Auburn St manhole manhole 18 SAN S NA Loras Blvd& Brick Improve or replace February February 05392 Atlantic St manhole manhole 2016 2016 19 SANS 1686 Lawndale St Brick Improve or replace July 2012 05612 manhole manhole 7-27 20 SAN S 1633 Avoca St Brick Improve or replace June 2016 June 2016 05379 manhole manhole 21 SAN S 950 Wood St Brick Improve or replace August 2016 June 2016 05730 manhole manhole 22 SANS 1450 Alta Vista St Brick Improve or replace August 2016 June 2016 05628 manhole manhole 23 SANS 1760 Lawndale St Brick Improve or replace July 2012 05598 manhole manhole 24 SAN S 1608 Lawndale St Brick Improve or replace August 2016 June 2016 05624 manhole manhole SANS Alley behind Brick Improve or replace 25 07329 NA 17/889 Univ manhole manhole August 2016 May 2016 1 26 SANS 1040 Edina St Brick Improve or replace August 2016 June2016 05605 manhole manhole 27 SANS 1098 Edina St Brick Improve or replace July 2012 05615 manhole manhole 28 SANSNANGrandview Brick Improve or replace July 2012 04720 Ave manhole manhole 29 SANS 1871 Glen Oak St Brick Improve or replace June 2016 June 2016 05574 manhole manhole 30 SANS 1430 Glen Oak St Brick Improve or replace July 2012 05654 manhole manhole SANS 1881 Glen Oak St Brick Improve or replace July 2012 31 06789 manhole manhole Eliminated 32 SANS 1302 Atlantic St Brick Improve or replace August 2016 June 2016 05405 manhole manhole 33 SANS 1945 NGrandview Brick Improve or replace July 2012 05345 St manhole manhole 34 SANS 1460 Atlantic St Brick Improve or replace July 2012 05384 manhole manhole 35 SANS NA Delaware St Brick Improve or replace July 2009 05368 &Ashton PI manhole manhole 36 SAN S 1795 Asbury Rd Brick Improve or replace June 2016 June 2016 01947 manhole manhole SANS N Booth St& Brick Improve or replace 37 07012 NA Martha St manhole manhole August 2016 June 2016 38 SAN S 1419 Loras Blvd Brick Improve or replace August 2016 June 2016 06848 manhole manhole SANS Clarke Dr&N Brick Improve or replace 39 05458 NA Grandview manhole manhole July 2012 Ave 40 SANS 1576 Glen Oak St Brick Improve or replace August 2016 June 2016 05625 manhole manhole 41 SAN S 1086 Wood St Brick Improve or replace August 2016 June 2016 05752 manhole manhole Rosedale Ave SANS Brick Improve or replace February February 42 04703 1234 (on Glen Oak manhole manhole 2016 2016 43 SANS 1881 Asbury Rd Brick Improve or replace July 2012 01939 manhole manhole 44 SANS NA Glen Oak St Brick Improve or replace July 2012 05579 manhole manhole SANS Mt Pleasant Brick Improve or replace February February 45 05647 NA St&Loras manhole manhole 2016 2016 Blvd 46 SANS 935 Nevada St Brick Improve or replace July 2012 05731 manhole manhole 7-28 47 SANS 1050 Loras Blvd Brick Improve or replace August 2016 July 2016 05648 1 manhole manhole Bfek wee SANS University ,_^tee ....4.4e-No Request for 48 1550 Ave(behind 05833 PCC improvement Removal - building) Manhole Required Abandoned SANS alley behind Brick Improve or replace February February 49 05404 NA 1875 Custer manhole manhole 2016 2016 St 50 SAN S 1695 Mt Pleasant Brick Improve or replace August 2016 June 2016 05622 St manhole manhole 51 SANS 1555 NAlgona St Brick Improve or replace July 2012 05378 manhole manhole 52 SANS 1875 Audobon St Brick Improve or replace July 2012 04715 manhole manhole 53 SANS 1709 NAlgona St Brick Improve or replace July 2012 05356 manhole manhole 54 SAN S 1585 Wood St Brick Improve or replace August 2016 June 2016 06803 manhole manhole SAN S Fillmore St& Brick Improve or replace 55 05387 NA Algona St manhole manhole July 2012 SAN S Dexter St Brick Improve or replace 56 05355 NA (alley E of manhole manhole July 2012 Algona St) SANS N Grandview Brick Improve or replace 57 04721 NA Ave&Auburn manhole manhole July 2012 St 58 SANS 1421 NAlgona St Brick Improve or replace July 2012 05393 manhole manhole SAN S Alley behind Brick Improve or replace 59 05397 NA 1334 Atlantic manhole manhole July 2013 St 60 SANS 1755 Wood St Brick Improve or replace July 2012 06939 manhole manhole Eliminated 61 SANS 1650 NAlgona St Brick Improve or replace July 2012 05366 manhole manhole 62 SANS 2135 Green St Brick Improve or replace July 2012 05350 manhole manhole 63 SANS 1195 Vernon St Brick Improve or replace July 2009 05637 manhole manhole 64 SANS 2020 Green St Brick Improve or replace July 2012 05327 manhole manhole SAN S Brick 65 05541 615 Angella St manhole """"'—MH August 2016 June 2016 Eliminated 66 SANS 1819 Pierce St Brick Improve or replace July 2012 05544 manhole manhole 67 SANS 595 Angella St Brick Improve or replace August 2016 June 2016 05536 manhole manhole 68 SAN S 1893 Wood St Brick Improve or replace December 05464 manhole manhole 2020 SAN S Angella St& Brick Improve or replace 69 05549 NA Pierce St manhole manhole August 2016 June 2016 SANS Brick Improve or replace July 2012 70 05539 1903 Pierce St manhole manhole Eliminated Loras SANS property near Brick Improve or replace 71 05560 NA Kirkwood& manhole manhole August 2016 June 2016 Blake Sts 7-29 72 SAN S NA Vernon St& Brick Improve or replace July 2012 05640 Glen Oak St manhole manhole 73 SAN SNA Cox St& Brick Improve or replace June 2016 June 2016 05559 Angella St manhole manhole 74 SANS 601 Angella St Brick Improve or replace August 2016 June 2016 05540 manhole manhole 75 SAN S 1265 Vernon St Brick Improve or replace August 2016 June 2016 05642 manhole manhole SANS Brick Improve or replace December 76 05411 1790 Custer St manhole manhole 2021 77 SANS 1037 Kirkwood St Brick Improve or replace July 2012 05562 manhole manhole 78 SANS NA Kirkwood St Brick Improve or replace August 2016 June 2016 05553 manhole manhole 79 SAN S 1375 Auburn St Brick Improve or replace December 05402 manhole manhole 2021 Auburn St SANS (alley Brick Improve or replace December 80 05415 NA between manhole manhole 2021 Custer& Univ) 81 SAN S 1081 N Booth St Brick Improve or replace June 2016 June 2016 05724 manhole manhole 82 SANS NA Decorah St& Brick Improve or replace July 2012 05364 Atlantic St manhole manhole Atlantic St SAN S (alley Brick Improve or replace 83 05413 NA between manhole manhole August 2016 June 2016 Custer& Univ) 84 SANS 1645 Atlantic St Brick Improve or replace July 2012 05359 manhole manhole 85 SANS 890 Kirkwood St Brick Improve or replace July 2012 05543 manhole manhole 86 SAN S 1380 N Booth St Brick Improve or replace July 2012 05652 manhole manhole 87 SAN S 935 N Booth St Brick Improve or replace July 2012 05725 manhole manhole 88 SAN S 1319 Mt Pleasant Brick Improve or replace August 2016 June 2016 05721 St manhole manhole 89 SANS 1145 Mt Pleasant Brick Improve or replace June 2016 May 2016 05722 St manhole manhole 90 SAN S 1850 N Grandview Brick Improve or replace August 2016 June 2016 01941 Ave manhole manhole 91 SAN S 1435 Mt Pleasant Brick Improve or replace August 2016 June 2016 05646 St manhole manhole 92 SAN S 940 Mt Pleasant Brick Improve or replace August 2016 June 2016 05723 St manhole manhole 93 SAN S 1445 Wood St Brick Improve or replace August 2016 June 2016 06961 manhole manhole 94 SANS 1775 Wood St Brick Improve or replace July 2012 05335 manhole manhole 95 SANS 1715 Asbury Rd Brick Improve or replace June 2016 June 2016 01782 manhole manhole 96 SAN S 1655 Asbury Rd Brick Improve or replace August 2016 June 2016 05319 manhole manhole 97 SANS 1555 Mt Pleasant Brick Improve or replace July 2012 05636 St manhole manhole 7-30 98 SANS 1937 St Ambrose St Brick Improve or replace August 2016 June 2016 05343 manhole manhole 99 SANS 1905 Asbury Rd Brick Improve or replace June 2016 June 2016 05336 manhole manhole 100 SANS 1925 Pierce St Brick Improve or replace August 2016 June 2016 07363 manhole manhole 101 SANS 1535 Irving St Brick Improve or replace July 2012 05320 manhole manhole 102 SANS 1537 Irving St Brick Improve or replace July 2012 05395 manhole manhole 103 SANS 1978 Cox St Brick Improve or replace July 2012 05534 manhole manhole 104 SANS 1715 Glen Oak St Brick Improve or replace July 2012 07013 manhole manhole 105 SANS 995 Nevada St Brick Improve or replace July 2012 05732 manhole manhole 106 SAN S 1060 Auburn St(at Brick Improve or replace Oct 2013 05412 Custer St) manhole manhole 107 SANS 1790 Glen Oak St Brick Improve or replace August 2016 June 2016 05589 manhole manhole 108 SANS 1760 Custer St Brick Improve or replace December 07328 manhole manhole 2021 109 SANS 1735 Avoca St Brick Improve or replace August 2016 July 2016 05362 manhole manhole 110 SAN S 1100 Vernon St Brick Improve or replace August 2016 June 2016 05634 manhole manhole SANS Atlantic St& Brick Improve or replace 111 05340 NA Dexter St manhole manhole July 2012 112 SAN S 1795 Adair St Brick Improve or replace August 2016 June 2016 05334 manhole manhole 113 SAN S 1669 Adair St Brick Improve or replace August 2016 August 2016 05326 manhole manhole 114 SANS 1475 Adair St Brick Improve or replace August 2016 July 2016 05372 manhole manhole 115 SANS 1799 Lawndale St Brick Improve or replace July 2012 05588 manhole manhole 116 SAN S 1420 Loras Blvd Brick Improve or replace February February 05421 manhole manhole 2016 2016 117 SAN S 1865 Adair St Brick Improve or replace August 2016 June 2016 04711 manhole manhole 118 SANS 1910 Asbury Rd Brick Improve or replace August 2016 June 2016 05349 manhole manhole SANS NA Algona St& Brick Improve or replace 119 05330 Dexter St manhole manhole July 2012 SANS NA Decorah St& Brick Improve or replace 120 05374 NAlgona St manhole manhole July 2012 121 SANS 1425 Adair St Brick Improve or replace August 2016 July 2016 05380 manhole manhole 122 SAN S NA Loras Blvd& Vented MH Replace cover June 2015 June 2015 05381 Nowata St Cover SAN S St.Ambrose Smoke Improve or replace 123 05348 NA St around MH manhole August 2016 June 2016 Ave 124 SANS NA Custer St& Smoke Improve or replace December 05409 Atlantic St around MH manhole 2021 SAN S Martha St Smoke Improve or replace 125 05657 NA and Nevada around MH pipe to northeast 2010 St and catch (SAN P 05553) 7-31 basin at SE Cnr of Intersection SANS Smoke from Improve or replace 126 SANS 1871 Glen Oak St Gromanhole near June 2016 May 2016 g A'Ns WLocust St& Smoke from Improve or replace 127 95436 NA Clarke Or crack in pipe(Grade 4 pipe, _ _ pavement SAN P06063) Flood&dye storm 128 STO S 1855 Wood St Smoke from sewer;televise October 04272 catch basin sanitary;improve as 2013 needed STOS Smoke from Protruding lateral 129 04376 catch basin 995 Nevada St tap;property August 2016 June 2016 ownerto repair Possibly lateral 130 STOS 1871 Glen Oak St Smoke from from 1825 Glen October 04340 catch basin Oak;property 2013 owner to repair Flood&dye storm 131 STOS 1795 Adair St Smoke from sewer;televise October 04231 catch basin sanitary;improve as 2013 needed Delaware St Flood&dye storm 132 STOS NA &Grandview Smoke from sewer;televise October 04310 Ave catch basin sanitary;improve as 2013 needed 7.1.4 Grade 4 Sewer Pipe Corrections GIS ID Street Defect Corrective Action Completion Final Completion Date Date Sag @ 191.3;long.crack October SAN P W Locust St @285.2;sag @295.6,314.4; Install pipe liner or replace a 2013 04919 joint offset @343.4;sag portion of the pipe @436.2 SAN P Sag @15.5;circumferential Install pipe liner or replace a November 05558 N Booth St crack @27.5;sag @39.8, otall of the a 2013 59.6,82.0,118.8 p pipe SAN P W Locust St Sag and joint offset in pipe @ Install pipe liner or replace a November 05097 133.0 portion of the pipe 2013 SAN P Sag in pipe @ 28.9; Install pipe liner or replace a November 05101 W Locust St 69.3(questionable); hole portion llpipe of hneror 2013 @173.8(plugged,ok?) e pipe SAN P Circumferential crack @22.0, Install pipe liner or replace a October 05112 Glen Oak St 37.0(not id'd on TV);sag portion of the pipe 2013 @45.9,125.3 Circumferential crack @32.8; October SAN P Glen Oak St sag @59.5;broken pipe Install pipe liner or replace a 2013 05513 @66.2-70.0;long.crack portion of the pipe @124.6 SAN P Joint offset @13.4(not id'd Install pipe liner or replace a October 05319 Adair St on TV);Heavy shale(15.5- portion of the pipe 2013 23.9) Joints leaking with dye 220- 2009 SAN P Kirkwood St 223',232.4';joint offset Install pipe liner or replace a 05486 @310.2 portion of the pipe SAN P Circumferential crack @30.7; Install pipe liner or replace a October 05546 Glen Oak St chuck out of top of pipe portion pipe he a 2013 @105.3 p pipe 7-32 SAN P Alley behind Longitudinal crack @45.9;sag Install pipe liner or replace a November 1324 Atlantic in pipe @47.7;last 25'of pipe 2013 05587 St not televised portion of the pipe SAN NGrandview Circumferential crack@13.2; Install pipe liner or replace a November 2013 05589 Ave sag @10.0-114.6; 157.9 portion of the pipe Hole @43.1;joint gusher October SANP Wood St @160.3(not id'd on TV);sag Install pipe linerreplace a 2013 05600 @161.3 portion of the pippee SAN P Broken pipe @4.0';leaking Install pipe liner or replace a 2012 06113 Decorah St joint @71.8 portion of the pipe Sag in pipe @151.3;holes in October SANP Delaware St pipe @155.5(3 to 5 and 7 to Install pipe liner or replace a 2013 06117 9) portion of the pipe SAN P Tap/break-in @9.8(hole near Install pipe liner or replace a October 06120 Dexter St tap);sag in pipe @29.1-62.0, portion of the pipe 2013 102.5(not on TV report) SAN P Clarke Or Sag in pipe @36.4,178.4, Install pipe liner or replace a October 06142 211.9;leaking joint@234.1 portion of the pipe 2013 SAN P N Algona St Circumferential crack @65.2; Install pipe liner or replace a October 06127 shale buildup 70-88',90-110'; portion of the pipe 2013 sag @140-150 SAN Auburn St Multiple fractures,hole, Improve or replace pipe December 05622 lateral intruding 2021 SAN P Multiple fractures,hole in Improve or replace pipe December Custer St 05621 pipe 2021 SAN Multiple fractures,joint December 05619 Custer St separated,circumferential Improve or replace pipe December crack 2021 SAN December Custer St Multiple fractures Improve or replace pipe 05615 2021 SAN Multiple fractures, Improve or replace pipe December Custer St 05620 longitudinal crack,joint offset 2021 Requested The SAA4R e fractures are minor and the V, -Q- Q% removal B6B63 - Re-evaluated as OK from the pipe has little to no flow on high ground.No infiltration. program 7.1.5 Grade 5 Sewer Pipe Corrections Final Completion Completion GIS ID Street Defect Corrective Action Date Date Broken pipe @23.1; SANP cracked pipe Install pipe liner or replace a portion December 05571 Wood St broken pipe @58.5;58.5; of the pipe 2020 broken pipe @62.2 (into brick MH) SAN P Glen Oak St Broken pipe @ 75.0 Install pipe liner or replace a portion October 05516 (replace 16') of the pipe 2013 SAN P Joints gushing @136.8, Install pipe lineror replace a portion October 05496 Alta Vista St 139.5,142.2,143.1, of the pipe 2013 144.3,145.9,148.1 Pipe located under SAN P Glen Oak St buildings;pipe broken Install pipe liner or replace a portion October 05525 @ 76.1(north edge of of the pipe 2013 house at 1191 Edina) SAN P Hole in pipe @57.7; Install pipe liner or replace a portion October 05532 Lawndale St hole in pipe @ 60.5 of the pipe 2013 7-33 SAN P Wood St Broken pipe @23.5 Install pipe lineror replace a portion December 05572 of the pipe 2020 SAN P W Locust St Broken pipe @147.7 Install pipe liner or replace a portion November 06071 of the pipe 2013 SAN P Delaware St Hole in pipe @84.4 Install pipe liner or replace a portion October 06130 of the pipe 2013 SAN P Atlantic St Hole in pipe @17.9; Install pipe liner or replace a portion October 06136 hole in pipe @ 41.0 of the pipe 2013 Hole in pipe @63.8; SAN P shale&debris @ Install pipe lineror replace a portion October 06174 Auburn St 107.6,135.4,146.8,165.8 of the pipe 2013 ,185.1;shale obstruction @188.0 SAN P Avon St Broken pipe @8.0 Install pipe liner or replace a portion October 06183 of the pipe 2013 7.2 SEWERSHED 12 CORRECTIVE ACTION PLAN SCHEDULE The City continues to work with property owners to make corrections to their private properties. These are corrections made to private properties and therefore dependent upon funding by the property owner. The City's intent is to work with owners to achieve completion of the corrections without placing undue financial hardship on the private property owner. 