Loading...
Southfork Sewer Conn Fee Ph IIIUB E MEMORANDUM June 11, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager South fork Sanitary Sewer Connection Fees - Phase Ill Public Works Director Mike Koch is recommending the establishment of connection fees for the South Fork Sanitary Sewer- Phase III construction project. Final acceptance of the project as completed by Stewart Construction in the amount of $613,467.99 was done at the May 20, 2002 City Council meeting. The connection fee schedule for this project includes all serviceable properties within the sanitary sewer drainage basin for the South Fork Interceptor Sewer- Phase III. Many of these properties within the basin are located outside of the corporate limits of the City of Dubuque; however, the connection fees will not become due and payable until such time as any properties included in the schedule of connection fees are annexed and until such time that an actual connection is made to the sanitary sewer for any individual properties. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Mike Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM June 6, 2002 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director South Fork Sanitary Sewer Connection Fees - Phase III A public hearing was set by the City Council for June 17, 2002, to approve the schedule of connection fees for the South Fork Sanitary Sewer- Phase III. The connection fee schedule for this project includes all serviceable properties within the sanitary sewer drainage basin for the South Fork Intemeptor Sewer - Phase II1. Many of these properties within the basin are located outside of the corporate limits of the City of Dubuque; however, the connection fees will not become due and payable until such time as any properties included in the schedule of connection fees are annexed and until shall time that an actual connection is made to the sanitary sewer for any individual properties. Prepared by: Gus Psihoyos, Assistant City Engineer Address: 5OW. 13~ Street, Dubuque, IA 52001 ORDINANCE NO. 49-02 AN ORDINANCE ESTABLISHING A SCHEDULE OF SEWER CONNECTION FEES FOR THE CONNECTION OF PROPERTY TO THE SOUTH FORK SANITARY SEWER PROJECT - PHASE III Whereas, after full consideration of the schedule of sanitary connection fees proposed to be made for the South Fork Sanitary Sewer Project - Phase III, which schedule of connection fees was filed in the office of the City Clerk on the 20th day of May, 2002; and Whereas, the City Council has determined that the amounts shown on said schedule are proper and are in proportion to the benefits conferred; and Whereas, the City Council further finds that the schedule of sewer connection fees for the South Fork Sanitary Sewer Project - Phase III be approved and adopted. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE; IOWA: Section 1. There is hereby established a schedule of sewer connection fees the South Fork Sanitary Sewer Project - Phase III for the connection of property to said City sewer. Section 2. Each property owner whose property will be served by connection to said City sewer shall pay a sewer connection fee to the City, as shown on the schedule of sewer connection fees attached hereto. Section 3. Such connection fee shall be due and payable when a sewer connection application is filed with the City. All fees collected under this Ordinance shall be paid to the City Treasurer. Section 4. The City Clerk is hereby authorized and directed to certify a copy of this Ordinance for recording in the office of the Dubuque County Recorder. Passed, adopted and approved this 17th day of June, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk L -- South Fork Phase III Basin Limits -- South Pork Interceptor Sewer South Fork Sanitary Sewer Interceptor - Phase III MEMOR ANDUM May 14,2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager South Fork Sanitary Sewer - Phase III Public Works Director Mike Koch recommends acceptance of the South Fork Sanitary Sewer Phase Ill. as completed by Stewart Cc qstruction, in the final contract amount of $613.467.99. Even though the cc qstruction was completed in 2000, final costs for '- associated easements for the project and crop damage were not submitted until the end of 2001. It is further recommended that a public hearing ae set for June 17, 2002, on the establishment of connection fees for the sanitary sewer district. