Phase 11 30-inch Forcemain Project Acceptance Copyrighted July 5, 2017 City of Dubuque Consent Items # 13. ITEM TITLE: Phase II 30-inch Forcemain Project Acceptance SUMMARY: City Manager is recommending acceptance of the construction contract for Phase II of the 30 Inch Force Main Relocation Project from 11 th Street to 12th Street as completed by Top Grade Excavating, Inc. RESOLUTION Accepting Phase I I of the 30-Inch Force Main Relocation Project from 11 th Street to 12th Street and authorizing the payment of the contract amount to the Contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Acceptance of Phase II 30-Inch Forcemain Project- City Manager Memo MVM Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque fta B E I 11p y Masterpiece 012 the Mississippi 2007.2012«2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street DATE: June 28, 2017 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street, as completed by Top Grade Excavating, Inc. in the final contract amount of $355,517.76, which is a 4.9% increase from the original contract amount of$338,888 due to an increase in 30 inch fittings used to avoid a gas main that was deeper than anticipated. Additionally, potentially contaminated soils were stockpiled and tested. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen ` MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE C , . DUUB-WaFE ►,� � 0 �. Masterpiece on the Mississippi 2012 TO: Michael C. Van Milligen, City Manager ---..-.. FROM: Gus Psihoyos, City Engineer SUBJECT: Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street. DATE: June 28, 2017 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Phase 11 of the 30 inch Force Main Relocation Project from 11 th Street to 12th Street. BACKGROUND Phase II of the 30 inch Force Main Relocation Project from 11th Street to 12th Street extended the pipe installed under the phase I contract, from the northeast corner of the intersection of 11th Street and Elm Street, to the cul-de-sac at the east end of 12th Street. The project consisted of; 458 LF of 30 inch DIP, 68 LF of 42 inch bored and jacked steel casing and an air release structure. There is only one remaining phase of the 30 inch Force Main Relocation Project, from 7th Street to 12th Street, around the former Public Works Garage and Alliant Energy Sites. Phase III is the section of force main on Washington Street, from 7th Street to 9th Street. This section is planned to be completed in conjunction with the reconstruction of Washington Street from 7th to 9th Streets. Phase III would also include the tie-in, at 12th Street and 7th street, and the abandonment of the existing force main through the old Public Works Garage site and the Alliant Energy Site. Completing phase III will complete the re-routing project and will be constructed as part of the street project. FY2017 budget allocated $640,683.88, for constructing Phase II and Phase III of the 30 inch Force Main Relocation Project. DISCUSSION Phase 11 of the 30 Inch Force Main Relocation Project from 11 th Street to 12th Street was completed by Top Grade Excavating, Inc., of Farley, Iowa, in the final contract amount of $355,517.76 which is 4.9% increase from the original contract amount of $338,888.00. The increase was due to an increase in 30 inch fittings, used to avoid a gas main that was deeper than anticipated. Also, additional potentially contaminated soils were stockpiled and tested. This project realized a savings, along with the Jule Project by disposing of the material as fill for the Jule site. The EPA approved the use of this material based on testing results. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $355,517.76 to Top Grade Excavating, Inc., for Phase II of the 30 inch Force Main Relocation Project from 11th Street to 12th Street. BUDGETIMPACT The summary of project cost for Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street Project is summarized as follows: Award Final Construction Contract $338,888.00 $355,517.76 Contingency 34,719.75 0.00 Construction Engineering & Inspection 57,287.59 44,567.68 Easement Acquisition 6,000.00 6,000.00 Total Project Cost $436,895.34 406.085.44 The remaining balance of$234,598.44 will be used for the construction of Phase III of the 30 Inch Force Main Relocation Project from 7th Street to 12th Street. This project funding is as follows: CIP No. Fund Description Fund Amount 7102413 Relocation 30" Force Main $406,085.44 Total Project Funding 06.085.44 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution accepting the improvements, and establishing the final contract amount of $355,517.76, and for the payment of the contract amount to Top Grade Excavating for Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street. Prepared by Todd Irwin cc: Jenny Larson, Budget Director William O'Brien, Water Pollution Control Manager John Klostermann, Public Works Director Todd Irwin, Engineering Technician 2 RESOLUTION NO. 235-17 ACCEPTING PHASE II OF THE 30 INCH FORCE MAIN RELOCATION PROJECT FROM 11TH STREET TO 12TH STREET AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Relocation of 30" Force Main around Old Public Works Garage fund for the contract amount of $355,517.76 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 5th day of July, 2017. Kevir,�``. Firnstaht CIVIC City Clerk Roy D. Buo'I, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF PHASE II OF THE 30 INCH FORCE MAIN RELOCATION PROJECT FROM 11TH STREET TO 12TH STREET The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $406,085.44. Dated this day of L1-/,(/ 9— , 2017. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the day of -,' , 2017. Kevir(.rFirnst C City Clerk hl