7.2.1 Private Property Inspections Corrections The total number of private property inspection corrections reported in the Sewershed 12 Corrective Action Plan was 73. As shown in the table below, only one issue is yet to be corrected. Line item 59 shows a sump pit without pump; therefore, it is removed from this list as requiring a connection as the City has verified the sump pump discharge line is not connected to the sanitary sewer. Line House Street Name Defect Corrective Action Corrected and No. No Passed Re-inspection 1 230 ALPINE Roof Drain discharge not located Dye Test Downspout yes confirm discharge 2 626 ALPINE ST Undetermined from Inspection Re-inspected-ok yes 3 555 ALPINE ST Stairwell drain connected to Sanitary Coverstairwell yes Flexible Hose used to discharge Replace flex hose w/ 4 620 ALTA VISTA ST yes P g PP Sum rigid a 5 1260 ALTA VISTA Sump pump to sanitary,Roof Drain Disconnect&discharge yes to sanitary. to land 6 603 ARLINGTON ST yard drain discharges to Sanitary Disconnect,landscape yes 7 1370 BELMONT ST Roof Drain to Sanitary discharge overland yes discharge overland 8 1395 BELMONT ST Roof Drain to Sanitary Disconnect drain yes discharge overland 9 702 CALEDONIA PL Stairwell drains to basementfloor Cover stairwell yes drain right inside door 10 1118 CENTER PLACE Roof Drain discharge unknown Dye Test Downspout yes confirm discharge 11 565 FENELON PL Downspout dischargesto Sanitary Disconnect&discharge yes to land 7-34 12 990 GROVE TERRACE Roof Drain discharge unknown Dye Test Downspout Yes confirm discharge 13 493 HAVDENSLN Open clay downspout Cap downspout Yes Flexible Hose used to discharge Replace flex hose w/ 14 309 HILL ST Yes P g PP Sum rigid a 15 257 HILL ST Roof Drain discharge unknown Dye Test Downspout Yes confirm discharge 16 636 JEFFERSON ST Sump Pump discharges to Sanitary Disconnect&discharge Yes to land 17 1090 LANGWORTHV ST Roof Drain to Sanitary Disconnect,cap& yes discharge to land 18 1175 LANGWORTHV ST Yard drain discharges to Sanitary Disconnect&landscape Yes 19 157 LOCUST ST Roof Drain discharge unknown Disconnect,cap& Yes discharge to land 20 259 LOCUST ST Driveway run off discharges to Discuss options with Yes sanitary property owner 21 401 LOCUST ST Sump Pump discharges to Sanitary Disconnect&discharge Yes to land 22 1105 LOCUST ST Roof drain and stairwell drain Dye Test confirm Yes discharge unknown discharge 23 1088 MELROSE TERRACE Entry denied Re-inspect Yes Flexible Hose used to discharge Replace flex hose w/ 24 1090 MELROSE TER Sump rigid pipe Yes 25 1575 MONTROSE TER Roof Drain to Sanitary Disconnect,cap& yes discharge to land Flexible Hose used to discharge Replace flex hose w/ 26 1505 MONTROSE TER Sump rigid pipe Yes 27 1493 MONTROSE TERRACE Outside floordrain dischargesto Disconnect orcover Yes sanitary 28 555 NEVADA Window well drains,stairwell drains Disconnect/plug and Yes discharge to sanitary cover stairwell 29 983 OXFORD ST Sump Pump discharges to Sanitary Disconnect&discharge Yes to land 30 969 OXFORD ST Roof Drain discharge unknown Dye Test and Disconnect Yes 31 529 PICKETT ST Roof Drain to Sanitary Disconnect,cap& yes discharge to land Flexible Hose used to discharge Replace flex hose w/ 32 1182 RACE ST Sump rigid pipe Yes 33 1152 RACE ST Downspout discharges to Sanitary Disconnect,cap& yes discharge to land Flexible Hose used to discharge Replace flex hose w/ 34 921 ROSE ST Yes P g PP Sum rigid a 35 764 ROSE ST Sump Pump discharges to Sanitary Disconnect&discharge Yes to land Flexible Hose used to discharge Replace flex hose w/ 36 1256 UNIVERSITY AVE Yes P g PP Sum rigid a 7-35 37 1120 UNIVERSITVAVE Sump Pump discharges to Sanitary Disconnect&discharge yes to land 38 1052 UNIVERSITVAVE Two sump pumps discharge to Disconnect&discharge yes sanitary to land Flexible Hose used to discharge Replace flex hose w/ 39 728 UNIVERSITVAVE Yes P g PP Sum rigid a 40 1089 UNIVERSITVAVE Window leakto sump pit,sumpto Seal leak Yes sanitary Flexible Hose used to discharge Replace flex hose w/ 41 696 UNIVERSITVAVE Yes P g PP Sum rigid a 42 782 UNIVERSITVAVE Roof Drain to Sanitary Disconnect,cap& yes discharge to land Roof drain and stairwell drain Dye test& 43 1224 UNIVERSITVAVE Yes discharge unknown disconnect/cap 44 1087 W3RD ST Stairwell drains to sump pit Cover stairwell Yes 45 1095 W3RD ST Yard drains are driveway drains and Disconnect&landscape Yes property has 2 of them 46 1084 W3RD ST Stairwell to sanitary Cover stairwell Yes 47 453 W4TH ST Roof Drain to Sanitary Disconnect,cap& Yes discharge to land Flexible Hose used to discharge Replace flex hose w/ 48 639 W 5TH ST Yes P g PP Sum rigid a 49 852 W5TH ST Roof Drain to Sanitary Disconnect,cap& yes discharge to land 50 866 W5TH ST Sump Pump discharges to Sanitary Disconnect&discharge yes to land 51 971 W5TH ST Sump Pump discharges to Sanitary Disconnect&discharge yes to land Flexible Hose used to discharge Replace flex hose w/ 52 997 W 5TH ST Yes P g PP Sum rigid a 53 1023 W5TH ST Sump pump discharges to Floor Disconnect&discharge Yes Drain to land 54 1030 W5TH ST Roof Drain to Sanitary Disconnect,cap& Yes discharge to land 55 1003 WEST 5TH ST Roof Drain discharge unknown Dye test Yes 56 350 W6TH ST Window drain discharges to sanitary Cover window well No 57 664 W 7TH ST Pit No Pump Install rigid pipe and Yes pump 58 461 W 8TH ST Yard drain discharges to Sanitary Disconnect&landscape Yes 34 §86 pump Refl+eve4fefl�� 60 1051 WALNUT ST Roof Drain to Sanitary Disconnect,cap& Yes discharge to land 61 1090 WEST 3RD ST Roof Drain to Sanitary Disconnect,cap& Yes discharge to land 7-36 62 555 WEST 11TH ST yard Drain discharge unknown Disconnect&landscape yes 63 827 WEST 11TH ST Stairwell Drain Unknown Dye test yes 64 490 WILBUR Roof d rain a nd sta irwell d m in Dye test yes discharge unknown 65 695 WILSON Roof Drain discharge unknown Disconnect,cap& yes discharge to land 66 716 WILSON Roof Drain discharge unknown Dye test yes 67 757 WILSON ST Sump Pump discharges to Sanitary Disconnect&discharge yes to land 68 815 WILSON Roof Drain discharge unknown Dye test yes 69 845 WILSON ST Sump Pump discharges to Sanitary Disconnect&discharge yes to land Flexible Hose used to discharge Replace flex hose w/ 70 852 WILSON ST yes P g PP Sum rigid a 71 1040 WILSON Roof Drain discharge unknown Dye test yes 72 390 WINONA Occupa nt failed to show for Inspection-ok yes inspection. 73 883 VALE CT Roof Drain discharge unknown Dye test-ok yes 7.2.2 Sanitary Sewer Smoke Testing: Private Property Defects Corrections— Laterals The City will work directly with property owners to determine the degree with which corrective action is required. The property owners are responsible for both the work and financial responsibility of the sanitary sewer lateral from the building to the public sewer. The City acknowledges the financial burden this may place on property owners, and those eligible to receive assistance may request financial assistance from the City. Televising the lateral may be costly for private property owners and may not provide conclusive evidence of inflow or infiltration, similar to televising of public mains. Therefore, the City will assist the private property owners with financial assistance, as funds are available, to televise the lateral and perform either dye or flood testing during the televising operation to determine the condition of the resident's lateral. Line No. Location Ownership Observation Corrective Action Completed 1 825Air Hill St Private Smoke from sidewalk joints Televise service lateral during dye No below downspout test.Repair/replace lateral as needed. 2 548 W 7th St Private Smoke from holes(5)in Televise service lateral during dye No backyard test.Repair/replace lateral as needed. 3 638 W 8th St Private Smoke from front retaining Televise service lateral during dye No wall test.Repair/replace lateral as needed. 1025 Melrose Smoke from water shutoff Televise service lateral during dye 4 Private No Terr. by telephone pedestal test.Repair/replace lateral as needed. 5 631 Chestnut St Private Smoke from ground Televise service lateral during dye No test.Repair/replace lateral as needed. 6 1125 Highland Private Smoke from ground Televise service lateral during dye No Place test.Repair/replace lateral as needed. 7-37 7 500 W 7th St Private Smoke from ground Televise service lateral during dye No test.Repair/replace lateral as needed. 8 1296 Langworthy Private Smoke from ground near Televise service lateral during dye St roof drain test.Repair/replace lateral as needed. No 9 1142 University Private Smoke from ground Televise service lateral during dye No Ave test.Repair/replace lateral as needed. 10 1142 University Private Smoke from curb Televise service lateral during dye No Ave test.Repair/replace lateral as needed. 11 1120 University Private Smoke from ground Televise service lateral during dye No Ave test.Repair/replace lateral as needed. 12 567 Arlington Private Smoke from retaining wall Televise service lateral during dye No Street test.Repair/replace lateral as needed. 1155 Grove Smoke from ground and Televise service lateral during dye 13 Terrace Private No retaining wall test.Repair/replace lateral as needed. 14 1105 Highland Private Smoke from ground Televise service lateral during dye No Place test.Repair/replace lateral as needed. 15 1075 Walnut St Private Smoke from ground Televise service lateral during dye No test.Repair/replace lateral as needed. 704 Caledonia Televise service lateral during dye 16 Private Smoke from sidewalk joints No Place test.Repair/replace lateral as needed. 17 514 Cooper Place Private Smoke from ground Televise service lateral during dye No test.Repair/replace lateral as needed. 18 555 W 5th St Private Smoke from ground Televise service lateral during dye No test.Repair/replace lateral as needed. 19 554 W 5th St Private Smoke from ground Televise service lateral during dye No test.Repair/replace lateral as needed. Televise service lateral during dye 20 495 W 5th St Private Smoke from ground No test.Repair/replace lateral as needed. 775 Hill St Private Smoke from ground around Televise service lateral during dye No water valve test.Repair/replace lateral as needed. Smoke by gutter downspout E221090 W 3rd St Private and pipe coming out of Televise service lateral during dye No o ground test.Repair/replace lateral as needed. 7.2.3 Sanitary Sewer Smoke Testing: Private Property Defects Corrections— Various During the reporting period three properties were corrected, for a total of five of eight properties corrected. Following field verification, Line Item No. 4's address has been corrected from 1091 and 1099 Central Place to 1051 Central Place. Line No. Location Ownership Observation Corrective Action Completed Smoke from storm Dye test storm sewer system,CCN 1 Loras College Private intake sanitary sewer.Repair storm/sanitary No sewer 997&983 Oxford Smoke from sump Determine sump pump discharge.This 2 Private Yes St discharge at curb property was corrected. 3 795 Alpine St Private Smoke from clean out Notify property owner to install clean out Yes cap 4 1051 Center PI Private Smoke from below Further investigate with property owner Yes building addition to explain possible cause Smoke from stairwell Notify property ownerto disconnect 5 1051 Center PI Private drain stairwell drain from sanitary sewer or Yes enclose stairwell 6 461 W 8th St Private Smoke from around Notify Utility to further investigate and No telephone manhole explain observation 7 150'East of 461W Private Smoke from around Notify Utility to further investigate and No 8th St telephone manhole explain observation 8 453 W 4th St Private Smoke from pipe on the Notify property owner to cap outside Yes east side of building standpipe.This property was corrected. 7-38 7.2.4 Sanitary Sewer Smoke Testing: Public Property Corrections Eight locations [see below] were identified as possible sources of infiltration. The following table reflects public sanitary sewer corrections identified in the Sewershed 12 Corrective Action Plan dated December 2012 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2016. Line Final Completion No. Location Ownership Observation Corrective Action Completion Date Date Dye test area, Smoke from concrete CCTV main line October 2016 1 Bluff&1st St Public island for inflow Confirmed Private Sewer. Dye test area, 2 Loras College 61 Smoke from retaining CCTV main line June 2016 Improvements Private" wall for inflow completed in 2015;further work required. MH 5576- Smoke from retaining Dye test area, 3 Montrose& Public wall near manhole CCTV main line December 2018 Pickett for inflow Dye test area, 4 515 Cooper PI Public/ Smoke from base of Private" retaining wall CCTV main line Septem ber 2026 for inflow Public/ Smoke from base of Dye test area, 5 515 Cooper PI Private" power pole CCTV main line September2026 for inflow Alley between Dye Center Pl&Alta Public/ Smoke from base of CCTV mainst lin 6 CCTV main line December 2017 Vista St.on Private" retaining wall for inflow U n Avei Confirmed Private Alley between Smoke from valve& Dye test area, 7 18th C&15th Private' sidewalk cracks Sewer.Work CCTV main line June 2016 Ston Cornell vatt l for inflow completed in 2015. MH 5619- Smoke from retaining Dye test area, 8 Loras&Cox St Public wall CCTV main line October 2016 for inflow 7.2.5 Sewershed 12 Sanitary Sewer Smoke Testing: Storm Catch Basins The locations shown in the following table along Hill Street were close-circuit televised and rehabilitated by method of sanitary sewer cured in place pipe lining, which was completed by SAK Construction of O'Fallon, Missouri. The lining contractor was also responsible for dye testing sanitary sewer laterals prior to restoring sanitary sewer service to ensure only those active laterals were reinstated; thereby reducing unnecessary openings to the sanitary sewer main and groundwater inflow. Location/ Final Completion Line No. Address Ownership Observation Corrective Action Completion Date Date Smoke from 8th Dye test catch basin 1 461 W 8th St Public Street catch basin CCTV Sanitary Sewer- October 2013 Premier Linen Repair lateral or building section of sewer 7-39 Dye test catch basin 2 12th&Bluff Public Smoke from catch CCTV Sanitary Sewer- October 2013 St basin Repair lateral or section of sewer Dye test catch basin 8 Hill St& public Smoke from catch CCTV Sanitary Sewer- October 2016 July 2016 Caledonia PI basin Repair lateral or section of sewer Dye test catch basin 4 W8th St& public Smoke from catch CCTV Sanitary Sewer- October 2013 Hill St basin Repair lateral or section of sewer Dye test catch basin 5 461 W 8th St Public Smoke from catch CCTV Sanitary Sewer- October 2013 basin Repair lateral or section of sewer Smoke from catch Dye test catch basin 6 11th Street& Public basin in NW CCTV Sanitary Sewer- October 2013 Bluff Street corner of Repair lateral or intersection section of sewer Smoke from catch Dye test catch basin 7 Hill St&Birch Public basin in SE corner CCTV Sanitary Sewer- October 2016 July 2016 St of intersection Repair lateral or section of sewer Smoke from catch Dye test catch basin 8 Hill St&Birch Public basin in SW corner CCTV Sanitary Sewer- October 2016 July 2016 St of intersection Repair lateral or section of sewer Smoke from catch Dye test catch basin Hill St&W Public basin on south CCTV Sanitary Sewer- 9 5th St side of Repair lateral or October 2016 July 2016 intersection section of sewer Dye test catch basin 10 Hill St&W Public Smoke from catch CCTV Sanitary Sewer- October 2013 8th St basin Repair lateral or section of sewer 7.2.6 Sewershed 12 Manhole Corrections The following table reflects public sanitary sewer corrections identified in the Sewershed 12 Corrective Action Plan dated December 2012 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2016. All ten of the corrective actions have been completed. Final Line Completion No. Location Address Ownership Observation Corrective Action Date Completion Date Smoke from manhole and Reconstruct November 1 MH 6767 Cox @ Loras Public sidewalk in front manhole November of Loras Physical chimney 2013 Plant 12th& Smoke from Reconstruct November 2 MH 5684 Grove Public around manhole manhole 2013 chimney va 3 MH 7055 5th& Public Smoke from ^,.. `-'�- August August Raymond around manhole ehimmey 2016 2016 Rehabilitation Smoke from 5th& August August 4 MH 6758 Roberts Public ground near 2016 2016 manhole 7-40 Rehabilitation Pickett& Smoke from R AGt"" 5 MH 5572 Public pavement joints June 2016 June 2016 Montrose around manhole Rehabilitation Smoke from Reconstruct 6 MH 5606 Walnut& Public joints around manhole August August Loras 2016 2016 manhole chimney Smoke from R...RAF st 7 MH 5632 Cummins St Public joints around June 2016 June 2016 manhole Eh mmey Rehabilitation Smoke around R...RAF A 8 MH 7008 16th& Public manhole in """""8. August August Montrose backyardEh mmey 2016 2016 Rehabilitation Smoke around R...RAF A 9 MH 5619 Cox @Loras Public manhole and June 2016 June 2016 sidewalk Rehabilitation Smoke from joints around Reconstruct November 10 MH 5594 Alley at Dell Public manhole and manhole 2015 adjacent steps chimney 7.2.7 Sewershed 12 Brick Manhole Corrections The following table reflects public sanitary sewer corrections identified in the Sewershed 12 Corrective Action Plan dated December 2012 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2016. All 25 of the scheduled corrections have been completed. Line item number 17 shows two final completion dates; the new manhole riser rings were installed in June 2016 and the spray seal manhole contract was completed in August 2016. Line Completion Final Item Manhole ID Location Lid/Cover Type Manhole Type Date Completion No. Date 1545 1 SAN S07008 Place Fairview Closed Pick Brick August 2016 August 2016 Place 2 SAN S05619 776 Loras Blvd Closed Pick Brick June 2016 June2016 3 SAN S05594 567 Arlington, Closed Pick Brick October 2013 Rear 4 SAN 504302 Maiden Lane Closed Pick Brick MH Eliminated 5 SAN S 04232 205 Bluff St Open NoBolt Brick August 2016 August 2016 6 SAN S 0424 Alley btw 441 &467 Bluff Open NoBolt Brick Private MH 7 SAN S 0424 491 W4th St OpenNoBolt Brick February 2016 8 SAN S 0430 Maiden Lane Open NoBolt Brick October2013 9 SAN S 0430 Maiden Lane Open NoBolt Brick October2013 10 SAN S 04325 Alley E of Bluff St Open NoBolt Brick August 2016 August 2016 11 SAN S 04327 Alley E of Bluff,S of W 4th St Open NoBolt Brick February 2016 7-41 12 SAN S05715 970 Grove Terr Open NoBolt Brick 2011 13 SAN S04515 801 Bluff St Open NoBolt Brick February 2016 14 SAN S05587 525 Loras Blvd Open Bolt Brick November 2013 15 SAN S05603 637 Arlington St, Open NoBolt Brick October 2013 Rear 16 SAN S05623 Cnr Loras and Open NoBolt Brick February 2016 Cummins 17 SAN S05627 604 Chestnut St, Open NoBolt Brick June 2016 June 2016& Rear August 2016 18 SAN S05671 1132 Center PI, Open NoBolt Brick November Rear 2013 19 SAN S 05676 Alley E of Race St, S of Rose St Open Pick Brick June 2016 June 2016 20 SAN S05680 Ailey 982 Center Open NoBolt Brick June 2016 June2016 21 SAN S05682 Alley 1025 Walnut Open NoBolt Brick June 2016 June 2016 St 22 SAN S05693 618 University Ave Open NoBolt Brick October2013 23 SAN S05706 590 University Ave Open NoBolt Brick October2013 24 SAN S05804 Alley 716 Wilson Open NoBolt Brick October 2013 St 25 SAN 507174 825 Air Hill St Open NoBolt Brick August 2016 August 2016 7.2.8 Sewershed 12 Sanitary Sewer Rehabilitation/Corrections The following table reflects public sanitary sewer corrections identified in the Sewershed 12 Corrective Action Plan dated December 2012 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2O16. Est.Total Modified Final Line U/S D/S Sewershed Pipe Length, Completion Completion No. Manhole Manhole No. Location Dia.