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director TO: FROM: SUBJECT: CITY OF DUBUQUE, IOWA MEMORANDUM May 14, 2002 Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ~Y'. ,/i/,~/~ South Fork Sanitary Sewer- Phase III INTRODUCTION The enclosed resolutions provide for final acceptance of the improvements to the South Fork Sanitary Sewer - Phase III and the establishment of connection fees for connection to the South Fork Sanitary Sewer. DISCUSSION Construction of the improvements to the South Fork Sanitary Sewer - Phase III has been completed by Stewart Construction Company of Dubuque. The final contract amount is $613,467.99. Even though the construction was completed ~n 2000, final costs for associated easements for the project and crop damage were not submitted until the end of 2001. This sewer provides sewer service to 1347.28 acres of developable preper~y. Connection fees from future connections to this sewer will pay for the cost of the sewer. This project was funded under the Sanitary Sewer Extension Policy which allows the City to construct interceptor and collector sewers with City funds and establish a connection charge to benefiting property owners within the sanitary district if and when property owners connect to the sewer. The connection fees for this interceptor sewer are based on the cost per acre for the sewer project and are allocated to all properties within the district, except for 97.32 acres of undevelopable "floodplain" in this basin. The connection fees will be collected as properties in the district are developed. The connection fees are estimated to be $732,083.86. This is calculated at the rate of $543.3797 per developable acre. RECOMMENDATION I recommend that the improvements in the South Fork Sanitary Sewer Phase Ill project be accepted and that the schedule of connection fees be approved. BUDGET IMPACT A summary of the budget costs is as follows: Construction Contract Contingency/Miscellaneous Engineering Easement Total Project Cost BID FINAL $779,179.42 $613.567.99 77, 917.94 10,557.40 128,564.21 92,020.20 301000.00 16,038.27 $1,015,661.98 $732,083.86 This project was funded from the General Fund. The funds are being repaid to the General Fund from the Sewer Fund and through connection charges as development occurs in the district. ACTION TO BE TAKEN The City Council ~s requested to adopt the attached resolutions accepting the improvements in the South Fork Sanitary Sewer Phase III and establishing the final construction cost of the project, and setting a public hearing on the establishment of connection fees for the sanitary sewer district. MAK/Ims Prepared by Gus Psihoyos. Assistant City Engineer RESOLUTION NO. -02 ACCEPTING THE PUBLIC IMPROVEMENT TO THE SOUTH FORK SANITARY SEWER PROJECT - PHASE III Whereas, the contract for the South Fork Sanitary Sewer Pro~ect - Phase II has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same ~s hereby accepted. Section 2. That the City Treasurer be and is hereby directed to pay to the contractor from the General Fund an amount equal to the amount of the contract, less any retained percentage provided for therein. Passed, approved and adopted this day of ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. -02 FINAL COST OF THE IMPROVEMENT TO THE SOUTH FORK SANITARY SEWER PROJECT - PHASE III Whereas, the contract for the South Fork Sanitary Sewer Project - Phase III has been completed and the City Engineer has submitted his statement showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE iT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the cost of said improvement is hereby determined to be $613,467.99. Passed, approved and adopted this day of ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk City of Dubuque ENGINEERING DIVISION FINAL ESTIMATE FOR: South Fork Sanitary Sewer -- Phase Ill ITEM QTY. UNIT UNIT COST TOTAL COST 1.18" DIP wNVrap 2.30" Steel Casing Pipe 3. Concrete Manhole Base. Complete 4. Concrete Manhole Sidewall Complete 5. Manhole Ring & Cover, Complete 6. Concrete Pipe Encasement 7. Bedding Stone, 1" Clean 8. Limestone Backfill 9. One Man Rip-Rap 10.3/4" Rolled Stone Base 11. AC Street Patch 12. Rock Excavation 13. Traffic Control / Safety 14. Seeding w/Mulch EXTRA WORK: 8" DIP w Wrap Machine time and labor to install pipe under US 20 bddges 18" DIP w/Wrap under bridges 9869.59 36.00 443.63 36.00 396.00 4264.10 606.92 349.49 101.34 42.93 888.10 0.90 5.70 444.75 1.00 363.80 Lin. Ft. $45.00 $444,131.55 Lin. Ft. $175.00 No. of $400.00 $14.400.00 Lin. Ft. $75.00 $33.272.25 No. of $225.00 $8,100.00 Lin. Ft. $40.00 $15,840.00 Tons $?.00 $29.848.70 Tons $4.50 $2.731.14 Tons $10.00 $3.494.90 Tons $8.50 $861.39 Tons $60.00 $2,575.80 Cu. Yds. $0.05 544.41 Lump $1,100.00 $990.00 Acres $925.00 $5,272.50 Lin. Ft. $25.50 $11.341.13 Lump $31.687.50 $31,687.50 Lin. Ft. $24.40 $8.876.72 TOTAL DUE CONTRACTOR ENGINEERING TOTALCONSTRUCTION COST I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Mitligen, City Manager City of Dubuque,Iowa The unders gned, ~',4t;l,~ ~. ~7'~47~, contractor for the above improvement does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. $613,467.99 $92,020.20 $705,488.19 Michael