(in) (FT) Date Date 1 SAN S SAN S 12-1 Cornell St. 8 137 November 07007 07008 2013 2 SANS SAN S 12-1 Arlington St. 8 194 October 2013 3 SANS SAN S 12-1 Arlington St. 8 245 October 2013 4 SANS SANS 12-1 Arlington St. 8 171 October 2013 05594 5 SANS SANS 12-1 Cummins St. 8 132 October 2013 05632 05623 6 SAN S SAN S 12-1 Dell St. North 8 133 November 05592 05587 2013 SAN S SAN S December 7 05715 05720 12-1 Grove Terrace 8 214 2022 8 SAN S SAN S 12-1 8 176 December 05720 05688 Grove Terrace 2022 9 SANS SANS 12-1 Loras Blvd 8 145 October 2013 05614 10 SAN S SAN S 12-1 Loras Blvd 8 320 November 05593 05587 2013 11 SAN S SA NS 05600 12-1 Prairie St. 8 132 October 2013 7-42 06930 12 SAN S SAN S 12-1 W 12"St. 8 315 November 04517 04520 2013 13 SANS SAN S 12-2 Center PI 8 206 October 2013 14 SAN S SAN S 12-2 Delhi St. 8 217 Main 05831 05827 Abandoned 15 SAN S SANS 12-2 Delhi St. 8 106 Main 05832 05831 Abandoned 16 SAN SSAN S 12-2 Rose St. 8 273 October 2013 05664 17 SANS SAN SNovember 12-2 University Ave g 218 05693 05706 2013 18 SAN S SAN S 12-2 University Ave 8 198 October 2013 05698 05815 19 SANS SANS 12-2 Wilson Ave. 8 239 October 2013 05761 20 SAN S SANS 12-3 Cooper PI 9-6 211 December 04297 04298 2026 21 SAN S SAN S 12-3 W 8t'St. 8 154 November 05713 04512 2013 22 SAN S SAN S 12-3 W 8t'St. 8 135 November 05705 07416 2013 23 SAN S SAN S 12-3 W8th St. 8 180 October 2013 05708 05709 24 SANS SANS 12-3 Maiden Lane 86 167 December 04304 04303 2026 25 SANS SANS 12-3 Maiden Lane 9-6 193 December 04303 04302 2026 26 SANS SANS 12-3 Maiden Lane 86 159 December 04302 07433 2026 27 SAN S 07151 SANS 12-4 Alpine St. 8 238 October 2013 05741 28 SANS SANS 12-4 Ha rvard St. 86 325 December 05747 05746 2025 29 SANS SANS 12-4 Wilson Ave. 8 359 October 2013 05804 30 SAN S SAN S 12-4 Wilson Ave. 8 313 October 2013 05-7804 05805 31 SAN S SAN S 12-5 Cardiff St. 8 154 October 2013 04279 04280 SANS SANNovember __ _ 32 94347 SQ7372 12-5 sluff St.4 9.12 324 2013 04520 04519 SANS SANS 33 &b39 Q45= 12-5 St Ma ry's St. 8 157 November 07173 04347 2013 34 SAN S SAN S 12-5 Langworthy St. 8 203 October 2013 03951 03952 35 SANS SANS 12-5 Summitt St. 8 138 October 2013 04274 04275 36 SAN S SAN S 12-5 W 3'tl St. 8 261 November 04283 04348 1 1 1 2013 7.3 SEWERSHED 7 CORRECTIVE ACTION PLAN SCHEDULE The City continues to work with property owners to make corrections to their private properties. These are corrections made to private properties and therefore dependent upon funding by the property owner. The City's intent is to work with owners to achieve completion of the corrections without placing undue financial hardship on the private property owner. 7-43 The following sections also reflect public sanitary and storm sewer corrections identified in the Sewershed 7 Corrective Action Plan dated December 2013. The original tentative completion date is shown along with a modified completion date as reflected in the Status update report dated April 2O16, and afinal completion date. 7.3.1 Sewershed 7 Failed and Corrected Private Property Inspections The total number of private property inspection corrections reported in the Sewershed 7 Corrective Action Plan was 29; this was increased to 30 as inspections continue. All 30 have been corrected. Corrected and Line No. House No. Street Name Defect Corrective Action Passed Re- inspection 1 2444 BROADWAY Downspout to Sanitary Sewer Disconnect&d ischa rge to la nd Yes 2 402 PRIMROSE Exterior sta irwell dra ins to Plug a nd Provide for Covered Yes sanitary Area or Pipe to Storm sewer 3 2845 CENTRAL AVE Flex Hose Used to Discharge Install rigid pipe Yes Sump 4 2006 N MAIN ST Flex Hose Used to Discharge Install rigid pipe Yes Sump 5 2777 BROADWAY Sump Pump to Sanitary Sewer Disconnect&discharge to land Yes 6 2670 CENTRAL AVE Sump Pump to Sanitary Sewer Disconnect&discharge to land Yes 7 2812 CENTRAL AVE Sump Pump to Sanitary Sewer Disconnect&discharge to land Yes 8 2247 CENTRAL AVE Sump Pump to Sanitary Sewer Disconnect&discharge to land Yes 9 2892 MUSCATINE Exterior stairwell drains to Completed Yes Sanitary Sewer 10 2908 CENTRALAVE Flex Hose Used to Discharge Completed Yes Sump 11 1006 CLARKE CREST CT Flex Sum Hose Used to Discharge Completed Yes P 12 2447 CENTRAL AVE Pit no pump Completed Yes 13 1006 CLARKE DR Pit no pump Completed Yes 14 1002 CLARKE CREST CT Pit no pump Completed Yes 15 2438 CENTRALAVE Pit no pump and flex hose used Completed Yes 16 41 DIAGONAL Roof drainsto sanitary Completed Yes 17 2005 NMAIN ST Roof drainsto sanitary Completed Yes 18 245 KING Showerto sump to outside Completed Yes 19 350 GAY Exterior stairwell drainsto Completed Yes sa n ita ry 20 524 KAU FMANN AVE Flex Sum Hose Used to Discharge Completed Yes P 21 380 LOWELL Flex Hose Used to Discharge Completed Yes Sump 22 492 KAU FMANN AVE Sump pump connected to Completed Yes sanitary sewer 23 315 KING Sump pump connected to Completed Yes sanitary sewer 24 875 COTTAGE PL Yard and driveway drain to Completed Yes sa n ita ry 25 821 LOWELL Ya rd d ra in con netted to sa n ita ry Completed Yes sewer 26 2360 CLARKE CREST DR Sump pump drains to floor drain Completed Yes 7-44 27 2613 CENTRAL AVE Yard drain connected to sanitary Completed Yes ewer 28 49 DIAGONAL Flex Hose Used to Discharge Completed Yes Sump 29 2901 CENTRAL AVE Flex Sum Hose Used to Discharge Completed Yes P 30 2463 CENTRAL AVE Sump pump drains to sanitary Disconnect&discha rge to land Yes sewer 7.3.2 Sewershed 7 Sanitary Sewer Smoke Testing - Private Property Defect Corrections The total number of private property smoke detected corrections reported in the Sewershed 7 Corrective Action Plan was 48 properties. This was reduced to 45 due to duplicate entries/locations. A total of 17 of the 45 properties have been corrected. The property owners are responsible for both the work and financial responsibility of the sanitary sewer lateral from the building to the public sewer. The City acknowledges the financial burden this may place on property owners, and those eligible to receive assistance may request financial assistance from the City Televising the lateral may be costly for private property owners and may not provide conclusive evidence of inflow or infiltration, similar to televising of public mains. Therefore, the City will assist the private property owners with financial assistance, as funds are available, to televise the lateral and perform either dye or flood testing during the televising operation to determine the condition of the resident's lateral. Line House No. No. Street Name Ownership Smoke Observed from: Corrective Action Completed the yard outside the Televise sanitary service lateral during 1 2761 BROADWAY ST Private house above a broken dye test and/or Repair/replace lateral No sanitary lateral as needed. the yard outside the Televise sanitary service lateral during 2 2685 BROADWAY ST Private house above a broken dye test and/or Repair/replace lateral No sanitary lateral as needed. Televise sanitary service lateral during 3 2623 BROADWAY ST Private awater stop box dye test and/or Repair/replace lateral No as needed. 4 2528 BROADWAY ST Private adownspout Notify property ownerto disconnect Yes downspout. 5 2445 BROADWAY ST Private asanitary sewer Notify property owner to replace or Yes cleanout repair clean out. 6 2247 CENTRALAVE Private adownspout Notify property ownerto disconnect yes downspout. 7 2247 CENTRALAVE Private adriveway drain Notify property ownerto disconnect Yes driveway drain 8 2917 CENTRALAVE Private asanitary sewer Notify property ownerto replace or Yes cleanout repair clean out. yard drain alongside of Notify property ownerto disconnect 9 2613 CENTRALAVE Private house direct connection area drain. Yes to san smoke coming from Televise sanitary service lateral during 10 2691 CENTRALAVE Private foundation by plant dye test and/or Repair/replace lateral No asneeded. Televise sanitary service lateral during 11 2687 CENTRALAVE Private smoke leaking up from taus dye test and/or Repair/replace lateral No as needed. 7-45 smoke coming from Televise sanitary service lateral during 12 2601 CENTRALAVE Private foundation,possible dyetestand/or Repair/replace lateral No broken lateral asneeded. a private manhole with 13 2535 CENTRALAVE Private sanitary lateralflowing Notify propertyownerto replace or No through repair manhole. 14 2523 CENTRALAVE Private a private sanitary sewer Notify property ownerto replace or Yes manhole repair manhole. along the building Televise sanitary service lateral during 15 2326 CENTRALAVE Private foundation dye test.Repair/replace lateral as No needed. along the building Televise sanitary service lateral during 16 2326 CENTRALAVE Private foundation dye test.Repair/replace lateral as No needed. along the building Televise sanitary service lateral during 17 2326 CENTRALAVE Private dye test.Repair/replace lateral as No foundation needed. a sanitary sewer Notify property owner to replace or 18 2326 CENTRALAVE Private manhole,as well as the No yard around the lateral repair manhole. along the building Televise sanitary service lateral during 19 2306 CENTRALAVE Private foundation dye test and/or Repair/replace lateral No asneeded. 20 2455 CLARKE CREST Private a downspout Notify property ownerto disconnect Yes DR downspout. 21 1275 CLARKE DR Private a broken lateral clean Notify property ownerto replace or Yes out repair clean out. 22 995 CLARKE DR Private a broken lateral clean Notify property ownerto replace or Yes out repair clean out. a leaking clean out or Televise sanitary service lateral during 23 945 CLARKE DR Private broken lateral dye test and/or Repair/replace lateral Yes asneeded. a private sanitary Televise sanitary service lateral during 24 672 CLARKE DR Private lateral,around the dye test and/or Repair/replace lateral Yes water stop box asneeded. 25 2815 DAVENPORTST Private adownspout Notify property ownerto disconnect Yes downspout. the yard outside the Televise sanitary service lateral during 26 57 DIAGONAL ST Private house above a broken dye test and/or Repair/replace lateral No sanitary lateral asneeded. the yard outside the Televise sanitary service lateral during 27 2244 FRANCIS ST Private house above a broken dye test and/or Repair/replace lateral No sanitary lateral asneeded. 28 2252 FRANCIS ST Private a pvc pipe sticking out Notify property ownerto replace or Yes Of the ground repair clean out. the yard outside the Televise sanitary service lateral during 29 2593 FULTON ST Private house above a broken dye test and/or Repair/replace lateral No sanitary lateral asneeded. the yard outside the Televise sanitary service lateral during 30 2617 FULTON ST Private house above a broken dye test and/or Repair/replace lateral No sanitary lateral asneeded. the yard outside the Televise sanitary service lateral during 31 2131 HEEB ST Private house above a broken dye test and/or Repair/replace lateral No sanitary lateral asneeded. 32 2186 HODGDON ST Private a leaking sanitary sewer Notify property ownerto replace or Yes manhole repair manhole. KAUFMANN Televise sanitary service lateral during 33 526 AVE Private back ofthe curb in yard dye test and/or Repair/replace lateral No asneeded. 7-46 KAUFMANN along driveway where Televise sanitary service lateral during 34 366 AVE Private wood retaining wall is dye test and/or Repair/replace lateral No as needed. KAUFMANN Televise sanitary service lateral during 35 370 AVE Private aretaining wall dye test and/or Repair/replace lateral No as needed. KAUFMANN Televise sanitary service lateral during 36 370 AVE Private aretaining wall dye test and/or Repair/replace lateral No as needed. KAUFMANN Televise sanitary service lateral during 37 390 AVE Private concrete stairs dye test and/or Repair/replace lateral No as needed. KAUFMANN Televise sanitary service lateral during 38 410 AVE Private retaining wall dye test and/or Repair/replace lateral No as needed. KAUFMANN Televise sanitary service lateral during 39 430 AVE Private retaining wall dye test and/or Repair/replace lateral No as needed. KAUFMANN the yard outside the Televise sanitary service lateral during 40 400 AVE Private house above a broken dye test and/or Repair/replace lateral No sanitary lateral as needed. 41 850 LOWELL ST Private a private sanitary sewer Notify property owner to replace or Yes clean out repair clean out. the yard outside the Televise sanitary service lateral during 42 468 LOWELL ST Private house above a broken dye test and/or Repair/replace lateral No sanitary lateral as needed. 43 452 LOWELL ST Private adownspout Notify property ownerto disconnect Yes downspout. the yard behind the Televise sanitary service lateral during 44 2750 MUSCATINE ST Private curb dye test and/or Repair/replace lateral No as needed. smoke coming from Televise sanitary service lateral during 45 808 SPIRES DR Private yard,possible broken dye test and/or Repair/replace lateral No lateral as needed. 7.3.3 Sanitary Sewer Smoke Testing: Public Property— Sanitary Sewer Corrections The following table reflects public sanitary sewer corrections identified in the Sewershed 7 Corrective Action Plan dated December 2013 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2016. Rehabilitation of the sewers is scheduled for 2019. Line Final No. Nearest St.Address Ownership Observation Corrective Action Completion Date Completion Date New water Televise sanitary BROADWAY valve installed, sewer near water CCTV Feb 2016/December N CCFebruary 1 2701 ST Public smoke coming valve.Repairsewer 2019 2016 up from valve as needed. Sewer Rehab body 2 2524 BROADWAY Public open pickhole Replace manhole See Section ST MH lid lid 7.3.5 Televise sanitary See Section BURLINGTON fromSmowater sewer near water 3 335 Public from water 7.3.5 ST valve box valve.Repair as needed. See Section 4 335 BURLINGTON Public open pickhole Replace manhole 7.3.5 ST MH lid lid 7-47 open pick hole Replace manhole See Section 6 2901 CENTRAL AVE Public MH lid lid 7.3.5 Televise sanitary CCTV Feb 2016/December Quest utility sewer near utility. CCTV February 7 2540 CENTRAL AVE Public manhole Repair sewer as 2019 2016 needed. Sewer Rehab 8 1005 CLARKE Public open pick hole Replace manhole See Section CREST CT MH lid lid 7.3.5 9 2525 CLARKE Public open pick hole Replace manhole See Section CREST DR MH lid lid 7.3.5 CLARKE Missing See Section 10 2530 CREST DR Public manhole cover Install new bolt 7.3.5 bolt See Section 11 2470 CLARKE Public open pick hole Replace manhole 7.3.5 CREST DR MH lid lid 12 2480 CLARKE Public Open pick hole Replace manhole See Section CREST DR MH lid lid 7.3.5 13 2320 CLARKE Public Open pick hole Replace manhole See Section CREST DR MH lid lid 7.3.5 14 998 CLARKE Public Open pick hole Replace manhole See Section CREST DR MH lid lid 7.3.5 15 2240 CLARKE Public open pick hole Replace manhole See Section CREST DR MH lid 7.3.5 Smoke coming Apply sealant to See Section 16 1275 CLARKE DR Public from behind curb manhole casting 7.3.5 Smoke corm ng Televise sanitary 17 1275 CLARKE DR Public from crack in sewer along street. December 2019 street Repair/rehabilitate sewer as needed. 18 2443 DIVISION ST Public open pick hole Replace manhole See Section MH lid lid 7.3.5 smoke coming Apply sealantto See Section 19 908 FARRELL CT Public from around rim manhole casting 7.3.5 of MH Smoke coming Inspect manhole 20 2295 FOVE ST Public from around chimney. See Section concrete around Repair/rehabilitate 7.3.5 MH as needed. alley way between Francis Replace manhole See Section 21 2230 FRANCISST Public and central behind 2230 lid 7.3.5 Francis Smoke coming Inspect manhole 22 2282 HAROLD ST Public from around chimney. See Section concrete around Repair/rehabilitate 7.3.5 MH as needed. Smoke coming from around HEMPSTEAD Replace manhole See Section 23 2464 ST Public MH and yard lid 7.3.5 around driveway HEMPSTEAD Smoke coming Replace manhole See Section 24 2320 ST Public MH around lid 7.3.5 7-48 Smoke coming Inspect manhole 25 836 KAUFMANN Public from around chimney. See Section AVE concrete ring Repair/rehabilitate 7.3.5 around MH as needed. Televise sanitary San Sewer main sewer in location. KAUFMANN 26 828 AVE Public running up to Examine flow data. December 2021 Ferrel Ct. Repair/rehab as needed. Televise sanitary sewer in location. KAUFMANN the back of curb 27 530 AVE Public in and Examine flow data. December 2021 y Repair/rehab as needed. Televise sanitary smoke coming sewer in location. KAUFMANN from curb and 28 524 AVE Public gutter possible Examine flow data. December 2021 broken lateral Repair/rehab as needed. South West corner of Kleine Televise sanitary and Chapel Ct. sewer in location. 29 2145 KLEINE ST Public Examine flow data. December 2021 Smoke coming from back of Repair/rehab as needed. curb smoke bleeding Inspect manhole 30 806 LACEY CT Public up from grass chimney. See Section around MH Repair/rehabilitate 7.3.5 as needed. Televise sanitary MONTCREST Smoke coming sewer in location. 31 750 Public from cracks in Examine flow data. December 2024 ST street Repair/rehab as needed. corner of Montcrest and Hempstead MONTCREST Replace manhole See Section 32 750 ST Public Smoke coming lid 7.3.5 from around concrete around MH smoke coming Inspect manhole 33 505 NAPIER ST Public out from around chimney. See Section concrete around Repair/rehabilitate 7.3.5 MH as needed. Inspect manhole PLEASANT fromsmoundee cc r chimney. See Section 34 2742 Public from under VIEW DR manhole casting Repair/rehabilitate 7.3.5 as needed. 35 701 RAVENWOOD Public open pick hole Replace manhole See Section CT MH lid lid 7.3.5 36 707 RAVENWOOD Public Open pick hole Replace manhole See Section CT MH lid lid 7.3.5 Televise sanitary smoke coming sewer in location. See Section 37 2425 SPIRES CT Public from crack in Examine flow data. 7.3.5 street Repair/rehab as needed. Smoke coming Inspect manhole 38 2460 SPIRES CT Public from grass chimney. See Section around manhole Repair/rehabilitate 7.3.5 as needed. 7-49 smoke coming Inspect manhole 39 2420 SPIRES CT Public from under chimney. See Section Repair/rehabilitate 7.3.5 manhole casting as needed. smoke coming Inspect manhole 40 2400 SPIRES CT Public from under chimney. See Section Repair/rehabilitate 7.3.5 manhole casting as needed. smoke coming Inspect manhole 41 808 SPIRES DR Public from under chimney. See Section Repair/rehabilitate 7.3.5 manhole casting as needed. smoke coming Inspect manhole 42 807 SPIRES DR Public from under chimney. See Section Repair/rehabilitate 7.3.5 manhole casting as needed. 43 2709 VENTURAPublicopen pick hole Replace manhole See Section43 2709 VENTURAPublic lid lid 7.3.5 7.3.4 Sewershed 7 Sanitary Sewer Smoke Testing: Public Property— Storm Sewer Corrections The following table reflects public sanitary and storm sewer corrections identified in the Sewershed 7 Corrective Action Plan dated December 2013 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2016. Rehabilitation of the sewers is scheduled for 2019. Final Line Completion Completion No. Nearest St.Address Ownership Observation Corrective Action Date Date Dye test catch CCTV Feb BROADWAY smoke coming basin/CCN San. 2016m CCN 1 2609 ST Public from catch Sewer/and/or be/Dece/Dece February basin Repair or Rehab. Sewer Rehab 2016 Seweras needed. Dye test catch CCTV Feb BROADWAY smoke coming basin/CCN San. 2016m CCN 2 2604 ST Public from catch Sewer/and/or be/Dece/Dece February basin Repair or Rehab. Sewer Rehab 2016 Seweras needed. Dye test catch CCTV Feb BROADWAY smoke coming basin/CCN San. 2016/Decem CCN 3 2600 Public from catch Sewer/and/or February ST basin Repairor Rehab. berSewer2019 Rehab 2016 Seweras needed. Dye test catch CCTV Feb BROADWAY smoke coming basin/CCN San. 2016/Decem CCN 4 2575 Public from catch Sewer/and/or February ST basin Repairor Rehab. berSewer2019 Rehab 2016 Seweras needed. Dye test catch CCTV Feb BROADWAY smoke coming basin/CCN San. 2016/Decem CCN 5 2550 Public from catch Sewer/and/or February ST basin Repairor Rehab. berSewer2019 Rehab 2016 Seweras needed. Dye test catch smoke coming basin/CCN San. December 6 2887 CENTRALAVE Public from catch Sewer/and/or 2019 basin Repair or Rehab. Sewer as needed. 7-50 Dye test catch smoke coming basin/CCN San. December 7 2571 CENTRALAVE Public from catch Sewer/and/or 2019 basin Repair or Rehab. Sewer as needed. SW cornerof 24th and Dye test catch central,in basin/CCN San. December 8 0 CENTRALAVE Public front of Bus Sewer/and/or 2019 Barn smoke Repair or Rehab. coming from Sewer as needed. catch basin NW cornerof Dye test catch CCTV Feb 24th and basin/CCN San. 2016/Decem CCN 9 2403 CENTRALAVE Public Central smoke Sewer/and/or February coming from Repair or Rehab. ber2019 2016 catch basin Sewer as needed. Sewer Rehab NE Corner of Dye test catch CCN Feb 24th and basin/CCN San. 2016/Decem CCTV 10 2400 CENTRALAVE Public Central smoke Sewer/and/or February comingfrom Repair or Rehab. ber2017 2016 catch basin Sewer as needed. Sewer Rehab SE cornerof Dye test catch CCTV Feb 24th and basin/CCN San. 2016/Decem CCN 11 2360 CENTRALAVE Public Central smoke Sewer/and/or February coming from Repair or Rehab. ber2019 2016 catch basin Sewer as needed. Sewer Rehab Dye test catch CCTV Feb smoke coming basin/CCN San. 2016/Decem CCN 12 2311 CENTRALAVE Public from catch Sewer/and/or February basin Repair or Rehab. ber2019 2016 Sewerasneeded. Sewer Rehab SW cornerof Dye test catch CCTV Feb W23rd and basin/CCN San. 2016/Decem CCN 13 2277 CENTRALAVE Public Central smoke Sewer/and/or February coming from Repair or Rehab. ber2019 2016 catch basin Sewer as needed. Sewer Rehab Dye test catch KAUFMANN smoke coming basin/CCN San. December 14 796 AVE Public from catch Sewer/and/or 2021 basin Repair or Rehab. Sewer as needed. Dye test catch KAUFMANN smoke coming basin/CCN San. December 15 520 AVE Public from catch Sewer/and/or 2021 basin Repair or Rehab. Sewer as needed. South East Corner of Dye test catch KAUFMANN Hempstead basin/CCN San. December 16 496 AVE Public and Kaufmann Sewer/and/or 2021 smoke coming Repair or Rehab. from catch Sewer as needed. basin Dye test catch KAUFMANN smoke coming basin/CCN San. December 17 499 AVE Public from catch Sewer/and/or 2021 basin Repair or Rehab. Sewer as needed. Dye test catch KAUFMANN smoke coming basin/CCN San. December 18 361 AVE Public from catch Sewer/and/or 2021 basin Repair or Rehab. Seweras needed. 7-51 Dye test catch smoke coming basin/CCN San. KAUFMANN December 19 330 AVE Public from catch Sewer/and/or 2014 basin Repair or Rehab. Sewer as needed. South East cornerof Dye test catch Kleine and basin/CCN San. KAUFMANN December 20 290 AVE Public Kaufmann Sewer/and/or 2014 smoke coming Repair or Rehab. from catch Sewer as needed. basin Dye test catch smoke coming basin/CCN San. KAUFMANN December 21 290 AVE Public from catch Sewer/and/or 2014 basin Repair or Rehab. Sewer as needed. south west corner of N Dye test catch KAUFMANN Main and basin/CCN San. December 22 230 AVE Public Kaufmann Sewer/and/or 2014 smoke coming Repair or Rehab. from catch Sewer as needed. basin Dye test catch KAUFMANN smoke coming basin/CCN San. December 23 120 AVE Public from catch Sewer/and/or 2014 basin Repair or Rehab. Sewer as needed. Corner of Francis and Dye test catch KAUFMANN Kaufmann basin/CCN San. December 24 0 AVE Public smoke coming Sewer/and/or 2014 from catch Repair or Rehab. basin Sewer as needed. Dye test catch KAUFMANN smoke coming basin/CCN San. December 25 191 AVE Public from catch Sewer/and/or 2014 basin Repair or Rehab. Sewer as needed. Dye test catch smoke coming basin/CCN San. KAUFMANN December 26 305 AVE Public from catch Sewer/and/or 2014 basin Repair or Rehab. Sewer as needed. Dye test catch smoke coming basin/CCN San. December 27 2155 NMAIN ST Public from catch Sewer/and/or 2014 basin Repair or Rehab. Sewer as needed. Dye test catch smoke coming basin/CCN San. December 28 806 LOWELL ST Public from catch Sewer/and/or 2014 basin Repair or Rehab. Sewer as needed. NW cornerof Woodworth Dye test catch basin/CCTV San. 29 2303 WOODWORTH public and Lowell Sewer/and/or December ST smoke coming Repair or Rehab. 2014 from catch Sewer as needed. basin 7-52 7.3.5 Sewershed 7 Manhole Corrections The following table reflects public sanitary sewer corrections identified in the Sewershed 7 Corrective Action Plan dated December 2013 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2O16. Line Completion Final No. Location Nearest St.Address Observation Corrective Action Date Completion Date 1 SAN S 2524 BROADWAY open pickhole Replace manhole October 06329 ST MH lid lid 2016 SANS BURLINGTON open pickhole Replace manhole October 2 06471 335 ST MH lid lid 2016 3 SAN S 335 BURLINGTON Open pickhole Replace manhole February February 06469 ST MH lid lid 2016 2016 4 SAN S 2901 CENTRAL AVE open pick hole Replace manhole October 06615 MH lid lid 2015 SANS CLARKE CREST open pick hole Replace manhole October 5 06222 1005 CF MH lid lid 2015 6 SAN S 2525 CLARKE CREST open pick hole Replace manhole June 2015 06241 DR MH lid lid 7 SANS 2530 CLARKE CREST Missing manhole Install new bolt June 2015 06242 DR cover bolt SANS CLARKE CREST open pick hole Replace manhole 8 06245 2470 DR MH lid lid June 2015 SANS CLARKE CREST Open pick hole Replace manhole 9 06244 2480 DR MH lid lid June 2015 10 SAN S 2320 CLARKE CREST Open pick hole Replace manhole June 2015 06219 DR MH lid lid SANS CLARKE CREST Open pick hole Replace manhole October 11 05508 995 DR MH lid lid 2015 SANS CLARKE CREST open pick hole Replace manhole 12 06225 2240 DR MH lid June 2015 SANS Smoke coming Apply sealantto October 13 07011 1275 CLARKE DR from behind manhole casting 2015 curb „____:_i,h_i_ o__i______h_i_ 44 SAP!-5 �442 ^`T�"�^"^^�" Duplicate - B§333 4w-lid !id Manhole smoke coming 15 SANS 908 FARRELL CT from around rim mantto manhole 06238 June 2015 of MH manhole casting Smoke coming ehimmey, SANS from around " -' '--`- "-`- 16 2295 FOVE ST "` June 2016 June 2016 06276 concrete around --m,.eeee —This MH manhole can be eliminated. alley way SAN S between Francis Replace manhole October 17 04678 2230 FRANCIS ST and central lid 2015 behind 2230 Francis 7-53 Smoke coming ehimmey, SANS from around " -' '--`- "-`- 18 2282 HAROLD ST "` June 2016 June 2016 05483 concrete around --m,.eeeed-This MH manhole can be eliminated Smoke coming 19 SAN S 2464 HEMPSTEAD from around MH Replace manhole December 05471 ST and yard around lid. 2023 driveway 20 SAN S 2320 HEMPSTEAD Smoke coming Replace manhole December 05478 ST from around MH lid 2023 Smoke coming Inspect manhole 21 SAN S 836 KAUFMANN from around chimney. December 06774 AVE concrete ring Repair/rehabilitate 2021 around MH as needed. Inspect manhole 22 SANS smoke coming 806 LACEY CT up from grass chimney. June 2015 06235 around MH Repair rehabilitate as needed. corner of Montcrest and SAN S MONTCREST Hempstead Replace manhole August 23 05466 750 ST Smoke coming lid 2016 August 2016 from around concrete around MH smoke coming Inspect manhole SANS out from around chimney. August 24 505 NAPIER ST August 2016 06273 concrete around Repair/rehabilitate 2016 MH as needed. Inspect manhole smoke coming SANS PLEASANT chimney. August 25 06374 2742 VIEW DR from under Repair/rehabilitate 2016 August 2016 manhole casting as needed. 26 SAN S 701 RAVENWOOD open pick hole Replace manhole June 2015 06243 Cf MH lid lid SAN S RAVENWOOD Open pick hole Replace manhole 27 06247 707 Cf MH lid lid June 2015 Inspect manhole SANS Smoke coming chimney. 28 2460 SPIRES CT from grass June 2016 June 2016 06254 around manhole Repair/rehabilitate as needed. Inspect manhole 29 SANS smoke coming 2420 SPIRES CT from under chimney. June 2016 June 2016 06253 manhole casting Repair/rehabilitate as needed. Inspect manhole 30 SANS smoke coming 2400 SPIRES CT from under chimney. June 2016 June 2016 06260 manhole casting Repair/rehabilitate as needed. Inspect manhole 31 SANS smoke coming 808 SPIRES DR from under chimney. June 2016 June 2016 06257 manhole casting Repair/rehabilitate as needed. smoke coming Inspect manhole 32 SAN S 807 SPIRES DR from under chimney. June 2016 June 2016 06256 Repair/rehabilitate manhole casting as needed. 33 SAN S 2709 VENTURA DR open pick hole Replace manhole February 06361 MH lid lid 2016 7-54 7.3.6 Sewershed 7 Brick Manhole Corrections The following table reflects public sanitary sewer corrections identified in the Sewershed 7 Corrective Action Plan dated December 2013 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2O16. Tentative Modified Final Line Manhole ID Location Lid/Cover Type Completion Completion Completion No. Date Date Date SANS ALLEY BEHIND CENTRAL Concealed Pickhole- 1 October 2015 March 2016 March 2016 04673 HARTIG DRUG AVE Not Bolted 2 SANS ALLEY BEHIND CENTRAL Open Pickhole-Not October 2015 March 2016 March 2016 04679 HARTIG DRUG AVE Bolted SANS behind 338 Concealed Pickhole- 3 06277 Kaufmann CHAPEL CT Not Bolted October 2015 March 2016 March 2016 4 SANS 2421 DIVISION ST Concealed Pickhole- October 2015 June 2025 06312 Not Bolted 5 SANS 2443 DIVISION ST Open Pickhole-Not October 2015 June 2025 06333 Bolted 6 SAN S @ Lowell FOYE ST Concealed Pickhole- October 2015 March 2016 March 2016 06288 Not Bolted SANS KAUFMANN Concealed Pickhole- 7 51 October 2015 October 2015 04680 AVE Not Bolted 8 SANS @Foye LOWELL ST Concealed Pickhole- October 2015 March 2016 March 2016 06271 Not Bolted 9 SANS Eliminated 480 LOWELL ST Manhole October 2015 March 2016 06272 March 2016 can be eliminated 10 SANS 546 LOWELL ST Concealed Pickhole- October 2015 March 2016 March 2016 06283 Not Bolted 11 SANS ROSEALINE LOWELL ST Concealed Pickhole- October 2015 March 2016 March 2016 06289 Not Bolted 12 SANS 430 LOWELL ST Concealed Pickhole- October 2015 March 2016 March 2016 06290 Not Bolted 13 SANS @Paul St LOWELL ST Concealed Pickhole- October 2015 March 2016 March 2016 06293 Not Bolted 14 SANS 364 LOWELL ST Concealed Pickhole- October 2015 March 2016 March 2016 06294 Not Bolted 15 SANS 315 LOWELL ST Concealed Pickhole- October 2015 March 2016 March 2016 06295 Not Bolted 16 SAN S 70 W 23RD ST Concealed Pickhole- October 2015 March 2016 March 2016 04674 Not Bolted 17 SAN S Division St W 24TH ST Concealed Pickhole- October 2015 March 2016 March 2016 06314 Not Bolted 7.3.7 Sewershed 7 Sanitary Sewer Corrections The following table reflects public sanitary sewer corrections identified in the Sewershed 7 Corrective Action Plan dated December 2013 and modified in April 2016. The tentative completion dates reflect the dates outlined in the Status update report dated April 2016. All scheduled improvements are completed. Tentative Final Sewershed U/S Manhole D/S Manhole Street Diameter, Length, Completion Completion Sub Area Location Inches Feet Date Date Kaufmann December December 7--1 SAN S 04771 SAN S 04769 Ave 12 385 2014 2014 7--1 SAN S 04769 SAN 504767 Kaufmann 12 255 December December Ave. 2014 2014 7-55 7--1 SAN S O4767 SAN S 0468 Kaufmann 12 265 December December Ave. 2014 2014 Kaufmann December December 7--1 SAN S 04684 SAN S 04682 Ave 12 164 2014 2014 7--1 SAN S O4682 SAN S 0468 Kaufmann 12 76 December December Ave. 2014 2014 7--3 SAN S 05482 SAN S 05456 Lowell St. 6 179 November November 2015 2015 7--3 SAN S 05456 SAN S 05455 Lowell St. 6 206 November November 2015 2015 7--3 SAN S 05455 SAN S 05454 Lowell St. 8 238 December December 2014 2014 7--3 SAN S 05454 SAN S 05453 Lowell St. 8 193 December December 2014 2014 7--3 SAN S 05453 SAN S 05481 Lowell St. 8 105 December December 2014 2014 7--3 SAN S 07424 SAN S 05481 Lowell St. 8 148 December December 2014 2014 7--3 SAN S 05480 SAN S 07424 Lowell St. 8 265 December December 2014 2014 7--3 SAN S 06285 SAN S 05480 Lowell St. 8 265 December December 2014 2014 7--3 SAN SO 284 SAN S 06285 Lowell St. 8 77 December December 2014 2014 7.4 SEWERSHED 5 CORRECTIVE ACTION PLAN SCHEDULE The City continues to work with property owners to make corrections to their private properties. These are corrections made to private properties and therefore dependent upon funding by the property owner. The City's intent is to work with owners to achieve completion of the corrections without placing undue financial hardship on the private property owner. The section also includes data describing public sanitary and storm sewer corrections identified in the Sewershed 5 Corrective Action Plan dated November 2014 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2016. 