A. Koch Public Works Director RESOLUTION NO. -02 RESOLUTION PROVIDING FOR NOTICE OF THE DATE, TIME AND PLACE OF A PUBLIC HEARING ON AN ORDINANCE ESTABLISHING THE SOUTH FORK SANITARY SEWER PROJECT - PHASE III AND A SCHEDULE OF CONNECTION FEES Whereas, the City Council of the City of Dubuque, Iowa, proposes to establish, by Ordinance after notice of a public hearing, the South Fork Sanitary Sewer Project - Phase III and to provide a schedule of connection fees therefor; and Whereas, Iowa Code Section 384.38(3) requires notice and a public hearing on such Ordinance; and NOW, THEREFORE, BE iT RESOLVED BY THE CiTY COUNCIL OF THE CITY OF DUBUQUE, iOWA: Section 1. The City Clerk is hereby authorized and directed to publish notice of the date, time and place of the hearing on said proposed Ordinance, which hearing shall be on June 17, 2002 at 6:30 p.m. in the Public Library Auditorium in the City of Dubuque, Iowa, such publication to be once each week for two consecutive weeks in the manner provided by Section 362.3, the first publication of which shall not be less than ten (10) days before the date of the headng. Section 2. The notice shall be in substantially the following form: Notice To Property Owners Notice is given that there is now on file for p_ublic inspection in the office of the Clerk of the City of Dubuque, City Hall, Dubuque, Iowa, a proposed Ordinance establishing the South Fork Sanitary Sewer Project - Phase III and providing for connection fees. The Council will meet at 6:30 p.m. on June 17, 2002, at the Public Library Auditorium, 360 West 11th Street, in the City of Dubuque, Iowa, at which time the owners of property subject to connection fees in the South Fork Sanitary Sewer project - Phase III or any other person having an interest in the matter may appear and be heard for or against the establishment of the District, or the schedule of connection fees. A person subject to such connection fees will be deemed to have waived all objections unless at the time of hearing, the person has filed objections with the Clerk. Section 3. Not less than fifteen (15) days before the hearing, the Clerk shall also send a copy of the notice by mail to each property owner whose property will be served by connection to said City sewer and be subject to the connection fees at the address as shown by the records of the County Auditor. Passed, approved and adopted this day of ,2002. Terrance M. Duggan. Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CONNECTION FEE SCHEDULE SOUTH FORKINTERCEPTOR-PHASEIII $~3.3797CONNECTIONFEEPERACRE OFPROPERTYCONNECTED PROPERT~ OWNER AIGNER. SCOTT W & YODITH D ALEXANDER, CI-IARLES DENNIS & SUSAN E. ALTHAUS. MICHAEL E. &CHAP. LENE ANDERSON, BRETT D & JEANNE M. ANT, ULO H & SANDI L ASlvI1JSSEN. STOY H & DIANE M AUTEKMAN, PAUL D. AUTERMAN, PAUL D. BARRINGTON LAKES PROPERTY OWNERS ASSOC. BARRINGTON LAKES PROPERTY OWNERS ASSOC. BAKRINGTON LAKES PROPERTY OWNERS ASSOC. BARRINGTON LAKES PROPERTY OWNERS ASSOC. B A1LRINGTON LAICES PROPERTY OWNERS ASSOC. BARRINGTON LAKES PROPERTY OWNERS ASSOC. BARRY, ALLAN P & RITA BAUM~N, GEORGE H & KEBECCA N. BAUMHOVER, DALE J & PEN~NY M BELLAVER, PETER J & CONSTANCE BENTZ, MICHAEL J & KATHY S BERG, HEATHER L BETTCHER, LEROY J. & JEANETTE BETrCHER, LEROY J. & JEANETTE BLOK, MELINDA M BLOK, MELINDA M BLOI<~ MICHAEL M B Olq~E, ARNOLD H & MARIE L. BRADLEY, BETTY LOU BRADLEY, DALE E & MADONNA M. BRADLEY; MARGARET BRADLE?[, ROBERT W & SHARON L BROUGHTON, ROBERT E. BRUGGEMAN, ROGER J. BURr)S, THOMAS P & NANCY A. BURDS, THOMAS P & NANCY A. BURGER. JOSEPH R & MOLLY M. CATE, PAUL W. & JAYNE H. CATE, PAUL W. & JAYNE H. CHRIST, RODNEY & DONNA COGAN, K~REN L COP. NELL, KENDALL R & MARYANN D E SMITH & ASSOCIATES INC D E SMITH & ASSOCIATES [NC DALSING, SARA J DALSING, SARA J DALSING. TODD E & CANDACE S DAUGHTERS, KENNETH A & CAROL A DAVIG, LARRY S & GREElq, MARY L. DAVIS, RiCHARD S. & CAROL A. DAVIS, THOMAS A & BARBARA J DECKER, RANDY J & JONi S DELANEY. JOSEPH J & LINDA S DIX~ ROGER G & CAROL M. DODDS, DR RiCHARD M & JILL A DUCLOS, DAN L & LORENE M. DUDDECK. GERRARD & RUTH EDWARDS, DOUGLAS A & AMY C LEGAL BAKRINGTON LAKES #2 - LOT 9 BLOCK 7 BAPOJNGTON LAKES #2 - LOT 7 BLK 8 BARRINGTON LAKES #2 - LOT 2 BLK I 1 BARRINGTON LAKES #2 - LOT 11 BLK 12 WOODLAND ESTATES - LOT 21 BARRINGTON LAKES #2 - LOT 1-3 & LOT 2-2 BLK S 1/2 LOT 2-1- I SW 1/4, SW 1/4 SEC. 28 W 1/2 LOT 1-2 & LOT 2 OF 2 OF SW SW SEC. 28 BAR1LINGTON LAKES #2 - LOT 8 BLK 2 BARRINGTON ]~&KES #2 - LOT 10 BLK 3 BARRINGTON LAKES #2 - LOT 9 BLK 1 BAPdKINGTON LAKES #2 - BLK A BARRINGTON LAKES #2 - LOT 8 BLK 13 BARRINGTON LAKES #2 - LOT 8 BLK 13 BARRINGTON LAKES - EOT ¢ BLK 2 WOODLAND ESTATES - LOT 22 BARRINGTON LAKES #2 - LOT 4 BLK 11 BARRINGTON LAKES #2 - LOT 4 BLK 8 BARRINGTON LAKES - LOT 6 BLK 2 LOT 2-I-2 SW SE SEC. 29. LOT 2-2 