7.4.1 Sewershed 5 Failed and Corrected Private Property Inspections In Sewershed 5, there were 68 failed private property inspections; these are listed below of which 66 have been corrected. There were five private property corrections during this reporting period. Corrected and Line No. House No. Street Name Defect Corrective Action Passed Re- inspection 1 3463 DOVE Broken lateral Line or replace private lateral NO 2 2672 RAVEN OAKS clean out broken Repair clean out NO 3 2680 DOVE Exterior stairwell drain to sanitary Plug and Provide for Covered YES Area or Pipe to Storm sewer 4 2340 CRISSY DR Exterior stairwell drain Plug and Provide for Covered YES Area or Pipe to Storm sewer Repair seepage holes and install 5 2422 GORDON DR Seepage collection system to sump pump and discharge to YES floor drain land 6 2330 TRYGG DR Seepage collection system to Repair seepage holes and install YES floor drain sump pump and discharge to 7-56 land 7 3030 ARBOR HILLS DR Sump pump to sanitary Disconnect&discharge to land YES 8 2875 BRUECK Sump pump to sanitary Disconnect&discharge to land YES 9 3155 CASTLE WOODS LN Sump pump to sanitary Disconnect&discharge to land YES 10 549 MILL RUN DR Sump pump to sanitary Disconnect&discharge to land YES 11 2225 CARTER RD clean out broken COMPLETED YES 12 2225 CARTER RD clean out broken COMPLETED YES 13 3150 1 F KENNEDY RD clean out broken COMPLETED YES 14 2947 W 32ND ST clean out broken COMPLETED YES 15 2329 CARTER RD Driveway drain to sanitary COMPLETED YES 16 3462 ASBURY RD Exterior stairwell and yard drain COMPLETED YES to sanitary 17 2530 CRISSY DR Exterior stairwell drain to sanitary COMPLETED YES 18 2419 EVERGREEN DR Exterior stairwell drain to sanitary COMPLETED YES 19 2549 ROSEWOOD DR Exterior stairwell drain to sanitary COMPLETED YES 20 2561 ROSEWOOD DR Exterior stairwell drain to sanitary COMPLETED YES 21 2584 ROSEWOOD DR Exterior stairwell drain to sanitary COMPLETED YES 22 2590 ROSEWOOD DR Exterior stairwell drain to sanitary COMPLETED YES 23 2309 W32ND ST Exterior stairwell drain to sanitary COMPLETED YES 24 3053 ARBOR HILLS DR Flex hose used COMPLETED YES 25 3030 ASBURY RD Flex hose used COMPLETED YES 26 2221 CARTER RD Flex hose used COMPLETED YES 27 2598 HACIENDA DR Flex hose used COMPLETED YES 28 2143 JUDSON DR Flex hose used COMPLETED YES 29 3439 KAUFMANN AVE Flex hose used COMPLETED YES 30 3358 KIMBERLY DR Flex hose used COMPLETED YES 31 3486 KIMBERLY DR Flex hose used COMPLETED YES 32 2929 KRISTEN CT Flex hose used COMPLETED YES 33 2661 MARYWOOD DR Flex hose used COMPLETED YES 34 3325 SUNSET PARK CIR Flex hose used COMPLETED YES 35 3335 SUNSET PARK CIR Flex hose used COMPLETED YES 36 3441 SUNSET PARK CIR Flex hose used COMPLETED YES 37 3466 SUNSET PARK CIR Flex hose used COMPLETED YES 38 3344 TIBEY CT Flex hose used COMPLETED YES 39 3494 WALLER ST Flex hose used COMPLETED YES 40 2310 MARTIN DR Pit no pump COMPLETED YES 41 3416 KAUFMANN AVE Seepage Collection to sanitary COMPLETED YES 42 3406 DOVE ST Seepage Collection and sump to COMPLETED YES sanitary 43 2595 GLENVIEW CIR Sump pump to sanitary COMPLETED YES 44 2527 HACIENDA DR Sump pump to sanitary COMPLETED YES 45 2625 KENNEDY RD Sump pump to sanitary COMPLETED YES 46 2395 THEDA DR Sump pump to sanitary COMPLETED YES 47 3245 THEDA DR Sump pump to sanitary COMPLETED YES 7-57 48 3207 ARROWWOOD LN sump to sanitary COMPLETED VES 49 3250 BLASEN DR sump to sanitary COMPLETED VES 50 2940 BRUECK sump to sanitary COMPLETED VES 51 2584 GLENVIEW CIR sump to sanitary COMPLETED VES 52 2299 GORDON DR sumpto sanitary COMPLETED VES 53 2326 GORDON DR sumpto sanitary COMPLETED VES 54 2483 GORDON DR sumpto sanitary COMPLETED VES 55 2498 HACIENDA DR sump to sanitary COMPLETED VES 56 2578 HACIENDA DR sump to sanitary COMPLETED VES 57 3370 KAUFMANN AVE sump to sanitary COMPLETED VES 58 2659 KENNEDY RD sump to sanitary COMPLETED VES 59 2278 MARTIN DR sump to sanitary COMPLETED VES 60 2318 MARTIN DR sump to sanitary COMPLETED VES 61 2537 MARVWOOD DR sump to sanitary COMPLETED VES 62 2541 MARVWOOD DR sump to sanitary COMPLETED VES 63 2600 MARVWOOD DR sump to sanitary COMPLETED VES 64 2689 MARVWOOD DR sump to sanitary COMPLETED VES 65 2551 ROSEWOOD DR sump to sanitary COMPLETED VES 66 2350 WOODLAWN sump to sanitary COMPLETED VES 67 3142 W 32ND ST Yard drain COMPLETED VES 68 2206 WOODLAWN Yard drain to sanitary COMPLETED VES Sewershed 5 inspections presented a new issue, a sump pit without a sump pump. The area was more recently developed and properties were permitted to have pits installed without sump pumps; the sump pumps or pits discharge line have been verified as not connected to the sanitary sewer and therefore at this time are not illegal connections and do not require corrective action. However, the City is considering, what, if any, further action needs to be taken. The list of properties meeting this description was originally reported in the March 2015 Semi Annual report. 7.4.2 Sewershed 5 Sanitary Sewer Smoke Testing—Private Property Defect Corrections The original reported private property correction list was 25 properties; this is reduced to 22 due to duplicate addresses. A second correction to the following table includes the change of 3047 Woodlawn to 3047 Karen Street; the incorrect address was identified following smoke testing. To date, 17 of the 22 amended total properties have been corrected. Line House Smoke Observed No. No. Street Name Ownership from: Corrective Action Corrected 1 2615 W32ND ST Private Sanitary Sewer Replace cleanout cap Yes Cleanout 2 3142 W32ND ST Private Sanitary Sewer Replace cleanout cap Yes Cleanout 3 3023 W32ND ST Private Sanitary Sewer Replace cleanout cap Yes Cleanout 4 3047 �'�"'�'�'"T Private Sanitary Sewer Replace cleanout cap Ves KAREN ST Cleanout 7-58 Televise sanitary service lateral 5 2210 WOODLAWN ST Private Curb and/or Gutter during dye test and/or No Repair/replace lateral as needed 6 2206 WOODLAWN ST Private Curb and/or Gutter Replace cleanout cap yes 7 2678 RAVEN OAKS DR Private Sanitary Sewer Lateral Replace cleanout cap yes Televise sanitary service lateral 8 3406 WALLER ST Private yard during dye test and/or No Repair/replace lateral as needed Televise sanitary service lateral 9 3463 DOVE ST Private yard during dye test and/or No Repair/replace lateral as needed 10 2680 RAVEN OAKS DR Private Sanitary Sewer Cleanout Replace cleanout cap yes 11 2359 W32ND ST Private Sanitary Sewer Replace cleanout cap yes Cleanout 12 3003 KAUFMANN AVE Private yard Replace cleanout cap No 13 3040 KAUFMANN AVE Private Sanitary Sewer Replace cleanout cap yes Cleanout 14 2660 RAVEN OAKS DR Private Sanitary Sewer Notify property ownerto replace or No Manhole repair manhole 15 3049 ASBURY RD Private Sanitary Sewer Replace Manhole lid yes Manhole 16 2659 DHN F KENNEDY Private Sanitary Sewer Other Replace cleanout cap yes Sanitary Sewer Dig down and put casting over clean 17 2221 CARTER RD Private Cleanout outto protect from snow plows and Yes replace cleanout cap. 18 3361 KENNEDY RD Private Sanitary Sewer Replace cleanout cap Yes Cleanout 19 3342 JOHN WESLY DRIVE Private Sanitary Sewer Install Bolts in Manhole lid Yes Manhole 20 3325 SUNSET PARK Private Sanitary Sewer Replace cleanout cap Yes CIRCLE Cleanout 21 2671 OWEN Cf Private Sanitary Sewer Replace cleanout cap Yes Cleanout 22 3400 KIMBERLY DR Private Sanitary Sewer Replace cleanout cap Yes Cleanout 7.4.3 Sewershed 5 Manhole Corrections In Sewershed 5, one hundred and twenty-two (122)manholes were determined to be in need of repair following smoke testing and physical inspections. These manholes were separated into two groups, Sewershed 5 Manhole Corrections which are listed below, and Sewershed 5 manhole corrections specific to the Carter Road Detention Basin Area which are listed in Section 7.4.4. The Manhole Corrections have been reduced to as two were duplicates, one for 3105 Arbor Oaks and one for 3107 Kerry Court. The table shows public sanitary sewer corrections identified in the Sewershed 5 Corrective Action Plan dated November 2014 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2016. Of the total 98 Sewershed Manhole Corrections, all have been completed with the exception of those where the City has requested removal of the manhole from the program per a follow up inspection completed in 2015 which showed the manhole to be okay. 7-59 Tentative Line No. Manhole No. Nearest St.Address Corrective Action Completion Modified Final Date Completion Date Completion Date 1 SAN S05228 2715 ARABIAN TRAIL Replace Manhole Lid Jun-16 Feb-16 2 SAN S05137 3133 ARBOR OAKS DR Seal/Grout Manhole Jun-16 June 2016 3 SAN S05133 3095 ARBOR OAKS DR Seal/Grout Manhole Jun-16 Feb-16 4 SAN S05128 3049 ARBOR OAKS DR Replace Manhole Lid Jun-16 June 2016 5 SAN S05131 3075 ARBOR OAKS DR Replace Manhole Lid Jun-16 Feb-16 6 SAN S05132 3087 ARBOR OAKS DR Replace Manhole Lid Jun-16 June 2016 7 SAN S05134 3105 ARBOR OAKS DR Replace Manhole Lid Jun-16 June 2016 8 SAN S05130 3119 ARBOR OAKS DR Seal/Grout Manhole Jun-16 Feb-16 9 SAN S05128 3049 ARBOR OAKS DR Seal/Grout Manhole Jun-16 June 2016 Requestfor 10 SAN S00421 3280 ARBORETUM DR Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 11 SAN S00402 3354 ARROWWOOD LN Seal/Grout Manhole Jun-16 June 2016 Requestfor 12 SAN S05286 3075 ASBURV RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 13 SAN S05279 3350 ASBURV RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 14 SAN 507033 3059 ASBURV RD Replace Manhole Lid Jun-16 June 2016 Requestfor 15 SAN 505282 3300 ASBURV RD Replace Manhole Lid Jun-16 Removal from the program,per OK inspection 16 SAN 505280 3330 ASBURV RD Replace Manhole Lid Jun-16 June 2016 Requestfor 17 SAN SO4954 3378 ASHLEY LN Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 18 SAN SO4959 2829 BONSON RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 19 SAN S O4910 0 CARTER CT Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 20 SAN S O4909 0 CARTER RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 21 SAN S05192 2829 CARTER RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 7-60 Requestfor 22 SAN S04913 0 CARTER RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 23 SAN S04911 0 CARTER RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 24 SAN S04912 0 CARTER RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 25 SAN S04918 0 CARTER RD Seal/Grout Manhole Jun-16 August 2016 August 2016 26 SAN 504922 0 CARTER RD Seal/Grout Manhole Jun-16 Nov-15 27 SAN 505195 2807 CARTER RD Replace Manhole Lid Jun-16 Feb-16 %pq.Rh.,e 28 SAN 504916 3000 CARTER RD Jun-16 Feb-16 Replace Manhole Lid 29 SAN 505194 2809 CARTER RD Seal/Grout Manhole Jun-16 February 2016 30 SAN 505270 2267 CARTER RD Replace Manhole Lid Jun-16 Feb-16 Requestfor 31 SAN S05273 2245 CARTER RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 32 SAN S04915 3051 CARTER RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 33 SAN S04917 3051 CARTER RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 34 SAN S05155 2933 CASTLE WOODS LN Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 35 SAN S05156 2901 CASTLE WOODS LN Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 36 SAN 505158 3032 CASTLE WOODS LN Replace Manhole Lid Jun-16 Feb-16 Requestfor 37 SAN S05047 3513 COPPER FIELD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 38 SAN S05181 3300 DAVID DR Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 39 SAN S06840 0 DAVID DR Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 40 SAN S05113 3008 HUNTINGTON DR Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 7-61 Requestfor 41 SAN 505112 3008 HUNTINGTON DR Replace Manhole Lid Jun-16 Removal from the program,per OK inspection 42 Seal{6reuN q.Rh.,e SAN 506856 0 JOHN F KENNEDY RD Jun-16 Feb-16 43 Replace MH Lid Only 44 SAN 505277 2345 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 45 SAN 505077 3199 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 Requestfor 46 SAN 500382 3361 JOHN F KENNEDY RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 47 SAN 504985 2659 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 June 2016 48 SAN 504987 2639 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 August 2016 August 2016 49 SAN 504991 2571 JOHN F KENNEDY RD Seal/Grout Manhole Jun-16 August 2016 August 2016 50 SAN 505281 2333 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 51 San 505180 2935 JOHN F KENNEDY RD Seal/Grout Manhole Jun-16 June 2016 52 San 505179 2926 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 53 San 505083 2995 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 54 San 505085 2995 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 55 San 505080 3057 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 56 SAN 505079 3169 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 57 SAN 505078 3150 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 58 SAN 505081 3038 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 59 SAN 505084 2986 JOHN F KENNEDY RD Replace Manhole Lid Jun-16 Feb-16 Requestfor 60 SAN 504853 2885 JOHN F KENNEDY RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 61 SAN 501710 2125 JUDSON DR Replace Manhole Lid Jun-16 Feb-16 62 SAN 501700 2120 JUDSON DR Replace Manhole Lid Jun-16 Feb-16 63 SAN S05201 3074 KANECT Seal/Grout Manhole Jun-16 June 2016 Requestfor 64 SAN S05199 3105 KANECT Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 65 SAN S05203 3038 KANECT Replace Manhole Lid Jun-16 June 2016 Seal,'GFSWt Manhele 66 SAN 506420 2970 KANE ST Jun-16 Feb-16 Replace MH Lid Requestfor 67 SAN S05213 2920 KATRINA CIRCLE Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 68 SAN S04875 3165 KAU FMANN AVE Seal/Grout Manhole Jun-16 June 2016 69 SAN S04863 2477 KAU FMANN AVE Replace Manhole Lid Jun-16 Feb-16 70 SAN S05291 3189 KAU FMANN AVE Replace Manhole Lid Jun-16 Feb-16 7-62 'GFS .a -Svc 71 SAN 504864 3035 KAUFMANN AVE Jun-16 Feb-16 Replace Manhole Lid 72 SAN S00382 3361 KENNEDY RD Replace Lid Bolts Jun-16 Jun-15 Requestfor 73 San S06906 3170 KERRY CT Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 74 San S05244 3000 LINDALE ST Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Error-Pipe Zg sAPIPA649A 2363 A4ARXWAA9BR °Reply E-e- .anhele 6 d W, 16 Segment.See - Section 7.4.5 76 SAN 504424 3260 RAVEN OAKS DR Replace Manhole Lid Jun-16 Feb-16 Requestfor 77 SAN S04423 2691 RAVEN OAKS DR Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 78 SAN S04425 2691 RAVEN OAKS DR Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 79 San S04428 2691 RAVEN OAKS DR Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 80 San S04429 2691 RAVEN OAKS DR Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 81 San S04427 2691 RAVEN OAKS DR Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 82 San S04430 2685 RAVEN OAKS DR Seal/Grout Manhole Jun-16 June 2016 Requestfor 83 SAN S05161 2826 SPRING OAKS CT Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 84 SAN S05169 2933 SPRING OAKS CT Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 85 SAN S05170 2933 SPRING OAKS CT Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection Requestfor 86 SAN 504789 3170 SPRING VALLEY RD Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 87 SAN 505182 3297 SPRING VALLEY RD Replace Manhole Lid Jun-16 Feb-16 88 SAN 505122 3049 SPRING VALLEY RD Replace Manhole Lid Jun-16 June 2016 89 SAN 505183 3297 SPRING VALLEY RD Seal/Grout Manhole Jun-16 June 2016 Requestfor 90 SAN S04851 3375 SUNSET PARK CIRCLE Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 7-63 Request for 91 SAN 506725 3395 SUNSET PARK CIRCLE Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 92 San 504787 2811 SUNSET PARK CIRCLE Replace Manhole Lid Jun-16 Feb-16 93 San S05061 2749 TIFFANY CT Seal/Grout Manhole Jun-16 August 2016 August 2016 Request for 94 SAN S05060 2724 TIFFANY CT Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection 95 SAN SO4966 3406 WALLER ST Seal/Grout Manhole Jun-16 August 2016 August 2016 Request for 96 SAN S O4968 3494 WALLER ST Seal/Grout Manhole Jun-16 Removal from the program,per OK inspection pq.Rh.,a 97 SAN SO4886 3135 WESTMORE DR Jun-16 Feb-16 Replace MH Lid �a 98 SAN 505264 2266 WOODLAWN ST Jun-16 Feb 16 Replace MH Lid 7.4.4 Sewershed 5 Carter Road Detention Basin - Manhole Corrections The table shows public sanitary sewer corrections identified in the Sewershed 5 Corrective Action Plan dated November 2014 for the Carter Road Detention Basin area. The original tentative completion date is shown along with a modified completion date as requested in the Status update report dated April 2016, and a final completion date. During the reporting period three manholes were corrected. All corrections have been completed. Final Line Tentative Modified Completion No. Manhole NoT Location Corrective Action Completion Date Completion Date Date Carter RD DB West 1 SAN S 0489 Carter Rd.Detention Manhole Grouting and June 2015 July 2015 July 2015 Seal November November Novem 2 SAN S 0489 Carter Rd.Detention 4aa4New Cone and Barrel Backorder June 2015—M/Hon Novem vem vem Sections required 2015 aaaad-Barrel June 2015—M/Hon November November 3 SAN S 0489 Carter Rd.Detention Backorder 2015 2015 4-44� 4 SAN S 0489 Carter Rd.Detention Manhole Grouting and June 2015 July 2015 July 2015 Seal Baa' June 2015—M/Hon November November 5 SAN S 0479 Carter Rd.Detention Sea4New Cone and Barrel Backorder November November Sections required 2015 June 2015—M/Hon November November 6 SAN 504791 Carter Rd.Detention Sea4New Cone and Barrel Backorder 2015 2015 Sections required 7 SAN S06722 Carter Rd.Detention Manhole Grouting and June 2015 July 2015 July 2015 Seal 8 SAN S06723 Carter Rd.Detention Manhole Grouting and June 2015 July 2015 July 2015 Seal 7-64 9 SAN S 0478 Carter Rd.Detention tea"' June 2015—M/Hon August 2016 June 2016 Sea4New Manhole Req Back order 10 SAN S 0479 Carter Rd.Detention tea"' June 2015—M/Hon June 2016 June 2016 Sea4New Manhole Req Back order 11 SAN S07219 Carter Rd.Detention tea"' June 2015—M/Hon June 2016 June 2016 Sea4New Manhole Req Back order 12 SAN S 0479 Carter Rd.Detention Manhole Grouting and June 2015 July 2015 July 2015 Seal Carter Rd DB South 1 SAN S 0489 Carter Rd.Detention Manhole Grouting and June 2015 July 2015 July 2015 Seal June 2015—M/Hon November November 2 SAN S 0489 Carter Rd.Detention Seal New Cone and Barrel Backorder 2015 2015 Sections required November November Novem 3 SAN S 0489 Carter Rd.Detention Seal New Cone and Barrel Backorder June 2015—M/Hon Novem vem vem Sections required 2105 4 SAN S 0489 Carter Rd.Detention Manhole Grouting and June 2015 July 2015 Seal 5 SAN S 0488 Carter Rd.Detention Manhole Grouting and Seal June 2015 July 2015 6 SAN S 0488 Carter Rd.Detention Manhole Grouting and Seal June 2015 July 2015 7 SAN S 0488 Carter Rd.Detention Manhole Grouting and June 2015 July 2015 Seal 8 SAN S 0488 Carter Rd.Detention Manhole Grouting and June 2015 July 2015 Seal June 2015—New 9 SAN S 0487 Carter Rd.Detention Seal&New Frame outing and Frame on Back February February 2016 2016 order June 2015—New 10 SAN S 0487 Carter Rd.Detention Seal&New Frame outing and Frame on Back February February 2016 2016 order 7.4.5 Sewershed 5 Sanitary Sewer Corrections The City has completed sanitary sewer main rehabilitation of approximately 13,444 lineal feet along with any necessary