SW SE SEC. 29 LOT 2-2-1 SE SE SEC. 29 AND LOT 2-1-2-1 SE SE SEC. 29 AUDREY PLACE - LOT 2-2-2 NORTH CASCADE ROAD - SUB - LOT 1; SEC. 7 AUDKEY PLACE - LOT 1-2-2 BOHLE TRAVIS PLACE - LOT 1 LOT 1-2 NV/NE LOT 1-2-1 NW NE LOT 1-I-1-2-1-2NE NE GREEN VALLEY FAILMS SUB - LOT 1 LOT 1 SIEGERT'S PLACE 3P.D ADD. LOT 2 X3FESTSIDE COMMERCIAL PARK RAP. DIE PLACE- LOT 1 MILE HILL LANE LOT 2-1-1 -I SE SW; SEC. 07 - LOT I-1-I OF MILE HILL LANE BARRINGTON LAKES g2 - LOT 5 BLK 10 NENE SEC. 31 SE SE SEC. 31 LOT 2-1-2-1-1 SE SE SEC. 29 DANE PLACE - LOT 1-1 BARRINGTON LAKES #2 - LOT 5 BLK 5 DANE PLACE - LOT 2 LOT 2-1-3 E 1/2 NW & NVCNW E 1/2 LOT 1-2 NW SW E 1/2 LOT 1-2-2-2-2 DALS1NG PLACE #2 - LOT 1 DALSING PLACE #2 - LTO 2 BARRINGTON LAKES #2 - LOT I l BLK l 1 BAKRINGTON LAKES #2 -LOT 12 BLK 12 LOT 2-1-1-I-1 SW 1/4, SW 1/4, SEC. 28 T89 R2E BARRINGTON LAKES #2 -LOT 6 BLK 1 BARRINGTON LAKE~ #2 - LOT 2 BLK ] BARILINGTON LAKES #2 -LOT 4 BLK 10 BAP,2O. INGTON LAKES - LOT 2 BLK 1 BAKRINGTON LAICES #2 - LOT 5 BLK 5 BARRINGTON LAKES #2 - LOT 5 BLK 13 LOT 2-2-2-1 SW NE LOT 2-2-1-1 -I NW NE WOODLAND ESTATES - LOT 8 ACRES 0.0208 1.0202 1.2415 1.3336 1.0158 1.2659 0.5052 1.0384 0.7542 0.8785 0,5197 11.3933 0.8736 EHLERS; MI CI-L4~EL P & KIM M ERICKSON. KENNETH J & SHARON L ETIENNE~ JOHN J & JACQUILYN FAZIO. FRANK C & MARCENE R FERP. ING, ROBERT W FERRING. ROBERT W FERRING. ROBERT W & MARY JANE FITZGERALD, PAUL J & MARY A FLEEGE, MICHAEL G & SUSAN L. PLEEGE. MICHAEL G & SUSAN L PLUHR. GERALD J. & MARGARET E. GAMBLE. DAVID & DEBORAH GBK DEVELOPMENT LLC GEISLER, THOMAS A GERAGHTY. DENNIS P & JULIANNE GILLIGAN~ JOHN M & CXFNTHIA L GLOCK, DAVID A & MELVINA GOETZ. CRAIG H & PATRICIA A, GOETZINGER. ROGER J & DEBORAH M. GKATTON, LINrDA M & ZIEGENFUSS, CHRISTOPHER GREEN VALLEY DEVEL CORP, C/O SCOTT BROWN GREEN VALLEY DEVEL CORP1 C/O SCOTT BROWN GREEN VALLEY DEVEL COP, P. C/O SCOTT BROWN GI~EEN VALLEY DEVEL COP-P, C/O SCOTT BROWN GREEN VALLEY DEVEL CORP, C/O SCOTT BROWN GREEN VALLEY DEVEL COP-P. C/O SCOTT BROV~q BARRINGTON LAICES #2 - LOT 16 BLK I 1 BARKINGTON LAKES #2 - LOT 7 BLK 11 BAP-JPdNGTON LAKES - LOT 3 BLK 2 BAKRINGTON LAKES #2 - LOT 6 BLK 13 LOT 2-I-2-3 EI~ NW & NWNW LOT 1-2 E 1/2 SW & NW SW; FORM RD RT LOT 2-2-3 E 1/2 N~V & OF NvvV NW, LOT 2'2 E BARRI~GTON LAKES #2 - LOT 3 BLK 9 BARRINGTON LAKES #2 - LOT 5 BLK 2 BARRINGTON LAKES #2 - LOT 6 BLK 2 LOT 2-1-2-1-1-1 M.L. 289 BARRINGTON LAKES #3 - LOT I LOT 2-t WAL-MART SUB. WOODLAND ESTATES - LOT 13 BAKRINGTON LAKES #2 - LOT 5 BLK 1 BAKRI-NGTON LAKES #2 - LOT 11 BLK 1 BAILRINGTON LAICES #2 - LOT 15 BLK 11 BARRINGTON LAKES #2 - LOT 2 BLK 13 BARPJNGTON LAKES #2 - LOT 2 BLK 9 BARRINGTON LAKES #2 - LOT 1 BLK 11 GKEEN VALLEY FARMS SUB - LOT 4 GREEN VALLEY FARMS SUB - LOT 2 GREEN VALLEY FARMS SUB. - LOT 3 GREEN VALLEY FARMS SUB. - LOT 5 MIN LOT 283 LOT 1-2 MIN LOT 284 LOT 2-1-1-I-2-1-1 M.L. 289 LOT 2-1 M.L. 289 BARRINGTON LAKES #2 - LOT 13 BLK 11 BAP-KI NGTON LAKES #3 - LOT 3 BARILrNGTON LAKES #2 - LOT 6 BLK 10 BARILINGTON LAKES #2 - LOT 9 BLK S BARRINGTON LAKES #2 - LOT 3 BLK 1 AUDREY PLACE- LOTS 1-2-I & 1-2-2-1 BARRINGTON LAKES - LOT 3 BLK 1 WOODLAND ESTATES - LOT 20 HENKEL~ GERALD E & SHIRLEY A & RUDrN, BARRY & ~ CONSTANCE PLACE - LOT 2 HENRY. RICHARD A & ANN M HEILRIG. RONALD J. & KIMBERLY G. HINDERMAN. JOHN J. & MARY L. HINZ, THOMAS E & BARBARA J. HOEFFLIN. GENE W & LORNA E. HOFFMAN. DALE D HOLDRIDGE. DONALD P & SUSAN M HOLSCHER, ELEANOR S HOLSCHER. ELEANOR S HOLT, THOMAS J & CARLA M HORSFIELD COMPAN'~ iNC HORSFIELD COMPANY. [NC HORSFIELD COMPANY. INC HORSFIELD COMPANY~ [NC HORSFIELD COMPANY, rNC HORSFIELD COMPANY. [NC HORSFIELD COMPANY. [NC HORSFIELD COMPANY. INC HORSFIELD COMPANY. [NC HORSFIELD COMPANY. INC HOWE, JOSEPH R & TONYA R HUDSON. DAVID E & PEGGY L HUGHES. RONALD S & SUZETTE A HUNT)T. CHARLES H & SUSAN R IES UTILITIES [NC. JOHLL, WILLIAM P & LINDA L KALB, MARK H & CHERYL J LOT 1-1-2-3 NE 1/4, SW 1/4, SEC. 28. T89N R2E BARRINGTON LAKES #2 - LOT 3 BLK 7 B AP. PdNGTON LAKES #2 - LOT 8 BLK 3 WOODLAND ESTATES - LOT 4 LOT 1-2-2-2 SW SW BA1LRiNGTON LAICES #2 - LOT 4 BLK 5 ~FOREST RIDGE ESTATES THItED ADD- LOT 1 FOP-JEST RIDGE ESTATES SECOND ADD - LOT 1 FOREST RIDGE ESTATES - LOT 2 FOREST RIDGE ESTATES - LOT 1 FOREST RIDGE ESTATES THIRD ADD - LOT 2 FOREST P/DOE ESTATES LOT 6 FOREST RIDGE ESTATES - LOT 7 FOREST RIDGE ESTATES - LOT 8 FOREST RiDGE ESTATES - LOT 9 FOREST RIDGE ESTATES LOT 10 BARRINGTON LAKES #2 - LOT 18 BLK 1 I BARRINGTON LAKES #2 -LOT 19 BLK 11 BARRINGTON LAKES #2 -LOT 17 BLK 11 BARRINGTON LAKES #2 - LOT 14 BLK 11 LOT 1-1-1 SE SE SEC. 29 AND LOT 2-1-1-1-1-2-1-1 SE SE SEC BAKRINGTON LAKES #2 - LOT 14 BLK 11 BARRINGTON LAKES #3 - LOT 7 1.1412 0.7069 0.6963 1.0194 2.7534 2.2706 1.7031 1.2922 1.1742 1.1397 0.8423 L0143 KANE. THOMAS P & JULIE M. KANE. THOMAS P & JULIE M KEPPLE~ RICHARD J & SUSAN