point repairs in the following Sewershed 5 sub-basins. The contract was awarded and completed by SAK Construction of Missouri. The table below shows public sanitary sewer corrections identified in the Sewershed 5 Corrective Action Plan dated November 2014 and modified in April 2016. The completion dates reflect the dates outlined in the Status update report dated April 2016. All work per the submitted schedules is complete. Sewershed Pipe U/S D/SCompletion Final Sub Area Name Manhole Manhole Street Diameter Length Date Completion Date 5-1 SAN P SAN S SAN S CARTER RD 18" 482 August 2016 June 2016 04807 04909 04907 5-1 SAN P SAN S SAN S CARTER RD 18" 444 August 2016 June 2016 04806 04910 04909 5-1 SAN P SAN S SAN S CARTER RD 18" 82 August 2016 June 2016 04805 04911 04910 7-65 5--1 SAN P SAN 5 SAN 5 CARTER RD 18" 135 August 2016 June 2016 04804 04912 04911 5--1 SAN P SAN 5 SAN 5 CARTER RD 18" 236 August 2016 June 2016 04803 04913 04912 5--1 SAN P SAN 5 SAN 5 CARTER RD 18" 323 August 2016 June 2016 04801 04914 04913 5--1 SAN P SAN 5 SAN 5 CARTER RD 18" 383 August 2016 June 2016 04799 04917 04915 5--1 SAN P SAN 5 SAN 5 CARTER RD 18" 202 August 2016 June 2016 04797 04918 04917 5--1 SAN P SAN 5 SAN 5 CARTER RD 18" 196 August 2016 June 2016 04796 04919 04918 5--1 SAN P SAN 5 SAN 5 CARTER RD 18" 231 August 2016 June 2016 04795 04920 04919 5--1 SAN P SAN 5 SAN 5 CARTER RD 18" 194 August 2016 June 2016 04794 04921 04920 5--1 SAN P SAN 5 SAN 5 CARTER RD 18" 152 August 2016 June 2016 04751 04922 04921 5--3 SAN P SAN 5 SAN 5 Arbor Oaks 8 206 August 2016 June 2016 05832 05126 05129 Or 5--3 SAN P SAN 5 SAN 5 Arbor Oaks 8 124 August 2016 June 2016 05840 05134 05135 Or Esmt. 5--3 SAN P SAN 5 SAN 5 Arbor Oaks 05843 05135 04892 Or Esmt. 8 104 August 2016 June 2016 5--3 SAN P SAN 5 SAN 5 Chippewa 10 366 August 2016 June 2016 06426 05268 05255 Dr. 5--3 SAN P SAN 5 SAN 5 Chippewa 8 288 August 2016 June 2016 06428 05271 05268 Dr. 5--3 SAN P SAN 5 SAN 5 Evergreen 10 356 August 2016 June 2016 04790 04880 04879 Dr. 5--3 SAN P SAN 5 SAN 5 Evergreen 8 473 August 2016 June 2016 06413 05272 05254 Dr. 5--3 SAN P SAN 5 SAN 5 Evergreen 10 414 August 2016 June 2016 06415 05254 04880 Dr. SAN P SAN 5 SAN 5 Glenview 5--3 06490 05016 05015 Cir 8 144 August 2016 June 2016 5--3 SAN P SAN 5 SAN 5 Marywood 8 149 August 2016 June 2016 06491 05015 05017 Or 5--3 SAN P SAN 5 SAN 5 06090 05193 05194 Hickory Hill 8 167 August 2016 June 2016 5--3 SAN P SAN 5 SAN 5 JFK Esmt 8 293 August 2016 June 2016 05769 05079 05080 5--3 SAN P SAN 5 SAN 5 JFK Esmt 8 283 August 2016 June 2016 05777 05080 05082 7-66 5--3 SAN P SAN S SAN S 05776 05082 05083 JFK Esmt 8 137 August 2016 June 2016 5--3 SAN P SAN S SAN S JFK 8 109 August 2016 June 2016 05775 05085 05083 5--3 SAN P SAN S SAN S 05770 05083 05180 JFK 8 276 August 2016 June 2016 5--3 SAN P SAN S SAN S Kane Ct 8 271 August 2016 June 2016 06511 05202 05200 5--3 SAN P SAN S SAN S Kane Ct 8 137 August 2016 June 2016 06507 05200 05201 5--3 SAN P SAN S SAN S 06096 05198 05028 Kane Ct 8 101 August 2016 June 2016 5--3 SAN P SAN S SAN S Kane Ct 8 389 August 2016 June 2016 06097 05028 05200 5--3 SAN P SAN S SAN S 06410 05260 05257 Karen Ct 8 274 August 2016 June 2016 5--3 SAN P SAN S SAN S Lindale 8 314 August 2016 June 2016 06408 05242 04880 5--3 SAN P SAN S SAN S Lindale 8 283 August 2016 June 2016 06438 05245 05244 5--3 SAN P SAN S SAN S Lindale 8 221 August 2016 June 2016 06441 05243 05242 5--3 SAN P SAN S SAN S Martin 8 299 August 2016 June 2016 06444 05250 05241 SAN P SAN S SAN S Martin 5--3 06926 05291 06802 Esmt 8 130 August 2016 June 2016 5--3 SAN P SAN S SAN S Marywood 8 236 August 2016 June 2016 06482 05000 04999 Or 5--3 SAN P SAN S SAN S RAVEN 8 146 October 04665 04436 06723 OAKS 2014 SAN P SAN S SAN S RAVEN October 5--3 04666 06723 06722 OAKS 8 62 2014 5--3 SAN P SAN S SAN S RAVEN 12" 332 October 04741 07219 04793 OAKS 2014 SAN P SAN S SAN S RAVEN October 5--3 04743 04793 04743 OAKS 12" 335 2014 SAN P SAN S SAN S RAVEN October 5--3 04745 04788 06722 OAKS 12 408 2014 5--3 SAN P SAN S SAN S RAVEN 12" 151 October 04747 06722 04791 OAKS 2014 SAN P SAN S SAN S RAVEN October 5--3 04754 04791 04790 OAKS 12 146 2014 5--3 SAN P SAN S SANS KAUFMANN 12" 324 October 04782 04869 04876 2014 7-67 5--3 SAN P SAN S SANS KAUFMANN 12" 20 October 04783 04876 04878 2014 5--3 SAN P SAN S SAN S KAUFMANN 12" 229 October 04784 04878 04889 2014 5--3 SAN P SAN S SANS KAUFMANN 12" 95 October 04787 04889 04888 2014 5--3 SAN P SANS SAN S KAUFMANN 12" 105 October 04788 04888 04887 2014 5--3 SAN P SANS SAN S KAUFMANN 12" 155 October 04759 04887 04885 2014 5--3 SAN P SAN S SAN S KAUFMANN 12" 385 October 04760 04885 04897 2014 5--3 SAN P SAN S SAN S KAUFMANN 12" 121 October 04761 04897 04896 2014 5--3 SAN SANS SANS KAUFMANN 12" 211 October 04762 04896 04895 2014 5--3 SAN P SAN S SAN S KAUFMANN 12" 212 October 04763 04895 04891 2014 5--3 SAN P SAN S SAN S CARTER RD 12" 153 October 04752 04891 04890 2014 5--3 SAN P SAN S SAN S CARTER RD 12" 88 October 04756 04894 04893 2014 5--3 SAN P SAN S SAN S CARTER RD 12" 162 October 04757 04893 04890 2014 7.5 SEWERSHED 10 CORRECTIVE ACTION PLAN SCHEDULE The City continues to work with property owners to make corrections to their private properties. These are corrections made to private properties and therefore dependent upon funding by the property owner. The City's intent is to work with owners to achieve completion of the corrections without placing undue financial hardship on the private property owner. In addition, to working with private property owners the City is conducting improvements to the public sanitary sewer system. The following tables describe the location and corrective actions necessary to reduce inflow and infiltration into the sanitary sewer system, along with a proposed schedule for the public improvements. 7.5.1 Sewershed 10 Failed and Corrected Private Property Inspections In Sewershed 10, there are 163 failed private property inspections as identified in the Corrective Action Plan dated December 2015, of which 135 are corrected; three property corrections remain. 7-68 Corrected Line No. House Street Name Defect Corrective Action and Re- Paassed Inspection 1 9 E 26TH ST Flexhose Replace Hose with Rigid Pipe Yes 2 2450 ELM ST Flexhose Replace Hose with Rigid Pipe Yes 3 2722 ELM ST Flexhose Replace Hose with Rigid Pipe Yes 4 2010 FARLEY ST Flexhose Replace Hose with Rigid Pipe Yes 5 2190 FARLEY ST Flexhose Replace Hose with Rigid Pipe Yes 6 2532 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 7 2720 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes S 809 RHOMBERG AVE Flexhose Replace Hose with Rigid Pipe Yes 9 2527 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 10 2568 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 11 2605 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 12 2615 WINDSOR AVE Flexhose Replace Hose with Rigid Pipe Yes 13 705 E 22ND ST Roof Drain to Sanitary Disconnect and Cap Drain Yes 14 2540 CENTRALAVE Stairwell drain to Cover stairwell or pipe to open or Yes sanitary storm sewer 15 931 ALTHAUSER ST Sump to Sanitary Disconnect and discharge to open No air 16 407 E 25TH ST Sump to Sanitary Disconnect and discharge to open Yes air 17 520 EDITH ST Sump to Sanitary Disconnect and discharge to open No air 18 2413 JACKSON ST Sump to Sanitary Disconnect and discharge to open No air 19 2981 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 20 3075 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 21 2233 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 22 2314 PRINCE ST Sump to Sanitary Disconnect and discharge to open Yes air 23 1403 RHOMBERG AVE Sump to Sanitary Disconnect and discharge to open Yes air 24 2526 WASHINGTON ST Sump to Sanitary Disconnect and discharge to open Yes air 25 2714 WASHINGTON ST Sump to Sanitary Disconnect and discharge to open Yes air 26 2513 WINDSOR AVE Sump to Sanitary Disconnect and discharge to open Yes air 7-69 27 2254 JACKSON ST Yard Drain to Sanitary Disconnect and discharge to open Yes air 28 2503 WINDSOR AVE Yard Drain to Sanitary Disconnect and discharge to open Yes air 29 3056 WHITE ST Broken Clean Out Repair or replace Clean Out Yes 30 866 HARLAN ST Driveway drain to Disconnect and discharge to open Yes sanitary air Exterior Drain to Disconnect and discharge to open 31 729 LINCOLN AVE Yes Sanitary air Exterior Drain to Disconnect and discharge to open 32 1450 RHOMBERG AVE Yes Sanitary air Exterior Drain to Disconnect and discharge to open 33 702 RIES ST Yes Sanitary air 34 2938 BURLINGTON Exterior stairwell Cover stairwell or pipe to open or Yes storm sewer 35 2480 ELM ST flex hose Replace Hose with Rigid Pipe Yes 36 2582 CENTRALAVE Flexhose Replace Hose with Rigid Pipe Yes 37 2706 CENTRALAVE Flexhose Replace Hose with Rigid Pipe Yes 38 2706 CENTRALAVE Flexhose Replace Hose with Rigid Pipe Yes 39 2726 CENTRALAVE Flexhose Replace Hose with Rigid Pipe Yes 40 2920 CENTRALAVE Flexhose Replace Hose with Rigid Pipe Yes 41 74 E 25TH ST Flexhose Replace Hose with Rigid Pipe Yes 42 102 E 25TH ST Flexhose Replace Hose with Rigid Pipe Yes 43 9 E 26TH ST Flexhose Replace Hose with Rigid Pipe Yes 44 232 E 26TH ST Flexhose Replace Hose with Rigid Pipe Yes 45 236 E 26TH ST Flexhose Replace Hose with Rigid Pipe Yes 46 236 E 27TH ST Flexhose Replace Hose with Rigid Pipe Yes 47 107 E 28TH ST Flexhose Replace Hose with Rigid Pipe Yes 48 2718 ELM ST Flexhose Replace Hose with Rigid Pipe Yes 49 2735 ELM ST Flexhose Replace Hose with Rigid Pipe Yes 50 2836 ELM ST Flexhose Replace Hose with Rigid Pipe Yes 51 2840 ELM ST Flexhose Replace Hose with Rigid Pipe Yes 52 2919 ELM ST Flexhose Replace Hose with Rigid Pipe Yes 53 2946 ELM ST Flexhose Replace Hose with Rigid Pipe Yes 54 2010 FARLEY ST Flexhose Replace Hose with Rigid Pipe Yes 55 2010 FENGLER ST Flexhose Replace Hose with Rigid Pipe Yes 56 710 HENNEPIN ST Flexhose Replace Hose with Rigid Pipe Yes 57 2532 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 58 2556 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 59 2571 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 60 2617 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 61 2618 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 62 2627 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 63 2655 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 7-70 64 2675 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 65 2657 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 66 2711 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 67 2719 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 66 2720 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 69 2735 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 70 2753 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 71 2756 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 72 2763 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 73 2764 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 74 2776 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 75 2504 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 76 2529 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 77 2967 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 76 3110 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 79 3111 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes SO 3125 JACKSON ST Flexhose Replace Hose with Rigid Pipe Yes 81 SOS LINCOLN AVE Flexhose Replace Hose with Rigid Pipe Yes 82 1527 LINCOLN AVE Flexhose Replace Hose with Rigid Pipe Yes 83 2515 PINARD ST Flexhose Replace Hose with Rigid Pipe Yes 84 1613 PRESCOTT ST Flexhose Replace Hose with Rigid Pipe Yes 85 1613 PRESCOTT ST Flexhose Replace Hose with Rigid Pipe Yes 86 2316 PRINCE ST Flexhose Replace Hose with Rigid Pipe Yes 87 609 RHOMBERG AVE Flexhose Replace Hose with Rigid Pipe Yes SS 2527 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 89 2539 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 90 2560 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 91 2563 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 92 2563 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 93 2565 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 94 2605 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 95 2623 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 96 2706 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 97 2726 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 96 2570 WASHINGTON ST Flexhose Replace Hose with Rigid Pipe Yes 99 2649 WHITE ST Flexhose Replace Hose with Rigid Pipe Yes 100 2655 WHITE ST Flexhose Replace Hose with Rigid Pipe Yes 101 2665 WHITE ST Flexhose Replace Hose with Rigid Pipe Yes 102 2674 WHITE ST Flexhose Replace Hose with Rigid Pipe Yes 103 2550 WHITE ST Flexhose Replace Hose with Rigid Pipe Yes 104 2516 WINDSORAVE Flexhose Replace Hose with Rigid Pipe Yes 7-71 105 2515 WINDSORAVE Flexhose Replace Hose with Rigid Pipe Yes 106 2543 WINDSORAVE Flexhose Replace Hose with Rigid Pipe Yes 107 2615 WINDSORAVE Flexhose Replace Hose with Rigid Pipe Yes Roof and Yard Drain to Disconnect and discharge to open 108 2245 PRINCE ST Yes Sanitary air 109 2950 BRUNSWICK ST Roof Drain to Sanitary Disconnect and discharge to open Yes air 110 2501 JACKSON ST Roof Drain to Sanitary Disconnect and discharge to open Yes air 111 3117 LEMON Roof Drain to Sanitary Disconnect and discharge to open Yes air 112 2523 WHITE ST Roof Drain to Sanitary Disconnect and discharge to open Yes air 113 2230 CENTRALAVE Sump to Sanitary Disconnect and discharge to open Yes air 114 407 E 25TH ST Sump to Sanitary Disconnect and discharge to open Yes air 115 103 E 26TH ST Sump to Sanitary Disconnect and discharge to open Yes air 116 887 EDISON ST Sumpto Sanitary Disconnect and discharge to open Yes air 117 887 EDISON ST Sumpto Sanitary Disconnect and discharge to open Yes air 118 730 EDITH ST Sump to Sanitary Disconnect and discharge to open Yes air 119 2719 ELM ST Sump to Sanitary Disconnect and discharge to open Yes air 120 2905 ELM ST Sump to Sanitary Disconnect and discharge to open Yes air 121 2939 ELM ST Sump to Sanitary Disconnect and discharge to open Yes air 122 2945 ELM ST Sump to Sanitary Disconnect and discharge to open Yes air 123 740 GOETHE ST Sump to Sanitary Disconnect and discharge to open Yes air 124 2288 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 125 2451 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 126 2615 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 127 2615 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 128 2709 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 129 2795 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 130 2981 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 131 2987 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 7-72 132 2233 JACKSON ST Sump to Sanitary Disconnect and discharge to open yes air 133 840 LAWTHER ST Sump to Sanitary Disconnect and discharge to open yes air 134 813 LINCOLN AVE Sump to Sanitary Disconnect and discharge to open yes air 135 813 LINCOLN AVE Sump to Sanitary Disconnect and discharge to open yes air 136 1005 LINCOLN AVE Sump to Sanitary Disconnect and discharge to open yes air 137 1111 LINCOLN AVE Sump to Sanitary Disconnect and discharge to open yes air 138 1325 LINCOLN AVE Sump to Sanitary Disconnect and discharge to open yes air 139 1705 LINCOLN AVE Sump to Sanitary Disconnect and discharge to open yes air 140 816 MERZ ST Sump to Sanitary Disconnect and discharge to open yes air 141 725 ONEILL ST Sump to Sanitary Disconnect and discharge to open yes air 142 2314 PRINCE ST Sump to Sanitary Disconnect and discharge to open yes air 143 2320 PRINCE ST Sump to Sanitary Disconnect and discharge to open yes air 144 601 RHOMBERG AVE Sump to Sanitary Disconnect and iischarge to open yes a 145 1232 RHOMBERG AVE Sump to Sanitary Disconnect and discharge to open yes air 146 1309 RHOMBERG AVE Sump to Sanitary Disconnect and discharge to open yes air 147 510 STEVENS CT Sump to Sanitary Disconnect and discharge to open yes air 148 2875 TIMBERLINE Sump to Sanitary Disconnect and discharge to open yes air 149 2526 WASHINGTON ST Sump to Sanitary Disconnect and discharge to open yes air 150 2714 WASHINGTON ST Sump to Sanitary Disconnect and discharge to open yes air 151 2886 WASHINGTON ST Sump to Sanitary Disconnect and discharge to open yes air 152 2926 WASHINGTON ST Sump to Sanitary Disconnect and discharge to open yes air 153 2943 WASHINGTON ST Sump to Sanitary Disconnect and discharge to open yes air 154 2642 WHITE Sumpto Sanitary Disconnect and discharge to open yes air 155 2424 WINDSORAVE Sump to Sanitary Disconnect and discharge to open yes air 156 2513 WINDSORAVE Sump to Sanitary Disconnect and discharge to open yes air 157 2995 WINDSORAVE Sump to Sanitary Disconnect and discharge to open yes air 7-73 Sump to Sanitary has a Disconnect and discharge to open 158 2722 WASHINGTON ST second sump with Yes flexhose air 159 2525 JACKSON ST Sump to Sanitary Disconnect and discharge to open Yes air 160 2563 ELM ST Yard Drain to Sanitary Disconnect and discharge to open Yes air 161 2284 JACKSON ST Yard Drain to Sanitary Disconnect and discharge to open Yes air 162 2431 JACKSON ST Yard Drain to Sanitary Disconnect and discharge to open Yes air 163 2503 WINDSORAVE Yard Drain to Sanitary Disconnect and discharge to open Yes air 7.5.2 Sewershed 10 Sanitary Sewer Smoke Testing—Private Property Defects There are 55 private property sites showing possible private property defects