D. LOT 2-1-1-3 E 152 NrC/~ NWNWq & LOT 1-1-2-3 BAILRINGTON LAKES #2 LOT 10 BLK 12 BARRINGTON LAKES #2 - LOT 12 BLK 11 BARI~INGTON LAKES - LOT 8 BLK 2 LOT 2-2-1-1 ~I M.L. 289 LOT 1-2-I-I E 1/2 NW &NWNW DANE PLACE - LOTS 1-2 & 2-2 OF CORRECTiON BARRINGTON LAKES #2- LOT 8 BLK 12 BARRINGTON LAKES #2 - LOT 5 BLK 3 BARRINGTON LAKES #2 - LOT 1-2 & LOT 2-3 BARRINGTON LAKES #2 - LOT 8 BLK 11 BARRINGTON LAKES #2 - LOT 10 BLK 11 BARRINGTON LAKES #2 -LOT 8 BLK 8 BARRINGTON LAKES #2 - LOT I BLK 7 BARRINGTON LAKES #2 - LOT 1 BLK 12 BAP,_RINGTON LAKES #2 - LOT 2 BLK 8 BARRINGTON LAKES #2 -LOT 2 BLK I( N 1/2 LOT 2-1-1 SW 1/2. SW 1/4 SEC. 28 WOODLAND ESTATES - LOT 17 NORTH CASCADE ROAD SUB - LOT 2 LEE. MARY CATHERINE AND BOCKENSTEDT. DENNIS LOT 2-1-1 W 1/2 NW LEIBFPdED. GEORGE MATTHIAS LEIGFL CHRISTOPHER J & MARY E LINK,~ROBERT B. LOWE'S HOME CENTERS LUDOVISSY, DAVID A & ANN M LYNCH. PATRICK J & SHEILA A MAIERS. WILLIAM J & JACQUELINE IVL~LLM OUTDOOR COMMUNICATION INC MARCH. DONALD MAQUOKETA VALLEY RURAL ELECTRIC CO. MCKEON. JAMES J & YVONNE M MCKEON. YVONNE MELLOY. ~TH J & MARY A MENARD iNC. MERFELD. LORENZ H & ADELE B. MEILHICK. SANDEE J MERZ. DONALD E & JOAN M. MILLER. GREGORY O & MARGARET M MOCKLER. JOHN V & CAROLINE R MOLD'I. JOANNE C MOLINE. DAVID A & GALE M MONTI. BEVERLY ANN MORAN. BRIAN D & GINA M MUELLEP~ lAMES J & DEBHIE A NEUM~ISTER, WILLIAM C. & MARY H. NEXTROP LLC C/O MIKE PORTZEN ONEYEAR, LEO M & PATRICIA J. PARNOW. THOMAS P & PALrLA J PAV,ZLENTY. LEROY J JR & CAROLYN PETER~. RICHARD J & I<D~REN J PHILIPPI. DANIEL E & DENISE K PITMAN= HENRY C & RUTH 3 POTHOFF. MICHAEL J QUAGLIANO. MICHAEL D. & TIMOTHY J. REEG. RYAN T & SANDY R RETTENMEIEP~ THO1VL~S & M~RY C. RHOMBERG_ CHARLES & CONSTANCE RICHARDS. IEFFREY A & PETERSON. LOPd K RIVER CITY STONE iNC C/O MATHY CONSTRUCTION RODRIGUEZ. MARGIE ROTLrNNO. MOLLY J & MCCLURE. MOLLY H. RUDIN. BARRY & SHIELA G SAFFRAN. GEORGE M & DAWN M BARPJNGTON LAKES #3 - LOT 10 BARRINGTON LAKES #2 - LOT 9 BLK 12 LOT 6 WESTSIDE COMMERCIAL PARK LOT I-I WAL-MART SUB BARIL[NGTON LAKES #2 - LOT 4 BLK 13 BARRINGTON LAKES #2 -LOT 5 BLK 9 BARRINGTON LAKES #2 -LOT 3 BLK 12 BILLBOARDS ASSESSEDAS REAL ESTATE WOODLAND ESTATES LOT 1 LOT 3 WAL-M2LRT SUB, LOT I-2-1 SW NE LOT 2-2-1-1 NW NE LOT 1-2-1-1-1 NW NE LOT 1-2-2-1 SWNE WOODLAND ESTATES - LOT 24 BAL OF LOT 2 SIEGERT'S PLACE 3RD ADD. BARRINGTON LAKES - LOT 5 BLK 2 BAILRINGTON LAKES #2 -LOT 4 BLK 7 BARRINGTON LAKES - LOT 1 BLK 2 BARILINGTON LAKES #2 - LOT 4 BLK 3 BARRINGTON LAKES - LOT 10 BLK 2 BARRINGTON LAKES #2 - LOT 4 BLK 9 BAP-2KINGTON LAKES #2 - LOT 2 BLK 6 BARRINGTON LAKES #2 - LOT 7 BLK 1 ] BAP, RINGTON LAKES #2 - LOT I BLK I3 BARRINGTON LAKES #2 - LOT 5 BLK 6 LOT 2-1-1-1-1-1 M.L. 289 AND LOT 2 M.L. 287 LOT 2-2-1 N 1/2 NE I/4 SEC. 6 LO'I 2-2-1-t OF MIN LOT 289 BARP, INGTON LAKES #2 - LOT 10 BLK ? BARRINGTON LAKES #2 - LOT 4 BLK 4 BARPdNGTON LAKES #2 - LOT 2 BLK 3 BARRINGTON LAKES #2 - LOT 6 BLK 3 BARPdNGTON LAKES #2 - LOT 15 BLK 11 WOODLAND ESTATES - LOT 3 LOT 2-2-2 ~ I-2-2 NE I/4. SW 1/4. SEC. 28 T89N 1L2E WOODLAND ESTATES - LOT 7 BARRINGTON LAKES #2 - LOT 9 BLK 11 BAiLRINGTON LAKES #2 - LOT 7 BLK 2 BARI~INGTON LAKES #2 - LOT 8 BLK 7 BUILDING ON LEASED LAND LOT 1 SW NW BARRINGTON LAKES #2 - LOT 1 BLK 6 BARRINGTON LAKES #2 - LOT 3 BLK 5 CONSTANCE PLACE- LOT 1 LOT 2-1-I-1-I-2-1-1 OF M.L. 289 4.0818 1.1817 1.2897 1.1394 0.3716 11.3601 11.2267 1.0374 0.7447 1.7329 1.0993 1.2752 0.8140 SALZMANN, DIANE L SALZMANN, DIANE L SCHAFEP~ DAVID R & SHERRARD L SCHIESL~ JAY M & THERESA L SCHMERBACH, DAVID A & PENELOPE SCHOLLMEYEP-~ GERALD & MARLENE SCHOLLMEXFER, GERALD B & MARLENE R. SCHROEDE~ CRAIG D & SUSAN M SCHULTZ, DONALD L & BETTE E SCHUSTER HEATING & PUMP SCHUSTER HEATING & PUMP SCOTT, SIDNEY W & JANICE E SEIFFERT, WILLIAM & DEBORAH SHEPERD, JAMES M & SUSAN M SHETH, VINOD R & WOODS, SANDRA K. SIEGERT, GERALD G & JUDITH M. SIEGERT, GERALD G & JUDITH M. SIEGERT, GERALD G. & JUDITH M. SIEGERT, GERALD G. & JUDITH M. SIEGERT, GERALD G. & JUDITH M. SIEGEKT, GERALD G. & JUDITH M. SIEGERT, GERALD G. & JUDITH M. SIEGERT, GERALD G. & JUDITH M. SIEGERT, GERALD G. & JUDITH M. SJEGERT, WILLIAM & JANET SIEGERT, WILLIAM & JANET SIEGERT, WILLIAM & JANET SIEGERTi WILLIAM & JANET SINDT, LEONARD J. & LAVERN F. SINDT, LEONARD J. & LAVERN F. SINDT, LEONARD J. & LAVEKN F. SLATTEd. Y, TIMOTHY Ji SLOCUM, BARRY & SCHERRIE SNUTrIER, JEROME H & SHARON D SOMMERS, DANIEL J. & SUSAN K SOPPE, GARY R SOPPE, GARY R & BARBARA A. SPAHN, JEFFREY K & CATHERINE A. SPRUCE WOOD DEVELOPMENT, LTD SPRUCE WOOD DEVELOPMENT, LTD SPURLING, TODD C & JANE S SPURLING, TODD C & JANE S STATE OF IOWA STATE OF IOWA STECKEL, JOHN J STEFFEN, RONALD A & REBECCA A STOFFEL, RICHARD A & JULIANNA STOVER, DOUGLAS J & JEAN M FROST-STOVER STROHMEYER, DONALD W & ANGELA M. STUMPF, DONALD J & KATHY A STUIv~F, DONALD J & KATHY A SWEHLA, HARVEY & LINDA K. THEN, RONALD R & BARBARA TH/LL, JUDITH E THUL, DALE & SHARON TIGGES, RONALD V & SUSAN M TOLZMANN~ CARROLL L & ROSE M. TRAVIS, ROBERT TSCHIGGFKIE, EDWARD D WAGNER. DAVID A & JANICE M. WAGlxrEp% DAVID A & JANiCE M. WAGNrER, DAVID A & JANICE M. WAHLERT, LAURA A & MAP-K D WALLER FAMILY TRUST (THE) LOT 2-1-2-t-2 OF NE 1/4 NE 1/2 AND LOT 1-I-3 OF SE & NE S 0.0059 LOT 2- t - 1-2- 1-2 NE NE LOT 2-2- l NW NE 0.5345 BARRINGTON LAKES #2 - LOT l BLK 10 0.8060 BAKRINGTON LAKES #3 - LOT 4 `1.0940 BARIU[NGTON LAKES #2 - LOT I ELK ] 1.5953 BARPJNGTON LAICES #2 - LOT 7 ELK 7 0.8637 BARRINGTON LAKES #2 - LOT 6 ELK 7 0.9474 BARRINGTON LAKES #2 - 0.9742 BARRINGTON LAKES #2 - LOT 4 ELK 2 1.1022 LOT 4 WESTS1DE COMMERCIAL PARK 1.3695 LOT 5 WESTSIDE COMMERCIAL PARK 0.3'138 BARPdNGTON LAKES #2 - LOT 6 BLK I I 0.8055 BARRINGTON LAKES #2 - LOT 2 BLK 12 0.8546 BAP~INGTON LAKES #2 ~ LOT 5 BLK l l 0.5363 BARP. iNGTON LAKES #2 - LOT 7 ELK 3 0.8833 SOUTH 10 ACRES OF LOT l SE NW 9.6885 LOT l NE SW o.404~ NW l~Wq SEC. 5 63.1500 SWNW SEC. 5 40.0000 S I/2 NE NSV SEC. 5 31.4500 BAL. OF LOT I SEC. 5 27.3400 LOT t NW NE SEC. 5 2.2900 LOT 2 SW NE SEC. 5 `1.7700 LOT 1 S 1/2 NE SEC. 6 54.5700 LOT 1 SWNViSEC. 32 6.4101 LOT 2 SW NE SEC. 32 9.7434 NW SW SEC. 32 36.7619 SW SW SEC. 32 40.0563 LOT 2-2-1-1 SE SE SEC. 29 AND LOT 2-1-2-1-1 SE SE SEC. 29 2.1136 LOT 2-I-1-1-2-I-1 SE SE SEC. 29 1.4369 LOT 1 SINDT PLACE 5.5700 LOT 2-1-1-I-I-I SW 1/4, SW 1/4, SEC. 28, T89N R2E 1.9o42 BARRINGTON LAKES - LOT 1 ELK 1 0.9810 BARKINGTON LAKES #2 - LOT 6 ELK 9 0.8492 LOT 1-1-2-1-1-1-I M.L. 289 ~.8550 HARDIE PLACE - LOT 2 MILE HILL LANE 1.942~ HARDIE pLACE - LOTS 3, 4 & 5 MILE HILL LANE 5.7990 AUDP. EY PLACE - LOT 1-2-2 5.7659 BARRINGTON LAKES #3 - LOT 6 1.0265 BARRINGTON LAKES #3 - LOT 9 1.265' BAKRINGTON LAKES - LOT 5 BLK 1 0.8505 BARRINGTON LAKES - LOT 4 ELK 1 o.8607 LOT A SIEGERT'S PLACE 3RD ADD. 4.1110 LOT B SIEGERTS PLACE 3RD ADD. 0.5754 LOT 2-1-1-1-I-1-2-I-1 OF M.L. 289 0.5284 BARRINGTON LAKES #2 - LOT 1 BLK 2 13879 BAP, P.1NGTON LAKES #3 - LOT 8 `1.0387 WOODLAND ESTATES - LOT 5 0.93O6 BAKRINGTON LAKES #2 - LOT 7 BLK 12 0.9692 AUDREY PLACE- LOT l-l-l-1 EXCEPT S 60' 5.3263 AUDKEY PLACE-S 60' OF W 216.55 LOT 1-I-1-1- 1.1125 BARRINGTON LAKES #2 - LOT 5 ELK 7 1.0280 AUDREY PLACE- LOT 3-2-1-1-1- & s. 60' 0.5671 LOT 1-2-1-I-1 W 1/2NW 0.7617 LOT 2-1-2-I-I OF MIN LOT 289 0.4099 BARRINGTON LAKES - LOT 7 ELK 2 1.1421 BARRINGTON LAKES #2 - LOT 3 ELK 4 1.oo99 BOHLE TRAVIS PLACE LOT 2 TABLE MOUND 1.4100 WEBER ACRES - LOT 2 4.5486 BARP. iNGTON LAKES #2 - LOT 5 ELK 12 0.82O0 BAP-P. YNGTON LAKES #2 - LOT ~ ELK 12 0.9380 AUDREY PLACE - LOT 2-1 ~ 1 2.0334 BARR1NGTON LAKES #2 - LOT I I ELK 7 0.9159 LOT 2 SE SE LOT 2-1-2-2- SW SW 8.4979 WALLER FAMILY TRUST (THE) WAL-MART STOKES INC. WALSH, MICHAEL J & CHRISTINE M WALSH, MICHAEL J & CHRISTINE M WALZ, JEFFERY T & HOLLY B WATTEKS, V~LLIAM J & JO¥CE E WEBER, JEFFREY M & JOA~NNE K XS~EBER, JEFFREY M & JOANNE K WERTZ, DAVID C & ANN P~ WHEATON, EDA BOWER '?fI-I~2~LOCK, PAUL A & WENDY S Vv2-IITE, DONALD J WIEZOREK, JAMES A & DALSING, MEGAN WILBPdCHT, ROBERT A & MARIKO WILLIAMS, WARREN K & ELLEN E. WILSON, MICHAEL D & GLENDA K WINDERS, DOLOKES E. WOLTER, JOHN A & CHARLENE M WOODHOUSE, GKEGORY M & LAURA D WOODLAND DEVELOPMENT CO, LLC WOODLAND DEVELOPMENT CO. LLC WOODLAND DEVELOPMENT CO. LLC WOODLAND DEVELOPMENT CO. LLC WOODLAND DEVELOPMENT CO. LLC WOODLAND DEVELOPMENT CO. LLC WOODLAND DEVELOPMENT CO. LLC WOODLAND DEVELOPMENT CO. LLC WOODLAND DEVELOPMENT CO. LLC WOODLAND DEVELOPMENT CO. LLC WORD OF LIFE CHURCH INC. WREN, ROBERT E & COLLEEN K. YAGER, JOHN E. ZARTMAN, SCOTT D & MARIE C LOT 2-1-1-1-1-1-1 W I/2 NW LOT 2 WAL-MART SUB. BARKINGTON LAICES #2 - LOT 7 BLK 6 BAP-JRINGTON LAKES #2 - LOT 8 BLK 6 WOODLAND ESTATES - LOT 6 NE SW BARP,1NGTON LAKES #3 - LOT 5 BARRINGTON LAKES #2 - LOT 3 BLK 6 BARRYNGTON LAKES #2 - LOT 9 BLK 3 BARRINGTON LAKES #2 - LOT 12 BLK 11 BARRINGTON LAKES #2 - LOT 4 BLK 6 BARiL1NGTON LAKES #2 - LOT 4 BLK 1 LOT 2-2 NW SW LOT 2-2-2-2-2 SW SW BARPdNGTON LAKES - LOT 7 BLK 1 BAKILINGTON LAKES #2 - LOT 2 BAP. RINGTON LAKES #2 - LOT 13 BLK 11 LOT 2-2-1-1-1-1 M.L. 289 WOODLAND ESTATES - LOT 16 BAILRINGTON LAKES #2 - LOT 3 BLK 9 WOODLAND ESTATES - LOT 12 WOODLAND ESTATES - LOT 14 WOODLAND ESTATES - LOT 15 WOODLAND ESTATES - LOT 18 WOODLAND ESTATES - LOT 19 WOODLAND ESTATES - LOT I 1 WOODLAND ESTATES - LOT I0 WOODLAND ESTATES - LOT 9 WOODLAND ESTATES - LOT 23 WOODLAND ESTATES - LOT 2 LOT 2 SINDT PLACE BARRINGTON LAKES #2 - LOT 1 BLK 5 LOT 1-1-2-1 SE SE SEC. 29 BARPdNGTON LAKES #2 - LOT 2 BLK 4 ,444.5987 Gross Acres - 97.32 Undevelopable Acres = 1,347.2787 Developable Acres 2.4921 35.4598 0.9659 0.7493 0.9979 33.9902 0.9498 0.9994 0.8369 0.8878 0.8562 0.8919 5.1468 1.0045 0.8650 0.5042 0.9939 0.9197 0.9878 0.961C 1.0025 