as observed during smoke testing. Identifying the source of I&I in a sanitary sewer lateral can be especially difficult and expensive for an individual property owner. Financial assistance may be available in the City's budget, for work completed on a private sanitary sewer lateral. Each year a request is made to fund these line items; however, they are subject to funding availability and are on a first come first served basis. There were no corrections made during the reporting period. Line House Street Name Ownership Smoke Observed from: Corrective Action Completed No. No. Yes/No 1 720 E 22ND ST Private Sanitary sewer cleanout Replace cleanout cap No Lawn space,possible Assist Property Owner with CCN 2 2600 BRECHT LN Private Sanitary sewer lateral Inspection and,if applicable No financial assistance 3 2950 BRUNSWICK ST Private Roof drain Reroute to go to storm sewer or No on grass Assist Property Owner with CCN 4 2954 BRUNSWICK ST Private Sidewalk Inspection and,if applicable No financial assistance 5 2954 BRUNSWICK ST Private Roof drain Reroute to go to storm sewer or No on grass BURLINGTON Assist Property Owner with CCN 6 2937 ST Private Building foundation Inspection and dye testing,and if No applicable financial assistance BURLINGTON Lawn space,possible Assist Property Owner with CCN 7 3040 Private Inspection and,if applicable No ST Sanitary sewer lateral financial assistance 8 2772 CENTRALAVE Private Sanitary sewer cleanout Replace cleanout cap No 9 2824 CENTRALAVE Private Sanitary sewer cleanout Fix cleanout manhole No 10 2880 CENTRALAVE Private Sanitary sewer cleanout Replace cleanout cap No 11 2908 CENTRALAVE Private Sanitary sewer cleanout Fix cleanout manhole No 12 3066 CENTRALAVE Private Sanitary sewer cleanout Replace cleanout cap No 13 520 CLINTON ST Private Sanitary sewer cleanout Replace cap No 7-74 14 801 DAVIS ST Private Sanitary sewer manhole Replace manhole lid No 15 940 DAVIS ST Private Sanitary sewer cleanout Replace cleanout cap No 16 1020 DAVIS ST Private Sanitary sewer cleanout Replace cleanout cap No 17 2563 ELM ST Private Yard drain Plug drain or reroute piping No Adjacent to property Assist Property Owner with CCN 18 714 HENNEPIN ST Private foundation,possible Inspection and,if applicable No Sanitary sewer lateral or financial assistance foundation drain 19 2813 JACKSON ST Private Roof drain Reroute to go to storm sewer or No on grass 20 3091 JACKSON ST Private Sanitary sewer cleanout Replace cleanout No 21 3103 JACKSON ST Private Sanitary sewer cleanout Replace cleanout No 22 1660 JANSEN ST Private Sanitary sewer cleanout Replace cleanout cap No 23 1751 JUSTIN LN Private Sanitary sewer cleanout Replace cleanout cap No Verify if the pipe can be safely 24 829 LAWTH ER ST Private Vent pipe? capped or remove pipe.Check No with Building Dept. Assist Property Owner with CCN 25 3106 LEMON ST Private Sanitary sewer lateral Inspection and,if applicable No financial assistance 26 704 PROVIDENCE Private Sanitary sewer cleanout Replace cleanout cap No ST PROVIDENCE Assist Property Owner with CCN 27 706 ST Private Water service stop box Inspection of lateral and,if No applicable financial assistance 28 2248 PRINCE ST Private Roof/yard drain Plug drain and redirect flow No overland 29 2529 QUEEN ST Private Sanitary sewer cleanout Replace cleanout cap No Assist Property Owner with CCN 30 705 RIES ST Private Sanitary sewer lateral Inspection and,if applicable No financial assistance 31 2155 ROOSEVELT ST Private Sanitary sewer manhole Replace manhole lid No 32 2375 ROOSEVELT ST Private Sanitary sewer manhole Replace manhole lid No Assist Property Owner with CCN 33 190 SAUNDERS ST Private Yard Drain Inspection and,if applicable No financial assistance Assist Property Owner with CCN 34 2416 STAFFORD ST Private Building foundation Inspection and,if applicable No financial assistance 35 2512 STAFFORD ST Private Sanitary sewer cleanout Replace cleanout cap No 36 820 STRAUSS ST Private Roof drain Reroute to go to storm sewer or No on grass 37 2600 WASHINGTON Private Storm sewer catch Reroute to go to storm sewer or No ST basin/inlet plug 38 2553 WHITE ST Private Cistern Disconnect cistern from sanitary No sewer 7-75 39 2702 WHITEST Private Sanitary sewer cleanout Fix cleanout manhole No 40 2766 WHITEST Private Sanitary sewer cleanout Replace cleanout cap No 41 2554 WHITEST Private Sanitary Sewer Cleanout Replace cleanout cap No 42 2858 WHITEST Private Sanitary sewer cleanout Replace cleanout cap No 43 3056 WHITEST Private Sanitary sewer cleanout Replace cleanout cap No 44 2513 WINDSORAVE Private Water service stop box Replace cap No 45 2715 WINDSORAVE Private Sanitary sewer cleanout Fix cleanout manhole No 46 3300 WINDSORAVE Private Roof drain 1 Reroute to go to storm sewer or No on grass 47 3300 WINDSORAVE Private Roof drain 2 Reroute to go to storm sewer or No on grass 48 3300 WINDSORAVE Private Yard Drain Reroute to go to storm sewer or No on grass 49 3390 WINDSORAVE Private Sanitary sewer manhole Replace open pick hole lid No 50 3390 WINDSORAVE Private Sanitary sewer manhole Replace manhole lid No 51 3390 WINDSORAVE Private Storm sewer catch Dye Test Catch Basin while No basin/inlet televising sanitary sewer 52 3390 WINDSORAVE Private Sanitary sewer Manhole Replace manhole lid No 53 3390 WINDSORAVE Private Sanitary Seer manhole Replace manhole lid No 54 3390 WINDSORAVE Private Sanitary sewer manhole Replace manhole lid No Air conditioner exhaust Verify if the pipe can be safely 55 3390 WINDSORAVE Private pipe modified to prevent storm water No from entering. 7.5.3 Sewershed 10 Sanitary Sewer Manhole Corrections Fifty-five (55) manholes with a high priority for repair, rehabilitation, or replacement were identified in the Corrective Action Plan for Sewershed 10. The locations are spread throughout the Sewershed, which reflects consistent aging of the system, with no one area in greater need than another. The tentative completion date reflects when funding may be available which may be subject to the sale of bonds or the ability to obtain timely State of Iowa Revolving Loans, along with coordination of sanitary sewer main improvements such as replacement or rehabilitation as listed in Section 7.5.4. Line Manhole SUB SWRSHED Nearest St. Tentative Final No. No. NO. Address Corrective Action Completion Completion Date Date 1 SAN S 00230 10 - 5 1735 AMELIA Replace manhole lid and install September CIRCLE chimney seal 2017 BURDEN Replace or rehab Brick MH and December 2 SANS 07660 10 - 4 2746 ST Replace manhole lid and install 2017 chimney seal 7-76 BURDEN Replace or rehab Brick MH and December 3 SAN S 06053 10 - 4 2838 ST Replace manhole lid and install 2017 chimney seal Replace or rehab Brick MH and 4 SAN S 06189 10 - 4 868 DAVIS ST Replace manhole lid and install December chimney seal 2017 Replace or rehab Brick MH and December 5 SAN S 06192 10 - 4 868 DAVIS ST Replace manhole lid and install 2017 chimney seal Replace or rehab Brick MH and December 6 SAN S 06191 10 - 4 868 DAVIS ST Replace manhole lid and install 2017 chimney seal 7 SAN S 06891 10 - 4 940 DAVIS ST Replace manhole lid and install September chimney seal 2017 8 SAN S 06884 10 - 4 960 DAVIS ST Replace manhole lid and install September chimney seal 2017 Replace or rehab Brick MH and December 9 SAN S 06885 10 - 4 996 DAVIS ST Replace manhole lid and install 2017 chimney seal 10 SAN S 00665 10 - 4 470 EDITH ST Replace manhole lid and install September chimney seal 2017 Replace or rehab Brick MH and December 11 SAN S 06671 10 - 1 2540 ELM ST Replace manhole lid and install 2017 chimney seal 12 SAN S 07158 10 - 4 835 EUCLID ST Replace manhole lid and install September chimney seal 2019 Replace or rehab Brick MH and 13 SAN S 06079 10 - 4 840 GOETHE ST Replace manhole lid and install December chimney seal 2017 September 14 SAN S 06065 10 - 4 846 HARLAN ST Replace manhole lid and install tem chimney seal 019 September 15 SAN S 00223 10 - 4 1640 JUSTIN LN Replace manhole lid and install 2017 chimney seal September 16 SAN S 06493 10 - 3 3040 KEOKUK CT Replace manhole lid and install tem chimney seal 017 September 17 SAN S 06492 10 - 3 3060 KEOKUK ST Replace manhole lid and install tem chimney seal 017 September 18 SAN S 06428 10 - 3 3060 KEOKUK CT Replace manhole lid and install 2017 chimney seal September 19 SAN S 06435 10 - 3 3130 KEOKUK CT Replace manhole lid and install 2017 chimney seal 20 SAN S 06443 10 - 3 3180 KEOKUK CT Replace manhole lid and install September chimney seal 7-77 2017 September 21 SAN S 00295 10 - 5 1321 LINCOLN Replace manhole lid and install 2017 AVE chimney seal Replace or rehab Brick MH and December 22 SAN S 06611 10 - 3 3040 LEMON ST Replace manhole lid and install 2017 chimney seal MARQUET Replace or rehab Brick MH and December 23 SAN S 06143 10 - 1 2530 TE PL Replace manhole lid and install 2018 chimney seal MARQUET Replace or rehab Brick MH and December 24 SANS 06113 10 - 1 2546 TE PL Replace manhole lid and install 2018 chimney seal MARQUET Replace or rehab Brick MH and December 25 SAN S 07159 10 - 1 2608 TE PL Replace manhole lid and install 2018 chimney seal MARQUET Replace or rehab Brick MH and December 26 SANS 06136 10 - 1 2620 TE PL Replace manhole lid and install 2018 chimney seal MARQUET Replace or rehab Brick MH and December 27 SAN S 06131 10 - 1 2626 TE PL Replace manhole lid and install 2018 chimney seal September 28 SAN S 06381 10 - 3 2990 OAK CREST Replace manhole lid and install 2017 DR chimney seal September 29 SANS 06396 10 - 3 3025 OAK CREST Replace manhole lid and install 2017 DR chimney seal September 30 SAN S 06379 10 - 3 3080 OAK CREST Replace manhole lid and install 2017 DR chimney seal September 31 SAN S 06380 10 - 3 3085 OAK CREST Replace manhole lid and install 2017 DR chimney seal Replace or rehab Brick MH and December 32 SAN S 06155 10 - 1 2469 PINARD ST Replace manhole lid and install 2017 chimney seal Replace or rehab Brick MH and December 33 SAN S 06109 10 - 4 2685 QUEEN ST Replace manhole lid and install 2017 chimney seal 34 SANS 06478 10 - 3 215 SAUNDERS Replace manhole lid and install December ST chimney seal 2017 STAFFORD Replace or rehab Brick MH and December 35 SANS 06151 10 - 1 2413 ST Replace manhole lid and install 2017 chimney seal STAFFORD Replace or rehab Brick MH and December 36 SAN S 06148 10 - 1 2421 ST Replace manhole lid and install 2017 chimney seal 7-78 STAFFORD Replace or rehab Brick MH and December 37 SANS 06146 10 - 1 2511 ST Replace manhole lid and install 2017 chimney seal September 38 SAN S 00234 10 - 5 1541 SUNFLOW Replace manhole lid and install 2017 ER Cl RCLE chimneyseal September 39 SAN S 06410 10 - 3 2888 TIMBER Replace manhole lid and install 2017 LINE chimneyseal September 40 SAN S 06399 10 - 3 2944 TIMBER Replace manhole lid and install 2017 LINE chimneyseal 1356 THOMAS Replace manhole lid and install September2017 41 SAN S00315 10 - 5 PL chimneyseal September 42 SAN S 00313 10 - 5 1358 THOMAS Replace manhole lid and install 2017 PL chimneyseal 43 SAN S 00311 10 - 5 1430 THOMAS Replace manhole lid and install September PL chimneyseal 2017 WAKE Replace manhole lid and install September 44 SAN S00244 10 - 5 1870 ROBIN CIRCLE chimney seal 2017 WASHINGT Replace or rehab Brick MH and December 45 SAN S 06618 10 - 1 2600 ON ST Replace manhole lid and install 2017 chimney seal WASHINGT Replace or rehab Brick MH and December 46 SANS 06787 10 - 1 2600 ON ST Replace manhole lid and install 2017 chimney seal WASHINGT Replace or rehab Brick MH and December 47 SAN S 06662 10 - 1 2600 ON ST Replace manhole lid and install 2017 chimney seal WINDSOR Replace or rehab Brick MH and December 48 SANS 06055 10 - 1 2210 AVE Replace manhole lid and install 2017 chimney seal WINDSOR Replace or rehab Brick MH and December 49 SAN S 04634 10 - 1 2509 AVE Replace manhole lid and install 2017 chimney seal 50 SAN S 06064 10 - 4 2909 WINDSOR Replace manhole lid and install September AVE chimneyseal 2017 WINDSOR Replace or rehab Brick MH and December 51 SANS 06144 10 - 1 2525 AVE Replace manhole lid and install 2017 chimney seal 52 SANS 06133 10 - 1 2617 WINDSOR Replace manhole lid and install September AVE chimneyseal 2017 WINDSOR Replace or rehab Brick MH and December 53 SAN S 06886 10 - 4 3196 AVE Replace manhole lid and install 2017 chimney seal 54 SANS 00641 10 - 4 3475 WINDSOR Replace manhole lid and install September AVE chimneyseal 2017 7-79 55 SANS 00633 10 - 4 3475 WINDSOR Replace manhole lid and install September AVE chimney seal 2017 7.5.4 Sewershed 10 Sanitary Sewer Rehabilitation The following table lists the City's recommendation to rehabilitate approximately 6,700 lineal feet using cured-in-place-pipe (CIPP) lining, along with any necessary point repairs in Sewershed 10. Tentative Final Sewershed Pipe U/S Manhole D/S Manhole Street Diameter Length Completion Completion Sub Area Name Date Date 10 - 1 SAN P SANS 06146 SANS 04634 Merz St S 500 December 06005 2017 10 - 3 SAN P December SAN S 06556 SAN S 07221 Lemon St 8 180 06763 2017 10 - 3 SAN P SANS 07221 SANS 06603 Lemon St 8 180 December 07478 2017 10 - 3 SAN P December SAN S 06603 SAN S 06633 Lemon St 8 470 06770 2017 10 - 3 SAN P SAN S 06588 SAN S 06586 Saunders St 8 45 December 06761 2017 10 - 3 SAN P SAN S 06593 SAN S 06588 Saunders St 8 120 December 06757 2017 10 - 3 SAN P SAN S06599 SAN S 06593 Saunders St 8 S0 December 06760 2017 10 - 3 SAN P SANS 06604 SANS 06599 Saunders St g 90 December 06759 2017 10 - 3 SAN P SAN S 06473 SAN S 06604 Saunders St 8 200 December 06758 2017 10 - 3 SAN P SAN S 06476 SAN S 06473 Saunders St 8 205 December 06747 2017 10 - 3 SAN P SAN S 06478 SAN S 06476 Saunders St 8 150 December 06746 2017 10 - 3 SAN P SAN S 06468 SAN S 06478 Saunders St 8 270 December 06749 2017 10 - 3 SAN P SANS 06415 SANS 06468 Saunders St 8 345 December 06748 2017 SAN P Klauer Bld- December 10 1 8 25 06838 SANS 06787 SANS 04645 Wash&Elm 2017 7-80 SAN P Klauer Bld- December 10 1 06537 SANS 06615 SANS 06757 Wash&Elm $ 180 2017 SAN P Klauer Bld- December 10 1 06536 SAN S 06662 SAN S 06615 Wash&Elm 8 150 2017 SAN P Klauer Bld- December 10 1 06535 SAN S 06655 SAN S 06662 Wash&Elm 8 145 2017 SAN P Klauer Bld- December 10 1 06533 SAN S 07550 SAN S 06655 Wash&Elm 8 145 2017 SAN P Klauer Bld- December 10 - 1 07791 SAN S 06654 SAN S 07550 Wash&Elm 8 20 2017 10 - 1 SAN P SANS 07327 SAN 06654 27TH ST 8 140 December 06534 2017 10 - 1 SAN P SANS 06645 SANS 07327 ELM ST S 305 December 06529 2017 10 - 1 SAN P SANS 06642 SANS 06645 ELM ST 8 180 December 06820 2017 10 - 1 SAN P SANS 04650 SANS 06642 ELM ST 8 185 December 06819 2017 10 - 4 SAN P SANS 06128 SANS 06127 Clinton St 8 100 December 05976 2017 10 - 4 SAN P SANS 06127 SANS 06126 Clinton St 8 130 December 05977 2017 10 - 4 SAN P SAN S 06126 SAN S 06125 Clinton St 8 160 December 05678 2017 10 - 4 SAN P SAN S06122 SAN S 06121 Link St 8 325 December 05967 2017 10 - 4 SAN P SANS 06111 SANS 06127 Brunswick 8 350 December 05975 St 2017 10 - 4 SAN P SANS 06193 SANS 06194 Edith St 8 255 December 05928 2017 10 - 4 SAN P SANS 06194 SANS 00627 Edith St 8 275 December 05929 2017 10 - 1 SAN P SAN S 06171 SAN S 06175 Thomas PI 8 250 December 06022 2017 10 - 1 SAN P SAN S 06175 SAN S 06178 Thomas PI 8 260 December 06021 2017 10 - 1 SAN P SANS 06178 SANS 07627 Thomas PI 8 105 December 06023 2017 10 - 1 SAN P SANS 07627 SANS 06182 Thomas PI 8 135 December 07880 2017 10 - 1 SAN P SANS 06182 SAN S 06183 Thomas PI 8 85 December 06024 2017 7-81 7.5.5 Sewershed 10 Sanitary Sewer Replacement In addition to sanitary sewer rehabilitation, the following table lists sanitary sewer improvements where CIPP method is not recommended. These locations will require removal and replacement/relocation of the existing sanitary sewer. The schedule reflects funding, surveying, design, permitting, and construction of the improvements. The projects may also require coordination with other utilities and replacement of those utilities, which may alter the construction schedule, if such a scheduling conflict occurs the City will provide additional information to the USEPA and the DNR. Sewershed Pipe Tentative Completion Sub Area Name U/S Manhole D/S Manhole Street Diameter Length Completion Date Date 10 - 1 SAN P SANS 06146 SANS 04634 Merz St S 500 December 06005 2017 10 - 3 SAN P SANS 06556 SANS 07221 Lemon St 8 180 December 06763 2017 10 - 3 SAN P SANS 07221 SANS 06603 Lemon St 8 180 December 07478 2017 10 - 3 SAN P December SAN S 06603 SAN S 06633 Lemon St 8 470 06770 2017 10 - 3 SAN P SAN S 06588 SAN S 06586 Saunders St 8 45 December 06761 2017 10 - 3 SAN P SAN S 06593 SAN S 06588 Saunders St 8 120 December 06757 2017 10 - 3 SAN P SAN S06599 SAN S 06593 Saunders St 8 80 December 06760 2017 10 - 3 SAN P SAN S 06604 SAN S 06599 Saunders St 8 90 December 06759 2017 10 - 3 SAN P SAN S 06473 SAN S 06604 Saunders St 8 200 December 06758 2017 SANS 06476 SANS 06473 Saunders St 8 205 December 06747 2017 10 - 3 SAN P 10 - 3 SAN P SAN S 06478 SAN S 06476 Saunders St 8 150 December 06746 2017 10 - 3 SAN P SAN S 06468 SAN S 06478 Saunders St 8 270 December 06749 2017 10 - 3 SAN P SAN S 06415 SAN S 06468 Saunders St 8 345 December 06748 2017 SAN P Klauer Bld- December 10 1 06838 SANS 06787 SANS 04645 Wash&Elm 8 25 2017 7-82 SAN P Klauer Bld- December 10 1 06837 SANS 06615 SANS 06757 Wash&Elm $ 180 2017 SAN P Klauer Bld- December 10 1 06836 SAN S 06662 SAN S 06618 Wash&Elm 8 150 2017 SAN P Klauer Bld- December 10 1 06835 SAN S 06658 SAN S 06662 Wash&Elm 8 145 2017 SAN P Klauer Bld- December 10 1 06833 SAN S 07580 SAN S 06658 Wash&Elm 8 145 2017 SAN P Klauer Bld- December 10 - 1 07791 SAN S 06654 SAN S 07580 Wash&Elm 8 20 2017 10 - 1 SAN P SANS 07327 SAN 06654 27TH ST 8 140 December 06834 2017 10 - 1 SAN P SANS 06645 SANS 07327 ELM ST 8 305 December 06829 2017 10 - 1 SAN P SANS 06642 SANS 06645 ELM ST 8 180 December 06820 2017 10 - 1 SAN P SANS 04650 SANS 06642 ELM ST 8 185 December 06819 2017 10 - 4 SAN P SANS 06128 SANS 06127 Clinton St 8 100 December 05976 2017 10 - 4 SAN P SANS 06127 SANS 06126 Clinton St 8 130 December 05977 2017 10 - 4 SAN P SAN S 06126 SAN S 06125 Clinton St 8 160 December 05678 2017 10 - 4 SAN P SAN S06122 SAN S 06121 Link St 8 325 December 05967 2017 10 - 4 SAN P SANS 06111 SANS 06127 Brunswick 8 350 December 05975 St 2017 10 - 4 SAN P SANS 06193 SANS 06194 Edith St 8 255 December 05928 2017 10 - 4 SAN P SANS 06194 SANS 00627 Edith St 8 275 December 05929 2017 10 - 1 SAN P SAN S 06171 SAN S 06175 Thomas PI 8 250 December 06022 2017 10 - 1 SAN P SAN S 06175 SAN S 06178 Thomas PI 8 260 December 06021 2017 10 - 1 SAN P SANS 06178 SANS 07627 Thomas PI 8 105 December 06023 2017 10 - 1 SAN P SANS 07627 SANS 06182 Thomas PI 8 135 December 07880 2017 10 - 1 SAN P SANS 06182 SAN S 06183 Thomas PI 8 85 December 06024 2017 7-83 8.0 CMOM Update 8.1 THE CMOM PROGRAM The City of Dubuque's Capacity, Management, Operation and Maintenance Plan (CMOM) provides a summary of the City's policies, procedures, practices, and responsibilities associated with its sanitary sewer collection system. It is the blueprint for the City's managers and field workers to better manage, operate, and maintain Dubuque's sanitary sewer collection system, investigate capacity-constrained areas, prevent SSOs, respond to SSOs that may occur, and plan for future system expansion. The EPA approved the City of Dubuque's CMOM plan on June 4, 2012. 8.2 CMOM IMPLEMENTATION As required by Paragraph 13 of the Consent Decree, the City fully implemented the CMOM within two calendar months (August 4, 2012) of approval by the EPA. Section 6.4 of the City of Dubuque's CMOM Program, requires the City to annually inspect fifty (50) miles of gravity sanitary sewer through various methods including visual inspection, pipeline jetting, or closed- circuit televising (CCTV). The inspection is in addition to the predictive and preventive maintenance also prescribed in the CMOM. The total of miles cleaned, televised, and inspected in 2016 is 103.02 miles. The City developed the CMOM to serve as a "living" document. As the City reviews its current procedures and codes, the CMOM will be updated and new procedures implemented as needed. Any revisions to the CMOM will be submitted to EPA, DOJ, and DNR for review and approval. 8.2.1 Fats, Oils, and Grease The City purchased software and approved an ordinance amendment to supportthe W&RRC, Building Department, Health Services Department and the Engineering Department in managing and enforcing a FOG program. In addition, the City held a series of three public meetings with local food establishments, vendors, plumbers and grease haulers on the revised FOG program, the meetings were held on September 2, October 14, and November 4, 2014. As part of the proactive program,the City has dedicated two staff members that inspect food establishments and help ensure the proper use of grease interceptors. At inspections, food establishments are provided with a Best Management Practice poster that is required to be visible in the food establishment. The FOG Program requires food establishments to apply for an annual grease discharge permit along with a$100 permit fee. The fee covers the direct cost of staff time to perform inspections, managing the software and hardware, and vehicle expenses. During the reporting period, grease was responsible for no overflows. 8-84 9.0 Assessments and Engineering Analyses The City's Engineering Department, Public Works Department and Water &Resource Recovery Center (W&RRC) staff continue to evaluate and analyze the sanitary sewer collection system and W&RRC to ensure compliance with all legal requirements. No new assessments or engineering analyses were completed during the reporting period. 9-85 APPENDIX A FLOW METER LOCATION MAP Ujim Q JP o €>•>>,'^ HV I No NVN��J I� wF3n f Wi po r SN JE +.,_.`>orn a-. vNPOp. JOOW w _u 2 Vl w 3001a 3 Yy JYh w�� S,EIO P OS S W pE p0 3 Ol a 9 63010 P�R%OF �^tlxx {1'� Ei �p v w15>3allY1°Q W4%SW ��fJP•NOp E'Y C b'LOoy P`' tAS 40 E ON Itl lti z b4�. MO VEE rf Y�' �p�eSPR SRI jNSJ$ l0 pLOpD u 3DItlOstl� SI9EW ON r'°13N•P 00� 1S1NYAa0 Mryt ¢ 'ML v 0.P1ER ID lxns f'tA'f 'i0 3>'Y ,apz'1 9 _ao / � y '^�C�IINSET �¢I b0153M - p d �Qa A30? 1[OB6b L pN I IDGE A3M 1 N'" � PS�y m �OORiO ¢ PL � $/b O 3901a yo'..Fp40.1f' Sy 9R i tbON3 �p Sa31NnN Op � 4 2¢n+¢W pEEpEo yj lA'2 NES V s p3 p U N Q O 54 PI LJPAR I G 33 ¢ DiPP6 LL Aaa3N 2 P 300 SNE EDJPL r^1'1 2 Ny x N4NpJ 3JV "ENELNQ of 2V .3 4 p p P��O4 a` j� GE Op 3j 3S G LLry �6 aDNxOf33 L531D9V bSM �b p M3Hllbq a0A>Hl b ,y �o � NOLLIDAN NR 10 SOy 'N AJy Dad01311HM �� � r Q 6DMlYD F D B e Ny o.E o � ¢'O aONOiOtla ¢ AJN,'S Y ��8 UO 4 w m u 2 a°G p L\PDp ON O 3 O W O a 3L1VM roi im `� as nm aJ � 3 e 'a ¢ xJILYAGNNI S 2 }� '{fj�G0 6 NALES MILL RD ¢ y xt°pp. Tb>>b3i>7ry W 'Y' DZ M1H b0 E@y� •F ° Mo»obe Of NVQ M 00 Wo O� b'10•yd a00M3D03M (OP 3. �,}, y a T M1 t W.db 51M 31 yJ °pl ��yW ��90 ¢1 fJm Ta oa vane }(P�0 M>ga of O�m' a3aNnx1 Pl QS AHJOb o 03 Fm m f< e4 w 'vO Q vb3bb9 APPENDIX B SEWERSHED 5: LOCATION MAP AND FLOW METER DATA 5ST r` 55SON0 P ,,�rteea' fog 5151OB1155 Sia 3Ai&� 1SI< G 1 SSN50 SE P = S5S 1031ROpJ\ ' '(ER � 1S3Nr�'� idb cii w o w NyJ�PS )P OZrN GOLD SS 'V 0 Z> rN r Y i q Za Y N S odd� y F Ya Z DLAKES O 2t`7 0 050 1S HIHGMGDDM S7 LL � O P S i iia Oma v QP\ 5'( 1St1088b �SSPu OC O 3 v FPRCTLL �7bp a �1b e a n LN 3S0 b L°OD 2 v 3NbV700 AN C7 W 1S1AOH •� z`� M ^bM3j�o N Q in fob ¢ ¢ CORT NbbeN z (n U 1,7 'ys � a N>�ord• ¢�° ¢iy 3 OOVENY PARK 10 �4 a ry A&8A&83)4AR RPPL do wLn z y } ° i YJ m0 CQ SCA�Op ob U3tbbD y 4b&,7 s . 7mK " 3 R a OOO" HO ASSIH�I1bbGy J o s a° A d a s ado °P? d\' tS3n00.1 o ° - Ousna jo0 1Ddy Q�.��v OP LEY LN�p q y 1Q z° A5H OQQ yp y� GGPRGLE "rdl, PORESRTD o X20 § ti ° Q\P 10 b1SIAV7 bo3N GATEyO "�b�z S u pCIENOA DR ti NS 0y�d� OUA03NN3NHILTOg OR G ° EPRIN 60 M3/A V K 1S3AHVH J Z � x Q } w } P P�PO41 ¢ £ o HO AVOIlSAM SAMANTHA DR C O O a E E c 0 K � O m - N Q r� O O O y 5 _ GD t0 /yI M N O O O O d J O N C O o 3 � N m f7 L 0 E u N c m � _ N O O O � m N Q (O O b V M N O V N O 6 6 V M N N O O O O O 9 O O O p p p O O U p6w 0 oU' 0 p6w O C O - O U1) N O O M _ a E LL O r Sti N LL �' M UI N O > m x CIO ¢ s LL 2 s N � p N � � y d - Q O O N O h O �(1 0 0 O N O V O O O O O O tO M PBW UI APPENDIX C SEWERSHED 7: LOCATION MAP AND FLOW METER DATA ..1— :. vn),': A do> 97 O�>A PER KERPERK gRVO d'3ob�N N poo V bAA y�yyb� vv �gdKBRVD BUD bA Y ; a� Q o s yJA, oo Z o a •s m xa o a g x w s<r<y Mysn Ami E N1 t m LL rN PVE 52 L n Of?y� w r 1-H'S2 E�tP ray SPO 52 N •ti m} c f y ry m o I.i e T ni m" H1r H E 52 a c 5 x o E NST P`EVO'52 E52 oxN� H�2E 52 NP OB NNP52 w rc O 0 2 52 v x = J ev P�HPS ELMS .�JNS,E - �Hj2E HCk5 82 MAIN ST Z N y c 0 5 H�2 ppP Z N 'p_ rtCy d. =x0 1 ,..a� 52 Y 4 1 Y PJHS 0 1 .,,.. "ti ROP 5JP �Q� Q o G O p�HPs 5 / .. H S DEH2P V N 6 5 W a yS IAO NNY G r E�'��50�52 .J0 ',odbb o20t 5'� �V HH ahN '� OHAROLLD COX 52 LL �b� E52GE�2� '( '^ �PJFPNE W J y W q r a' 0 HS AO off �E�D v e'� P0� x� z w o g ° ELgKE 5 a' 52 W 2 10 1HDN 4O m ,aGG g 37 03s O N LA 3 y1n w U C Y i b�bb0 rN Ob c 3. am J rN w00 ' z oRE 1s�A-(O b0 �� wbNNnA QEC�G� boJ�j�bb� 3 h 3 N10 DOOR OA w PS u ,NV-D E'N CT 3AV HOYT N PNDRSNA Y ~ M3lnONbND N 't1� �.7 5T NO D N r z O/bN N w �oL b u 3j M 1NON L z 74 bL t 3g 2 Ati 3nb ¢ CORTO ZQ C M3/n ONbNON W N i ¢ KDR �� > BUNKERS N !/07097b8 ¢ w �y� HALL RDLL 3 �rNyJA o u�s C O r O E - E ��-- O 4 ❑ r O M O IL r O O S ? •— _ m G 4 GD N c� M N 30 10 b 9 OI � L S ry E z v >d _ Q (0 O N c0 O N O V N O h O M N N O O O O 0 O O O O O O O O fJ O O O O O O O O O O O O 0 p6w ui p6w \ � } / \ \ 7 � > ! q \/ \ 6 , ° , , , , : ° / C O S _ � O — O O j I p N M r - 0 N > 02 0 0 3 c � o � o o O C £ N - a m 3 � � n O O c L1. � >YN > I Q O O o of N ON O to N N 0 O O O O O V O O O O O O O O O O p6w ui p6w C O M = c J z i D) { N Q p O y O O � 3 0 m t ry LL S � O N � N _-- CO - N M O K 0 = N }' g O N O N O M O N O N N O � m (V N - O U O O O O �I O pfiw c 0 O D - £ O _ C IO LL _ 4z N � O _ O G N N V H O O � N z M O r O = O LL K g S d O 0 O N N y N O N V 6 N N O O O O O O p O O O O U p6w o o ' o p6w 0 C O _ � M M C - N W M .N.. J � � N _ N Q N _ O 3 M U q I ci N o � � Q N — sF O OI l0 E 4 N W M m N O � N LL >0 m — O N 0 0 ci O O h O O O O O O V (7 mN N 0 Ul p6w ui = I � 2 � ! - �` 2� ) 2 � � ) - \ � � \ _ ! / 7 § E _ � I � �- ƒ : _ : : / : 0 C O M N O — fn Q _ O O o m q bd. m t O O — — V O 3 _ N O — N O N O O O O O O N t0 V N O M t0 p N N O O O O 0 0 N N N N N r U p6w u! O APPENDIX D SEWERSHEDS 10 & 6: LOCATION MAP AND FLOW METER DATA P yp a Rp'VIINOPNfEi y >� ,. LOCK 6CAM RD VOWNTEER Y ry1PPsj J �°i b0 �� WAIXIXI OR y'P9a`>'bi 27 Oi"3jN 5M1 3i OJjA,J all y 6NIRPSPK "> u �y �ryOP A oQ e � 4W �y jYY4 y q QT 2 Ob bHOb3A' O 3F dam" .° a y Iii P:13iaavN§�", {sj f�D'�a °'v° oz tTV " c O Nlxtl Sll! u Wf4 0 }� rj E�IP Q W s 4 9 ep"A 4Ra 7r 1tb3sN W>b YS�jH�b y �- l1J� NfiWIIIO]rc� N'aO,JO`)'v Savy`E1A�51 Q Ml N 4 n w ¢ 0 3Pbz06041M PJEpyj W2& PjiE Ory05{YPt�ryj1110NOj ON O W Ov ]NDN w sS '� pPOQI B)NP yl PS NES w gJP r)P DF o x• js t 4y,50 H Y y4- Ow y, w1JA3103N g �. B�'j0{ON5 py mry4NE(E1a350H'Pb w BMSA\DPxRr V °0g� PPJ qM1 Sj Mp543 `• R 9455{ i t F B Oj vAW TO �cE�Q �n BOP 4'F Qp.O 5 N u` OWN ss fPP f�. C dsti P1x ,1 M1ON p01 L ./ COCMM Bpc Q Bp0 S ,f E41) 5Ng0 jPBPP Pj st � ASA JP v$Oa4 W iB'�xs{N�4x sj '� �PM1 H ,a ZyJ� BROPOW y'Wxryf�+ Y 4P50` P4B1eB n 50 ~ PYR NR65 pJE P 0 CO EN NPPDR ? �ge Sa`i qS Om w r r`;+Y Yo V@j •�xrN �bBg '¢ l ¢ p® r sOY Ssn e4B4 l r0. 300/b Y7 rN pi gON "i gQ° y W (H�JllNpS rs O¢d 4 p� °Q 4BM1 aN w e, oB PogP ul'xuNxex °a 3NI� > f¢l� u1tlnY �4EV 4{ Oj B a3etvia H3N�t5 aPy. 0 fp0.ft�xNPM i �L yx1S]NS HVO p VO` a yP �6i 3 OOyryJ OBOP W 2V id 60 vCe00 S. O OOOMOIIM PNDRENct �' O b03yyyHlbON MNDPGi N'IAObXS NB"P EVIEW 111 N Q: C �a~baNS NP'M2NOPNE 01 Q >by p ".. LOLN6G/M fl0 VOLUNT550 LP o 4 pP5 _O 9WIY SstbopyY ?P EES N�2 � [. ao i � L avlNwlvm Jyg>�J 60 h5 4 "ay 7,Yy3A lvd P SIIFPPSPVE y P y a WY � 'dal ¢ lLp °aa a3 Vl WW�iiiiA� b 4�^„e yi `� apO0Gj02 hpp9y�, p4t �h ®• E W1A` Nt N/13iV Py P84 4S• E ZQ�+4 P H w` cY�Eaoesoxbrs Ip ���`�,`��`� P� Alii ��� Cssi � vervC stEpPCE� ,qQ OOOMNI FEPY flO p 4v b» �N2ppP09 y a it a o yaa III III 4i44Ti � rs�H�� o f p HV17NnbNOS y � II4 5 5 po I iII�P' v III .� 1O LanN EV c1 II II lP L,L2 `OBN n Fn0. OryPM x o av oo- u r T LT 1 6 Q; pOOMOIMI PNOaEW �a W _ Fu by3Oolbf/�bpM � 0p>py00'a A� 6 f NtAptlbF 0 � I/ a :J a''2 N•SWbh �o � � r � Q ME M1 C O M � M M C E4*7 Y O N O O LL Z m Q � N � O I � p o 0 Yr _ LL.00 O i M N N V H O G K t p � N N � c E t N u O � C y v N 0 LL � 3 _ -- -- Q S O M O O V N 0 1n t M N N p6w O Ul p6w 0 C O M M O C � O C M v f/1 O _ O Ci O O O lV 9 _ J O1 C O £ ESeLLo CF v �P O N � p L � O O > O Q O N V O a N 1 0 U N � N d J LL a 0 O W l0 V N O N O h O Y] p6w w � � k F _ w � ) w � § ! 2i , »rd ` : \2 ®p ° 3 C O yy M (O �Xr O S N I � m m J N N N O O n O W p E LL o O O O y 3 MO > m Q O N a o m N m i 6 N I E O - N 11 �� a U) { 0 N O �O O N O N O VJ V N O N p6w � ui Q I C O O M O _ U E n o c I o N p � M O LL t0 m UI Q N Q O O O N_ G C O LL O O 3 c N N M O p N N p N N V H O N c _ m _ o -- n 0 0 Id o r Y N N m a ' O � N - tD O O W l0p N t0 V N O M N 0 N O O O O O O O O O O U O O 00 O O O O O O O p6w w pbw C O .a N C I C N O W M O_ d d — J N N N — O N - O O O fV E ii c 3 N O �y g N N � L O N LL F- O _ n O y Q N <V O > N Q o N O N r 0 3 a �O 0 0 IK � F3 O N LL Q O O O W tp d N t0 d N p al t0 N O TJ O O O b O P6w m O '✓L' � Qo ke�a ppAp V9LVNiEEfl 9flx l 1 R0 Jt �. sN\PP�t J 153NIY �NOyy a PNE E� y x 15, 3 3 x P°°sof/ eo�w C °Ttlb 31tl9 o>.u�I6 L E dP NN3N}II95 'IJO>shJ �6 ; _N oP A 4 SN10.P5 Ob o Jb eb yb"4 At J {S fOjp� d(N( 1, Aa JEl E4 �d �OO hi R'of4� p omMo YeQ do 4P p_°°°E bY'bltnr a 2"t r^�W,�y 0.2vtV2. � PHo9y 5 I� N p Y U 3Atltlp59NIM S Q n� .PSP y Y' aP1' Ot 09tli1H9°JL�EyE Ps5151°PPy wA3la3YP��\(}'MPP�PY N5S40 3 ^I u 3NV �u (\ v6PPLE F EE PS0 yi J' � � 099M NI'^']n 3PY J0�� 4EP tG OP� NQS Obs �d aw w4 OOOMNI 8 + P B` NS ORPN n^ GP N � YIPsS 5 54 R '�I a R GPPtlINPIy¢ y9 uW� 11110 VE pa PYEPPER LO b9 NJOJY3CL° pa 0 w°r° ~ h4 P( ✓� 3OOIN r° s 1a pc�c 3Hreliv�w `�'39pro d rYn SF�t `-yy 4pS`` t'`°I• 'Z c F W 6 1X91116 s stbb o"'ns s W°k4ys . 3 2 P S RtJ C Ila ¢ o Jp1W w s L pJ �^ tN,a W �p\DOE _ 'v O1S3bJ VJ p Nl SN3HONYp �Zw f � MYO rt 3 w � y v,E m X9a V) N\ b � g �O s " O6�Y P"" Sp.. iRPIL y eV%41 6 °M1bI O 1>21 NOW aPY � � 1>A083N1J 5Ntl°� PP1aP Ab�H> w4 lO 9NING5 ON. ¢L A3Nbtll�M b 44 N �0 6y`a SNiEie p`leN 'a i O WO N305Y�IT 09, v oy }O N319 WNO 0 4 Ni 3b°µ}7ibB. lNls53b03 SO SIOM [�6 QWPWWb ONbJb iO .l >49RN C O r U F` E ) Fes. M O 0 - a - O O � C 1` Ec 0 L a _ b p6w o i 0 p6w O C O — - M C C U) I O N M J N O � — O O rC _ f LL O Fo _ N s > WR -` N — O � LL - O N N (D V N O T V O] c0 r l0 1(J V O o O O ❑ O fp6w APPENDIX E SEWERSHED 11: LOCATION MAP AND FLOW METER DATA V). E 51 SToN rN rN b0 0 rLNJpsill rY Yirir MN3J�Ub 51 ELM ST Fr` 1�" u inx Y'^ ern rin PINT YY 1p0µ5014 III,StPJE PSt i tpp I0� Y z N 3> i u+ OEN r rN N rs ZZ �O 111 X1(1. N ,c I'OCUS ovEpP N oto SPt a� r SNEv,BNTt m`n, s sTP Oto E tE GE t is NMpINS a'�a in}r ZE O YnN YIV ES P� 0 Y o N OOipIP ogy OPtR51t1NE a �'� O� t NII PVER013055t J FOYE ST ��Z Nx LOR EGE O5 OLL 'f y. RP OE NPL R IS OdVAHVH w d c NN U z GPK ONt gt ALPINE STz +IADP St N\54P y.NEN BOOTH ST m tP r a cuo W v BAKE Sr Pra o NOPK St 1SNV0 O m S g 3 o Zp1 ZK?GLEPSpNt ST c N370 OPLESMT PL PTp, 1',n .s ..-.. yK LA, �ax�NO ST > y 000 5T AOIR p Y A v u d p ST '^ y 1 PUO�O,N u1� oPUg0RN$T y�� bps _ boa LppL OJ1SVNOO 7VN t op Joc,5t m m � 1S lAOH Q? IR G AVOCA ST �+ rN j� s �rs� 0 J t a o¢ SfZ1»� INLEy 5 rN Oil 771H d3NN79 LL y ti 10 2y 0 o U 37VON370 �2 08 A3NVH0 Py V Vd07d 0O'0h,�O J COVL•NTRY PARR 1�= 3AVNOSN0/H ". W7Vd C O O _ � V _ O K o c o N Q s N Q O � O � O W ❑ O � O C S 0 OI L ! 0 � C r pNj O O O � no p N N LL K >d N Q N 0 O of tD a N O V N O V M N N O 6 O O O O O O O O O O U p6w O o f 0 p6w 0 C O _—_-- _ N _ C N N O 3 J —2 t N O � 3 ------------ R c p a E 0 o WWWj YS3 O N LL M O _ O E O rYs N LL — 3 3 - 0 N O (q (p e{ N N O N O N O 4n O V M pbw UI C O G V E 4� W M C O N I Y � O O I � I � Q N O O O I l0 M I O O b y � C Q 'UN LC N O L O O u 9 O C O � N V � N O N C r M o d o Y a 3 � O � N LL d 3 0 O N lD V N f0 V N O l0 V N N 0 o O o 0 0 0 o u p6w p Ul p pBw O c 0 O N O M z� J O � N O O � � O O O CO N u � � O � � p � O O NN- FC O t0 E N M O >LL 9. Q c - N N O ro t0 V N O In O N O M N p V Cl N N O p6w ui C O p s M O � E T� m + K _ o � Q N Q O O r �- m I o o OON w _ O 30 N V O - � 0�, N fV VVyS Vi fD � O � N o F y o o N V d (O U N C O � O O O d 7 N � N -_ t0 O H O O tp VN ON O N p N 0 0 o O o u 0 0 o c o 0 0 0 o p p6w ui p6w G O N _ N � % M —y N N � O G � O N_ d OI � ❑ N ws m a N � N r O n O 0 3 co O) N E ��_ m _ — LL' Q _ m _ O l0 V N O M wV N O w N m N O m OJ N O O O O 1 O O U 0 0 0 0 0 0 0 0 ui O p6w APPENDIX F SEWERSHED 12: LOCATION MAP AND FLOW METER DATA All � \ a ) ! ) j \ \ ; Qa ! ¥ W« & esr.911 \ \ § \ } ^ § ! \ � � � \ ( ® ® � ` * a a � Eq vAkf ` \ / %/ Sf } { 1451 ] IL \ \ / �I � ; � \ \ BLLIFF T � , i \ \ \ \ 00\%y : ¥ »` �*! @ a , sot,t5 w `® e � "*&\ �r ` � �f11 {'- IT -- - 7 ƒ "t. ¥% \o {_» { a w\ / i ° a ma ¢ # » _ / / {5 ° ` � ^ y E �� �} 8 ! 2 . ` ! ® �N ° , 0 m A,47,9 \ \ / ) \ IJOOQ ST 'IS ._N�2 t : E / k \ / Q \ ®�`�® �`510 � w «§ C O O c p I E � � I N c Ip t N 49, O } LL O O O r — f0 m N M N r i O � O � o O N C � N E -M7 V N C m 0 Y N 3 O N r N LL � (if O O of t0 V N (O V N OCA (p V N N O O O O O O O p6w 0 p6w 0 C O O _ _ C N O 0 J - r � N N � O O O N N _ O O N N t0 > d d O N------------- O O O O M M N ry r O O p6w w C O p M O a E E m - o � 3 I o ur y o M 3 0 v= 0 m V1 Q N O C I O � o 3 M N C v « i N � O E O O O O � � a O N O N N V N O C0 V N N O O O O O O U O O O O O O O O O C O O p6w w p6w C O M N a fV C I C _ m N r M N d d J N N mg N Q O O In O O O O N � E LLo N y B o m N � O N O L O N LL - F O N ai -- O N y O - 3 m � N E - -- M o =� o - d =� N IL ' v - 0 N O N O R N O o] (D V N O W N O N N N r r r r O U O O O Ul Q p6w c O m m E a E o c m C5 � V1 lr � K o � 2` � I � N Q N Q O O O O G i M N ❑ O N C t Q no O 00 f O O O V C O O n O Ods O O Y 0 N d _ O 0 N O tp V N O O 0 a V N O N O O O O O O O O U p6w o 0 o p6w C O M O O O C C � I M N O � O O J _ 10 W N Q O y M O O v v N o � o 00 N lL Il � p a r O N fV 'n ¢ N c � N V O � N 0 30 0 0 o 0 Io � H N Q � N O N V M N O Yl O 4n O N 0 O V O O OO O N N � � O Q pb, m C O G � M O O r ' o s ) O Z � N N Q O O O r P' p LL o q O O ry� GO l0 o r4 O >. � O C � N y 0 3 N O U N E � o o o _ o aT Y p � N LL F N 0 N 0 O O O O O V O O O O O O O O O O 0 p6w ui p6w c O t M N o � � � M N J ) 3� N O O MO O O O r W N 3 W N � _ o Z r4 W V - '— N col N >W > O _ J s ~ 0 N N O NO O N O N O N N O O O O M M N N U p6w w 0 C O M E E � I o IE 0 M 3 0 LL ❑ A d N O O O 4 _ M O LL p O N N 3 _ m O o c a CO N 'N d ES N � c 0 O N C � N m Y 3 O O l N Ec r di ILI o — N � M N 3 a 0 M l0 IT N N V N O t0 N V M N N O O O OO O O O O O O O U p6w of 0 p6w 0 C O Sy C C � � � N C O N M v J � N Q 4- p O r M N � N 3 00 _ O Q N N GCD f y O - 3 o � _ M W _ K - 1- 3 O N N Il M V d M N O N O N O N U O O O O O O O O V M M N N .- p6w w