3.9779 1.0501 0.9885 1.444.5987 1,347.2787 Developable Acres @ $543.3797/Developable Acre = $732,083.86 Total Cost Prepared by: Michael A. Koch, Public Works Director, City of Dubuque, 50 W. 13'" Street, Dubuque, ~owa (563)589~,270 NOTICE TO PROPERTY OWNERS Notice is given that there is now on file for public inspection in the office of the Clerk of the City of Dubuque, City Hall, Dubuque. Iowa. a proposed Ordinance establishing the South Fork Sanitary Sewer Project - Phase It and providing for connection fees. The Council will meet at 6:30 p.m. on June 17, 2002, at the Public Library Auditorium, 360 West 11th Street, in the City of Dubuque, Iowa, at which time the owners of property subject to connection fees in the South Fork Sanitary Sewer Project - Phase III or any other person having an interest in the mat[er may appear and be heard for or against the establishment of the District, or the schedule of connection fees. A person subject to such connection fees will be deemed to have waived all objections unless at the time of hearing, the person has filed objections with the Clerk. Any visual or hearing impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 589-4193 in the Human Rights Department at least 48 hours prior to the meeting. Jeanne F: Schneider, CMC, City Clerk RESOLUTION NO. 275 -02 RESOLUTION PROVIDING FOR NOTICE OF THE DATE, TIME AND PLACE OF A PUBLIC HEARING ON AN ORDINANCE ESTABLISHING THE SOUTH FORK SANITARY SEWER PROJECT - PHASE II1 AND A SCHEDULE OF CONNECTION FEES Whereas, the City Council of the City of Dubuque, Iowa, proposes to establish, by Ordinance after notice of a public hearing, the South Fork Sanitary Sewer Project - Phase III and to provide a schedule of connection fees therefor; and Whereas, Iowa Code Section 384,38(3) requires notice and a public hearing on such Ordinance; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, iOWA: Section 1. The City Clerk is hereby authorized and directed to publish notice of the date, time and place of the hearing on said proposed Ordinance, which hearing shall be on June 17, 2002 at 6:30 p.m. in the Public Library Auditorium in the City of Dubuque, Iowa, such publication to be once each week for two consecutive weeks in the manner provided by Section 362~3, the first publication of which shall not be less than ten (10) days before the date of the hearing. Section 2. The notice shall be in substantially the following form: Notice To Property Owners Notice is given that there is now on file for public Inspection in the office of the Clerk of the City of Dubuque, City Hall, Dubuque, Iowa, a proposed Ordinance establishing the South Fork Sanitary Sewer Project - Phase Ill and providing for connection fees. T,,he Council Will meet at 6:30 p.m. on June 17, 2002, at the Public Ltbrary Auditorium, 360 West 11th Street, in the City of Dubuque, Iowa, at which time the owners of property subject to connection fees in the South Fork Sanitary Sewer Project - Phase II1 or any other person having an interest in the matter may appear and be heard for or against the establishment of the District, or the schedule of connection fees. A person subject to such connection fees will be deemed to have waived all objections unless at the time of heating, the person has filed objections with the Clerk. Section 3. Not less than fifteen (15) days before the hearing, the Clerk sha[I also send a copy of the notice by mail to each property owner whose property will be served by connection to said City sewer and be subject to the connection fees at the address as shown by the records of the County Auditor. Passed, approved and adopted this 2ot~ day of My ,2002. T~rrance M. Duggan/~yor Attest: ~..].// .LKarem ti. Chemt'e~mau, Deputy Cit~. Clerk RESOLUTION NO. _Z7.1_-02 ACCEPTING THE PUBLIC IMPROVEMENT TO THE SOUTH FORK SANITARY SEWER PROJECT - PHASE Ill Whereas, the contract for the South Fork Sanitary Sewer Project - Phase III has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CiTY COUNCIL OF THE CiTY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. Section 2. That the City Treasurer be and is hereby directed to pay to the contractor from the General Fund an amount equal to the amount of the contract, less any retained percentage provided for therein. Passed, approved and adopted this 20th Attest: [ ' ~ t~..Chest'e~m~n, De-p~ty City Clerk T/brrance M. Dugga/~yor RESOLUTION NO. 27~ -02 FINAL COST OF THE IMPROVEMENT TO THE SOUTH FORK SANITARY SEWER PROJECT - PHASE ill Whereas, the contract for the South Fork Sanitary Sewer Project - Phase III has been completed and the City Engineer has submitted his statement showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the cost of said improvement is hereby determined to be $613,467,99, Passed, approved and adopted this 2otb day of y,a~, ,2002. ce M. Dugg,,~ayor L~Attest: ~ . MEMORANDUM May 14,2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager South Fork Sanitary Sewer - Phase III Public Works Director Mike Koch recommends acceptance of the South Fork Sanitary Sewer Phase III, as completed by Stewart Construction, in the final contract amount of $613,467.99. Even though the construction was completed in 2000, final costs for associated easements for the project and crop damage were not submitted until the end of 2001. It is further recommended that a public hearing be set for June 17, 2002, on the establishment of connection fees for the sanitary sewer district. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director TO: FROM: SUBJECT: CITY OF DUBUQUE, IOWA MEMORANDUM May 14, 2002 Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ,,~,j~/,,~,~ South Fork Sanitary Sewer- Phase III INTRODUCTION The encloSed resolutions provide for final acceptance of the improvements to the South Fork Sanitary Sewer- Phase III and the establishment of connection fees for connection to the South Fork Sanitary Sewer. DISCUSSION Construction of the improvements to the South Fork Sanitary Sewer - Phase Ill has been completed by Stewart Construction Company of Dubuque. The final contract amount is $613,467.99. Even though the construction was completed in 2000, final costs for associated easements for the project and crop damage were not submitted until the end of 2001. This sewer provides sewer service to 1347.28 acres of developable property. Connection fees from future connections to this sewer will paY for the cost of the sewer. This project was funded under the Sanitary Sewer Extension Policy which allows the City to construct interceptor and collector sewers with City funds and establish a connection charge to benefiting property owners within the sanitary district if and when property owners connect to the sewer. The connection fees for this interceptor sewer are based on the cost per acre for the sewer project and are allocated to all properties within the district, except for 97.32 acres of undevelopable "floodplain" in this basin. 'Fhe connection fees will be collected as properties in the district are developed. The connection fees are estimated to be $732,083.86. This is calculated at the rate of $543.3797 per developable acre. RECOMMENDATION I recommend that the improvements in the South Fork Sanitary Sewer Phase III project be accepted and that the schedule of connection fees be approved. BUDGET IMPACT A summary of the budget costs is as follows: Construction Contract Contingency/Miscellaneous Engineering Easement Total Project Cost BID FINAL $779,179.42 $613,567.99 77,917.94 10,557.40 128,564.21 92,020.20 30,000.00 16,038.27 $1,015,661.98 $732,083.86 This project was funded from the General Fund. The funds are being repaid to the General Fund from the Sewer Fund and through connection charges as development occurs in the district. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvements in the South Fork Sanitary Sewer Phase II1 and establishing the final construction cost of the project, and setting a public hearing on the establishment of connection fees for the sanitary sewer district. MAK/Ims Prepared by Gus Psihoyos, Assistant City Engineer City of Dubuque ENGINEERING DIVISION FINAL ESTIMATE FOR: South Fork Sanitary Sewer -- Phase III ITEM QTY. UNIT UNIT COST 1.18" DIP w/Wrap 9869.59 Lin. Ft. $45.00 TOTALCOST $444,131.55 2.30" Steel Casing Pipe 3. Concrete Manhole Base, Complete 4. Concrete Manhole Sidewall, Complete 5~ Manhole Ring & Cover, Complete 6. Concrete Pipe Encasement 7. Bedding Stone, 1" Clean 8. Limestone Backfill 9. One Man Rip-Rap 10.3/4" Rolled Stone Base 11. AC Street Patch 12. Rock Excavation 13. Traffic Control / Safety 14. Seeding w/Mulch Lin. Ft. 36.00 No. of 443.63 Lin. Ft. 36.00 No. of 396.00 Lin. Ft. 4264.10 Tons 606.92 Tons 349.49 Tons 101.34 Tons 42.93 Tons 888.10 Cu. Yds. 0.90 Lump 5.70 Acres EXTRA WORK: 8" DIP w Wrap 444.75 Lin. Ft. Machine time and labor to install pipe under US 20 bridges 1.00 Lump 18" DiP w/Wrap under bridges 363.80 Lin. Ft. $175.00 $400.00 $75.00 $225.00 $40.00 $7.00 $4.50 $10.00 $8.50 $60.00 $0.05 $1,100.00 $925.00 $25.50 $31,687.50 $24.40 $14,400.00 $33,272.25 $8,100.00 $15,840.00 $29,848~0 $2,731.14 $3,494.90 $861.39 $2,575.80 $44.41 $990.00 $5,272.50 $11,341.13 $31,687.50 $8,876.72 TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Miliigen, City Manager City of Dubuque,Iowa The undersigned, ~/¢¢1J(:; C. ~'¢¢¢~ontractor for the above improvement, does hereby accept the above 'q'otal Due Contractor", as full settlement for all claims for said improvement. CONTRfi}CT/OR: W~-..- ~--~~77~u¢7'~4,// /.,cc. $613,467.99 $92,020.20 $705,488.19 Michael A. Koch Public Works Director